SUBSTATION AUTOMATION (FROM CONVENTIONAL SUBSTATION TO GSM/CDMA AUTOMATION SYSTEM)

PREPARED BY GOPALA KRISHNA PALEPU ADE/400KV/ VS/HYD [email protected], Mobile:9440336984

™

From substation control and protection to Fibre optics based Substation.

™

Fibre optics based Substation to GSM /CDMA based Substation Automation.

™

From modern Automation

™

System Architectures

™

Functional Structures

™

Application examples

™

Features and Benefits

to

intelligent

Substation

¾

IT based solution for protection and control offer cost effective measures to counteract large area system disturbances.

¾

Effective fault location is mandatory for faster finding and fixing of problems.

¾

Integrated numerical protection & control allows automated power restoration and load shedding.

¾

On-line condition monitoring reduces maintenance costs and enables.

¾

Substation Automation offers infrastructure for implementing monitoring of assets.

¾

Voltage instability prediction is a new approach for early indication voltage collapses and enables to work plants and systems harder.

¾

Integrated asset management improves utility performance and productivity.

a cost effective on-line condition

overall

General Principles of Substation Automation The general principles of the substation operation have not changed, since their developing days. Therefore the control and protection tasks remain the same.

The objective of modern substation automation (SA) is to solve these tasks in a more efficient and economical way by using state of the art information technologies (IT) and to provide more functionality to work plant and systems harder.

CONVENTIONAL SUBSTATION PRACTICES PREPARED BY GOPALA KRISHNA PALEPU ADE/400KV/ VS/HYD [email protected], Mobile:9440336984

CONVENTIONAL SUBSTATION 1. 2. I.

II.

III.

III. III.

IV.

Very Wide Cabling. i.e. from equipment to BMB/CTMB/CVT MB and from BMB/CTMB/CVT MB to Control Room Dedicated Device. For each function Dedicated Device. Bay Control – Control Panels for the Bay Circuit Breaker Control & Indication. Isolator Control & Indication. Earth Switch Indication. DC & AC Healthy Indication and Testing. Annunciation facia for Troubles. Panel Meters & Energy Meter. Bay Protection – Relay & Protection Panels - Protective Relays of Concerned bay Circuit Breaker Relay Panel (A/R, LBB, TSR, CB Troubles, Master Trip Relays etc). Line Protection Panel (21L1, 21L2, 67, 59-1, 59-2, 50 Stub, 87 Teed-1, 87 Teed-2 etc). ICT Protection Panel (87T1, 87T2, 67HV, 67IV, 50O/L, 99HV, 99IV etc). Reactor Protection Panel (87R, 64R, 21R, 87Teed-1, 87Teed-2 etc). Bus Bar Protection – Entire Substation Protection - Each Voltage Level Bus Bar Protection Panels High Impedance Bus Bar Protection With Main & Check Panels for each Bus. Medium Impedance Bus Bar Protection Panels for each Bus. Low Impedance Bus Bar Protection Panels for Each Bus. Numerical Bus Bar Protection Panels for Centralised or Distributed Architecture. Redundant Numerical Bus Bar Protection for each Voltage Level. Fault Recorder – Disturbance Recorder - For each Bay stand alone Disturbance Recorder Line, Transformer/ICT, Reactor & Bus bar Event Recorder – SOE / EL / ER for all Bays The Operation of all Equipments & Protective relays will be shown in a sequence with millisecond resolution. This is Time Synchronised with GPS. RTU – Remote Terminal Unit For Monitoring the Substation information from Load Dispatch Centre

CONVENTIONAL CONTROL & PROTECTION Bay Control 225kV LIGNE ABOBO 1

ABB

Bay Protection =D04+R01

225kV LIGNE ABOBO 1

ABB

Process Level

Bay Level

Station Level

ABB

ABB

Busbar Protection ABB

=D04+R01

225kV LIGNE ABOBO 1

=D04+R01

Fault Recording 225kV LIGNE ABOBO 1

ABB

=D04+R01

Event Recording 225kV LIGNE ABOBO 1

ABB

=D04+R01

SCADA RTU 225kV LIGNE ABOBO 1

ABB

=D04+R01

ABB

125VDC Distributuion Battery A

125VDC Distributuion Battery A

125VDC Distributuion Battery B

125VDC Distributuion Battery B

125VDC Distributuion Battery A

125VDC Distributuion Battery B

125VDC Distributuion Battery A

125VDC Distributuion Battery B

125VDC Distributuion Battery A

125VDC Distributuion Battery B

L316*4 E R an orkP etw N B A

ABB RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

cti a d In 0 5 6 c6 ti a d In 0 5

1

9

2

1

10

3

1

4

12

5

13

6

14

7

15

8

16

ON/OFF

056 ci tcad nI

0 56 citc adnI

05 6 citca dnI

=W1 BAY CONTROL RELAY REC316*4 =W2 1 =W

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

2 =W

9

1

0 1

2

-Q1 SEL

-Q2 SEL

1

3 1 -Q

2 1

4

3 1

5

4 1

6

5 1

7

6 1

8

ON/OFF o ri e V b .2 4 sn

M R E F

c c

-Q0 TESTE LAMPE

SEL

LOCAL CONTROL

METERING cti a d In 0 5 6 L316*4 E R

c6 ti a d In 0 5

an orkP etw N B A

ABB 1

9

2

10

3

1

4

12

5

13

6

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

3

14

7

15

8

16

8

ON/OFF

OUVRIRFERMER ABB LINE PROTECTION RELAY REL316*4 ESC

EXE

50 B E R an orkP etw N B A

ABB

DISTANCE LOC

BUSBAR PROTECTION REB500

BMB/BMK/SyMB

CVT MB/JB

CT MB/JB

GIS or AIS Switchgear

1-89A ISO

1-52 CB 1-89B ISO

Local Marshalling Boxes

1-CVT 1-CT 1-89L ISO

1-89LE ES

SUBSTATION MONITORING SYSTEM (Next Development) PREPARED BY GOPALA KRISHNA PALEPU ADE/400KV/ VS/HYD [email protected], Mobile:9440336984

SUBSTATION MONITORING SYSTEM 1. 2. I.

II.

III.

III. III. IV. V. VI.

Still Very Wide Cabling. i.e. from equipment to BMB/CTMB/CVT MB and from BMB/CTMB/CVT MB to Control Room Dedicated Device. For each function Dedicated Device and some functions are Integrated due to Numerical Advantage. Bay Control – Control Panels for the Bay Circuit Breaker Control & Indication. Isolator Control & Indication. Earth Switch Indication. DC & AC Healthy Indication and Testing. Annunciation facia for Troubles. Panel Meters & Energy Meter. Bay Protection – Relay & Protection Panels - Protective Relays of Concerned bay Circuit Breaker Relay Panel (A/R, LBB, TSR, CB Troubles, Master Trip Relays etc). Line Protection Panel (21L1, 21L2, 67, 59-1, 59-2, 50 Stub, 87 Teed-1, 87 Teed-2 etc). ICT Protection Panel (87T1, 87T2, 67HV, 67IV, 50O/L, 99HV, 99IV etc). Reactor Protection Panel (87R, 64R, 21R, 87Teed-1, 87Teed-2 etc). Bus Bar Protection – Entire Substation Protection - Each Voltage Level Bus Bar Protection Panels Numerical Bus Bar Protection Panels for Centralised or Distributed Architecture. LBB is part of Bus Bar Protection Redundant Numerical Bus Bar Protection for each Voltage Level. Fault Recorder – Disturbance Recorder - For each Bay stand alone Disturbance Recorder Line, Transformer/ICT, Reactor & Busbar – Part / Inbuilt Function of Numerical Relays Event Recorder – SOE / EL / ER for all Bays – Inbuilt function of Numerical Relays RTU – Remote Terminal Unit For Balance Events not Covered by Protective relays are wired to RTU. All are connected to System and from system to communication Media to ALDC FBS – Fall Back Switch – FSK/NSK Modem. Communication Media to ALDC / SLDC for Transfer of Data and Monitoring the Data from SLDC.

SUBSTATION MONITORING SYSTEM Bay Control 225kV LIGNE ABOBO 1

ABB

Bay Protection =D04+R01

225kV LIGNE ABOBO 1

ABB

Busbar Protection

SCADA RTU 225kV LIGNE ABOBO 1

ABB ABB

225kV LIGNE ABOBO 1

125VDC Distributuion Battery A 125VDC Distributuion Battery A ABB

ABB

SCADA- SMS

=D04+R01

=D04+R01

=D04+R01

125VDC Distributuion Battery B

125VDC Distributuion Battery B

ABB

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT 125VDC Distributuion Battery A

125VDC Distributuion Battery B L316*4 E R

an orkP etw N B A

Station Level

ABB 1

9

2

10

3

1

4

12

5

13

6

14

7

15

8

16

ON/OFF

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT BAY CONTROL RELAY REC316*4 =W1 1 =W

ON/OFF

2 =W

1

9

2

0 1

3

=W2

1 1 -Q

4

2 1

5

3 1

6

4 1

7

5 1

8

-Q1 SEL

-Q2 SEL

6 1

o ri e V b .2 4 sn

M R E F

c c

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT LOCAL CONTROL -Q0

METERING L316*4 E R

an orkP etw N B A

ABB

SEL

ON/OFF

TESTE LAMPE 1

9

2

10

3

1

4

12

5

13

6

14

7

15

8

16

d gi t al

RER111

ABB Power Automation AG OUVRIRFERMER

LINE PROTECTION RELAY REL316*4

500SCM 500SCM 500SCM 01 01 01 Tx1 Tx1 Tx1

50 B E R an orkP etw N B A

ABB

ABB

ESC

Rx1

EXE

Tx2

DISTANCE

BUSBAR PROTECTION REB500

LOC

01 Tx1

01 Tx1

Rx1

Rx1

Rx1

Rx1

Tx2

Tx2

Tx2

Tx2

Rx2

Rx2

Rx2

Tx3

Tx3

Tx3

Rx3

Rx3

Rx3

Rx2

Tx3

Tx3

Rx3

Rx3

Rx2

500SCM 500SCM

Interbaybus Star coupler

di gi t al

COM581

ABBPower Automation AG

Communication Converter

NCC / RCC

FBS

Process Level

Bay Level

C

BMB/BMK/SyMB

CVT MB/JB

CT MB/JB

GIS or AIS Switchgear

1-89A ISO

1-52 CB 1-89B ISO

Local Marshalling Boxes

1-CVT 1-CT 1-89L ISO

1-89LE ES

COMMUNICATION: LEVELS OF SUBSTATION CONTROL & AUTOMATION Control Centre Level

Substation Level

Bay Level Process Level Switchgear

SUBSTATION AUTOMATION SYSTEM (Stage-1 Development) PREPARED BY GOPALA KRISHNA PALEPU ADE/400KV/ VS/HYD [email protected], Mobile:9440336984

SUBSTATION AUTOMATION SYSTEM(STAGE-1) 1. 2. 3. 4.

5. 6. 7. 8. 9. 10. 11.

12.

13. 14.

This system is exciting Conventional System to convert Remote Control System. This is same as Substation Monitoring System. Additionally One More RTU is Provided for Remote Control & Operation. Normally RTU Having 3 Types of cards 1. Analog Input Card - To Monitor the Analog Values 2. Digital Input Card – To Monitor the Status of Equipment 3. Digital Output Card – To Control & Operation of Substation Equipment Exciting RTU for only Monitoring the Substation from Remote Control Station exclusively for ALDC / SLDC / RLDC / NLDC. Without disturbing the exciting RTU the following works are carried. All Controls of Circuit Breakers & Isolators are Brought to RTU to Control Card. All Status of Circuit Breakers & Isolators are Brought to RTU to Digital Card. Each Bay is provided with Multifunction Meters. They are connected in Modbus configuration and brought to network. Transformer OTI, WTI, Online DGA & Tap Changer Positions information is available in 420mA. They are brought to RTU Analog Card. Switch yard is fixing with no of Digital Cameras and focusing the major equipment to View the yard and this is having a facility to slow motion moving round to cover all the Major equipments. This also put in Network to Monitor from remote/ Local The RTU, Energy Meters, MFM and Digital Cameras are connected in Network in Ethernet Switch and to Station Control System and connected to Modem & Router to Remote Control Center. The Operator, those who are sitting at Remote control Center having a System and he can Monitor the substation and take a decision for any thing. This is Stage-1 Substation Control System.

SUBSTATION AUTOMATION SYSTEM (STAGE-1) Bay Protection Busbar Protection

Bay Control

RTU 225kV LIGNE ABOBO 1

ABB 225kV LIGNE ABOBO 1

ABB 225kV LIGNE ABOBO 1

ABB

=D04+R01 ABB

=D04+R01

225kV LIGNE ABOBO 1

125VDC Distributuion Battery A ABB

ABB

125VDC Distributuion Battery A

ABB

RTU =D04+R01

225kV LIGNE ABOBO 1

ABB

SCADA- SCS

=D04+R01

=D04+R01

125VDC Distributuion Battery B

125VDC Distributuion Battery A

125VDC Distributuion Battery B

125VDC Distributuion Battery B 125VDC Distributuion Battery A

125VDC Distributuion Battery B

L316*4 E R an orkP etw N B A

Station Level

ABB

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

1

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

9

2

10

3

1

4

12

5

13

6

14

7

15

8

16

ON/OFF

1

ON/OFF

9

2

0 1

BAY CONTROL RELAY REC316*4 3

1

4

2 1

5

3 1

6

4 1

7

5 1

8

6 1

=W1

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

1 =W

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

2 =W

1 -Q

=W2 ON/OFF

ON/OFF

o ri e V b .2 4 sn

-Q1 SEL

-Q2 SEL

M R E F

c c

LOCAL CONTROL

METERING RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

L316*4 E R an orkP etw N B A

ABB

-Q0 TESTE LAMPE

SEL

1

9

2

10

3

1

4

12

5

RTU 200IN 1 IN 2 IN 3 IN 4 IN 5 IN 6 IN 7 IN 8 OUT

d gi ta l

13

6

14

7

15

8

16

ON/OFF

ON/OFF

RER111

ABB Power Automation AG LINE PROTECTION RELAY REL316*4 OUVRIRFERMER

500SCM 500SCM 500SCM

50 B E R an orkP etw N B A

ABB ABB

ESC

EXE

BUSBAR PROTECTION REB500

DISTANCE LOC

01 Tx1 Rx1

01 Tx1

01 Tx1

Rx1

Rx1

Tx2

Tx2

500SCM 500SCM 01 Tx1

01 Tx1

Rx1

Rx1

Tx2

Tx2

Tx2

Rx2

Rx2

Rx2

Rx2

Rx2

Tx3

Tx3

Tx3

Tx3

Tx3

Rx3

Rx3

Rx3

Rx3

Rx3

Interbaybus Star coupler

Process Level

Bay Level

TO ALDC / SLDC / RLDC

BMB/BMK/SyMB

CVT MB/JB

CT MB/JB

COM581

ABBPower Automation AG

Communication Converter

NCC / RCC

FBS C

Local Marshalling Boxes

GIS or AIS Switchgear

1-89A ISO

1-52 CB 1-89B ISO

di gi t al

1-CVT 1-CT 1-89L ISO

1-89LE ES

SUBSTATION AUTOMATION SYSTEM (Stage-2 Development) PREPARED BY GOPALA KRISHNA PALEPU ADE/400KV/ VS/HYD [email protected], Mobile:9440336984

SUBSTATION AUTOMATION SYSTEM(STAGE-2) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.

12.

13. 14. 15.

This system is adopted for New Substations, at the time of tendering. This is same as Substation Monitoring System except new IED is introduced in a Panel. It is called Bay Control Unit. This Replaces additional one More RTU for Remote Control & RTU for ALDC / SLDC / RLDC / NLDC as if it is new Substation. The Bay Control Unit IED is one unit per Bay and it is Provided in CB Relay Panel. This is almost RTU, but limited to one Bay and nothing but Mini RTU / Distributed RTU. All Controls & Status of Circuit Breakers & Isolators and Circuit Breaker Troubles and Alarms are Brought to BCU of Particular Bay in addition to Conventional Control Panel. Each Bay is provided with Energy Meters &Multifunction Meters. They are connected in Modbus configuration and brought to network. The control panel also having Panel Meters. Transformer OTI, WTI, Online DGA & Tap Changer Positions information is available in 420mA. They are brought to BCU Analog Card. Transformer Troubles and Alarms and are brought to BCU Digital Card. Transformer Tap Changer Control is brought to BCU Control Card. Switch yard is fixing with no of Digital Cameras and focusing the major equipment to View the yard and this is having a facility to Move in slow motion, around the bay to cover all the Major equipments. This also put in Network to Monitor from remote/ Local. The Numerical IEDs , Energy Meters, MFM and Digital Cameras are connected in Network in Ethernet Switch and to Station Control System and connected through Gateway to Remote Control Center and ALDC / SLDC / RLDC / NLDC. The Operator, those who are sitting at Remote control Center having a System and he can Monitor the substation and take a decision for any thing. This is Stage-2 Substation Control System. Still Extensive Wide cabling and conventional Control Panels existing.

SUBSTATION AUTOMATION SYSTEM (STAGE-2) SCADA- SCS Bay Protection Busbar Protection

Bay Control

225kV LIGNE ABOBO 1

ABB 225kV LIGNE ABOBO 1

ABB

ABB

ABB

=D04+R01

ABB

225kV LIGNE ABOBO 1

=D04+R01

=D04+R01

125VDC Distributuion Battery A

ABB

125VDC Distributuion Battery B

125VDC Distributuion Battery A

125VDC Distributuion Battery B

d gi t a l

L316*4 E R an orkP etw N B A

Station Level

ABB 1

9

2

10

3

1

4

12

5

13

6

14

7

15

8

16

di gi t al

BAY CONTROL RELAY REC316*4 =W1

1 =W

2 =W

1

9

2

0 1

3

M

1 1 -Q

4

2 1

5

=W2

M

3 1

6

4 1

7

5 1

8

6 1

M o ri e V b .2 4 sn

-Q1 SEL

-Q2 SEL

M R E F

c

LOCAL SET REMOTE OPERATION

c

? LOCAL CONTROL

METERING L316*4 E R

an orkP etw N B A

ABB

-Q0 TESTE LAMPE

SEL

1

9

2

10

3

1

4

12

5

13

6

14

7

15

8

16

RER111

ABB Power Automation AG LINE PROTECTION RELAY REL316*4 OUVRIRFERMER

500SCM 500SCM 500SCM

50 B E R an orkP etw N B A

ABB ABB

ESC

EXE

BUSBAR PROTECTION REB500

DISTANCE

500SCM 500SCM

01 Tx1

01 Tx1

01 Tx1

01 Tx1

01 Tx1

Rx1

Rx1

Rx1

Rx1

Rx1

Tx2 Rx2

Tx2

Tx2

Tx2

Tx2

Rx2

Rx2

Rx2

Rx2

Tx3

Tx3

Tx3

Tx3

Tx3

Rx3

Rx3

Rx3

Rx3

Rx3

LOC

Inter bay bus Star coupler

TO REMOTE CONTROL CENTER

FBS ABBPower Automation AG

Communication Gate way

COM581

Communication Converter

Process Level

Bay Level

C

BMB/BMK/SyMB

CVT MB/JB

NCC / RCC

CT MB/JB

Local Marshalling Boxes

GIS or AIS Switchgear

1-89A ISO

1-52 CB 1-89B ISO

TO ALDC / SLDC / RLDC

1-CVT 1-CT 1-89L ISO

1-89LE ES

SUBSTATION AUTOMATION SYSTEM (Stage-3 Development) Distributed Control Room using Bay Kiosks or say Portable Relay Rooms PREPARED BY GOPALA KRISHNA PALEPU ADE/400KV/ VS/HYD [email protected], Mobile:9440336984

SUBSTATION AUTOMATION SYSTEM (STAGE-3) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.

12.

13. 14. 15. 16. 17. 18.

This system is adopted for New Substations, at the time of tendering. This is Distributed Control Rooms using Bay Kiosks and called Portable Relay Rooms. In this Conventional Control Panel is not required. The Bay Control Unit IED is one unit per Bay and it is Provided in CB Relay Panels for Control & Monitoring. This is almost RTU, but limited to one Bay and nothing but Mini RTU. All Controls & Status of Circuit Breakers & Isolators and Circuit Breaker Troubles and Alarms are Brought to BCU of Particular Bay. Each Bay is provided with Energy Meters &Multifunction Meters. They are connected in Modbus configuration and brought to network. Transformer OTI, WTI, Online DGA & Tap Changer Positions information is available in 4-20mA. They are brought to BCU Analog Card. Transformer Troubles and Alarms and are brought to BCU Digital Card. Transformer Tap Changer Control is brought to BCU Control Card. Switch yard is fixing with no of Digital Cameras and focusing the major equipment to View the yard and this is having a facility to Move in slow motion, around the bay to cover all the Major equipments. This also put in Network to Monitor from remote/ Local. The Numerical IEDs , Energy Meters, MFM and Digital Cameras are connected in Network in Ethernet Switch and to Station Control System and connected through Gateway to Remote Control Center and ALDC / SLDC / RLDC / NLDC. The Operator, those who are sitting at Remote control Center having a System and he can Monitor the substation and take a decision for any thing. This is Stage-3 Substation Control System. Still Extensive Wide cabling between Bay Kiosks/PRR to Switch yard equipment. But cables reduced to 60% to 80%. The Main Control Room Having only Network system with Printer and Aux System Monitoring. But still Auxiliary system Location is Not Distributed and Centralised. This concept is not changing. All IEDs are connected to Fibre Optic cable and Ethernet Switches. Even if FO cables damaged, still protection function is working and it is unable to Monitor and control from Control Room / RCC / ALDC / SLDC.

BAY LEVEL AUTOMATION (STAGE-3) Station Level

Network Control Center NCC

ABB Network Partner AG

C E

Interbay

Bus =D04+R01

225kV LIGNE ABOBO 1

ABB

125VDC Distributuion Battery A

125VDC Distributuion Battery B REL316*4

ABB Network Partner

ABB

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

BAY CONTROL RELAY REC316*4 =D04 ABOBO 1

ABB POWER MONITORING UNIT =W1

=W2

M

Bay Level

-Q1 SEL

Process Level

COM581

M

-Q2 SEL

-Q0 SEL

LAMPE TESTE

M OUVRIR

FERMER

DISTANCE

ABB

ESC

EXE

LOCAL SET REMOTE OPERATION

?

LOCAL CONTROL ABB

LOC

METERING REL316*4

ABB Network Partner

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

LINE PROTECTION RELAY REL316*4 ABB

ABB Network Partner

REB500

BUSBAR PROTECTION REB500

-Q2

-Q0 -Q1

-Q9

-Q8

BAY LEVEL AUTOMATION (STAGE-3) Features

Benefits Less inventories and spare parts

Mainstream Hardware

Less training & Familiarisation

Mainstream Software platforms

Less Hardware and panels

Integrated SA System • Control (BCU) • Monitoring (BCU) • Metering (BCU) • Protection (BPU) • DR (BPU) • SOE / ER (BCU+BPU) • Billing (TVM/EM) • etc.

Less operation and maintenance costs More availability

Open System TCP / IP Ethernet communication Using fibre optic media for communication Compact design Decentralised system structure closer to process Distributed Control Rooms Or called Bay Kiosks Or called Portable Relay Rooms

No conventional mimic board

Minimising outage breaks Integration of third-party equipment Less cabling and installation costs Less testing and commissioning costs Less space and civil works

HIGHLIGHTS BAY LEVEL SA Features

Benefits

Numerical Protection (BPU)

Easy to use and to customise

Numerical Control (BCU)

Efficient operation

Safe interlocking

• Avoiding errors • Less hazards and breaks • Reduction of operation costs

Self supervision Modern MMI / HMI Operator guidance Maintenance support

Increasing availability Reducing maintenance costs Higher power quality

ENHANCED FUNCTIONALITY OF BAY LEVEL SA Features Process status information

Benefits Better planning • more timely data

On-line Primary equipment monitoring

Efficient trouble shooting

SA System status information

All information at one glance

Events and Alarms evaluation

Better monitoring

Disturbance records Trends and calculations

Supports operation decisions

Reports

Efficient asset management

SUBSTATION AUTOMATION SYSTEM (Stage-4 Development) PROCESS LEVEL INTELLIGENT SUBSTATION AUTOMATION PREPARED BY GOPALA KRISHNA PALEPU ADE/400KV/ VS/HYD [email protected], Mobile:9440336984

SUBSTATION AUTOMATION SYSTEM (STAGE-4) 1. 2. 3. 4. 5. 6. 7. 8. 9.

10.

11. 12. 13. 14. 15. 16. 17.

This system is adopted for New Substations, at the time of tendering. This is Distributed IEDs for each Switch Yard Equipment for Operation and Maintenance.This is Called Process Bus Automation. Non Conventional Instrument Transformers for Voltage and Current Measurement . In this Distributed Control Rooms / Bay Kiosks / Portable relay Rooms are not required. One complete Panel for one Bay. All control, Protection IEDs TVM/EM are available. No Physical wiring from Switch Yard to Bay to Control. Total Fibre Optic Ethernet connection and IEC61850 Communication. No Cable Trenches. No DC Leakage. But Centralised Auxiliary System and Physical Cabling to all Bay switch yard equipment and relays and other accessory systems. Switch yard is fixing with no of Digital Cameras and focusing the major equipment to View the yard and this is having a facility to Move in slow motion, around the bay to cover all the Major equipments. This also put in Network to Monitor from remote/ Local. The Numerical IEDs , Energy Meters, MFM and Digital Cameras are connected in Network in Ethernet Switch and to Station Control System and connected through Gateway to Remote Control Center and ALDC / SLDC / RLDC / NLDC. The Operator, those who are sitting at Remote control Center having a System and he can Monitor the substation and take a decision for any thing. This is Stage-4 Substation Control System called Process Bus Substation Automation System. Civil Engineering Cost in the yard reduces Drastically. The Main Control Room Having only Network system with Printer and Aux System Monitoring. But still Auxiliary system Location is Centralised, but Not Distributed. This concept is not changing. Redundant, alternative communication channels are required to safe guard if FO cable damages. The reliability of system Depends on availability of Fibre Optic System.

INTELLIGENT SA ARCHITECTURE Station Level

Network Control Center NCC

ABB Network Partner AG

C E

Interbay B

us =D04+R01

225kV LIGNE ABOBO 1

ABB

125VDC Distributuion Battery A

ABB

125VDC Distributuion Battery B REL316*4

ABB Network Partner

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

Bay Level

BAY CONTROL RELAY REC316*4 =D04 ABOBO 1

ABB

POWER MONITORING UNIT

=W1

=W2 -Q1 SEL

-Q2

SEL M

M LAMPE TESTE

-Q0 SEL

M OUVRIR

ESC

ABB

FERMER

DISTANCE

EXE

LOCAL

?

SET

REMOTE

ABB

1 2 3 4 5 6 7 8

LOC

OPERATION

LOCAL CONTROL

METERING REL316*4

ABB Network Partner

9 10 11 12 13 14 15 16

LINE PROTECTION RELAY REL316*4 ABB

ABB Network Partner

REB500

BUSBAR PROTECTION REB500 ABB

U G IT N M R E W O P

EM

E C N A T IS D

C LO

-Q2 -Q0 -Q1

-Q51

PISA B

PISA A

PISA A

PISA

Process B us

Process Level

COM581

-T1

-Q9

-Q8

IMPLEMENTATION OF INTELLIGENT SAS Intelligent Primary Equipment

125VDC Distributuion Battery A ABB

125VDC Distributuion Battery B REL316*4

ABB Network Partner

1 2 3 4 5 6 7 8

MicroSCADA

=D04+R01

225kV LIGNE ABOBO 1

ABB

Interbay bus Ethernet Switches

9 10 11 12 13 14 15 16

BAY CONTROL RELAY REC316*4

t

d gi tal =D04 ABOBO 1

ABB

POWER MONITORING UNIT

=W1

=W2

-Q2

-Q1

M

-Q1 SEL

M

-Q2 SEL

-Q0 SEL

LOCAL

SET

REMOTE

-Q2

OUVRIR

FERMER

ESC

EXE

LOC

OPERATION

LOCAL CONTROL ABB

-Q51

1 2 3 4 5 6 7 8

METERING REL316*4

ABB Network Partner

9 10 11 12 13 14 15 16

COM 581 ABBPower Automation AG

LINE PROTECTION RELAY REL316*4 ABB

ABB Network Partner

COM581

Communication Converter

NCC / RCC

REB500

C

-Q0 PISA A

-Q8 -Q9 -Q8

PISA A PISA B

Feeder Marshalling

-Q0

-T1 -Q9

i it l

DISTANCE

? ABB

-Q1

di gi t al

LAMPE TESTE

M

PISA

BUSBAR PROTECTION REB500

Process Bus

INTELLIGENT SAS ABB

Actuator for isolator & earthing switch control

PISA PISA

PISA

=D04+R01

225kV LIGNE ABOBO 1

ABB

125VDC Distributuion Battery A ABB

125VDC Distributuion Battery B REL316*4

ABB Network Partner

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

Abgangsschutz Line Protection 1I

BAY CONTROL RELAY REC316*4 =D04 ABOBO 1

ABB

POWER MONITORING UNIT

=W1

PISA

=W2 M

-Q1 SEL

M

-Q2 SEL

-Q0 SEL

Feldleitgerät Bay Controller

LAMPE TESTE

M

Star Coupler

?

ABB

OUVRIR

FERMER

ESC

EXE

DISTANCE LOCAL

SET

REMOTE

LOC OPERATION

LOCAL CONTROL

Actuator for circuit breaker control

ABB

1 2 3 4 5 6 7 8

METERING REL316*4

ABB Network Partner

9 10 11 12 13 14 15 16

PISA A

Abgangsschutz Line Protection 2II LINE PROTECTION RELAY REL316*4

PISA A

ABB

ABB Network Partner

REB500

PISA B

Bus Bar Protection

Sensors for current & voltage measurement

BUSBAR PROTECTION REB500

Process Bus Phase L1

Inter bay bus 1 Inter bay bus 2

INTELLIGENT SA: FEATURES AND BENEFITS Features

Benefits

Bus (serial) communication to primary equipment

Further reduction in yard cabling and installation costs

Intelligent primary equipment

More information from primary equipment

Sampling and signal processing locally in primary equipment

Operation enhancements Reducing operation and maintenance costs Less primary equipment costs Less project execution time

SUBSTATION AUTOMATION SYSTEM (Stage-5 Development) PROCESS LEVEL INTELLIGENT SUBSTATION AUTOMATION WITH GSM / CDMA NETWORK PREPARED BY GOPALA KRISHNA PALEPU ADE/400KV/ VS/HYD [email protected], Mobile:9440336984

SUBSTATION AUTOMATION SYSTEM (STAGE-5) 1. 2. 3. 4. 5. 6. 7. 8.

9.

10. 11. 12. 13. 14. 15. 16.

This system is adopted for New Substations, at the time of tendering. This is Distributed IEDs for each Switch Yard Equipment for Operation and Maintenance. This is Called Process Bus Automation. Non Conventional Instrument Transformers for Voltage and Current Measurement . In this Distributed Control Rooms / Bay Kiosks / Portable relay Rooms are not required. One complete Panel for one Bay. All control, Protection IEDs TVM/EM are available. No Physical wiring from Switch Yard to Bay to Control. Total GSM/CDMA connection and IEC61850 Communication. But Centralised Auxiliary System and Physical Cabling to all Bay switch yard equipment and relays and other accessory systems. Switch yard is fixing with no of Digital Cameras and focusing the major equipment to View the yard and this is having a facility to Move in slow motion, around the bay to cover all the Major equipments. This also put in Network to Monitor from remote/ Local. The Numerical IEDs , Energy Meters, MFM and Digital Cameras are connected in Network in Ethernet Switch and to Station Control System and connected through Gateway to Remote Control Center and ALDC / SLDC / RLDC / NLDC. The Operator, those who are sitting at Remote control Center having a System and he can Monitor the substation and take a decision for any thing. This is Stage-5 Substation Control System called Process Bus Substation Automation System. Civil Engineering Cost in the yard reduces Drastically. The Main Control Room Having only Network system with Printer and Aux System Monitoring. But still Auxiliary system Location is Centralised, but Not Distributed. This concept is not changing. Redundant, alternative communication channels are required with GSM / CDMA. The reliability of system Depends on availability of GSM / CDMA.

Station Level

INTELLIGENT GSM/CDMA SA ARCHITECTURE TO RCC/ALDC/SLDC GSM

GSM

CDMA

ABB Network Partner AG

COM581

CDMA C E

=D04+R01

225kV LIGNE ABOBO 1

ABB

125VDC Distributuion Battery A

125VDC Distributuion Battery B

L316*4 E R

an orkP etw N B A

ABB

1

9

2

10

3

1

4

12

5

13

6

14

7

15

Bay Level

8

16

BAY CONTROL RELAY REC316*4

=D04 ABOBO 1

GSM

1 =W

2 =W

M

1 -Q

L E S

M

2 -Q

L E S

M

M E P M LA

0 -Q

S E T

L E S

M

M

I R V U O

? ?

ABB

SET SETLOCAL REMOTE OPERATION REMOTE OPERATION

LOCAL

C S E

LOCAL CONTROL

M R E F

X E

METERING L316*4 E R

an orkP etw N B A

ABB

1

9

2

10

3

1

4

12

5

13

6

14

7

15

8

16

LINE PROTECTION RELAY REL316*4

CDMA

50 B E R

an orkP etw N B A

ABB

BUSBAR PROTECTION REB500

ABB

U G IT N M R E W O P

EM E C N A T IS D

GSM

CDMA GSM

CDMA

-Q2 -Q0 -Q1

-Q51

PISA B

PISA A

PISA A

PISA

Process Level

C LO

-T1

-Q9

-Q8

IMPLEMENTATION OF CDMA / GSM INTELLIGENT SAS Intelligent Primary Equipment

125VDC Distributuion Battery A ABB

125VDC Distributuion Battery B REL316*4

ABB Network Partner

1 2 3 4 5 6 7 8

MicroSCADA

=D04+R01

225kV LIGNE ABOBO 1

ABB

GSM

9 10 11 12 13 14 15 16

BAY CONTROL RELAY REC316*4

t

d gi tal =D04 ABOBO 1

ABB

POWER MONITORING UNIT

=W1

=W2

GSM

-Q2

-Q1

PISA

-Q2

-Q1

GSM

M

-Q1 SEL

M

-Q2 SEL

-Q0 SEL

LAMPE TESTE

M

OUVRIR

FERMER

ESC

EXE

DISTANCE

? ABB

LOCAL

SET

REMOTE

-Q51

1 2 3 4 5 6 7 8

METERING REL316*4

ABB Network Partner

9 10 11 12 13 14 15 16

CDMA CDMA

COM 581 ABBPower Automation AG

LINE PROTECTION RELAY REL316*4 ABB

ABB Network Partner

i it l

OPERATION

LOCAL CONTROL ABB

di gi t al

CDMA

LOC

COM581

Communication Converter

GSM NCC / RCC

REB500

C

-Q0 PISA A

-T1 -Q9

-Q8 -Q9 -Q8

PISA A PISA B

GSM

CDMA

Feeder Marshalling

-Q0 BUSBAR PROTECTION REB500

CDMA

ADVANTAGES OF SUBSTATION AUTOMATION SYSTEM

PREPARED BY GOPALA KRISHNA PALEPU ADE/400KV/ VS/HYD [email protected], Mobile:9440336984

ADVANTAGES OF SA More Effective Long Term Planning & Loading Decisions PLANNING

Real-time Analysis that Avoids Interruptions ENGINEERING

Reduction in the Need for Costly Field Visits PROTECTION

Precise and Confident Operator Decisions in Restoring Service MAINTENANCE

ADVANTAGES OF SUBSTATION AUTOMATION 1. LOCAL & REMOTE GRAPHICAL VISUALISATION OF ELECTRICAL DIAGRAMS OF BAY & SYSTEM VIEWS. 2. ALARM PAGES & SOE ARE DISPLAYED AND PRINTABLE. 3. TREND WINDOWS: SEVERAL CURVES CAN BE FULLY CUSTOMISED BY THE OPERATOR. 4. CONTROL WITH THE “SELECT-BEFORE OPERATE” SECURITY COMMANDS. 5. SAVING OF HISTORICAL FILES. 6. SYSTEM CONFIGUARATION SCREEN. 7. TIME SYNCHRONISATION 8. MONITORING OF CIRCUIT BREAKER. 9. MONITORING OF TRANSFORMER. 10. MONITORING OF CTs, PTs, & CVTs. 11. MONITORING OF RELAYS, ENERGY METERS & PANEL METERS. 12. CONFIGUARATION OF RELAYS 13. DISTURBANCE RECORD VIEW. 14. MONITORING OF SWITCH YARD SURVELLIANCE SYSTEM. 15. MONITORING OF NETWORK 16. MONITORING OF PLCC / OLTE EQUIPMENT & COMMUNICATION.

UTILISATION OF SUBSTATION AUTOMATION 1. MAINTANENCE A. TRANSFORMERS B. BREAKERS C. CTs D. PTs &CVTs E. LAs F. ISOLATORS

2. CONTROL&PROTECTION A. CONTROL (BCU) B. METERING (BCU) C. PROTECTIONS (BPU) D. PROTECTION DIAGRAMS E. CONFIGUARATION F. DISTURBANCE RECORDER G. ENERY METERS H. ANALYSIS OF FAULT I. GPS J. RTU

3. OPERATIONS: A. STATION DIAGRAM B. ALARMS C. SOE / ER D. METERING VALUES E. ICT/ EQUIP PARAMETERS F. HISTORY G. SOE H. DISTURABANCE REPORT & ANALYSIS.

4. COMMUNICATIONS A. Analog PLCC B. Digital PLCC C. FIBRE OPTIC D. DIGITAL MICROWAVE E. VSAT F. DIDICATED COMMUNICATION G. MUX H. CHANNEL AIDED PROTECTION I. DATA TRANSMISSION

5. ENGINNERING A. VOLTAGE CONTROL B. FREQUENCY CONTROL C. LOAD CONTROL D. VAR CONTROL E. GRID CONTROL F. POWER SYSTEM ANALYSIS (LOAD FLOW) G. HARMONIC ANALYSIS H. SYSTEM STABILITY I. ABT ANALYSIS J. GENERATION CONTROL

6. SECURITY A.LIVE CAMERA B.SURVELLIANCE SYSTEM C. ENTRY LOG 7. INFORMATION TECH A. Web Browser View B. Commissioning Via Web View C. Advanced IT Tech D. Messages E. Notes

MONITORING OF SUBSTATION IN SMS/SCS/SA

PREPARED BY PREPARED GOPALA KRISHNABY PALEPU GOPALA KRISHNA PALEPU ADE/400KV/ VS/HYD [email protected], ADE/MRT(PROTECTION) Mobile:9440336984

MONITORING via IEDs for PROTECTION Advanced analysis tools

Automatic printing Summary report

GPS

CONCISE / FAST Distance to Fault

Alarm Classes

User friendly visualization Universal Time synchronization

Mo 12. 11. 96 GMT 17:02.43.305

Ayer Rajah & Labrador Feeder One

Sequence of Events IED Parameter

# Of trips ABB Network Partner AG

1

9

2

10

3

11

4

12

5

13

6

14

7

15

8

16

REL 316*4

Bay

C E

I O

C E

R F C E

Smart Screen “Wizards” • • • • • • •

One Line Diagrams Event Logger IED Faceplate IED Tabular Values Annunciator Panel Alarm List with Sorting Feature Trending

Substation Level Supervision • Single line diagram – U, I

=>”fast”

– P, Q, E

=> “slow”

• Overview pictures – P, Q,

=> “slow”

• Customised measurements – P,Q, E – Summation – Minimum / maximum – Average values – Lists – Bar charts – etc. upon request

MAMIDIPALLY SS DISPLAY

SUBSTATION DISPLAY (400KV SIDE) TAP A KV MW MVAR

F1

A KV MW MVAR

F2

A KV MW MVAR

TAP

TAP

A KV MW MVAR

A KV MW MVAR

F3

A KV MW MVAR

F4

A KV MW MVAR

F5

A KV MW MVAR

A KV MW MVAR

F6

SUBSTATION DISPLAY (220KV SIDE) TAP A KV MW MVAR

A KV MW F1 MVAR

F2

A KV MW MVAR

TAP A KV MW MVAR

TAP A KV MW MVAR

A KV MW F3 MVAR

A KV MW F4 MVAR

SUBSTATION DISPLAY (220KV SIDE) TAP A KV MW MVAR

TAP A KV MW MVAR

TAP A KV MW MVAR

A KV MW MVAR A KV MW F1 F2 MVAR

A KV MW MVAR

A KV MW F3 F4 MVAR

A KV MW MVAR

F5 F6

A KV MW MVAR

SOE RECORDER EVENTS LIST

Monitors and Records all System Event Characteristics

• Time stamped to nearest milli-second • Synchronizable to GPS via IRIG-B • Automatic retrieval from IED to Host • Storage on host disk • Automatically forward to operations PC • Data sort capability included – Standard filters •Time •Device Type •Alarm Condition – Custom filters per your needs

ALARM PROCESSING Recording and time stamping of alarms

Persisting and fleeting alarms

Alarm Annunciation Panel • Configurable Alarm Conditions – Any present value can drive an alarm – Set range of operation

• Failure Alarms – Equipment generated – System generated – Grouped per IED

Remote Communication of Critical Alarms

TREND CURVES

TREND PARAMETERS

Recording of Trends and Alarm Generation

Upper Alarm (A) hysteresis Upper warning (W) Lower warning

Lower alarm

A

W

ABB DISTURBANCE RECORDER

ABB Diagnostic: Fault Recording and Evaluation

Automatic Fault Location Printout

ALSTOM DISTURBANCE RECORDER

ALSTOM DISTURBANCE RECORDER

DISTURBANCE RECORDER

GE Oscillography/Fault Reporting

SIEMENS Disturbance Recorder

SIEMENS Disturbance Recorder Analysis

BASLER – DISTURBANCE RECORDER

NXT-PHASE DISTURBANCE RECORDER

SUBSTATION AUTOMATION

2 Ports for RCC & 2 Ports for ALDC/SLDC COMMUNICATION GATEWAY TO RCC & ALDC RCC LDC

Base System

Service Modem

DM Printer For 15 Min Metering & Trends

Engineering & DR work Station LAPTOP

Base System

Alarm Unit

Alarm Unit

Hardcopy Printer + MFD

Auxiliary Alarm Annunciation

Alarm/Event Line Printer

GPS Meinberg

Printer Server

POWER V1 OVP

ACQR LOCK

GPS 166 SATELLITE CONTROLLED CLOCK

NORMAL OPERATION WED 11.12.1996 MEZ 11.42.25 SV 24 > SYN

MENU CLR NEXT INC ACK MEINBERG

Ethernet (TCP/IP) Network Partner

Rugged Com/Equivalent Ethernet Switches forming ‘Redundant Managed switched Ethernet LAN on fiber optic medium Interbay bus on IEC61850 Communication Gate way with hot standby for RCC and SLDC’ For Control and Protection Relays.

SSLTA 88SRS485MSRS485MSREDU/M SERVICE RS232 RS485

RS485

1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028

M

M

M

LOCAL

?

REMOTE

SET OPERATION

DIGITAL PLCC/ OLTE SYSTEM

DIGITAL PLCC/ OLTE SYSTEM

ABB Network Partner AG

9 10 11 12 13 14 15 16

9 10 11 12 13 14 15 16

DIGITAL PLCC/ OLTE SYSTEM

9 10 11 12 13 14 15 16

C E M

M

M

LOCAL

?

REMOTE

M

SET OPERATION

CARR PROT SYSTEM

ABB Network Partner AG

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

LOCAL REMOTE

M

SET OPERATION

EM

M

M

LOCAL

?

CARR PROT SYSTEM

REMOTE

1 2 3 4 5 6 7 8

C E

9 10 11 12 13 14 15 16

C E

M

M

?

REL531

9 10 11 12 13 14 15 16

C E

CARR PROT SYSTEM

9 10 11 12 13 14 15 16

HYD RAN

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

C E

SET OPERATION

CARR PROT SYSTEM

ABB Network Partner AG

REL531

9 10 11 12 13 14 15 16

9 10 11 12 13 14 15 16

CARR PROT SYSTEM

CARR PROT SYSTEM

9 10 11 12 13 14 15 16

9 10 11 12 13 14 15 16

EM

HYD RAN

EM

HYD RAN

EM

AVR

EM

AVR

EM

OTH

EM

OTH

C E C E

M

M

M

LOCAL

?

REMOTE

EM

AVR

EM

OTH

SET

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8

OPERATION

C E

M

M

M

?

LOCAL REMOTE

9 10 11 12 13 14 15 16

C E

ABB Network PartnerREL511 AG

SET OPERATION

C E

Network Partner

SSLTA 88SRS485MSRS485MSREDU/M SERVICE RS232 RS485

RS485

1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028

CONTROL & RELAY PANELS IN CONVENTIONAL SYSTEM PREPARED BY PREPARED GOPALA KRISHNABY PALEPU GOPALA KRISHNA PALEPU ADE/400KV/ VS/HYD [email protected], ADE/MRT(PROTECTION) Mobile:9440336984

400KV INTEGRATED CONTROL PANELS

400KV LINE CB RELAY & PROTN PANEL 4RLA

4RTB

4RLB

79 + 25 (AUTO RECLOSURE + CHECK SYNC RELAY)

79 + 25 (AUTO RECLOSURE + CHECK SYNC RELAY)

50 Z (LBB / BFR)

50 Z (LBB / BFR)

21 MAIN 1

CB TROUBLE ALARAM AND TRIP RELAYS TSR TC-1

DC I & II

CB TROUBLE ALARAM AND TRIP RELAYS

TSR TC-1I

TSR TC-1

DC I & II

TSR TC-1I

21 MAIN 2 86 GR -A

1-PH TRIP RELAYS -6 FOR 21M2

D/T CH-1 RECEIVE RELAYS

D/T CH-2 RECEIVE RELAYS

59 L1 59 L2 O/V STG-1 O/V STG-1i

BREAKER UNDER VOLTAGE MULTIPLICA RELAY TION RELAY

DC-1I

86 GR -B

DC-1

86 GR -A

1-PH TRIP RELAYS -6 FOR 21M1

21 MAIN 1 21 MAIN 1i AUX RELYS AUX RELYS

87 HIGH TEED-1

87 LOW TEED-2

1-PH TRIP RELAYS -6 FOR 21M1

86 GR -B

1-PH TRIP RELAYS -6 FOR 21M2

D/T CH-1 RECEIVE RELAYS

D/T CH-2 RECEIVE RELAYS BREAKER MULTIPLICA TION RELAY

400KV LINE + R CB RELAY & PROTN PANEL 4RLA 79 + 25 (AUTO RECLOSURE + CHECK SYNC RELAY)

4RLRB

4RTB

4RLC

79 + 25 (AUTO RECLOSURE + CHECK SYNC RELAY)

75 A 75 B 75 L

50 Z (LBB / BFR)

87 MAIN HIGH IMP

21 MAIN 1

CB TROUBLE ALARAM AND TRIP RELAYS

21 IMP DISTANCE

1-PH TRIP RELAYS -6 FOR 21M1 1-PH TRIP RELAYS -6 FOR 21M2

D/T CH-1 D/T CH-2 RECEIVE RECEIVE RELAYS RELAYS UNDER BREAKER VOLTAGE MULTIPLIC ATION RELAY RELAY

DC I & II

86 GR -A

HIGH SPEED

64 REF AUX TRIP RELAYS

TSR TC-1I

21 MAIN 2

DC-1I

86 GR -B

TSR TC-1

DC-1

86 GR -A

TSR TC-1I

DC-1I

DC I & II

CB TROUBLE ALARAM AND TRIP RELAYS

DC-1

TSR TC-1

50 Z (LBB / BFR)

59 L1 59 L2 O/V STG-1 O/V STG-1i 21 MAIN 1 21 MAIN 1i AUX RELYSAUX RELYS

87 HIGH TEED-1

87 LOW TEED-2

1-PH TRIP RELAYS -6 FOR 21M1

86 GR -B

1-PH TRIP RELAYS -6 FOR 21M2

D/T CH-1 RECEIVE RELAYS

D/T CH-2 RECEIVE RELAYS BREAKER MULTIPLICA TION RELAY

400KV ICT HV + IV CB RELAY & PROTN PANEL 4RTRA

4RTRC

4RTRB 75 A 75 B 75 L

75 A 75 B

50 Z (LBB / BFR)

50 Z (LBB / BFR)

87 MAIN 1 LOW IMP

CB TROUBLE ALARAM AND TRIP RELAYS TSR TC-1I

TSR TC-1

87 MAIN 2 HIGH IMP

86 GR -A

86 GR -B

INTER TRIP INTER TRIP RECEIVE RECEIVE RELAYS RELAYS

HIGH SPEED AUX TRIP RELAYS

67 HV

BREAKER MULTIPLICA TION RELAY

99T HV O/F

DC I & II

TSR TC-1I

86 GR -B

DC-1I

86 GR -A

DC I & II

DC-1

TSR TC-1

CB TROUBLE ALARAM AND TRIP RELAYS

67 IV

99T IV O/F

ICT / ATF TROUBLES ALARAM & TRIP FLAG RELAYS AUX RLYS FOR HV

AUX RLYS FOR IV

87 HIGH TEED-1

87 LOW TEED-2

AUX RLYS AUX RLYS INTER TRIP INTERTRIP RECEIVE RECEIVE BREAKER MULTIPLICA TION RELAY

400KV BUS REACTOR CB RELAY & PROTN PANEL 4RBRA

4RTB

4RBRB

79 + 25 (AUTO RECLOSURE + CHECK SYNC RELAY)

75 A 75 B

50 Z (LBB / BFR)

50 Z (LBB / BFR)

87 MAIN HIGH IMP

CB TROUBLE ALARAM AND TRIP RELAYS TSR TC-1I

21 IMP DISTANCE

64 REF BREAKER MULTIPLICA TION RELAY

TSR TC-1

DC I & II

86 GR -A

86 GR -B

DC-1I

86 GR -A

DC I & II

DC-1

TSR TC-1

CB TROUBLE ALARAM AND TRIP RELAYS

87 HIGH TEED-1

HIGH SPEED AUX TRIP RELAYS 87 LOW TEED-2

TSR TC-1I

1-PH TRIP RELAYS -6 FOR 21M1

86 GR -B

1-PH TRIP RELAYS -6 FOR 21M2

D/T CH-1 RECEIVE RELAYS

D/T CH-2 RECEIVE RELAYS BREAKER MULTIPLICA TION RELAY

400KV BUSBAR PROTECTION & COMMON CONTROL PANEL 4RBB2 BBM1 + 96 UNITS

4RBB3 BBM2 + 96 UNITS

CONTROL & RELAY PANELS IN SUBSTATION AUTOMATION SYSTEM

PREPARED BY PREPARED GOPALA KRISHNABY PALEPU GOPALA KRISHNA PALEPU ADE/400KV/ VS/HYD [email protected], ADE/MRT(PROTECTION) Mobile:9440336984

400KV & 220KV BUSBAR & COMMON CONTROL PANEL 4RBB

2 RBB

BCU1

BCU1

BCU2

BCU2 BCU3

BUSBAR CENTRAL UNIT

DC -1 DC -2

89BB2 AE CMR

Bus Bar Aux relays

89BB1 AE CMR

89BB2 AE CMR

89BB1 AE CMR

BUSBAR CENTRAL UNIT Bus Bar Aux relays

DC -1 DC -2

400KV LINE + REACTOR CB RELAY & PROTN PANEL 4RLA

4RLRC1/RBR3

4RLB

4RTB2

75A,B,L

LBB/ BU 50Z TRIP COIL

186 R1,Y1,B1 86 GR-A R2,Y2,B2

DC-1

286 86 R1,Y1,B1 GR-B R2,Y2,B2

DC-2

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

96 50Z

A/R+SC 79+25

64R

21L2

LBB/ BU 50Z TRIP COIL

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

Reactor Trouble Alarms & Trips

21R

59-1&2 CB PB

BAY2 BCU

186 86 R1,Y1,B1 GR-A R2,Y2,B2

DC-1

A/R+SC 79+25

87R

21L1

286 86 R1,Y1,B1 GR-B R2,Y2,B2

DC-2

BAY1 BCU

50 ZT

D/T-1 D/T-2 Receive Receive Relays Relays

99R

CB PB

400KV ICT CB RELAY & PROTN PANEL 4RTRA3

75A,B,L

LBB/ BU 50Z

186 86 R1,Y1,B1 GR-A R2,Y2,B2

DC-1

286 86 R1,Y1,B1 GR-B R2,Y2,B2

DC-2

50 ZT

CB PB

LV BAY BCU

LBB/ BU 50Z

LBB/ BU 50Z

87T2

TRIP COIL

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

86 GR-A 86 GR-B

DC-1

TRIP COIL

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

87T1

BAY3 BCU

DC-2

A/R+SC 79+25

75A,B

Transformer Trouble Alarms & Trips

67HV

Inter 96/ Trip 50Z Relays CB PB

MFM

67IV

TRIP COIL

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

86 GR-A 86 GR-B 96/ 50Z

99HV

99IV

DC-1

BAY2 BCU

4RTRC3

4RTRB3

DC-2

4RTB2

Inter Trip Relays CB PB

MFM

220KV FEEDER CB RELAY & PROTN PANEL 2RLA1

2RLB1

75A 75B BAY1 BCU

A/R+SC 79+25

21L1

LBB/ BU 50Z TRIP COIL

21L2

186 86 R1,Y1,B1 GR-A R2,Y2,B2

DC-1

286 86 R1,Y1,B1 GR-B R2,Y2,B2

DC-2

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

96 / 50Z

TTS CB PB

MFM

D/T-1 D/T-2 Receive Receive Relays Relays

220KV BC, TBC & BS CB RELAY & PROTN PANELS 2RTBC

TBC BCU

LBB/ BU 50Z TRIP COIL

96 50Z

186 86 R1,Y1,B1 GR-A R2,Y2,B2

DC-1

286 86 R1,Y1,B1 GR-B R2,Y2,B2

DC-2

86 GR-B

CB PB

50/51 A,B C,N

TRIP COIL

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

DC-1

86 GR-A

LBB/ BU 50Z

DC-2

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

A/R+SC 79+25

BS BCU

96 50Z

CB PB

LBB/ BU 50Z

LBB/ BU 50Z TRIP COIL

CB 1&2 TROUBLES HEALTHY & ALARMS LEDS

DC-1

BC BCU

LBB/ BU 50Z

2RBC

86 GR-A

DC-2

2RBC

86 GR-B 96 50Z

CB PB

50/51 A,B C,N

SUBSTATION AUXILIARIES & TERMINAL PANELS SSAUX For AC 415V System-1 BCU1 For DC 220V System-1 BCU3 For DC 48V System-1 BCU5 For Air condition System

For AC 415V System-2 BCU2 For DC 220V System-2 BCU4 For DC 48V System-2

Base System Alarm Unit

BCU6 For Fire Fighting System

BCU7

BCU8

For Diesel Generator System

For fire & Smoke Detector

BCU9

BCU10 COM581

Alarm Unit

Main Server ABB Network Partner AG

COM581

Redunt Server ABB Network Partner AG

COM581

C E

C E

Communication Gateway Network Partner

SSLTA 88 SERVICE RS232

ABB Network Partner AG

Hot Standby

SRS485M

SRS485M

RS485

RS485

SREDU/M

1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028

Ethernet Switch

Router to ALDC/SLDC Network Partner

SSLTA 88 SERVICE RS232

SRS485M

SRS485M

RS485

RS485

SREDU/M

1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028

Ethernet Switch

C E

Surveillance system

Line Printer for Alarm / Event

Metering Values DOT Matrix Printer

SUBSTATION AUTOMATION DM Printer For 15 Min Metering & Trends

2 Ports for RCC & 2 Ports for ALDC/SLDC COMMUNICATION GATEWAY TO RCC & ALDC RCC LDC

Base System Alarm Unit

Engineering & DR work Station LAPTOP

Base System Service Modem

Alarm Unit

Hardcopy Printer + MFD

Auxiliary Alarm Annunciation

Alarm/Event Line Printer

GPS Meinberg

Printer Server

POWER V1 OVP

ACQR LOCK

GPS 166 SATELLITE CONTROLLED CLOCK

NORMAL OPERATION WED 11.12.1996 MEZ 11.42.25 SV 24 > SYN

MENU CLR NEXT INC ACK MEINBERG

Ethernet (TCP/IP) Network Partner

Rugged Com/Equivalent Ethernet Switches forming ‘Redundant Managed switched Ethernet LAN on fiber optic medium Interbay bus on IEC61850 Communication Gate way with hot standby for RCC and SLDC’ For Control and Protection Relays.

SSLTA 88SRS485MSRS485MSREDU/M SERVICE RS232 RS485

RS485

1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028

M

M

M

LOCAL

?

REMOTE

SET OPERATION

DIGITAL PLCC/ OLTE SYSTEM

DIGITAL PLCC/ OLTE SYSTEM

ABB Network Partner AG

9 10 11 12 13 14 15 16

9 10 11 12 13 14 15 16

DIGITAL PLCC/ OLTE SYSTEM

9 10 11 12 13 14 15 16

C E M

M

M

LOCAL

?

REMOTE

M

SET OPERATION

CARR PROT SYSTEM

ABB Network Partner AG

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

LOCAL REMOTE

M

SET OPERATION

EM

M

M

LOCAL

?

CARR PROT SYSTEM

REMOTE

1 2 3 4 5 6 7 8

C E

9 10 11 12 13 14 15 16

C E

M

M

?

REL531

9 10 11 12 13 14 15 16

C E

CARR PROT SYSTEM

9 10 11 12 13 14 15 16

HYD RAN

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

C E

SET OPERATION

CARR PROT SYSTEM

ABB Network Partner AG

REL531

9 10 11 12 13 14 15 16

9 10 11 12 13 14 15 16

CARR PROT SYSTEM

CARR PROT SYSTEM

9 10 11 12 13 14 15 16

9 10 11 12 13 14 15 16

EM

HYD RAN

EM

HYD RAN

EM

AVR

EM

AVR

EM

OTH

EM

OTH

C E C E

M

M

M

LOCAL

?

REMOTE

EM

AVR

EM

OTH

SET

1 2 3 4 5 6 7 8

9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8

OPERATION

C E

M

M

M

?

LOCAL REMOTE

9 10 11 12 13 14 15 16

C E

ABB Network PartnerREL511 AG

SET OPERATION

C E

Network Partner

SSLTA 88SRS485MSRS485MSREDU/M SERVICE RS232 RS485

RS485

1MRSC60029 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028 1MRSC60028

POWER GRID CHINA SAS

SAS in POWER GRID, INDIA – SEONI (WR)

IEC 61850 RELAY MODELS OF DIFFERENT MANUFACTURERS MANUFACTURERS

BAY CONTROL UNIT

ABB

REC 670

AREVA

MICOM C264

FEEDER 67

REX 521 REF 615 MICOM P141

DISTANCE 21

LINE DIFFERENTIAL 87 L

DIFFERENTIAL 87 T

BUSBAR 87 BB

REL 670

RED 670

RET 670

MICOM

MICOM P543/547

MICOM P633/P643

REB 670 REB 500 MICOM P74 1/3/6

L 60, L 90

T 60

B 90,

SIPROTEC

SIPROTEC

SIPROTEC

P44 2/3/4

GE D 25,C90+, F 60 D 90, D 60 F650 MULTILIN SIEMENS SIPROTEC SIPROTEC SIPROTEC ( SIPROTEC )

6MD 66/3

7SJ 62/3/4

7SA 522/6..

7SD 522/61_

7UT 633/13/2

7 SS 52

SEL

SEL 451-4

SEL 451

SEL 421

SEL 487E

TOSHIBA

GRD 150

GRD 140

GRZ 100

SEL 387L GRL 100 / 150

SEL 487B GRB 100/150

GRT 100

BAY LEVEL SUBSTATION AUTOMATION ¾ DECENTRALIZED ARCHITECTURE DISTRIBUTED CONTROL ROOMS USING BAY KIOSKS CALLED PORTABLE RELAY ROOMS. ¾ BAY-ORIENTED CONCEPT – EACH BAY PROVIDED WITH BAY KIOSKS/ PORTABLE RELAY ROOMS. ¾ DISTRIBUTED INTELLIGENCE – EACH BAY PROVIDED WITH CONTROL IEDs (BCUs) FOR CONTROL & MONITORING FUNCTIONS. EACH BAY PROVIDED WITH PROTECTION IEDs (BPUs) FOR PROTECTION. ¾ DECENTRALIZED FUNCTIONS. ¾ USING IEC 61850 (UNIVERSAL) SUBSTATION AUTOMATION PROTOCOL. ¾ IT IS CALLED BAY LEVEL SUBSTATION AUTOMATION.

PRESENT STATUS OF IMPLEMENTATION OF SUBSTATION AUTOMATION SYSTEM IN APTRANSCO IS DISTRIBUTED CONTROL ROOMS USING BAY KIOSKS CALLED PORTABLE RELAY ROOMS USING IEC 61850 (UNIVERSAL) SUBSTATION AUTOMATION PROTOCOL. THIS IS CALLED BAY LEVEL SUBSTATION AUTOMATION