Project name

Document name here Version 1.0 | 15-Oct-2006

Copyright Information

1

This document is the exclusive property of XYZ (XYZ) and the recipient agrees that they may not copy, transmit, use or disclose the confidential and proprietary information in this document by any means without the expressed and written consent of XYZ. By accepting a copy, the recipient agrees to adhere to these conditions to the confidentiality of XYZ's practices and procedures; and to use these documents solely for responding to XYZ's operations methodology. © All rights reserved XYZ, 2005

1

Project Name

Table of Contents Copyright Information ............................................................................................ ........................2 1 Introduction............................................................................................................... ...................5 1.1 Purpose of this document........................................................................................................ .5 1.2 Scope of this document.......................................................................................................... ..5 1.3 References...................................................................................................................... ........5 1.4 Definitions, Abbreviation and Acronyms................................................................. ...........5 2 Build Strategies........................................................................................................... .................6 3 Testing Strategy......................................................................................................................... ...6 3.1 Testing Approach.................................................................................. ............................6 3.2 Test Considerations.......................................................................................................... .7 3.3 Test Completeness........................................................................................................... .7 3.4 Test Setup.......................................................................................................... ...............7 3.5 Features not to be tested................................................................................ ..................8 3.6 Risks that impact testing................................................................................. ..................8 3.7 Testing tools....................................................................................................... ...............8 3.8 Assumptions/Limitations/Dependencies....................................................................... .....9 3.9 Acceptance criteria........................................................................................................ ....9 4 Test Case Design & Development........................................................................................ .........9 4.1 Test Case Design Instructions....................................................................................... ....9 4.1.1 System Test cases................................................................................................... ....9 4.2 Test Case Design Deliverables.................................................................... .....................9 5 Test Execution................................................................................................................ ............10 5.1 Unit testing......................................................................................................... .............10 5.1.1 Environment....................................................................................... .......................10 5.1.2 Entry Criteria............................................................................................................. .10 5.1.3 Responsibility..................................................................................... .......................10 5.1.4 Exit Criteria.................................................................................................... ............10 5.2 Functional Testing - Module Wise............................................................ .......................10 5.2.1 Environment....................................................................................... .......................10 5.2.2 Entry Criteria............................................................................................................. .10 5.2.3 Responsibility..................................................................................... .......................10 5.2.4 Exit Criteria.................................................................................................... ............10 5.3 System testing............................................................................................................ .....11 5.3.1 Environment............................................................................................................. ..11 Test Plan. Version 1.0 | Updated: Proprietary and Confidential. © XYZ

Page 3 of 15

Project Name

5.3.2 Entry Criteria...................................................................................................... ........11 5.3.3 Responsibility ......................................................................................................... ...11 5.3.4 System Test Execution - Specific Instructions....................................................... ....11 5.3.5 Exit Criteria.................................................................................................... ............12 6 Test Results Tracking............................................................................................................ ......12 7 Test Schedule......................................................................................................................... ....14 8 Revision History............................................................................................... ..........................14 Office address............................................................................................................... ...............15 Web- www.XYZ.com......................................................................................... ...........................15

Test Plan. Version 1.0 | Updated: Proprietary and Confidential. © XYZ

Page 4 of 15

Project Name

Project name Document name here 1Introduction 1.1

Purpose of this document

This document describes the plan for testing releases of the Project Name application. This document will be referenced and used by the XYZ development team. This document is intended to meet the following objectives: •

The strategy, responsibilities and schedule for the overall testing.



Identify the project and software artifacts that should be tested.



List the scope of testing.



List the deliverables of the test phases.



Identify the risks and assumptions in the project, if any.



Define the entry and exit criteria for each of the testing phase.

1.2

Scope of this document

This document describes the test plan for the testing that will be carried out for the Project Name. This includes •

Module - Testing.



Integration - Testing.



System testing.

1.3 No 1.

References Reference/Prior Reading

Location of Availability 1. Use Case Specifications in Project Folder repository 2. Prototypes (.html Files) in Project Repository.

Requirements

1.4Definitions, Abbreviation and Acronyms Acronym

Description

UCS

Use Case Specifications

IE5

Internet Explorer Version 5

Test Plan. Version 1.0 | Updated: Proprietary and Confidential. © XYZ

Page 5 of 15

Project Name

2Build Strategies The Build process will be documented by the development team and will be provided to the test team to setup the software.

3Testing Strategy 3.1Testing Approach The following table lists the approach for the verification activities. Test Level

Description/Environment

Module– Testing

Each Individual module will be tested once by developers and test engineer The Application should be tested fully along with interdependent modules, once the individual modules are integrated. System Testing on QA environment.

Integration – Testing

System- Testing

Strategy/Test Type

Source for Test Case Identification

Techniques for Identification of test cases

Functionality Testing

Use Cases from Project Repository. Use Cases from VSS.

Understanding use cases of the individual modules.

All test cases are executed which are written for module and Integration testing.

The test cases will be identified based on the integration aspects to avoid duplication of tests.

Functionality Testing

System Testing.

Understanding use cases of the individual modules and dependent modules.

Detailed defect analysis will be done for the reported defects. The metrics to be collected during test life cycle are:



Defect location Metrics – Defects raised against the module will be plotted on a graph to indicate the affected module.



Severity Metrics – Each defect has an associated severity (Critical, High, Medium and Low), which is how much adverse impact the defect has or how important the functionality that is being affected by the issue. Number of issues raised against severity will be plotted on a graph. By examining the severity of a project’s issues, the discrepancies can be identified.



Defect Classification Metrics – Each defect will be classified into a defect type (like Enhancement, Unclear Requirements, Logical Defect etc.). Number of defects raised against defect type will be plotted on a graph. By examining the problem areas in the implementation stage can be identified.



Defect Closure Metrics – To indicate progress, the number of raised and closed defects against time will be plot on a graph.



Defect severity Trend – The number of defects found for different builds will be plotted on a graph against severity. By examining the severity of defects raised for different builds, the trends for discrepancies can be identified.

Test Plan. Version 1.0 | Updated: Proprietary and Confidential. © XYZ

Page 6 of 15

Project Name

These metrics will be collected and presented as test summary report after each test cycle. All the testing related documents would be managed using configuration management tool – VSS. The test documents will be managed along with the development documents.

3.2Test Considerations Test Type

Key factors to measure the test effectiveness

Conformance/functional

Interoperability Regression

Adequate number of test cases will be generated as per the understanding of functionality from the Use Cases, test scenarios and also from the discussion with BA and development team. Traceability mapping will be done between use cases developed by BA. All generated test cases will be executed for effective testing. Functional testing will be of Black box testing. This focuses on the overall functionality of the application. This method will allow the functional testing to uncover faults like incorrect or missing functions, error in any of the interfaces, errors in data structures and program initialization or termination. Interoperability testing involves testing of the system after integration of the software systems as a whole. Regression testing involves the re-testing of the application following modification to ensure that faults or bugs have not been introduced or uncovered as a result of the changes made during the System Testing. Regression tests are designed for repeatability and will be used when testing a later version of the application. Security testing involves testing the system in order to make sure that unauthorized personnel or other systems cannot gain access to the system and information or resources within it. Program that checks for access to the system via passwords are tested along with any organizational security procedures established. Security testing on application will be done with all possible roles. The portion of the testing that will involve the verification for the consistency of look and feel across the screens. How easily the user can navigate the system. E.g. Effective use of arrows, tab keys and hot keys. Performance testing involves testing whether the application responds quickly enough for the intended users. Here the focus is on the following tests. 1. Load Test. 2. Stress Test.

Security

Usability Test

Performance

3.3Test Completeness Test Type Manual Testing

Details Test Cases will be reviewed and baseline by the BA, development team and End users for correctness and completeness. The execution of all test cases will ensure test completeness.

3.4Test Setup Hardware setup – Server Side Test Plan. Version 1.0 | Updated: Proprietary and Confidential. © XYZ

Page 7 of 15

Project Name

Item Server

Description Any version of Windows 2000 and above 20 GB HDD, Minimum of 512 MB RAM

Software Requirements – Server Side Item Database Server

Description MySQL

Software Requirements – Client Side Item Client Machine

Description Any version of Windows 98 and Above supporting IE 5 and above JBOSS application server.

3.5Features not to be tested NA

3.6Risks that impact testing NO.

Risk Description

Level

Contingency plan

1.

Any of the deliverables by the development team not happening as per the Project plan.

High

The testing time may be lost and to compensate for this, additional resources would be added appropriately.

2.

System failure and loss of data during the Testing Process

High

A database backup strategy should be in place so that loss of data can be prevented.

3.

Functional specifications not updated with requirements modification/addition Test data not available for all the test cases

High

Have BA/Development team update the functional specifications and intimate the test team.

4.

Medium

Have Business Analyst prepare the test data.

3.7Testing tools Tool

Vendor/In-House

Test Defect Tracking

TD

XYZ Private Ltd.

Test Cases document

Excel 2000

Microsoft

Test Plan. Version 1.0 | Updated: Proprietary and Confidential. © XYZ

Page 8 of 15

Project Name

3.8Assumptions/Limitations/Dependencies     • •  • • •

The testing environment should be ready in terms of Application, Machines, and Server setup, Test Data Setup etc. Functionality is delivered to schedule. Software is of the required quality for the Sanity/Build verification testing. No major changes in the requirement would happen which would affect the test schedule. All “Show-Stopper” bugs receive immediate attention from the development team. All bugs found in a version of the software will be fixed and unit tested by the development team before moving the patch to test environment. Effective testing depends upon the review comments on test cases. The testing team will depend upon the BA, Development team & Client team for speedy resolution of all queries. All documentation will be up to date and delivered to the testing team. Functional and technical specifications will be signed off by the business.

3.9Acceptance criteria Type of document

Name of the customer

Test Plan document is accepted by Test case Document is accepted by Test execution results needs to be accepted by

4Test Case Design & Development 4.1Test Case Design Instructions 4.1.1

System Test cases

The use cases will be reviewed for correctness and completeness. This will be achieved by review and understanding of the existing functionality in the Project Name. System Test Cases will be developed manually for all the defined use cases. All system test cases will be derived from these use cases, and test team will consider the use cases as the base. The test team will consider the functional specs as reference document. In order to ensure full coverage of changes requested by business in Project Name, BA or Development Team will intimate the changes done to testing team members. PM and End Users will review the system test cases.

4.2Test Case Design Deliverables Test Cases will be developed by Test team and reviewed by PM before test execution. In case of requirements change, refer the Updated SRS.

Test Plan. Version 1.0 | Updated: Proprietary and Confidential. © XYZ

Page 9 of 15

Project Name

5Test Execution 5.1Unit testing The unit test cases will be developed by the development team and the development team would carry out the Unit testing and the testing team will review these unit test cases. 5.1.1

Environment

The test environment is basically the developer’s environment since the developer does the testing 5.1.2

Entry Criteria

At least a small piece of code, which is testable, should be available for doing Unit testing. Entry criteria will be on completion of a set of lines, which will enable the developer/tester to test the functionality for which it has been written for. 5.1.3

Responsibility

The developer will do the testing at this level. 5.1.4

Exit Criteria

Exit criteria will be once its certain that the code paths are fully tested and do not have any issues.

5.2Functional Testing - Module Wise The functional testing of each module will be performed by testing team, wherein the test engineer checks for the Integration of the module with all necessary units. Here top down approach is used for this testing. Note: Modules of Application are Admin, xyz, xyz1, Address book. 5.2.1

Environment

Testing will be performed on in QA environment. 5.2.2

Entry Criteria

The Unit Testing should be done at least once before this testing. 5.2.3 S.no. 1. 2. 3. 4. 5.2.4

Responsibility Testing Activity Test case designing Test cases review Test execution Test results reporting

Responsibility Test team PM and End users Test team Test team

Exit Criteria

All test cases have been executed and do not have any issues.

Test Plan. Version 1.0 | Updated: Proprietary and Confidential. © XYZ

Page 10 of 15

Project Name

5.3System testing The objective of System application testing is to ensure that the application addresses all the functional, user interface and security requirements. It is currently proposed to conduct one round of system testing and one final round of regression testing after all defects have been fixed. 5.3.1

Environment

Operating Systems: Windows XP Application Server: jboss-4.0.2 Application DB: MySQL 5.3.2

Entry Criteria

All modules testing should be done at least once before System testing. 5.3.3

Responsibility

S.no. 1. 2. 3. 4. 5.3.4

Testing Activity Test case designing Test cases review Test execution Test results reporting

Responsibility Test team PM and End users Test team Test team

System Test Execution - Specific Instructions

Functional Testing

User Interface Testing

Using the system test cases developed for functional requirement and by using valid and invalid data, verify the following: •

The expected results occur when valid data is used



The appropriate error or warning messages are displayed when invalid data is used

• Each business rule is properly applied Verify the following: •

Data Validation (Field length Validation, Data Type Validation using a checklist)



Application screens should follow the standards.



Navigation and usability through the target-of-test properly reflects functional requirements, including window-to-window, field-to- field, and use of access methods (Tab keys, Horizontal and Vertical Scrolling, Tool Tips) Window objects and characteristics, such as size, position, state, and focus conform to standards. Login as users with different roles and privileges to check if they can access the function and data they are allowed access to, and denied access to those functions for which they do not have authorization.



Security Testing



Test Plan. Version 1.0 | Updated: Proprietary and Confidential. © XYZ

Page 11 of 15

Project Name

5.3.5

Exit Criteria

All planned tests have been executed - All system test cases should be run through in each round of testing The system will be accepted if it has: • • •

No severity 1 defects (P1): Critical Bugs (System crashes and there is no work around.) No severity 2 defects (P2): High Functional Bugs (Functionality is significantly impaired. Either a task cannot be accomplished or a major work around is necessary.) A maximum of 10 open severity 3 and 4 defects. Should be part of Test report.

6Test Results Tracking The defect-tracking tool “TD” will be used for Reporting and Tracking of bugs during testing. The following table lists the different priorities that can be assigned to a defect and provides the criteria for assignment. Defect Prioritization

Criteria for assigning Priority

Blocker

Show Stoppers. These defects prevent testing of major functionality and do not have a workaround. Eg: • Click on a menu item that returns a blank page when a major process/workflow needs to be tested.

High

Critical Defects that do not allow major functionality to be tested but have a workaround. Eg: • Access Rules conditions not checked. • If exceptions are not handled properly. • If data not pre-populated. Etc.. Moderate Defects that prevent testing occasionally used or minor functionality. Eg: • No confirmation messages • Non-critical field validations not performed Minor Defects that do not prevent functionality from being tested.

Medium

Low

The Process for tracking and resolving the bugs reported by Testing Team will be as below. 1. Testing team will test modules in the test environment. 2. When a test Engineer identifies a defect, he will create a defect in the defect-tracking tool. A clear description of the defect along with the steps taken to create it will be logged in defect tracking tool. The status of the defect will be set to ‘Open’. 3. If necessary the Defect will be discussed in the defect prioritization meeting. 4. If the defect logged by Test Engineer is the same as an existing defect, the Defect Status will be set to ‘Duplicate’.

Test Plan. Version 1.0 | Updated: Proprietary and Confidential. © XYZ

Page 12 of 15

Project Name

5. If the defect logged by Test Engineer was found not to be a defect after discussion, the Defect Status will be set to ‘Not a Defect’. 6. After the development team member has modified and tested the code, the Defect Status will be changed to ‘Fixed’. 7. The modified code will be released into the test environment. Test team will be informed when a release is made into the test environment. Development team will prepare a Release Notes document that will list the defects that have been fixed. Release Notes will also include new functionalities. 8. The test engineer will re-test defects in ‘Fixed’ status. 9. The test engineer will change the Defect status to ‘Closed’ (if the defect has been fixed) or ‘Re-opened’ (if the defect still has not been fixed).

The following table explains each defect status and when it would occur during the workflow. Defect Status Open

Comments Created by Test Engineer and has been assigned to a Development team member for resolution

Not Reproducible

This status occurs when a defect found by Test Engineer is not reproduced.

Fixed

This status occurs if the defect has been Fixed by the Development team member.

Closed

The Test Engineer has tested the changes made by Development team and confirmed that they work.

Re-opened

This status occurs when the Test Engineer tests the changes made by Development team and finds that the defect is still present.

Not a defect

This status occurs if the defect is defined as ‘Not a defect’ after discussion with team/BA/PM/client.

Duplicate

This status occurs, If the defect logged by Test Engineer is the same as an existing defect.

Postponed

This status occurs when the defect is accepted by Development team member and will be resolved in the future versions.

Work in Progress

This status occurs when the development team is in the process to fix that defect.

Test Plan. Version 1.0 | Updated: Proprietary and Confidential. © XYZ

Page 13 of 15

Project Name

7Test Schedule Iteration

Task

Start Date

End Date

First

Integration Testing

18th May 2006

9th jun 2006

Second

System Testing 1

12th jun 2006

16th jun 2006

Third

System Testing 2

30th jun 2006

7th jul 2006

UAT Release

UAT

24th jul 2006

31st jul 2006

8Revision History Version 1.0 2.0

Date 18th-Aug-2006

Test Plan. Version 1.0 | Updated: Proprietary and Confidential. © XYZ

Author(s)

Reviewer(s)

Change Description

Mahindra V

Page 14 of 15

Project Name

XYZ Contact Information Office address Web- www.XYZ.com

Test Plan. Version 1.0 | Updated: Proprietary and Confidential. © XYZ

Page 15 of 15

Related Documents

Test Management Plan
November 2019 11
Test Plan
October 2019 21
Test Plan
November 2019 14
Management Plan
April 2020 9