Target Seq.xlsx

  • Uploaded by: Abidani Muratna
  • 0
  • 0
  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Target Seq.xlsx as PDF for free.

More details

  • Words: 201
  • Pages: 5
tahun luas BukaanExpose Bb Ave ThicknessDensity 2019 7.00 1.70 6 2020 5.80 1.10 6 2021 5.70 3.50 6 2022 6.00 3.50 6 2023 7.00 3.50 6 2024 3.50 6 2025 3.50 6 2026 2027

total target sisa

31.50 55.00 23.50 7.83

Cadangan Terukur

1.3 1.3 1.3 1.3 1.3 1.3 1.3

Cadangan 132,600.00 85,800.00 273,000.00 273,000.00 273,000.00 273,000.00 273,000.00 1,583,400.00

Terukur Seam A B Total Tertunjuk Seam A B Total

Mineout Area (m) Thickness Density Cadangan 282,037.00 6 1.3 2,199,888.60 162,096.00 3.5 1.3 737,536.80 2,937,425.40

Area (m)

Thickness Density Cadangan 475,360 6 1.3 3,707,808.00 162,096 3.5 1.3 737,536.80 4,445,344.80

147,597.20

Seam A B 12.24 Total

Area (m) Thickness 134,439.81 6 162,096.00 3.5

Seam A B Total

Area (m) Thickness 327,763 6 162,096 3.5

Density Cadangan 1.3 1,048,630.48 1.3 737,536.80 1,786,167.28

Density Cadangan 1.3 2,556,549.88 1.3 737,536.80 3,294,086.68

Luas (Ha) SEAM BB OB SR

2019 2020 2021 2022 2023 2024 6.4 6.1 5.2 10.0 8.2 10.0 5.5 5.8 6.7 3.5 4.3 3.5 270,000.00 270,000.00 270,000.00 270,000.00 270,000.00 270,000.00 720,900.00 723,800.00 832,500.00 842,500.00 792,300.00 822,300.00 2.67 2.68 3.08 3.12 2.93 3.05

2025 2026 Overall 11.0 11.7 68.56 3.2 3 270,000.00 270,000.00 2,160,000.00 865,700.00 882,100.00 6,482,100.00 3.21 3.27 3.00

Cad Asleh Cad Sisa

2,937,425.40 777,425.40

Related Documents

Target
May 2020 27
Target
November 2019 52
Target
May 2020 22
Target
October 2019 36
Target
November 2019 36
Target
November 2019 34

More Documents from ""