Te Rawhiti Marae Development - The Working Drawings

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Te Rawhiti Marae Development - The Working Drawings as PDF for free.

More details

  • Words: 891
  • Pages: 5
Te Rawhiti Marae Development Project Chairperson: Marara Te Tai Hook 094037064 [email protected] Secretary: Helen Mountain Harte 4 Cheverton Pl, Kohimarama Ph 5211837 021755553 [email protected] Project Co ordinator: Maria King Mavoa, [email protected]

June 26, 2008 Tena koe, Application for Variation to Resource Consent: Te Rawhiti Marae Extension and Renovation After a long process of hui, discussions and fundraising, the Marae Trust has decided to change the design you approved in 2006, to another which will carry our whanau in to the future with forward-thinking confidence based in tradition. Te Rawhiti Marae Development Committee is the project arm of the Marae Trust, to drive the project. The next step in the process is to apply for a variation to the resource consent we already have. Tangata whenua, affected boundary neighbours and interested parties in the community are given the information about the project and their comments, discussion. A Letter of Approval, will be signed by tangata whenua, affected boundary neighbours, especially, and anyone else if they want to. This is sent to the contact person, Helen Harte. She is available on email, phone and face to face. A consultation meeting will be held at the Marae at a date to be decided for any discussions from the community, should this be necessary. With a 95% community approval, we don’t think that this will be necessary. The forms will be added to the application. You have now been sent the new plans. The rest of the application is the same-the environmental assessment, the landscaping and Engineer’s Report. Your prompt response will expedite the process. We are looking to apply for major funding in December so there’s not much time. Kia ora, Marara Te Tai Hook Chairperson Te Rawhiti Marae Development Committee

Variation to Resource Consent Application RC-2070327-RMALUC in the Far North District S94 RMA 1991 Form of Written Approval for the Variation The Applicant: We, of Te Rawhiti Marae Development Committee representing Te Rawhiti Marae Trust are making application for a variation of Land Use Consent at 221 Rawhiti Road Hikurangi RD4 Northland 0184 being legally defined as Rawhiti 2A1 & 2A2A MB Ref 86 WH 287. The activities are summarised as follows: The activity is to extend, renovate and refurbish the Marae buildings. This is an integrated and staged development over a three year period. The design of the building is the major variation. The Wharehui verandah will be the original one. The interior of the Wharehui will resemble the original except that it will be bigger from 63m2 to 142.5 m2 The existing Dining Hall is to be detached and moved to the lower southern slope for refurbishment as a Mahi Toi centre and an administrative/ archival resource centre The Caretaker’s Cottage will be the existing ex-Kohanga Reo Building The Landscape Plan and Sewage and Wastewater system will remain the same The total proposed building coverage of the site is from 954m 2 to 1176 m2 within a total site area of 9414.00 m 2. The maximum height of the main building is from 5.83m to 5.75 m2 The total impermeable surface area is from 840m 2 to 646.10 m2 The earthworks variation have increased from 45m3 to 455.75m3 because of the larger wharehui and the re-use of the existing dining hall. Both are large structures and the flat area in the valley that is the marae site means strong retaining walls. The longer retaining wall along the northern bank follows the long, curved wall of the new wharehui. This wall ranges in height from 2.8 to 2.17 to 1.5 m. The previous height of 2.4m was approved. The Mahi Toi /Administration/Archive building, the present dining hall, is a large building (105m2 TFA) and has two retaining walls behind it. The longest wall will be 36.5m long and from 6.62m to 8.83m high. The shorter upper retaining wall has a maximum height of 10m. The soil will be excavated on dry days and removed to a Council approved site. 6m3 will be used on site. Sediment control measures will be put in to practice. All measures will be taken to prevent any sediment entering the CMA. The setback variation is to do with the north eastern line of the new building. The corners of the existing toilet block and the wharehui infringements were approved. The variations are now a .705m (toilet block) and a 1.650m (wharehui) infringement of the boundary setback. In mitigation is the fact that this boundary is tree-covered and this part of the land is unoccupied. If it were, visibility and light would not be affected. The visual effects will not be intrusive. The maximum height of the main building and the new Mahi Toi building is less than the existing building maximum height. The colours will be recessive. The glass walls will reduce the size, height and solidity of the building by being able to look through it. The only part to be visually prominent will be the Wharehui façade.The whole complex will be dwarfed by the site being in a tree filled valley with high hills around it. The property is within the Coastal Living surrounded by General Coastal and Outstanding Landscape of the Revised Proposed District Plan This form is the product of Te Rawhiti Marae Development Committee. The Secretary is Helen Mountain Harte: email [email protected] ph-095211837.mob-021755 553. If you require more information, please contact us

Related Documents