TUGAS TEKNIK PERENCANAAN PEMBANGUNAN PROYEK KONSTRUKSI MEMBUAT PERENCANAAN PEMBANGUNAN GARASI

Disusun Oleh: Iqbal Mirza Fuqhaha 051001500062

Dosen : Ir. Oktosa Harahap, MM.

JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK SIPIL DAN PERENCANAAN UNIVERSITAS TRISAKTI JAKARTA 2019

NO A.

B. I.

C.

URAIAN PEKERJAAN Pekerjaan Persiapan 1 Pek. Pagar pengaman Proyek 2 Pek. Bouwplank 3 Mobilisasi/Demobilisasi 4 Listrik dan Air Kebutuhan Proyek Pekerjaan Struktur Pek. Tanah dan Pondasi 1 Pek. Galian tanah 2 Pek. Urugan tanah kembali 3 Pondasi Batu kali - Pek. Pasang pondasi batu kali, 1pc:5ps 4 Pek. Balok sloof 5 Pek. Kolom Beton ukuran 15x15 k225 besi 170 kg 6 Pek. Balok ukuran 15x30 k225 besi 170 kg 7 Pek. Plat dak tb. 10 cm beton k225 besi 100 kg Pekerjaan Finishing 1 Pek. Dinding 2 Pek. Plester dan acian 3 Pek. Pengecatan dinding Total Pekerjaan

1 1 2 1

BOBOT

15.302% 4.345% 5.233% 3.925%

1 1

JUMLAH HARGA

5,847,750.00 1,660,500.00 2,000,000.00 1,500,000.00

0.037% 0.001%

2 3 3 4 4

SATUAN

508,500.00 110,700.00 2,000,000.00 1,500,000.00

14,107.50 192.17

0.645% 10.528% 9.075% 10.528% 15.314%

VOLUME

11.500 m' 15.000 m' 1.000 ls 1.000 ls

57,000.00 8,541.00

246,600.00 4,023,472.50 3,468,150.00 4,023,472.50 5,852,250.00

LAMA PEKERJAAN (HARI)

0.248 m3 0.023 m3

1,096,000.00 5,960,700.00 7,340,000.00 5,960,700.00 4,335,000.00

HARGA SATUAN

0.225 m3 0.675 m3 0.473 m3 0.675 m3 1.350 m3

5 7 3

221,000.00 42,000.00 43,000.00

14.168% 5.385% 5.513%

24.500 m2 49.000 m2 49.000 m2

5,414,500.00 2,058,000.00 2,107,000.00 38,215,994.67

0 0

1 15.302% 4.345%

0.001%

2

2.617% 3.925%

3

0.037%

4 5 6 7 8 9

KURVA S PEKERJAAN PEMBUATAN GARASI HARI KE 11 12 13 10

14

15

0.323% 0.323% 3.509% 3.509% 3.509% 3.025% 3.025% 3.025% 2.632% 2.632% 2.632% 2.632% 3.828% 3.828% 3.828% 3.828%

16

17

18

19

20

21

2.617%

2.834% 2.834% 2.834% 2.834% 2.834% 0.769% 0.769% 0.769% 0.769% 0.769% 0.769% 0.769% 1.838% 1.838% 1.838% 19.647% 6.542% 0.037% 0.323% 3.832% 3.509% 6.534% 5.859% 8.491% 5.466% 5.466% 10.063% 4.598% 4.598% 4.598% 0.769% 0.769% 0.769% 1.838% 1.838% 4.455% 19.647% 26.189% 26.226% 26.549% 30.381% 33.890% 40.425% 46.283% 54.774% 60.240% 65.705% 75.769% 80.367% 84.964% 89.562% 90.331% 91.101% 91.870% 93.708% 95.545% 100.000%