PROPOSED DESIGN, CONSTRUCTION AND COMPLETION OF 548 UNITS GOVERNMENT APARTMENTS AT PARCEL 17 RM4 PRECINCT 17, PUTRAJAYA
PROGRESS REPORT ON 28 JUNE 2009 – 31.26 Actual / 31.34 Target
IBS: TABLE OF CONTENTS
BENEFITS OF IBS
PROJECT COMPONENTS
CONSTRUCTION ELEMENTS
TYPICAL FLOOR LAYOUT
TYPICAL UNIT
CASTING SECTION
DELIVERY SECTION
INSTALLATION SECTION
MOCK-UP UNIT Page 2
IBS: BENEFIT OF IBS
Reduce Construction Time
Cost Competitive
Labour Independency
Material Optimisation
Quality and Better Finishes
Flexibility in Design
Safety and Environmental Friendly
Production in Controlled Condition Page 3
IBS: PROJECT COMPONENTS BLOCK E
PERSPECTIVE
BLOCK D BLOCK C
Others: Car Parks 3 nos.(660 parking bays) Substations 3 nos. Landscape Infrastructures
BLOCK B
BLOCK A
LAYOUT PLAN Block E
Car Park 3 Car Park 2
DEWAN N
Dewan 2 Storey
Surau 1 Storey Car Park 1 Block D Block C Block B Block A
SURAU BLOCKS STOREYS UNITS A
18
115
B
19
122
C
19
122
D
18
115
E
16
74
TOTAL
548 Page 4
IBS: CONSTRUCTION ELEMENTS PRECAST APARTMENTS • 2nd Floor to 17th Floor • Structural precast walls • Precast hollowcore slab • Non-structural precast wall panels • Precast staircases • Blockwork infill wall
Precast
Cast-in Situ
CAST-IN-SITU AMENITIES AND M&E ROOMS • Ground and first floor • Cast-in situ 250mm thk rc shear wall • Blockwork infill • 2nd Floor • Cast-in situ slab Page 5
IBS: TYPICAL FLOOR LAYOUT
Page 6
IBS: TYPICAL UNIT
(Cont’d)
Unit Size -9.0m X 14.4m (1,200 sqf) 3 Bedrooms • Master Bedroom (4.2m x 5.4m) 1 Living room (4.2m x 9.0m) 1 Kitchen (4.2m X 3.5m) 1 Store (1.3m x 1.5m) 2 Bathrooms Dry Yard Page 7
IBS: CASTING SECTION (Hollow Core Panel)
Page 8
IBS: CASTING SECTION (Other Precast Panel)
Page 9
IBS: CASTING SECTION (Quality Assurance and Control)
(Cont’d)
Page 10
IBS: DELIVERY SECTION
(Cont’d)
Page 11
IBS: INSTALLATION SECTION
(Cont’d)
Page 12
IBS: Construction of Joints and Support
(Cont’d)
Page 13
IBS: Progress Photos
(Cont’d)
Overall progress on 28 June 2009
Block E on 28 June 2009
IBS: Progress Photos
(Cont’d)
Block D on 28 June 2009
Block C on 28 June 2009
IBS: Progress Photos
(Cont’d)
Block B on 28 June 2009
Block A on 28 June 2009
IBS: Progress Photos
(Cont’d)
IBS: MOCK-UP UNIT
(Cont’d)
Page 18