2009-10 Action Plan

3 4

Schedule GC mandays

5

CNGtechs

6 7 8 9 10 11 12

OpenIssues BillofMaterials Material By Station BottleBlowdown PRVpiping PRVcaps MaterialNotes

B DESCRIPTION Manday/$ in job by station and activity Examination of GC manpower Examination of GC manpower Examination of CNG Tech manpower Issues current unresolved

13 Signs (refer to SignInventory112909.xls as well as the Sign Standard) 14 15 16 17

Eyewash OilCabinets StaAdr ESDinstallation

57

25699645.xls, Table of Contents

E

1 1

1

1

scope for 2010 scope for 2010 1

1

scope for 2010 1

1 1 1

only expense - 2010 1 not included 1

1 1 1 1 1

1 only expense - 2010 scope for 2010

1 1 only expense - 2010 1 1

1

not included 1 not included 1

1 1 1 1

1 1 1 1 1

not included

TOTAL CNG TECH STATIONS

2

D

PRV standard design PRV caps Miscl mtl notes Portion of the sign installation plans Eyewash station info Oil storage cabinet info Addresses of CNG stations ESD standard design notes

18 CNG TECH INVOLVEMENT (CLEARANCES, ESD WIRING/TESTING) 19 Auburn: signs, PRVstacks, oil tank rmvl, oilcab/eyewash 20 Bakersfield DO Removal Bakersfield SC: signs, PRVstacks, oilcab/eyewash, bolt QCBR to pad, 1 21 PRV installation 22 Belmont 23 Chico 24 Cinnabar: signs, PRVstacks, oilcab/eyewash, PRV(4) 25 Colma 26 Concord: signs, PRVstacks, oilcab/eyewash, ESD 27 Cupertino: signs, PRVstacks, oilcab/eyewash 28 Davis: signs, PRVstacks, oilcab/eyewash, oiltank rmvl 29 Eureka 30 Folsom St (SF): signs, PRVstacks, oilcab/eyewash 31 Fremont (LNG) 32 Fresno: signs, PRVstacks, oil tank rmvl, oilcab/eyewash, PRV(6) 33 Grass Valley: signs, PRVstacks, oilcab/eyewash 34 Hayward: signs, PRVstacks, oilcab/eyewash 35 Livermore: signs, PRVstacks, oilcab/eyewash, PRV(4) 36 Los Banos: signs, PRVstacks, oilcab/eyewash 37 Manteca 38 Martin 39 Marysville: signs, PRVstacks, oilcab/eyewash, oiltank rmvl 40 Merced: signs, PRVstacks, oilcab/eyewash, oiltank rmvl 41 Modesto 42 Oakland: signs, PRVstacks, oilcab/eyewash, ESD 43 Redding: signs, PRVstacks??, ESD 44 Richmond 45 Sacramento CNG: signs, PRVstacks, oilcab/eyewash, oiltank rmvl 46 Sacramento L/CNG 47 Salinas: signs, PRVstacks, oilcab/eyewash, oilstrg tank 48 San Rafael: signs, PRVstacks, oilcab/eyewash, PRV(1), ESD 49 Santa Cruz: signs, PRVstacks, oilcab/eyewash 50 Santa Rosa: signs, PRVstacks, oilcab/eyewash, ESD, oiltank rmvl 51 San Ramon : signs, dryer removal, ESD 52 Stockton: signs, PRVstacks, oilcab/eyewash, ESD, oiltank rmvl 53 San Ramon TES 54 Treat (SF): signs, PRVstacks, oilcab/eyewash, ESD 55 Vacaville: signs, PRVstacks, oilcab/eyewash 56 Woodland: Fuelmaker Removal

C

STACKS

WORKSHEET

ESD

A 1

PRV R&R

CONTENTS JOB 30734471 - CNG STATION COMPLIANCE WORK EXPENSE ORDER ____________ CNG STATION COMPLIANCE WORK

5

1

1 1

9

23

11/29/09

2009-2010 NGV STATION WORK SCOPE AUDIT + OPERATIONS ISSUE RESOLUTION A

1

B

C

D

E

F

2

3

G

H

J

Aud Activity ID

JRG HOURS

CNG MAINT TECH

GC ManDays

2009 CAPITAL & EXPENSE SCOPE CANDIDATES

6 7 8

AUDIT & RELATED COMPLIANCE ITEMS

M

N

O

P

Q

R

CAPITAL

MATERIAL

EXPENSE TOTAL w/Overheads

JRG HOURS

GC ManDays

MATERIAL

10

CAPITAL TOTAL w/Overheads

1.5

Capital Job Planning and Oversight (contractor) - JRG PLM data entry / records setup for all new equpment

9

30

Job Estimate Job Estimate Material Mandays Directs

Comments

revised 11/4/09 JRG

$30,000 2 2 $30,000

T3B T3A T3B

Antioch Planning for site work Assess landscaping issue GC site work - sign installation GC travel

Defer to 2010 2 0.5 0.5 2.5 $275

Auburn Planning for site work Eye wash station T3B Assess wall cabinet w/docs T3A GC site work - sign installation

27

T3B

site work - remove combustable weeds around tanks, tools, trash; relocate compr oil.

28 29

T3B T3J

GC site work oil storage cabinet GS site work relief stacks

30

OB9

31 32 33

T3B

0.5

0 $63

$506

0 $-

1

$-

$-

$-

3 0.5

$700

$700

0.5

0.5 0.5 This WILL be done by the maintenance tech

1

0.5

GC site work to disconnect oil storage and deactivate secondary containment (blind piping; remove tank and contents; transport/dispose contents; tank to Victor), GC Travel 1.5 $165

1 $125

1 $125

0.5

$900

$900

0.5

2

$100

$100

2

$50

$50

3 $330

$698

1 4

1 4 $500

$1,000

$2,745

$1,700 I don't think MDs are enough to include travel for the Bksfld trip

34

36

L

1.5

5

35

K

EXPENSE

4

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

I

KEY POINTS - Capital work set up on Job 30734471 - Several stations are noted as receiving major work in 2010, so work is not included in this 2009 job. - Some stations involve relatively small expense-only work, so this is deferred to 2010 to reduce 2009 work load. - GC travel assumes efficiences (e.g., once in the Bay Area, the crew moves from local station to local station). Travel is shown under capital only, assuming expense is done while on site. If expense is performed separately (e.g., deferred to 2010), travel must be added to the expense costs. - Card reader replacement has been reduced to buying six new heads, but not installing on this job.

Bakersfield District Office Fuelmaker Removal T2A T2C T3A T4C Travel

25699645.xls, 2009-10 Action Plan

10

3

11/12/09

- Capital work set up on Job 30734471 - Several stations are noted as receiving major work in 2010, so work is not included in this 2009 job. - Some stations involve relatively small expense-only work, so this is deferred to 2010 to reduce 2009 work load. - GC travel assumes efficiences (e.g., once in the Bay Area, the crew moves from local station to local station). Travel is shown under capital only, assuming expense is done while on site. If expense is performed separately (e.g., deferred to 2010), travel must be added to the expense costs. WORK SCOPE - Card reader replacement has been reduced to buying six new heads, but2009-2010 not installingNGV on thisSTATION job.

AUDIT + OPERATIONS ISSUE RESOLUTION

A

B

C

D

E

JRG HOURS

CNG MAINT TECH

2

3

Aud Activity ID

F EXPENSE

GC ManDays

G

H

I

MATERIAL

EXPENSE TOTAL w/Overheads

Site visit to create plan to cut and cap the gas supply line Document plans for GC M&C removal work GC work scope/oversight/coordination GC site work (2 man crew, 1 day) GC travel (2 man crew)

37 38 39 40 41 42 43 44

J

K

L

M CAPITAL

JRG HOURS

GC ManDays

MATERIAL

CAPITAL TOTAL w/Overheads

N

O

P

Job Estimate Job Estimate Material Mandays Directs

Q

R

Comments

1 1 2

14 $1,540

2 1 2

n/a

$250

2 1 3 $2,685

$-

Bakersfield Service Center - T2C T2G T2H T3A

45

46

Site visit to develop written plan for protection (bollards), bolting and ESD location resolution, vent stack T's replacement with sock, material, inspect rusting equipent, emer phone check,

47

Replace 5500 w/5kpsi PRV, main bottle (1)

48

install 5000 psi rated tees on all three bottles

49 50

T2C

51

T2G

0

6

0.3

1

$1,000

0.5 6

$700 $1,500

GC site work - dispensor protection - FIVE bollards front/side of quick change bottle racks

T2H

GC site work - seismic protection - bolt quick change bottle rack to concrete pad

0.5

53

T3A

GC site work - sign installation

0.5

54 55

T3B T3J

GC site work oil storage cabinet GS site work relief stacks

0.5

56

T4G

GC site work - piping marking <>

57

T3B

GC travel (combine w/SvcCntr work)

0.5

Belmont / San Carlos (major work in 2010+) Site planning - JRG Eye wash station Assess flammable landscape; remove plastic box

64

T3B

65

T2C

GC site work ESD relocation and/or addition

66

T3A

GC site work - sign installation

67

T3B

site work - weed removal

25699645.xls, 2009-10 Action Plan

0.5 6

$3,500

4

no buried conduit

$900

$900

2.5 $313

0.5

$50

1 0 $-

62 63

$700 $2,500

not in cap job est as apvd

52

61

0.3

$100

Eye wash station GC site work - add ESD button (2)

58 59 60

$900

$150

6 $660

$694

8.3 $1,038

1 12.3 $4,100

$8,696

$8,500 Delete from this job major 2010 project

2

2 xx

0.5 2

$500

4 This WILL be done by the maintenance tech

1

4

11/12/09

- Capital work set up on Job 30734471 - Several stations are noted as receiving major work in 2010, so work is not included in this 2009 job. - Some stations involve relatively small expense-only work, so this is deferred to 2010 to reduce 2009 work load. - GC travel assumes efficiences (e.g., once in the Bay Area, the crew moves from local station to local station). Travel is shown under capital only, assuming expense is done while on site. If expense is performed separately (e.g., deferred to 2010), travel must be added to the expense costs. WORK SCOPE - Card reader replacement has been reduced to buying six new heads, but2009-2010 not installingNGV on thisSTATION job.

AUDIT + OPERATIONS ISSUE RESOLUTION

A

B

C

D

E

JRG HOURS

CNG MAINT TECH

2

3

Aud Activity ID

68

T3B

GC site work oil storage cabinet

69

T3J

GC site work relief stacks

70

OB9

71 72 73 74

T3B

3

H

I

MATERIAL

EXPENSE TOTAL w/Overheads

J

K

L

M CAPITAL

JRG HOURS

GC ManDays

MATERIAL

0.5

$900

CAPITAL TOTAL w/Overheads

O

P

Job Estimate Job Estimate Material Mandays Directs

T3A

79

T3B

site work - remove combustable weeds and cardboard

80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97

T3B T3J T3B

GC site work oil storage cabinet GC site work relief stacks GC Travel

Site planning - JRG Eye wash station GC site work - sign installation

T3B T3A T3B T3J T3B

7

0 $875

$50

$1,658

$-

xx

8 4.5 $563

1 1 $1,400

$2,944

$-

6 xx 2 This WILL be done by the maintenance tech

1 0.5 3 1 $125

$900

xx

$50

5 $625

$50

6 $660

$1,530

1

1 1.5 $188

0 $900

$2,621

$-

2 2 0.5

$700

$3,600 $700

2 0.5

0.5

$900

$900

0.5

0.5 0.5 0.5

$50

1 $125

2 $220

$435

1 4

1 4 $500

$1,600

$3,480

$5,200 Delete from this job major 2010 project

Colma T3B T3A T3B T3B T3J

Site planning - JRG Assess flammable vegetation GC site work - sign installation GC site work oil storage cabinet GC Travel GC site work relief stacks ???

2 0.5 n/a

2 $220 Concord Site planning - JRG Eye wash station T2C GC site work - ESD addition T3A GC site work - sign installation T3B GC site work oil storage cabinet

25699645.xls, 2009-10 Action Plan

Comments

$50

2

1.5 $165

98

R

Delete from this job major 2010 project

2 $220 Cinnabar / San Jose Site planning - JRG Replace 5500 w/5kpsi PRV (4) 81S1F68-4 Eye wash station Assess flammable vegetation GC site work - sign installation GC site work oil storage cabinet GS site work relief stacks GC Travel

Q

The station is on gravel, so seismic design will change.

xx

2

1 $125

N

Chico (major work in 2010+)

76 77 78

99 100 101 102 103 104 105 106 107 108 109 110 111 112 113

GC ManDays

G

GC site work to disconnect oil storage and deactivate secondary containment (blind piping; remove tank and contents; transport/dispose contents; tank to Victor), GC Travel 0.5 $55

75

F EXPENSE

0.5

0 $63

$424

0 $-

1

0 $-

$-

$-

$-

2 0.5 3

$700 $1,200

$700 $1,200

0.5 3

0.5

$900

$900

0.5

0.5

5

11/12/09

- Capital work set up on Job 30734471 - Several stations are noted as receiving major work in 2010, so work is not included in this 2009 job. - Some stations involve relatively small expense-only work, so this is deferred to 2010 to reduce 2009 work load. - GC travel assumes efficiences (e.g., once in the Bay Area, the crew moves from local station to local station). Travel is shown under capital only, assuming expense is done while on site. If expense is performed separately (e.g., deferred to 2010), travel must be added to the expense costs. WORK SCOPE - Card reader replacement has been reduced to buying six new heads, but2009-2010 not installingNGV on thisSTATION job.

AUDIT + OPERATIONS ISSUE RESOLUTION

A

B

C

D

E

JRG HOURS

CNG MAINT TECH

2

3

Aud Activity ID

114

T3B

115 116 117 118 119 120 121 122 123 124 125 126

T3J T3B

site work - remove moss and weeds under storage tanks GS site work relief stacks GC Travel

T3A T3B T3J T3B

127 128 129 130 131 132 133 134

Davis Site planning - JRG Eye wash station T3A GC site work - sign installation

135

T3B

site work - combustable cleanup along fence.

136 137

T3B T3J

GC site work oil storage cabinet GS site work relief stacks GC site work to disconnect oil storage and deactivate secondary containment (blind piping; remove tank and contents; transport/dispose contents; tank to Victor), GC Travel

139 140 141 142 143 144

T3B

145

T3B

Assess landscaping/compustable proximity

146 147 148 149

T3A T3B T3B T3J

150

T3L

GC site work - sign installation site work - remove plastic piping GC site work oil storage cabinet GS site work relief stacks site work on combustable materials (relocate, change storage for bottles)

151

T3B

152 153 154 155 156 157

1 1 $125

EXPENSE TOTAL w/Overheads

K

L

M CAPITAL

JRG HOURS

GC ManDays

MATERIAL

CAPITAL TOTAL w/Overheads

N

O

P

Job Estimate Job Estimate Material Mandays Directs

Q

R

Comments

$50

1.5 $188

0.5

$50

2 $220

$709

1 5

1 5 $625

$2,800

$5,468

$2,800

0.5

$700

$700

0.5

0.5

$900

$900

0.5

$50 1

1

1

$2,000

1 $125

$50

4 $440

$593

1

2

2 $250

$1,600

$3,435

$1,600

2 0.5

$700

$700

0.5

0.5

$900

$900

0.5

2

$100

$100

2

0.5 1 0.5

1 $125

$50

1 $125

$50

2 $220

$615

4 7

1 4 $875

$1,700

$4,193

$1,700 Defer to 2010

2 1 0.5 1 n/a 0.5

$50

3 assumes local GC does the work so no large trvl

2 0 $-

25699645.xls, 2009-10 Action Plan

MATERIAL

J

4

GC Travel

Folsom St (SF) Site planning - JRG Eye wash station

I

0.5

1 $110 Eureka Site planning - JRG (assumes no travel)

H

2

2 $220

138

GC ManDays

G

1

1 $110 Cupertino Site planning - JRG Eye wash station GC site work - sign installation GC site work oil storage cabinet GS site work relief stacks GC Travel SAE Code 62 block tee, relief face seal fitting, bushing, bleed valve & associated pipe fittings or complete PRV replacement <<MTC here?>>

F EXPENSE

4 $500

3

0 $375

$50

$1,388

0 $-

1

0 $-

$-

$-

$-

3 0.5

6

$700

$700

0.5

11/12/09

- Capital work set up on Job 30734471 - Several stations are noted as receiving major work in 2010, so work is not included in this 2009 job. - Some stations involve relatively small expense-only work, so this is deferred to 2010 to reduce 2009 work load. - GC travel assumes efficiences (e.g., once in the Bay Area, the crew moves from local station to local station). Travel is shown under capital only, assuming expense is done while on site. If expense is performed separately (e.g., deferred to 2010), travel must be added to the expense costs. WORK SCOPE - Card reader replacement has been reduced to buying six new heads, but2009-2010 not installingNGV on thisSTATION job.

AUDIT + OPERATIONS ISSUE RESOLUTION

A

B

C

D

E

JRG HOURS

CNG MAINT TECH

2

3

Aud Activity ID

158

T3A

GC site work - sign installation

159

T3B

site work - remove garbage bags and plywood

160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188

T3B T3J T3B

GC site work oil storage cabinet GS site work relief stacks GC Travel

189

T3B

site work - remove combustable weeds

190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207

T3J T3B T3B

GS site work relief stacks GC site work oil storage cabinet GC Travel

208

T3A T3B T3J T3B

EXPENSE TOTAL w/Overheads

1 $125

2.5 $313

L

JRG HOURS

GC ManDays

MATERIAL

$50

3 $330

$896

M CAPITAL

CAPITAL TOTAL w/Overheads

N

O

P

Job Estimate Job Estimate Material Mandays Directs

Q

R

Comments

$900

$900

0.5

8 14.5 $1,813

1 2 $1,600

$5,614

$1,600

1 0.5

$700

$700

0.5

n/a? MTC

6 4 10.5 $1,313

$900

$900

0.5 1 2

n/a? MTC

0.5

0.5 $63

1 $110

$259

1

$1,600

$4,534

$1,600

2 3 0.5

$700

$5,400 $700

3 0.5

6 4 13.5 $1,688

$900

$900

0.5 1 5

0.5

$700

0.5

0.5 $63

2 $220

$259

1

$1,600

$5,261

$7,000

2 $700

0.5

0.2 This WILL be done by the maintenance tech

1 0.2

1 $125

$50

0.4 $50

2 $220

$428

1

0.5 0.5 1.5 $188

$900

$1,600

$900

$3,011

0.5 1 2

$1,600

2 0.5

$700

0.5

$900

0.5

0.5 0.5

$900

0.5 1 $125

2 $220

$353

1

0.5 1.5 $188

0.5 1.5 $900

$1,961

$1,600

2

Replace 5500 w/5kpsi PRV (4)

25699645.xls, 2009-10 Action Plan

K

$50

1

1 $110 Livermore Site planning - JRG

MATERIAL

J

6

1 $110 Hawyard Site planning - JRG Eye wash station GC site work - sign installation GC site work oil storage cabinet GS site work relief stacks GC Travel

I

This WILL be done by the maintenance tech 2

1 $110 Grass Valley Site planning - JRG Eye wash station T3A GC site work - sign installation

H

1

1 $110 Fresno Site planning - JRG Replace 5500 w/5kpsi PRV (6) Eye wash station T3A GC site work - sign installation T3B GC site work oil storage cabinet T3B GC Travel

GC ManDays

G

0.5

1 $110 Fremont (LNG) Site planning - JRG Eye wash station T3A GC site work - sign installation T3B GC site work oil storage cabinet T3B GC Travel

F EXPENSE

2

7

$3,600

2

re-build upstream piping w/ 3/4"

11/12/09

- Capital work set up on Job 30734471 - Several stations are noted as receiving major work in 2010, so work is not included in this 2009 job. - Some stations involve relatively small expense-only work, so this is deferred to 2010 to reduce 2009 work load. - GC travel assumes efficiences (e.g., once in the Bay Area, the crew moves from local station to local station). Travel is shown under capital only, assuming expense is done while on site. If expense is performed separately (e.g., deferred to 2010), travel must be added to the expense costs. WORK SCOPE - Card reader replacement has been reduced to buying six new heads, but2009-2010 not installingNGV on thisSTATION job.

AUDIT + OPERATIONS ISSUE RESOLUTION

A

B

C

D

E

JRG HOURS

CNG MAINT TECH

2

3

209 210 211 212 213 214 215 216 217

Aud Activity ID

T3A T3B T3J T3B

T2G T2G T3A T3B T3J T3B T3B

Los Banos Site visit to develop written plan for protection (bollards) and mtls Eye wash station USA work GC site work - 2 bollard installation GC site work - sign installation site work - remove leaves, cardboard, etc GS site work relief stacks GC site work - oil storage cabinet GC Travel

243

OB9

244 245 246 247

T3B

MATERIAL

EXPENSE TOTAL w/Overheads

1 $125

0.5 2 0.5

J

K

L

M CAPITAL

JRG HOURS

GC ManDays

MATERIAL

0.5

$700

$700

0.5

0.5

$900

$900

0.5

CAPITAL TOTAL w/Overheads

N

O

P

Job Estimate Job Estimate Material Mandays Directs

2 $220

$353

0.5 3.5 $438

250

T2C

251 252 253 254 255

T2C T3A T3B T3B

25699645.xls, 2009-10 Action Plan

Comments

$1,600

$3,386

$5,200

$700

$700

0.5

$900

$900

0.5 1 2

$300

uncertain 0.5 1 $125

3

0 $375

$300

$1,365

0.5 $-

$63

$1,600

$2,494

$1,600 Defer to 2010

1

2 0.5 0.5 $63

$-

2 $220

$259

1

2 2

0 $250

$-

$705

$-

6 $700

$700

0.5

6

$900

$900

0.5

12

$100

$100

2

0.5 1

$50

GC site work to disconnect oil storage and deactivate secondary containment (blind piping; remove tank and contents; transport/dispose contents; tank to Victor), GC Travel

Site planning - JRG Resolve conflict between CFC and NFPA ESD distances - consider adding a disconnect on nearby fence? GC site work disconnect addition? GC site work - sign installation GC site work oil storage cabinet GC Travel

R

0.5 3.5

1.5 $188

$50

6 $660

$521

2 20 $2,500

1 4 $1,700

$7,290

$1,700 This station is going to be removed, so esclude from this job

Martin (removal in 2010+)

249

Q

1

1 $110

248

I

1

1 $110 Marysville Site planning - JRG Eye wash station T3A GC site work - sign installation T3B GC site work oil storage cabinet T3J GS site work relief stacks

H

0.5

1 $110 Manteca Site planning - JRG T3A GC site work - sign installation T3B GC Travel

GC ManDays

G

0.5

1 $110

218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242

Eye wash station GC site work - sign installation GC site work oil storage cabinet GS site work relief stacks GC Travel

F EXPENSE

1

2

2 4 0.5

3

$500

4.5

2

8

6 4 10

$900 0

11/12/09

- Capital work set up on Job 30734471 - Several stations are noted as receiving major work in 2010, so work is not included in this 2009 job. - Some stations involve relatively small expense-only work, so this is deferred to 2010 to reduce 2009 work load. - GC travel assumes efficiences (e.g., once in the Bay Area, the crew moves from local station to local station). Travel is shown under capital only, assuming expense is done while on site. If expense is performed separately (e.g., deferred to 2010), travel must be added to the expense costs. WORK SCOPE - Card reader replacement has been reduced to buying six new heads, but2009-2010 not installingNGV on thisSTATION job.

AUDIT + OPERATIONS ISSUE RESOLUTION

A

B

C

D

E

JRG HOURS

CNG MAINT TECH

2

3

Aud Activity ID

256 257 258 259 260 261 262 263 264

T3B T3A T3B T3J

265

T3L

266

OB9

267 268 269 270 271 272 273 274 275 276 277 278 279

T3B

Merced Site planning - JRG Eye wash station Assess ivy / combustables GC site work - sign installation GC site work oil storage cabinet GS site work relief stacks

$563

G

H

MATERIAL

EXPENSE TOTAL w/Overheads

$500

I

$2,089

J

K

L

JRG HOURS

GC ManDays

MATERIAL

$220

1

$900

CAPITAL TOTAL w/Overheads

N

O

P

Job Estimate Job Estimate Material Mandays Directs

$3,555

Q

R

Comments

$-

2 $700

$700

0.5

$900

$900

0.5

0.5 6 1

site work on combustable landscaping

$50 This WILL be done by the maintenance tech

0.5

GC site work to disconnect oil storage and deactivate secondary containment (blind piping; remove tank and contents; transport/dispose contents; tank to Victor), GC Travel

Modesto Site planning - JRG T3A GC site work - sign installation T3J GS site work relief stacks T3B GC Travel

$1,250

M CAPITAL

0.5

12

1.5 $165

0.5 $63

1.5 $188

$50

2 $220

$698

$100

4 22 $2,750

$100

2 1 4

$1,000

$5,955

$1,700 Defer to 2010

1 0.5 0.2 1 $110

0.7

0 $88

$-

$296

0

0

$-

$-

$-

$-

$-

Oakland Site planning

281 282

Ob12

283 284 285 286 287 288 289 290 291 292 293 294 295 296

T3B T2C T3A T3B T3J T3B

298 299 300 301

GC ManDays

$330

280

297

F EXPENSE

Eye wash station initial investigation regarding property line issue confirm no flammable mtls present GC site work - ESD button addition GC site work - sign installation GC site work oil storage cabinet GS site work relief stacks GC Travel

1

Redding Site planning - JRG Resolve conflict between NFPA and CFC GC site work - ESD button addition GC site work - sign installation GC site work - remove combustable T3B grass/weeds T3B GC site work oil storage cabinet T3B GC Travel

25699645.xls, 2009-10 Action Plan

0.5

$700

$700

0.5

2

$750

$750

2

0.5

$900

$900

0.5

2 0.5 0.5 0.2 3.5 $385

T2C T2C T3A

Was this set of issues addressed in Jan09 construction project?

1

0.7 $88

$-

1 $110

$709

1 4

1 4 $500

$2,350

$4,440

$2,350

4 2 2

$900

$900

2

0.5

n/a 6 $660

0.5

0 $63

$-

$1,084

$-

9

No oil stored on site

2 4

2 4 $500

$900

$2,100

$900

11/12/09

- Capital work set up on Job 30734471 - Several stations are noted as receiving major work in 2010, so work is not included in this 2009 job. - Some stations involve relatively small expense-only work, so this is deferred to 2010 to reduce 2009 work load. - GC travel assumes efficiences (e.g., once in the Bay Area, the crew moves from local station to local station). Travel is shown under capital only, assuming expense is done while on site. If expense is performed separately (e.g., deferred to 2010), travel must be added to the expense costs. WORK SCOPE - Card reader replacement has been reduced to buying six new heads, but2009-2010 not installingNGV on thisSTATION job.

AUDIT + OPERATIONS ISSUE RESOLUTION

A

B

C

D

E

JRG HOURS

CNG MAINT TECH

2

3

Aud Activity ID

302 303 304 305 306 307 308 309 310

T3B T3A T3B T3B T3J

311

OB9

312 313 314 315

T3B

Sacramento CNG Site planning - JRG Eye wash station Assess acetylene storage fence GC site work - sign installation GC site work - remove plywood GC site work oil storage cabinet GS site work relief stacks

H

I

MATERIAL

EXPENSE TOTAL w/Overheads

T3B T3A

321

T3B

322 323 324 325 326 327 328 329 330 331 332

T3B T3B

333

OB9

334 335 336 337 338 339 340

T3B

J

K

L

JRG HOURS

GC ManDays

MATERIAL

0.5

$700

$700

0.5

0.5

$900

$900

0.5

2

$100

$100

2

0.5

1

0 $125

343

T2G

GC site work - replace three missing bollards

344 345 346

T3A T3B T3B

GC site work - sign installation GC site work - remove ivy and cardboard GC site work oil storage cabinet

25699645.xls, 2009-10 Action Plan

Job Estimate Job Estimate Material Mandays Directs

$50

$345

$-

1 3.5 $438

Q

R

Comments

1 4 $1,000

$2,156

$1,700 Station is out of service - exclude from capital job

n/a out of service 1

1 xx

0.5 4 0.5 xx 0.5 $63

4 $500

$-

$1,091

1

1 $110

n/a 0

0 $-

$-

$165

$-

5 $700

0.5

$900

0.5

$100

2

0.5 6 0.5

$900

$50 12

1 $110

342

P

$50

GC site work to disconnect oil storage and deactivate secondary containment (blind piping; remove tank and contents; transport/dispose contents; tank to Victor), GC Travel

San Rafael Site planning - JRG Eye wash station Replace 5500 w/5kpsi PRV (1) 81S1F68-4 added 11/8/09 T2C GC site work - add ESD button

O

0.5

1.5 $165 Salinas Site planning - JRG Eye wash station T3A GC site work - sign installation T3B GC site work oil storage cabinet T3J GS site work relief stacks

CAPITAL TOTAL w/Overheads

N

0.5

GC site work to disconnect oil storage and deactivate secondary containment (blind piping; remove tank and contents; transport/dispose contents; tank to Victor), GC Travel

Site planning - JRG Eye wash station Assess combustables poximity GC site work - sign installation GC site work - remove leaves from inside the station. GC site work oil storage cabinet GC Travel (w/Sacto above)

M CAPITAL

4

Sacramento L/CNG

317 318 319 320

341

GC ManDays

G

1

0.5 $55

316

F EXPENSE

1 $125

$50

5 $550

$428

1

6 24 $3,000

1 4 $900

$6,675

$1,700

3 0.5

$700

2

2

$700

0.5

$1,000

0.5

8

$2,000

$2,000

8

0.5

$900

$900

0.5

trench required

$200

0.5 0.5

10

11/12/09

- Capital work set up on Job 30734471 - Several stations are noted as receiving major work in 2010, so work is not included in this 2009 job. - Some stations involve relatively small expense-only work, so this is deferred to 2010 to reduce 2009 work load. - GC travel assumes efficiences (e.g., once in the Bay Area, the crew moves from local station to local station). Travel is shown under capital only, assuming expense is done while on site. If expense is performed separately (e.g., deferred to 2010), travel must be added to the expense costs. WORK SCOPE - Card reader replacement has been reduced to buying six new heads, but2009-2010 not installingNGV on thisSTATION job.

AUDIT + OPERATIONS ISSUE RESOLUTION

A

B

C

D

E

F EXPENSE

JRG HOURS

CNG MAINT TECH

2

3

Aud Activity ID

347

T3J

348

T3L

349 350 351 352 353 354 355 356

T3B

357

T3B

358 359 360 361 362 363 364 365 366 367 368

T3B T3J T3B

Santa Rosa Site planning - JRG Eye wash station T2C GC site work - add ESD button T3A GC site work - sign installation

369

T3B

site work - remove weeds

370 371

T3B T3J

372

OB9

373 374 375 376

T3B

GC site work oil storage cabinet GS site work relief stacks GC site work to disconnect oil storage and deactivate secondary containment (blind piping; remove tank and contents; transport/dispose contents; tank to Victor), GC Travel

GS site work relief stacks GC site work on combustable landscape (ivy removal)?? GC Travel

T3A

0.5 $63

H

I

MATERIAL

EXPENSE TOTAL w/Overheads

J

K

L

M CAPITAL

JRG HOURS

GC ManDays

MATERIAL

CAPITAL TOTAL w/Overheads

N

O

P

Job Estimate Job Estimate Material Mandays Directs

3.5 $438

$250

$1,290

3 $330

1 12 $1,500

$2,900

$7,095

$4,600

3

0.5 0.5

$700

0.5

0

1 $-

$900

$900

0.5

$50

$125

$50

3 $330

$428

2

1 1.5 $188

1 2 $900

$2,126

$1,600

3 $700 $1,200

0.5 6

T2C

GC site work - add ESD button

383 384

T3B T3A

Assess flammable landscaping GC site work - sign installation

385

T4C

site work - dispensor hose armor installation

This WILL be done by the maintenance tech

1 6 0.5

$900

12

1 $125

$900

0.5

$100

2

$50

1 $125

$50

3 $330

$780

4 22 $2,750

1 10 $900

$5,970

$2,900 MTC - ESD button decision/discussion

2 0.5 2.5 8

$100

1.5

$1,200

6

excavation req'd but no paving

0.5 This WILL be done by the maintenance tech

1

0.5 $55

25699645.xls, 2009-10 Action Plan

$100

0.5

GC travel (2 man crew, 1/2 day)

San Ramon - TES

excavation req'd

0.5

Dryer Removal - proximity compliance violation <> Site visit to create removal plan Review drawing set, revise as appropriate GC site work (2 man crew, 1/2 day)

382

Comments

1 10.5

San Ramon

379 380 381

R

0.5

2 $220

378

Q

$50

1

1 $110

377

386 387 388 389 390

1

1 $110 Santa Cruz Site planning - JRG Eye wash station GC site work - sign installation GC site work - remove combustable grass at fence, remove weeds GC site work oil storage cabinet GS site work relief stacks GC Travel

GC ManDays

G

1 $125

0.5 $63

$-

5 $550

$364

2 10 $1,250

1 8.5 $100

$2,850

$1,300

delete for 2009 since construction prevents access

11

11/12/09

- Capital work set up on Job 30734471 - Several stations are noted as receiving major work in 2010, so work is not included in this 2009 job. - Some stations involve relatively small expense-only work, so this is deferred to 2010 to reduce 2009 work load. - GC travel assumes efficiences (e.g., once in the Bay Area, the crew moves from local station to local station). Travel is shown under capital only, assuming expense is done while on site. If expense is performed separately (e.g., deferred to 2010), travel must be added to the expense costs. WORK SCOPE - Card reader replacement has been reduced to buying six new heads, but2009-2010 not installingNGV on thisSTATION job.

AUDIT + OPERATIONS ISSUE RESOLUTION

A

B

C

D

E

JRG HOURS

CNG MAINT TECH

2

3

Aud Activity ID

391 392 393 394 395 396 397

Site planning - JRG T3A T3B

H

I

MATERIAL

EXPENSE TOTAL w/Overheads

J

K

L

M CAPITAL

JRG HOURS

GC ManDays

MATERIAL

CAPITAL TOTAL w/Overheads

N

O

P

Job Estimate Job Estimate Material Mandays Directs

Q

R

Comments

This station may be removed or relocated

GC site work - sign installation GC Travel (include w/SRLC)

0.5 0.5

0 $63

$-

$259

0

0

$-

$-

$100

$150

$-

Stockton Develop written plan for ESD location changes / installation & comb mtls, remove vent stack Ts and replace with sock.

399 T2C T3A T3B T3B T3J

Develop plan for flex tubing replacement (compliance item) Eye wash station GC site work - ESD button installation GC site work flex tubing replacement GC site work sign installation GC site work - relocate ladders and oil GC site work oil storage cabinet GS site work relief stacks GC site work to disconnect oil storage and deactivate secondary containment (blind piping; remove tank and contents; transport/dispose contents; tank to Victor), GC Travel

407

OB9

408 409 410 411 412 413 414 415

T3B

416

T2C

GC site work - add ESD button

417

T3A

418

T3B

419 420

T3B T3J

GC site work - sign installation GC site work - remove pallets, weeds & plastic conduit GC site work oil storage cabinet GS site work relief stacks

1

2

1

Treat (SF) Site planning - JRG Eye wash station T3B Assess landscaping

0.5

0 $-

2 $220

$330

2

25699645.xls, 2009-10 Action Plan

0.5 8

$900

0.5

$100

2

trench required

0.5 3 $375

0.5 11.5 $-

$893

$3,200

3 0.5

$700

$700

0.5

4

$1,200

$1,200

4

0.5

$900

$900

0.5

0.5 overhead or dig

0.5 1 0.5 4

2.5 $275

T3B T3A T3J T3B

$-

$50 Hoses are out of compliance due to no continuity

$3,000

GC Travel

Vacaville Site planning - JRG Eye wash station Confirm flammable materials are still gone GC site work - sign installation GS site work relief stacks GC site work oil storage cabinet

$900

2

Time fill hoses should be replaced this year ??? T3B

$700 $1,500 defer to 2010 since travel = 0 defer to 2010 since travel = 0

2 $220

421 422 423 424 425 426 427 428 429 430 431 432

GC ManDays

G

1

1 $110

398

400 401 402 403 404 405 406

F EXPENSE

1 $125

5 $625

$3,050

$6,113

1

3 $330

1 6

1 6 $750

$2,100

$4,770

$2,800

2 0.5

$700

$700

0.5

0.5

$900

$900

0.5

0.5 0.5 0.5

$50

12

11/12/09

- Capital work set up on Job 30734471 - Several stations are noted as receiving major work in 2010, so work is not included in this 2009 job. - Some stations involve relatively small expense-only work, so this is deferred to 2010 to reduce 2009 work load. - GC travel assumes efficiences (e.g., once in the Bay Area, the crew moves from local station to local station). Travel is shown under capital only, assuming expense is done while on site. If expense is performed separately (e.g., deferred to 2010), travel must be added to the expense costs. WORK SCOPE - Card reader replacement has been reduced to buying six new heads, but2009-2010 not installingNGV on thisSTATION job.

AUDIT + OPERATIONS ISSUE RESOLUTION

A

B

C

D

E

JRG HOURS

CNG MAINT TECH

2

3

433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456

Aud Activity ID

T3B

1.5 $165

I

MATERIAL

EXPENSE TOTAL w/Overheads

J

K

L

JRG HOURS

GC ManDays

MATERIAL

1 $125

$50

2 $220

$510

4 $440 T2G Bollards for equipent protection Research to find locations where these are needed, beyond locations set forth in the audit.

0.5 1.5 $188

M CAPITAL

CAPITAL TOTAL w/Overheads

N

O

P

Job Estimate Job Estimate Material Mandays Directs

Q

R

Comments

0.5 1.5 $1,600

$3,011

$1,600

4 2 1 2

2 1 3 $250

$1,035

$-

2 2 $220

Building Permits - T2A Review existing permit binder to confirm what is in place Make initial contacts with all cities to explore resolution of building permit issue

1.5 12.8 14.3 $1,573

Fence Combustable Materials - T3B Explore whether self-extinguishing slats are available, pricing, etc.

1 2

458

Establish how to resolve the need for these (local fire dept discussions during building permit process? Confirm variance application strategy?)

5

464 465 466 467

H

Woodland Fuelmaker Removal T2A T2C T3A T3D T4C Site planning - JRG GC site work (2 man crew) GC travel (2 man crew, two 3-hr trips)

Obtain input from other NGV station operators

463

GC ManDays

G

GC Travel

457

459 460 461 462

F EXPENSE

8 $880 Combustable Landscaping Issue - T3B Check with other operators, develop variance strategy. Explore with a few cities in 2009

2 4 6 $660

468 SUBTOTAL AUDIT / COMPLIANCE ITEMS 469 MDs 470 TOTAL CAPITAL and EXPENSE 471 472 473 NON-AUDIT ITEMS 474 475 Card Reader Processor Replacement

25699645.xls, 2009-10 Action Plan

54.5 $5,995

16.5 $2,063

65.8 $8,225

$6,050

$30,750

13

125 $13,750

231.3 $28,913

$45,100

$122,370

11/12/09

- Capital work set up on Job 30734471 - Several stations are noted as receiving major work in 2010, so work is not included in this 2009 job. - Some stations involve relatively small expense-only work, so this is deferred to 2010 to reduce 2009 work load. - GC travel assumes efficiences (e.g., once in the Bay Area, the crew moves from local station to local station). Travel is shown under capital only, assuming expense is done while on site. If expense is performed separately (e.g., deferred to 2010), travel must be added to the expense costs. WORK SCOPE - Card reader replacement has been reduced to buying six new heads, but2009-2010 not installingNGV on thisSTATION job.

AUDIT + OPERATIONS ISSUE RESOLUTION

A

B

C

D

E

JRG HOURS

CNG MAINT TECH

2

3

476 477 478 479 480 481 482 483

484

485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500

Aud Activity ID

F EXPENSE

GC ManDays

G

H

I

MATERIAL

EXPENSE TOTAL w/Overheads

Assess whether card reader replacement deal can be made with manufacturer to capitalize the project. project management; purchasing, etc. GC site work to replace card readers (39 sites x 12 hrs each) GC travel (included in work above)

J

K

L

JRG HOURS

GC ManDays

MATERIAL

M CAPITAL

CAPITAL TOTAL w/Overheads

N

O

P

Q

Job Estimate Job Estimate Material Mandays Directs

R

Comments

2 12 $48,000 14 $1,540

$45,600

n/a 0

0 0

$-

$48,000

$74,310

$45,600

QC Bottle System Relief Valve (ADD TO SPECIFIC STATIONS ABOVE ONCE IDENTIFIED) Install ASME relief valve with a rated capacity for DOT quick change bottle filling system (DOT filling dispenser) which have not yet been retrofitted with correct relief valve.

$5,000

3

3 $5,000 Upcoming Capital Work from Nick Define scope, chase material, coordinate installation GC oversight & F/U 0

0 $-

$-

$-

2009 CAPITAL AND EXPENSE TOTALS Hours TOTAL CAPITAL and EXPENSE

54.5 $5,995

16.5 $2,063

65.8 $8,225

$6,050

$30,750

CAPITAL CONTINGENCY 20%

25699645.xls, 2009-10 Action Plan

139 $15,290

231.3 $28,913

$93,100

$196,680

135.3 $150,350 $15,560 $165,910 $300,700 31,119.00 $331,819

14

11/12/09

A 1 2 3 4 5 6 7 8 9

GC

PRV Recd Eyewash Recd Oil Cabinets Recd ESD Buttons Recd PRV Stack caps Bollards for Bksfld PRV stack clamps for Mrysv and 10 Vacaville 11 face seal assemblies 12 face seal bleed valves 13 Auburn: signs, PRVstacks, oil tank 14 rmvl, oilcab/eyewash 15 Bakersfield DO Removal Bakersfield SC: signs, PRVstacks, 16 oilcab/eyewash, bolt QCBR to pad, 1 PRV installation 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

Cinnabar: signs, PRVstacks, oilcab/eyewash, PRV(4) Concord: signs, PRVstacks, oilcab/eyewash, ESD Cupertino: signs, PRVstacks, oilcab/eyewash Davis: signs, PRVstacks, oilcab/eyewash, oiltank rmvl Folsom St (SF): signs, PRVstacks, oilcab/eyewash Fresno: signs, PRVstacks, oil tank rmvl, oilcab/eyewash, PRV(6) Grass Valley: signs, PRVstacks, oilcab/eyewash Hawyard: signs, PRVstacks, oilcab/eyewash Livermore: signs, PRVstacks, oilcab/eyewash, PRV(4) Los Banos: signs, PRVstacks, oilcab/eyewash Marysville: signs, PRVstacks, oilcab/eyewash, oiltank rmvl Merced: signs, PRVstacks, oilcab/eyewash, oiltank rmvl Oakland: signs, PRVstacks, oilcab/eyewash, ESD Redding: signs, PRVstacks, ESD Sacramento CNG: signs, PRVstacks, oilcab/eyewash, oiltank rmvl Salinas: signs, PRVstacks, oilcab/eyewash, oilstrg tank San Rafael: signs, PRVstacks, oilcab/eyewash, PRV(1), ESD Santa Cruz: signs, PRVstacks, oilcab/eyewash Santa Rosa: signs, PRVstacks, oilcab/eyewash, ESD, oiltank rmvl San Ramon : signs, dryer removal, ESD Stockton: signs, PRVstacks, oilcab/eyewash, ESD, oiltank rmvl Treat (SF): signs, PRVstacks, oilcab/eyewash, ESD Vacaville: signs, PRVstacks, oilcab/eyewash Woodland: Fuelmaker Removal

C MDs Contr

CONSTRUCTION MANPOWER SCHEDULE PLAN E F G H I J K L M N O P Q R S T U V W NOVEMBER DECEMBER CNG 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 D

1st 14

TOTAL MDs AVAILABLE @ 4 people per day, 5 days per week

25699645.xls, Schedule

X

Y

9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Z AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS AT

another 6

test & order

at this point, we can start PRV installation work 5

0.5

5

3

3

14.8

0.5

5

1

5

6.5

1

6.5

0.5

3

0.5

5

4.5

0.5

4.5

1

5.5

2.4

0.5

2.4

2.5

0.5

2.5

4.5

1

4.5

5

0.5

5

5.5

0.5

5.5

5.5

0.5

5.5

4.7

1

4.7

4.5

1

4.5

5

0.5

5

5

0.5

5

3 5

5.5

14

14.8

1

14

0.5

3

11

1

11

9

1

3

11.5

1

11 2.5

9 DEFER all exp work to 2010 - perform 11.5 only capital work in 2009

1

11

0.5

2.5

3

3 MDs for CNG Techs are for clearances and ESD wiring+testing with GC

43 TOTAL MDs FROM ABOVE 44

B

144 92

18

18

161.9 92

Ken Dean could unload 18 mandays by handling stations with no required GC work. Ken could unload another 10-15 mandays by handling sign and cabinet/eye wash installations at stations in which GC is working. If we take 3035 MDs off of the GC December load, we get closer to something that GC can handle with three 20-man crews

15

11/25/09

1) Start date is uncertain, since material may not be available. Woodland removal can be done first, since no material required and unlike Bksfld, no need to combine travel to Woodland. 11/17 start date is used to illustrate reasonble number of work days remainign in 2009 for capital compliance work (must be completed in 2009). 2) Two different levels of contract effort are included. Stage 1 = only send contractor only to sites where no GC work is planned. Stage 2 (incremental to St1) = send contractor to GC work sites to unload GC to the maximum extent possible. Results in 5-10 mandays duplicate travel time, but not much. 3) as of 11/16/09: Jim Myers JXMX 209 601 5613 / Josh Gardner J3GD 209 470 7696 Jim will be available M-Th and then gone two weeks. Another foreman may be available starting 11/30. Another foreman may be available to work Fri 11/20 with Josh

GC Cap + Contr Exp MDs Stage 1 13.6

Total MDs

GC Cap + Contr Contr Exp MDs Stage 1 Stage 2

160

107 27

13.6

49.2

Total Contr

Total MDs

Increment al MDs

62.8

170

10

total mandays total days (4 man crew)

146 37

Nov work days 11/17 start Dec workdays ~Remainng workdays 2009 Surplus (-Shortfall) calendar days

8 16 24

8 16 24

18 25 43

-13

-3

43

516

25699645.xls, GC mandays

16

hrs

11/17/09

Treat

1

1

1

TOTALS

Stockton

1

Vacaville

Santa Rosa

1

San Ramon

Santa Cruz

Salinas

1

San Rafael

1

Sacto

Redding

Merced

Marysville

Los Banos

Hayward

Livermore

Fresno

Grass Valley

Folsom

Davis

Concord 1

Oakland

1

Cupertino

Cinnabar

Auburn ESD BUTTON INSTALLATION

Bakersfield SC

CNG TECNICIAN SUPPORT FOR 12/09 CAPITAL

9

1) Station clearance required for electrical system 2) CNG technician needed for ESD system check once ESD button is added to existing ESD circuit. PRV REMOVAL AND REPLACEMENT

1

1

1

1

1

1

1

1

1

1

1

5

1) Station clearance required since sources of energy will need to be isolated: - Electrical power supply to compressors; - Block valves on both ends of CNG storage bottles; - Station gas supply valve Clearance holders must be CNG technician, or GC foreman with CNG station engineer oversight PRV STACK END CHANGEOUTS AND CAP INSTALLATION

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1 23

1) Station clearance required since sources of energy will need to be isolated: - Electrical power supply to compressors; - Block valves on both ends of CNG storage bottles; - Station gas supply valve Clearance holders must be CNG technician, or GC foreman with CNG station engineer oversight, or other options??? <> 2) Block and blow down piping upstream of PRV if possible. If no block and bleed is easily done, isolate the station and pressure sources as much as possible, and employ appropriate PPE in case the PRV vents. <> 3) Hot work permit (written by the foreman) will be needed in those few stations where PRV stack will need to be cross-drilled in place (requires electric drill motor operation inside classified area). Includes NSAOrion (in Arch Rd) for live gas detection while work is underway.

CRITICAL CNG tech participation (ESD and/or PRV)

1

1

1

1

1

1

1

Crew Truck Plan?? 25699645.xls, CNGtechs

17

11/29/09

OPEN ISSUES UNDERWAY

NICK Bakersfield Svc Cntr Chico Livermore Oakland Salinas clearance (see below) Removed oil tanks

Nick to discuss oil cabinet location with tech. Nick to discuss oil cabinet location with tech. Jerry to measure footprint space for oil cabinet. Nick to discuss oil cabinet location with tech. Nick to discuss oil cabinet location with tech. cabinet will fit in either space shown. Your preference? CNG sta tech needed on site when station is shut down, when ESD testing is conducted, etc etc?? bring to Victor yard?

MATT Butech 8:1 3/4" NPT nipple

what do we have in stock for the 16 we may need to replace? STOCK of Butech nipples????

PRV stack outlet valve for 3/4" tubing

Jim Myers suggested 3/4" tube to 3/4" NPT nipple adapter, and cut off and mount the flapper to the 3/4" nipple. Cross drill and bolt flapper to the nozzle.

Bakersfield SC Hoke tees Sign installation guide SanRamonLC conduit

Install face seal block now which replaces the tee on the one top bottle, downstream of block valve, with PRV. review draft standard for use on this project Bury all conduit. OK to mount ESD buttons and signs on existing fire ext and sign posts.

discuss who will write per new training. If we are going to be sutting in a Clearances for de-energizing fuelmaker, don't need a tech. For other stations, we want a tech there. station piping, compressors Clearances are being sought by Jody. Limit valve operation to only the CNG and electrical tech, only 3 isolation points, line of sight. PRV headers at a few stations may require clearances. Set these up for MTC. Limited fire permit / Hot work provide direction to JRG. Use of Orions for gas detection prior to welding. permit Limited hot work permit may or may not be required. Orion units are available.

ESD sign and button height

Redding ESD / Disconnect Signs San Rafael tubing at bottle PRV piping Santa Rosa

MATT / JRG / AAH

25699645.xls, OpenIssues

I've not found specs in the code. We've discussed button height and agreed no code, so will use 36". Stockton sign will be at 12' to sit above the instructions sign. Similar approach elsewhere (whatever works to be conspicuous for each dispenser). If fuelmaker has no internal power disconnect relay we can tap, we may have to just wire the ESD button into the power supply circuit. Can this be done? ESD contact ratings - MMills Have 240v 7a rating….Marten will provide material recommendation. Set up the audit findings to know what/where to install? Confirm this just leads to vent stack to support PRV removal. NO = probably feeds the QCBRack, so we have to leave in service Change excavation to full trench back to ESD button if the conduit is found to be too deep to tie into

MTC/JRG scope discussion => review w/AAH

18

11/25/09

OPEN ISSUES UNDERWAY

PRV fitting replacements Cinnebar (4) Fresno (6) Livermore (4) Bakersfield (1) San Rafael (1)

if the bottle fitting is not 1:8, consider tube trailer operation to replace bottle fittings are not 1:8 , consider tube trailer operation to replace if the bottle fitting is not 1:8, consider tube trailer operation to replace only one PRV, so defer fitting upgrade since schedule is too tight only one PRV, so defer fitting upgrade since schedule is too tight

JRG

Station Inventory Blowdown PRV standard All oil cabinets GC schedule/crew size CNG tech use on project Marysville/GrV signs Butech nipple MA12P12P Signs SRLC

CNG bottle 8:1 nipple installation

San Rafael excavation Face Seal Kits

25699645.xls, OpenIssues

write up procedure for vessel blowdown; confirm outlet for that vol of gals; put an official process together for this for MTC review obtain drawing expected to be provided by Marten Find 5gal bucket oil pump calendar time vs. manpower vs. objectives don't work. Resolve plans to complete work by 12/31. I am skeptical that GC can complete by year end. Discuss w/AAH the addition of Ken Dean and other resources set up plan with Nick explore whether GC will get to this work by early Dec, or whether MTC should arrange separately for Ted Robinson confirm length choices, pressure rating. Work with MR to order a pile, or should they be part of the PRV capital assembly from StaParts? Inventory / order development underway Look for electrical system drawings Sheridan and I have discussed bleeding CNG station botttles into the upstream distribution system as an alternative to compressing into tube trailers, as a method to remove station inventory to allow fitting replacement. Review w/Matt & Nick. A 6 bottle 4000 psi / 60 Mcf inventory can be regulated to the distribution system in 2 hours of 30 M/hr with the ambient trailer (50 M/hr for the trim heater trlrl). If the distribution system off of which the CNG station is fed is large, it may absorb these flow rates from the CNG station; local distribution planning engineers can provide the rates. Trucking from Hayward is $100/hr for a tube trailer - the regulator trailers can be transferred by PG&E employees at a similar cost. 11/16, 11/17 LM for Mark Silva 707 217 5714 to discuss trenching which may occur this week, and the proximity of what is likely to be power supply to the garage from the main building. Order more for a few spots to replace (e.g. Hoke tees at Bksfld SC)?

19

11/25/09

CAPITAL COMPLIANCE PROJECT DETAILED BILL OF MATERIALS This is intended to be used with Mike/Barry for ordering material. Capital work set up on Job 30734471

Item

Unit Price Source Info

Qty

Comments

ESD Button Systems ESD Button

$520.25

StationPartsSource, 10970 Biggee St, SteB, San Leandro 94577

quote in hand, lead time = 2 wks for buttons, 4 weeks for covers. 11/14/09 change to 12 since SRLC needs 3 buttons, not two

11

$5,723

$50.00 GC

1

$50.00 1/8 x 6" flat bar

$150.00 GC

1

traffic box for conduit connection points in pavement 17 x 30 x 30

$900.00

2

conduit protectors for pavement surface for 1" conduit, Powerback RFD9

$500.00

Wire end labels for new wiring, to be applied at both ends of the wire at termination points Steel fab stock for mounting Unistrut clamps for mounting buttons and sign masts on concrete filled 3" 4" and 6" bollards

$1,800.00

Powerback RFD9 cableramps.com/ 588

PVC coated for buried galvanized for above ground

100' 500'

conduit seals

20

flex connections (18") for connection at existing ESD stations

10

A&J Electric Cable, Fremont

SFTreat, SRosa, 11/11 don't need the one at Treat, but it may be useful at SRosa to create a deeper box if the conduit is deep. Bksfld 25', Concord 15',

conduit 1"

ESD BUTTON WIRE #14 THHN /THWM · 2 YELLOW wires as the main conductors · 2 BLACK wires as your extra pair · 1 GREEN wire as your ground (whether it is used OR spare)

$150.00 Oakland, SFTreat, SRosa

Bksfld 120', Concord 90', Oakl 20', Redding 15', SRafael 150', SRosa 8', SRamon 50', Stockton 75', SFTreat 60', but we may use much less

let's just get 20 to start…should work.

1500' Y 1500' B 1000' G

5 14ga conductors per run

Oil Storage Cabinets McMaster Carr 4495T24 McMaster Carr Seismic Bracket Kit $125.82 model 8400 Concrete mounting expansion bolts, 1/2" GC Unistrut and anchor lag bolts for asphalt 1/2" x 12" GC mounting lag bolts ground strap systems - wire and crimp eyes #6 soft for ends solid Concrete anchors for seismic bracket kit 1/2" Cabinet 43" W X 44" H X 18" D

$633.68

24 24

5 workdays to ship out from McM + 2 days by truck no McM catalog #, so specify mfg # $3,020 when order from McM

$15,208

for cabinets that will sit on asphalt or gravel (not concrete) 100'

Filter Drain Assemblies DVAJS-E614SCB Assorted 1/4 and 1/2" tubing fittings and tubing

Brian White, 510 733 5538 Specialty Process Equipment

??

??

$200.00

$200.00

Eye Wash Stations

Fendall 2000 / Sperian # 32-002000-0000 + accompanying fluid pack Mfg: 800 682-0839

Available from Grainger, item number 2DEB1 and $750.00 2DEB2 (the two parts make up an assembly)

Relief Valves Relief Valves, AndersonGreenwood assembly est including face seal / vent fitting

25699645.xls, BillofMaterials

24

$18,000

??

20

11/29/09

This is intended to be used with Mike/Barry for ordering material. Capital work set up on Job 30734471 CAPITAL COMPLIANCE PROJECT DETAILED BILL OF MATERIALS Item

Unit Price Source Info

Qty

Comments

Face seal fitting SAE Code 62 block tee, relief face seal fitting, bushing, bleed valve & associated pipe fittings or complete PRV replacement Bakersfield - main bottle 5000 psig set point, 81S1M68-4 Livermore - female connections 81CF68-4 low and med bank 5000 psig 81S1F68-6 high bank 5000 psig 81S1F68-4 common San Jose - Cinnabar - 81S1F68-4 5000 psig Fresno Storage vessles 81S1M68-4 ASME 2A, 2B, 2C 81S1M68-4 San Rafael 81S1F68-4 5000 psig BUTECH high pressure nipples 3/4" NPT x 3/4" NPT Butech 3/4 x 1/2 reducing nipples SRLearningCenter dryer removal pipe, 1.5" NPT x 38.5"

1

$-

2 1 1

$$$-

4

$-

3 3 1 16

$$-

MA12P12P

30

MA8P12P

6

$20.00 GC

1

High pressure tees 5000 psi rated NPT tees for Bakersfield CNG bottles, 3/4" NPT

3

PRV stack outlet caps 3/4" nominal pipe size 1" 1.5" 2" 2.5" 3" 1/4" bolts and nylocks to bolt caps to stack ends

$20.00

hold off on this - Matt may have us change

35 92 3 17 2 5 154

adapters from 3/4" tube to 3/4" pipe

30

PRV stack outlet extensions 3/4" NPT couplings and 12" nipples 1" NPT couplings and 12" nipples 1.5" NPT couplings and 12" nipples 2" NPT couplings, 12" & 24" nipples

20 20 5 5

10' lengths of 3/4" and 1" for NPT outlets

50'

3" x 0.156 or 0.188 Grade B (or whatever you find) for PRV welded stack extensions

6'

3/4" Grade B schedule 160 pipe and NPT fittings

for inlet and outlet of CNG bottle block valves $89 each

not needed

many fast fill dispensers have 3/4 tube stacks

used to make parts if needed, and for stacks at Marysville and Vacaville

20'

Livermore PRV rack relocation

40

ask Nick about these - do now or later?

Unistrut PRV racks/supports ESD supports VENT FILL aluminum engraved labels for the dispensor hose valve CNG Station Signs

see separate order/inventory file SignInventory112909.xls

3" x 1" pipe clamps

8

for Vacaville and Marysville PRV stacks

bollards

5

Bakersfield QCBRack

disconnect for Redding Fuelmaker

1

11/18 Marten is researching

25699645.xls, BillofMaterials

21

11/29/09

MATERIAL SUMMARY BY STATION REFER TO INDIVIDUAL STATION WORKSHEETS AND MATERIAL TABLES FOR CLARITY A

B

CNG TECH INVOLVEMENT (CLEARANCES, ESD WIRING/TESTING)

2 3

Auburn: signs, PRVstacks, oil tank rmvl, oilcab/eyewash Bakersfield DO Removal Bakersfield SC: signs, PRVstacks, oilcab/eyewash, bolt QCBR to pad, 1 1 PRV installation Belmont Chico Cinnabar: signs, PRVstacks, oilcab/eyewash, PRV(4) 4 + Butech nipples Colma Concord: signs, PRVstacks, oilcab/eyewash, ESD Cupertino: signs, PRVstacks, oilcab/eyewash Davis: signs, PRVstacks, oilcab/eyewash, oiltank rmvl Eureka Folsom St (SF): signs, PRVstacks, oilcab/eyewash Fremont (LNG) Fresno: signs, PRVstacks, oil tank rmvl, oilcab/eyewash, PRV(6) 6 + Butech nipples Grass Valley: signs, PRVstacks, oilcab/eyewash Hayward: signs, PRVstacks, oilcab/eyewash Livermore: signs, PRVstacks, oilcab/eyewash, PRV(4) 4 + Butech nipples Los Banos: signs, PRVstacks, oilcab/eyewash Manteca Martin Marysville: signs, PRVstacks, oilcab/eyewash, oiltank rmvl Merced: signs, PRVstacks, oilcab/eyewash, oiltank rmvl Modesto Oakland: signs, PRVstacks, oilcab/eyewash, ESD Redding: signs, PRVstacks, ESD Richmond Sacramento CNG: signs, PRVstacks, oilcab/eyewash, oiltank rmvl Sacramento L/CNG Salinas: signs, PRVstacks, oilcab/eyewash, oilstrg tank San Rafael: signs, PRVstacks, oilcab/eyewash, PRV(1), ESD 1 Santa Cruz: signs, PRVstacks, oilcab/eyewash Santa Rosa: signs, PRVstacks, oilcab/eyewash, ESD, oiltank rmvl San Ramon : signs, dryer removal, ESD Stockton: signs, PRVstacks, oilcab/eyewash, ESD, oiltank rmvl San Ramon TES Treat (SF): signs, PRVstacks, oilcab/eyewash, ESD Vacaville: signs, PRVstacks, oilcab/eyewash Woodland: Fuelmaker Removal TOTAL CNG TECH STATIONS 2

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

25699645.xls, Material By Station

D

E

F

ESD (+ unistrut for PRV R&R Oil Cabinets + mounting button + STACKS Bleed/drain (valve+face seal + mounts+ground, sign, wire, button See PRVcaps valve kits and piping+ unistrut) Eyewash (see station, conduit) table for cap & tubing (oil tank (see individual sta OilCabinets (see individual sta piping info removal) drwg) table) drwg)

1

4

C

22

1

1 o/s

1

1

1

future future 1

1 1 1

1 1 1

1

1

1 1 1 1 1

1 1 1 1 1

4

1 1

1 1

4 4

1

1

1

1

4

1 1 1 1

1 1 1 1

4

1

1

4

1

1 1

1 1

10

23

23

2

1

1 1

1 1 1 1

4

28 11/25/09

BOTTLE INVENTORY BLOWDOWN OPTIONS

ofc Scott Sannin Ladio Castro Victoria Sauerdesic

Cupertino / deAnza Fresno Livermore

cell

11/24 will analyze and advise me

(408) 799-2726 (559) 263-7316

x821-7316

(559) 417-1357

x481-3376

510 303 0115

(510) 784-2155

Jim Recton, check w/him

(510) 784-3376

Ladio: LM 11/20, 11/24 Rosa: LM 11/20 - probably not in this Victoria - wait until Scott has his first numbers….

25699645.xls, BottleBlowdown

23

11/25/09

CNG STORAGE BOTTLE PRV CONFIGURATION STANDARD

This standard applies to the PRV replacements for Capital Order Bakersfield (1) Cinnebar (4) - if the bottle fitting is not 8:1, conisider tube trailer operation to replace Fresno (6) - if the bottle fitting is not 8:1, conisider tube trailer operation to replace Livermore (4) - if the bottle fitting is not 8:1, conisider tube trailer operation to replace San Rafael (1) A - The 3/4" Butech hex nipples used between the ASME vessel and the isolation valve and face seal block are a Butech MA12P12P stainless steel hex nipple. Cal Osha requires the pipe/fitting between the tank and first valve to have an 8:1 FOS. B - Needle valve, Anderson Greenwood H5 VIS-22. C - The 1" nipple on the PRV outlet varies in length. Schedule 80 minimum D - Union, outlet, 3000# rating E - Block, clamps and bolting. Torque value for the face seal clamp bolts = 250 in-lbs. F - Code 62 Adapter FNPT 3/4", to PRV 3/4" MNPT inlet port G - 1" NPT elbow, 3000 # rating Wipe down/clean and prime with PG&E gray primer (coded item)

A B

G

C

C D F E

25699645.xls, PRVpiping

24

11/17/09

CNG STORAGE BOTTLE PRV CONFIGURATION STANDARD

SEEALUM INDUSTRIES 730 Eaton Way, Annacis Business Park Delta, B.C. Canada V3M 6J9 Phone: (604) 521-1170 Fax: (604) 522-0070 Toll Free 1-800-928-1170 Website: INDUSTRIES LTD. www.sealum.com

25699645.xls, PRVpiping

25

11/17/09

PRV STACK CAPS AND EXTENSION NOTES

1) For each station, take a cap, cross-bolted with 1/4" and nylock nut, Consider bolting to a short non-thread end of a nipple with a coupling, to thread onto the top of the existing PRV This1.66 avoids cross a classified2.88 area in the3.5 field. In a few cases, the existing stack Pipe OD (inches) 1.05stack in place. 1.3 1.9drilling in2.38 will need to be removed and threaded or cross-drilled. Cap Model 66ss 66xx 5xs 5 2 8x 11 2) Carry a set of SIZE pipe, nipples and couplings in typical sizes below to build NOMINAL PIPE 3/4" 1" 1.25" 1.5" extensions 2" as needed 2.5" to achieve 3" 10' minimum outlet height. Install caps oriented so that if the cap breaks off, it flies in the safest possible direction. Location Location Notes 3) Take (2) 3/4" tubing x 3/4" NPT adapters to each station, since the dispenser + bottle rack may both be 3/4" tubing (see next page) Antioch 4) Take extra caps to each station, since the list below is not 100% accurate. 5) ConsiderAuburn bolting caps to nipples in1advance, and 1 then attaching with couplings in1 the field to1reduce field drilling. take extra 2 & 3"caps; cut thrds or extd and cap Bakersfield District Office Bakersfield SC Belmont Chico

1

7

Cinnabar/SanJose

2

4

Colma Concord

2

3

Cupertino

1

Davis Eureka Folsom St. (SF) Fremont (LNG)

1

4

3

4

Fresno

2

7

Grass Valley Hayward Livermore Los Banos Manteca Martin

1 2 3 2

6 5 3

Marysville

2

10

Merced Modesto Oakland Redding Richmond Sacramento CNG (only) Sacramento L/CNG Salinas San Rafael Santa Cruz Santa Rosa SR Learning Center Stockton

1 1

9

25699645.xls, PRVcaps

3/4 extd 1'; 1" extd 2'; 1" ext 3'

(3) 1" are short and no threads- add 1' nipple at bottom of each? 1/2" extend 1' and adapt to 3/4" cap. Other heights OK.

one of 3/4 might be 1/2, so note when on site

3 3

2

1

heights OK; roof work with harness compr building dia uncertain - 3"?' 3/4" welded height OK; 2" NPT height OK 3/4" ext 0.5'; (3) 1" ext 0.5'; 3/4" ext 0.5'; other heights ok; take a 2" and 3" with you in case 2.5 is incorrect; 3/4" welded tee cut, thread and extend 1.5'; (6) 1" bolt heights OK 3/4" ext 1'; 1" ext 1.5'; other heights OK

1 2

take extra sizes with you

2

1

take 3", 3/4" and 1" clamps; (2) 1" ext 0.5'; 3/4" height ok, (~4) 1" new stacks 3" cut&drill; 3/4" +8"; cap+cplg+nipple

4

1

1

1 1 1 1

2 2 4 4

3

3

2

1

1 1

1

1", 2" & 3" bolt; 3/4" ext 2'; 1" ext 1'. Other heights OK. take extra sizes with you take extra sizes with you

2

26

1

2" ext 1.5' & 2'; 3/4" ext 3', 3" bolt

11/26/09

PRV STACK CAPS AND EXTENSION NOTES

TES Treat (SF)

1

4

Vacaville

1

5

3/4" ext 0.5', 1/4" tubing ext 0.5' and adapt to cap????; other heigts OK 3", 3/4" and 1" clamps; (2) 1" ext 1.5', (~4) 10' 1" new stacks

1

Woodland TOTALS 35 92 0 3 17 2 Pipe OD (inches) 1.05 1.3 1.66 1.9 2.38 2.88 Cap Model (check this) 66ss 66xx 5xs 5 2 8x NOMINAL PIPE SIZE 3/4" 1" 1.25" 1.5" 2" 2.5" 3/4" PRV discharge tubing on INSTALL adapter from tubing to 3/4" NPT, NPT nipple dispensers: take one assembly for each station in addition to the table above

5 3.5 11 3"

154

NIPPLE END MUST HAVE NO THREADS

Installing a 2" nipple with cross bolted cap may be easier than cutting top threads off of stack, and drilling and bolting the cap on in place In some cases, removing the stack for work will be easiest.

25699645.xls, PRVcaps

27

11/26/09

PRV STACK CAPS AND EXTENSION NOTES

http://www.raincap.net/raincap.htm

Raincap Industries 316 Main St. Voorhies, Iowa 50643 Phone: (319) 988-3381 Toll Free: (800) 728-8361 $11 for 1" + $15 for 3" typically in stock. Hinge bolt is 1/4" OD 304 stainless.

25699645.xls, PRVcaps

28

11/26/09

MISCL MATERIAL NOTES

Safety Cabinet for Flammables & Combustibles Counter Ht, Self-Closing/Hinged, Cabinet #!: 43" W X 44" H X 18" D 4495T24, 3 x 5gal cans per shelf, In stock at $633.68 Each Door sills are raised at least 2" to contain spills., This would hold six 5-gal oil containers Cabinet #2: 35" W X 35" H X 22" D 4495T27 for Bakersfield SC (height limit is 40") Davis (height limit is 42") Stockton (height restriction) Door sills are raised at least 2" to contain spills. This would hold six 5-gal oil containers McM will provide a drawing of the kit available from the cabinet mfg for bolting the cabinet down.

1548 cu in spill retention 0.89 cu ft 6.62 gallons Cabinet #1: 43" W X 44" H X 18" D 2 shelves x 3 cans Cabinet #2: 35" W X 35" H X 22" D 2 shelves x 3 cans Cabinet #3: 23-1/4" W X 35" H X 18" D4495T21 2 shelves x 2 cans

gallon spill 3.35

standard dia 12"

5 gallon oil can

16"

RICHMOND ESD BUTTONS Barry Richards Arch Road http://www.crouse-hinds.com/ class 1, div 2 5' from dspsr 10' from strorage 15' from vent

ESD pushbutton

EDSC 2184-S769-EM-SP $305.90 plus tax Craus Hindes - distributor: Randy Scull, OneSource 510 441-2411 x 5178 One of PG&E's required two primary vendors for majority of equipment

Cover

clear plastic cover that prevents activation when bumped NCCH1QA environmental protective cover Craus Hindes

Box

http://equipment.forconstructionpros.com/product/78016/Timco_Inc_Timcoloc_Asphalt_Anchor_Bolt_Fastening_System TIMCO (914) 736-0206, (800) 792-0030

25699645.xls, MaterialNotes

29

11/1/09

MISCL MATERIAL NOTES

866 520 8511 http://www.americanea.com/proddetail.php?prod=PE18-SQ 18" long with 1/2" square drive head

http://www.americanea.com/proddetail.php?prod=PE14-STD 14" aluminum anchor with socket machine screw head and 6" x 1/2" stud and nut

TECHNICAL DATA Ultimate Pullout Resistance At Minimum Depth In Pounds Anchor Size In Inches

Penetrato r

Minimum Vertical Hard Pan Depth Feet

14�

Class 1 Soil 2

Class 2 soil 2 Class 3 soil2

Soil

2,500

Dense Sand &

Medium Sandy

Gravel

Gravel

1,700

600

Class 4 soil2

Loose Loose Fine Medium Uncompac To ted Fine Sand

Sand

350

200

lag bolts, anchor bolts, timber spikes, etc. 4" long, every 4" in a section of unistrut Bolt the cabinet mounting system to the unistrut

web page 1476 for McMasterCarr long screws that might anchor in the ground

CABLE PROTECTORS 866 4421885 http://www.cableramps.com/

http://www.cableramps.com/product.php?id=18

25699645.xls, MaterialNotes

30

11/1/09

MISCL MATERIAL NOTES

BUTECH high pressure nipples Distribution center? 5672 Bolsa Avenue Huntington Beach, CA-92649 - USA - Ph (714) 751 - 7512 - Fax (714) 751 - 0213 800 576-6308 MA12P12P 3/4 x 3/4 NPT male hex nipple MA8P12P 3/4 x 1/2 NPT male hex nipple MTC wants these either side of the block valve downstream of the CNG bottle. 3 x factor of safety in fittings = 40/3 kpsi factory service pressure 8 x required for 5kpsi service = 40k psi design pressure ID for 3/4" NPT = MIke Hanter / Chris Newman - LM 11/13 430pm

25699645.xls, MaterialNotes

31

11/1/09

2009 CNG STATION COMPLIANCE WORK APPROXIMATE SIGN NEEDS GC - This table is intended to help select sign inventory for stations. However, since this was built after initial field trips were made, the set of signs taken to each station should be built using the SignInventory112909.xls file as well. MTC - replace older signs? Review photos to discuss…sign on each tank both directions? Or only some signs on each tank, and in other cases, one sign facing each direction is fine. Review Fresno and other report re: "stop motor" on compr wall. NFPA 52:4-14.9, “Stop Motor”, “No Smoking” and “Flammable Gas”. QCBR emer shutoff valve signs

slow fill dispensers

30 Fast Fill Dispensers SIGN NUMBER => Location

1

3

4

12

27

# of dispenser sides

CNG VESSELS

#2&3 decals

6 CNG Bottles

Other Vessels

3

0

7

8

9

10 16 SIGNS TO ADD, TO ADDRESS AUDIT FINDINGS

Antioch Auburn

2

2

2

2

2

2

Bakersfield District Office Bakersfield SC

# 1 disp & compr, 2, 3, 8 in compr area, vessels,

6

2

2

6

6

5

2

2

2

2

6

6

2

1 5 2

2 2

2 2 2

D 2 3

5 2

# 1, 2, 3, 13, vessels, raise ESD signs 6 # 1, 2, 3, vessels, dispensers 3 # 1, 2, 3, vessels, dispensers, 13

4

4

2

2

0

0 # 1, 2, 3, 13, vessels

MTC - supply vessels?

2

2

2

2

2

4

2

2

2

2

2

2

3

2 2 2

2 2 2

2 2 2

2 2 2

2 2 2

2 2 2

3 3 3

1

1

1

1

1

1

1

3

1

Fresno

2

2

2

2

2

2

6

6

2

2

2

0

6

Grass Valley

2

2

2

2

2

2

4

8

2

2

2

8

8

Hayward

3

3

3

3

3

3

3

1

4

2

2

2

4

4

Livermore Los Banos Manteca Martin Marysville

1 1

1 1

1 1

1 1

1 1

1 1

3 3

1

1 3

2 2

2 2

2 2

0 3

0 3

2

2

2

2

2

2

3

2

2

2

2

3

3 # 1, 2, 3, 13, vessels, dispenser signage

Belmont Chico Cinnabar/SanJose Colma Concord Cupertino Davis Eureka Folsom St. (SF) Fremont (LNG)

25699645.xls, Signs

32

1

2

# 1 disp & compr, 2, 3, 9 QCBRack, vessels,

2

6 # 1, 2, 3,

# 1 disp & compr, 2, 3, 8 in compr area, 13, vessels, 9 QCBRack # 1, 2, 3, vessels, 6 near the end of the tanks closest to the garage # 1, 2, 3, inside & outside of compr wall, vessels, # 1, 2, 3, 13, vessels # 1, 2, 3, vessels

11/29/09

2009 CNG STATION COMPLIANCE WORK APPROXIMATE SIGN NEEDS slow fill dispensers

30 Fast Fill Dispensers SIGN NUMBER =>

1

3

4

12

27

# of dispenser sides

Location

CNG VESSELS

#2&3 decals

6 CNG Bottles

2

2

2

2

2

7

8

9

10 16

Other Vessels

6

SIGNS TO ADD, TO ADDRESS AUDIT FINDINGS

Merced Modesto = no std sign config - mark up a photo Oakland Redding Richmond

2

1

2

2

0

1

1

1

1

1

1

3

2

2

2

2

2

Sacramento CNG

2

2

2

2

2

2

5

4

2

2

2

4

6

Salinas

2

2

2

2

2

2

3

6

2

2

2

3

3

San Rafael Santa Cruz

2 1

2 1

2 1

2 1

2 1

2 1

3 3

2 ?

2 2

2 2

2 2

3 2

3 0

Santa Rosa

2

2

2

2

2

2

3

1

6

2

2

2

6

6

2

2

2

2

2

2

3

1

3

3

2

3

1

1

2 2

2 2

2 2

2 2

2 2

2 2

4 3

3 2

2 2

2 2

4 2

0 2

2 # 1, 2, 3, vessels 2 # 1, 2, 3, 13, vessels

43

42

42

42

42

42

1

2 2

0 # 1, 2, 3, vessels, 9 QCBRack # 1, 2, 3, vessels, dispensers, 8 in compr area 2 # 1, 2, 3, 13, vessels # 17 # 1, 2, 3, 13, vessels, inside & outside of compr wall,

Sacramento L/CNG

SR Learning Center Stockton TES Treat (SF) Vacaville Woodland signs

25699645.xls, Signs

# 1, 2, 3, vessels, inside & outside of compr wall, # 1, 2, 3, vessels # 1, 2, 3, vessels, 9 QCBRack # 1, 2, 3, vessels, inside & outside of compr wall, 9 QCBRack # 17 # 1, 2, 3, vessels

82 51 48 50 56 66

33

11/29/09

EYE WASH STATION ANSI Z358.1 2004 33"–45" from the nozzles to the surface the user stands (Section 5.4.4) If the potential for freezing conditions, product specifically designed to avoid freezing should be utilized (Section 5.4.5) Self-contained units do not require activation, but require a visual inspection to verify adequate flushing fluid is available (Section 5.5.3) http://www.fendall.com/ Fendall 2000 24 mo self contained sealed fluid Sperian 800 682-0839 cartridge will freeze at 30-32 Fendall PortaStream III has freeze protection 16 gallon every 6mo, wash and refill. Grass Valley Auburn Marysville? Where else? Self-contained devices must be inspected and maintained according to manufacturer’s instructions.

25699645.xls, Eyewash

34

11/14/09

OIL CABINET MOUNTING

Mounting Location

Oil Cabinets

Antioch Auburn

1

Bakersfield District Office

o/s

Bakersfield SC Belmont Chico

1 future future

Cinnabar/SanJose

1

Concrete Floor can avoid this

Wall

Asphalt

with unistrut

Nick to check site

use unistrut and multiple lag bolts

Colma Concord

1

Cupertino

1

Davis

1

concrete wall, so might as well use floor?

yes

use unistrut and multiple lag bolts with unistrut offset, through bolts and fender washers

can avoid this

Eureka Folsom St. (SF) Fremont (LNG)

confirm no oil storage w/MTC

Fresno

1

Grass Valley

1

Hayward

1

Livermore

1

Los Banos Manteca Martin

1

Marysville

1

Merced

1

Modesto Oakland Redding Richmond

use unistrut and multiple lag bolts

1 connect to fence post with unistrut offset? yes with unistrut offset, through bolts and fender washers bolt through building floor? yes

use unistrut and multiple lag bolts use unistrut and multiple lag bolts

1

Nick to check site

1

can avoid this

with unistrut offset, through bolts and fender washers

Salinas

1

can avoid this

with unistrut offset, through bolts and fender washers

San Rafael

1

Sacramento CNG (only)

use unistrut and multiple lag bolts

Sacramento L/CNG

25699645.xls, OilCabinets

with unistrut offset, through bolts and fender washers

35

can avoid this

11/1/09

OIL CABINET MOUNTING

Mounting Location

Oil Cabinets

Concrete Floor

Wall

Santa Cruz

1

Santa Rosa

1

with unistrut offset, through bolts and fender washers

1

with unistrut offset, through bolts and fender washers

Asphalt use unistrut and multiple lag bolts

SR Learning Center Stockton TES Treat (SF)

1

Vacaville

1

use unistrut and multiple lag bolts use unistrut and multiple lag bolts

Woodland green

25699645.xls, OilCabinets

23 major construction soon, so no action on this job

36

11/1/09

PACIFIC GAS & ELECTRIC COMPANY NATURAL GAS FUELING STATION SURVEY Station Numbers

Address

Station Numbers

Address

1

Antioch Service Center 2111 Hillcrest Ave Antioch, CA 94509

22

Merced Service Center 624 W. 15th St. Merced, CA 95340

2

Auburn Service Center 333 Sacramento Street Auburn, CA 95603

23

Modesto Service Center 1525 N. Carpenter Rd. Modesto, CA 95351

3

Bakersfield Service Center 4101 Wibble Rd. Bakersfield, CA 93313

24

Monterey, City of (CARS Station) 23 Ryan Ranch Road Monterey, Ca

4

Bakersfield Dist Office 1918 H Street, Bakersfield

25

Oakland Service Center 4801 Oakport Road Oakland, CA 94601

5

Belmont Service Center 1970 Industrial Way Belmont, CA 94070

26

Redding Service Center 3600 Meadowview Drive Redding, CA 96002

6

Chico Service Center 11239 Midway Chico, CA 95928

27

Richmond Service Center 1100 South 27th Street Richmond, CA 94804

7

Cinnabar Service Center 308 Stockton Avenue San Jose, CA 95126

28

Sacramento Service Center 5555 Florin-Perkins Rd. Sacramento, CA 95826

8

Colma Service Center 450 Eastmoor Avenue Colma, CA 94115

29

Sacramento LNG 5555 FlorinPerkins Rd. Sacramento, CA 95826

9

Concord Center 1030 Detroit Ave Concord, CA 94518

30

Salinas Service Center 390 Griffin Street Salinas, CA 93901

10

Cupertino Service Center 10900 North Blaney Ave. Cupertino, CA 95014

31

San Rafael Service Center 1220 Andersen Street San Rafael, CA 94901

11

Davis Service Center 1415 2nd St. Davis, CA 95616

32

San Ramon Learning Center 3301 Crow Canyon Rd. San Ramon, CA 94583

12

Eureka Service Center 1000 King Salmon Ave Eureka, CA 95503

33

San Ramon ATS 3400 Crow Canyon Rd. San Ramon, CA 94583

13

Fremont Service Center 41800 Boscell Road Fremont, Ca

34

Santa Cruz Service Center 615 7th Avenue Santa Cruz, CA 95062

14

Fresno Service Center 3754 E. California Ave. Fresno, CA 93702

35

Santa Rosa Service Center 3965 Occidental Santa Rosa, CA 95401

15

Grass Valley Service Center 788 Taylorville Road Grass Valley, CA 95945

36

PG&E Service Center 425 Folsom St. San Francisco, CA

16

Hayward Service Center 24300 Clawiter Road Hayward, CA 94545

37

SF Service Center 536 Treat Ave San Francisco, CA 94110

17

Livermore Training Center 7205 National Dr. Livermore, CA 94550

38

Stockton Service Center 4040 West Lane Stockton, CA 95204

18

Los Banos Service Center 970 I Street Los Banos, Ca

39

PG&E Service Center 158 Peabody Vacaville, CA 95687

19

Manteca GC Yard 10901 E Hwy 120 Manteca, CA 95336

40

Woodland Service Center 50 Kentucky Ave Woodland, CA 95695

20

Martin Service Center 731 Schwerin Street Daly City

43

Endenvale Service Center

21

Marysville Service Center 18 7th Street Marysville, CA 95901

25699645.xlsM StaAdr

37

11/14/09

GENERAL PROCEDURES ESD BUTTON INSTALLATION REVIEW W/MMK FIRST Local Yard Notification - Contact the building depertment rep for each PG&E yard to advise of ESD work planned where work will be disruptive, in advance of start of work.

Bakersfield Concord Oakland San Rafael San Ramon Santa Rosa Stockton TreatSF

not disruptive - no contact needed not disruptive - no contact needed not disruptive - no contact needed trenching required - contact yard in advance trenching required - contact yard in advance trenching required - contact yard in advance trenching required - contact yard in advance trenching required - contact yard in advance

The addition of ESD button(s) to the station emergency shutdown system results in a change to the system. Because of this change, the function of the ESD system must be thoroughly and completely tested prior to returning the station to service. 1) Activate a clearance for the station and de-energize the electrical system, to prevent compressor start and to ensure the ESD wiring is de-energized. 2) Remove the existing ESD button at the connection point for the new ESD circuit, and test the functionality of the existing ESD button to confirm that it is a simple closed/open contact for a single wire pair.

existing 3) The new ESD button can then be extended as part of this series circuit. Apply wire number labels to all new wiring at the termination points in the existing and new ESD stations. Install conduit seals on all conduit ends (one at the existing ESD button connection point, and one at the new ESD station).

existing

new

4) Once the new button is connected, energize the compressor ESD circuit(s) and test the operation of each and every ESD button in the station to confirm the ESD circuit opens at the compressor end of the circuit. 5) MTC - Confirm we do not need a live ESD test with compr running.

25699645.xls, ESDinstallation

38

11/11/09

AUBURN

Oil storage cabinet - capital work item #1 Bolt to floor along wall adjacent to door, leaving clearance behind for the conduit on the wall. Grounding strap to building metal corner post? Nick OK Cabinet #2: 35" W X 35" H X 22" D 2 shelves x 3 cans

25699645.xls, Auburn

39

11/11/09

AUBURN

Oil storage tank and tubing removal - capital item #2 Remove drain plug or valve from concrete containment, so containment will no longer trap water. Feet supports are bolted and grouted. Remove bolts, break out grout if/as required to remove tank. Leave valves and 6" stub tubing downstream of each oil source for future drain servicing

Confirm tubing from drain valve on separator feed the oil tank. Confirm tubing below the tee feeds the oil tank. Install a valve below the tee, with a 6" tubing outlet, so tubing can still be used for drain servicing.

6" long tubing drain outlet

Remove remaining tubing from here to the oil tank. 25699645.xls, Auburn

40

11/11/09

AUBURN Remove remaining tubing from here to the oil tank.

RELIEF VALVE DISCHARGE STACKS - EXPENSE Exposed end of stack must not have threads, so when extensions are needed, either cut off or use threaded bushing wth a nipple above, with the top threads cut off. General - Remove NPT tee, extend to 10'+ above grade, install cap. Dispenser - Remove 1/2" tubing tee, install adapter and cap.

25699645.xls, Auburn

41

11/11/09

BAKERSFIELD DOWNTOWN OFFICE

Fuelmaker Removal - capital work item #1 Remove fuelmaker and return to Victor yard. Fragile - handle with care. Disconnect electrical power supply. Advise building maintenance in advance of generator out of service for 20 minutes during piping removal. The rigid conduit from the junction box to the generator was not investigated. The main breaker in the basement is labeled only for the fuelmaker, so no generator functionality should be on the circuit. None-theless, the rigid conduit does connect the junction box to the generator.

Power to junction box has been interrupted with breaker in basement of office building. Confirm. Remove wire from box to transformer to disconnect to fuelmaker. Remove transformer, disconnect, both boxes, unistrut and flex conduit; return to Victor yard. Leave junction box in place.

to fuelmaker

25699645.xls, BksfldDO

42

10/10/09

BAKERSFIELD DOWNTOWN OFFICE

Lock out standby generator. Close gas supply valve, remove piping to fuelmaker, plug tee. Open valve, purge through generator to remove air from piping work. Re-arm generator. Cut off piping to the fuelmaker at grade. Fill with paving patch or concrete.

remove this section Disconnect supply tubing, remove valve, cut off pipe flush with grade. Fill pipe with patch or concrete.

Disconnect outlet tubing, cut off pipe flush with grade. Fill pipe with patch or concrete

Remove dispensor as an assembly with the single bolt in the base socket. Return dispensor to Victor yard. Remove bollards/dispenser support, cut off bollards and gas supply pipe/conduit flush with pavement, fill with patch or concrete. Return base assembly and bollards to Victor yard.

Remove operating manual box and contents, and return to Victor yard.

25699645.xls, BksfldDO

43

10/10/09

BAKERSFIELD SERVICE CENTER

Oil Cabinet Installation - capital work item CAN NOT Install storage cabinet inside compressor building in 40" tall x 5' wide space below the center electrical control box. Nick to review

25699645.xls, BksfldSvcCntr

44

11/18/09

BAKERSFIELD SERVICE CENTER

Install bollards per the following. Confirm this is capital. Confirm this should be done as part of a single GC Bakersfield job. SECTION 312, CFC 2007 VEHICLE IMPACT PROTECTION 312.1 General. Vehicle impact protection required by this code shall be provided by posts that comply with Section 312.2 or by other approved physical barriers that comply with Section 312.3. 312.2 Posts. Guard posts shall comply with all ofthe following requirements: 1. Constructed of steel not less than 4 inches in diameter and concrete filled. 2. Spaced not more than 4 feet between posts on center. 3. Set not less than 3 feet deep in a concrete footing of not less than 15 inches diameter. 4. Set with the top of the posts not less than 3 feet above ground. 5. Located not less than 3 feet from the protected object. 312.3 Other barriers. Physical barriers shall be a minimum of 36 inches in height and shall resist a force of 12,000 pounds applied 36 inches above the adjacent ground surface. Add reflector tape wrap near top and in middle on each bollard

4' 4'

4' 4'

4'

Bolt quick change bottle rack to the concrete pad

25699645.xls, BksfldSvcCntr

45

11/18/09

BAKERSFIELD SERVICE CENTER

DISPENSER / ESD DISTANCES NO SCALE 1

E1

2

3

58'

4

5

6

North

7

8

9

10

11

75' 75'

PROPOSED E4

51'

E2

60' E3

PROPOSED

COMPR BLDG FENCED PIPING AREA 30' ~ 30' of new conduit to new ESD button on SW corner of compressor building. Install ESD sign

6'

15'

38' FENCE LINE

install conduit cover in gate crossing area

~ 120' of new conduit along base of fence, to new ESD button on NW corner of fenced area. Install ESD sign.

VIEW STANDING IN THE DISPENSOR ROW FACING EAST

North

E3

new conduit along bottom of fence to compr building ESD conduit ramp/cover in this gate crossing

AUDIT: Slow fill post 1 is located less than 25 feet and more than 75 feet from either ESD. Posts 8, 9, 10, and 11 are all located more than 75 feet from either ESD

conduit cover in this area?

25699645.xls, BksfldSvcCntr

Other conduit on top of slab, so OK to run new conduit on top of slab and pavement as shown here

46

11/18/09

BAKERSFIELD SERVICE CENTER

1 - Replace existing 5500 psi setpoint PRV with new AG 81S1M68-4 and face seal/bleed assembly, per standard in this workbook. Observe PG&E procedures for temporarily removing PRV from service on a CNG storage vessel. 2 - Replace nipple downstream of block valve with Butech nipples per PRV standard drawing.

2

3

25699645.xls, BksfldSvcCntr

47

11/18/09

BAKERSFIELD SERVICE CENTER

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above adjacent grade (most are current less than 10' above grade now), install weather cap and tether. Dispenser - Remove 1/2" tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed, use threaded bushing wth a nipple above, with the top threads cut off.

currently 7'-10" tall Remove outlet tees, extend from the current 9'-9" to 10'+ above concrete pad elevation

25699645.xls, BksfldSvcCntr

48

11/18/09

BELMONT SCHEDULED OF 2010 UPGRADE, SO DEFER ANY OR ALL OF THIS WORK FROM LATE 2009? SCHEDULED OF 2010 UPGRADE, SO DEFER ANY OR ALL OF THIS WORK FROM LATE 2009 Oil storage cabinet - capital work item #1 Bolt to floor along wall where ladder and hoses sit. Grounding strap to building metal corner post? Nick OK

34" 4'

The 43" W X 44" H X 18" D cabinet could fit where the ladder is standing, next to the post. The right door would not quit open 90 degrees, but the left door would have no issues.

25699645.xls, Belmont

electrical

49

10/16/09

BELMONT SCHEDULED OF 2010 UPGRADE, SO DEFER ANY OR ALL OF THIS WORK FROM LATE 2009?

Oil storage tank and tubing removal - capital item #2 Remove drain plug or valve from concrete containment, so containment will no longer trap water. Feet supports are bolted and grouted. Remove bolts, break out grout if/as required to remove tank. Leave with ball valve, needle valve and 6" stub tubing downstream of each oil source for future drain servicing

remove tubing

Leave a 6" section of tubing downstream to serve as a spout with ball valve and needle valve

Typical of each of two compressors

Remove tubing connecting to outside tank. Retain valve, add needle valve and 6" tubing stub for future drain servicing.

25699645.xls, Belmont

50

10/16/09

BELMONT SCHEDULED OF 2010 UPGRADE, SO DEFER ANY OR ALL OF THIS WORK FROM LATE 2009?

DISPENSER / ESD DISTANCES NO SCALE Row containing 5 posts - Two posts are located less than 25 feet and more than 75 feet from an ESD. New E3 will cover posts 8 & 9, and be 74.5' from D9. Row containing 4 posts – The slow fill post located closest to the ESD on this row is located less than 25 feet from that device and more than 75 feet from another ESD. New E3 will be located 25.5' from dispenser 3 to resolve this.

6

7

8

North

E1

9

74.5' or less

1

2

E2

3

E3

4

5

25.5' or more Install 36' of new conduit (buried with paving) from ESD button E2 to proposed new ESD button E3. Install new pedistal for E3.

E3

74.5' to dispenser 9

25699645.xls, Belmont

25.5' to dispenser 3

51

10/16/09

CHICO SCHEDULED OF 2010 UPGRADE, SO DEFER ANY OR ALL OF THIS WORK FROM LATE 2009? SCHEDULED OF 2010 UPGRADE, SO DEFER ANY OR ALL OF THIS WORK FROM LATE 2009 Oil Cabinet Installation - capital work item Install storage cabinet where ???? SITE VISIT WAS NOT CONDUCTED BY JRG Nick to check with tech

Nick's preference

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above adjacent grade (most are current less than 10' above grade now), install weather cap and tether. Dispenser - Remove 1/2" tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed, use threaded bushing wth a nipple above, with the top threads cut off.

25699645.xls, Chico

52

10/11/09

CINNABAR

Oil Cabinet Installation - capital work item Install storage cabinet adjacent to Knaack box. Insufficient space inside compressor building. Nick OK

25699645.xls, Cinnabar

53

11/10/09

CINNABAR

Install 81S1F68-4 (3) 5000 psi relief valves and face seal/bleed fittings on the three bottles. Observe PG&E procedures for temporarily removing PRV from service on a CNG storage vessel.

currently 9'-10", so extend to 10'+ by treading ends and add coupling and extension

25699645.xls, Cinnabar

54

11/10/09

CINNABAR

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee and install weather cap and tether. New stacks on bottle PRV's are 9'10", so extend to 10'. Dispenser - Remove tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed, use threaded bushing wth a nipple above, with the top threads cut off.

compr building tank stack currently under 10', so extend to 10'+

25699645.xls, Cinnabar

55

11/10/09

CONCORD

Oil Cabinet Installation - capital work item Install storage cabinet adjacent to existing parts cabinet, 8"+ out from wall to provide clearance from conduit. Nick OK

25699645.xls, Concord

56

11/11/09

CONCORD

DISPENSER / ESD DISTANCES NO SCALE AUDIT: ESD 1 is about 18 feet from the closest dispenser. Dispenser 4 is located more than 75 feet from either ESD device.

WEST WALL ~90 conduit from existing to new ESD button

LIGHT POLE E3 PROPOSED 69'

65'

COMPRESSOR BUILDING

E1 75' North

75' 1

E2

2

18'

3

4

5

6

Install ESD button 36" high on light pole. Install ESD sign facing dispensers 1 & 2 CONDUIT TO COMPR BUILDING

E3

25699645.xls, Concord

57

11/11/09

CONCORD

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee and install weather cap and tether. Outlets are above 10' already. Dispenser - Remove tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed, use threaded bushing wth a nipple above, with the top threads cut off.

25699645.xls, Concord

58

11/11/09

CUPERTINO

Oil Cabinet Installation - capital work item Install storage cabinet in place of small Knaack box. Return Knaack box to Arch Rd or Victor. Nick OK

25699645.xls, Cupertino

59

11/10/09

CUPERTINO

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above grade, install weather cap and tether. Dispenser - Remove 1/2" tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed, use threaded bushing wth a nipple above, with the top threads cut off.

bottle rack stack is welded. Cut off tee just below weld, above 10'

25699645.xls, Cupertino

60

11/10/09

DAVIS

Oil Cabinet Installation - capital work item #1 Install storage cabinet on outside of this wall.

Install oil cabinet on the outside of this wall. Nick OK

25699645.xls, Davis

61

11/10/09

DAVIS

Remove Oil Tank and Vent Stack Assembly - capital work item #2 Oil tank feed lines: 1) Main storage bottles - leave tubing and valve manifold in place at bottles. Remove tubing from there to oil tank. 2) 3/4" pipe - drains 6x3 reducer. Remove along west wall. Leave drain valve in place on reducer. 3) Along south floor to two recovery vessels and compressor #2 filter separator. 4) Remove drain plug or valve from concrete containment, so containment will no longer trap water.

Remove piping from downstream of valve to oil tank. Install tubing adapter and 12" of tubing downstream of valve for future drain servicing.

Cut here and leave 6" + length of tubing and three valve set for future drain servicing. Remove remaining drain tubing to oil tank.

25699645.xls, Davis

62

11/10/09

DAVIS

Recovery Vessels: Disconnect tubing at tee along floor. Remove tubing along floor. Leave short 90degree tubing and drain valve for future drain servicing. Compressor #2 filter/separator. Leave 6" length of tubing and valve for future drain servicing. Remove remaining tubing. Tubing runs which are buried in the floor can be left in place. Cut and tape ends at least 2" above the floor for potential future use.

Leave in service

Leave this section in place. Cut and remove downstream from here to 2" from where it is buried in the floor.

Leave in service

25699645.xls, Davis

63

11/10/09

DAVIS Leave in service

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above grade, install weather cap and tether. Dispenser - Remove tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed, use threaded bushing wth a nipple above, with the top threads cut off.

9'-9" tall need to be extended to over 10'

25699645.xls, Davis

64

11/10/09

EUREKA

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT stack top fitting, extend to 10'+ above grade, install weather cap and tether. QC Bottle Rack - may share the 2" dispenser PRV stack. Dispenser - Remove tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed, use threaded bushing wth a nipple above, with the top threads cut off.

25699645.xls, Eureka

65

11/8/09

FLOSOM - SF

Oil Cabinet Installation - capital work item Install storage cabinet in place of small Knaack box. Rerturn Knaack box to Arch Rd or Victor Nick OK

25699645.xls, FolsomSF

66

11/10/09

FLOSOM - SF

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee and install weather cap and tether. Outlets are above 10' already. Dispenser - Remove tubing tee, extend to above 10' (currently 9'-9") and install weather cap and tether. PRV outlet tees are NPT, but are above the canopy. Some tees may be possible to remove from below the canopy, and some may require the stack be removed from the PRV first, to provide access to the tee from below. Exposed end of stack must not have threads, so when extensions are needed, use threaded bushing wth a nipple above, with the top threads cut off.

25699645.xls, FolsomSF

67

11/10/09

FRESNO

Oil Cabinet Installation - capital work item Install storage cabinet in place of Knaack box. Return Knaack box to Arch Rd or Victor Nick OK

25699645.xls, Fresno

68

11/13/09

FRESNO

Install 81S1F68-4 (6) 5000 psi relief valves and face seal/bleed fittings on the six bottles, per standard drawing in this workbook. Observe PG&E procedures for temporarily removing PRV from service on a CNG storage vessel.

Delete relief valve body supports

delete this piping

1) Inspect fittings between bottles and block valves for 8:1 factor of safety. Advise Engineering. 2) If not 8:1, replace nipples on either side of block valve with Butech MA12P12P 3/4" NPT nipple. Tube trailer must be engaged to allow tranfer of gas from station CNG bottles and back, using station compression equipment. Contact Sheridan a week in advance for early December site work date. 3) Replace PRVs with new PRV+face seal config (ref std drawing worksheet in this workbook). 4) Replumb PRV outlets as shown on the next page, so exhaust stacks are verticle, evenly spaced, and terminate at the same height.

25699645.xls, Fresno

69

11/13/09

2) If not 8:1, replace nipples on either side of block valve with Butech MA12P12P 3/4" NPT nipple. Tube trailer must be engaged to allow tranfer of gas from station CNG bottles and back, using station compression equipment. Contact Sheridan a week in advance for early December site work date. 3) Replace PRVs with new PRV+face seal config (ref std drawing worksheet in this workbook). FRESNO 4) Replumb PRV outlets as shown on the next page, so exhaust stacks are verticle, evenly spaced, and terminate at the same height.

STACK SUPPORT FRAME

45 degree schedule 80 ell

25699645.xls, Fresno

70

11/13/09

GRASS VALLEY

Oil Cabinet Installation - capital work item Install storage cabinet in place of existing Knaack box. Return Knaack box to Arch Rd or Victor Nick OK

25699645.xls, GrassValley

71

11/10/09

GRASS VALLEY

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above grade, install cap. Dispenser - Remove 1/2" tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed, use threaded bushing wth a nipple above, with the top threads cut off.

2" NPT stack is 10'-4" tall, so merely remove the tee at the top

25699645.xls, GrassValley

72

11/10/09

HAYWARD

Oil Cabinet Installation - capital work item Install storage cabinet as shown. Return Knaack box to Victor or Arch Road Nick OK

Here in front of compr building.

25699645.xls, Hayward

73

11/10/09

HAYWARD

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above grade (QCbottlerack is currently 9'-4"), install weather cap and tether. Dispenser - Remove 1/2" tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed, use threaded bushing wth a nipple above, with the top threads cut off.

currently 8'-10"

25699645.xls, Hayward

74

11/10/09

LIVERMORE

Oil Cabinet Installation - capital work item Install storage cabinet on this wall? Or where the Knaack box sits? Discuss. Consider a smaller cabinet since this is tight. Return the Knaak box to Arch Rd or Victor Nick to check

PANEL

WALL

41"

KNAACK

Cabinet #!: 43" W X 44" H X 18" D could fit here, since Knaack box will be removed. Or should the new cabinet sit where the Knaack box sits?

68"

25699645.xls, Livermore

75

11/12/09

LIVERMORE

<<MTC - Swan or PG&E must have fire flow rate calcs - why not check suitability of existing tubing before we relocate / rebuild? We have time.>> Install four new PRVs for CNG bottles. Replace SS tubing between bottles and PRVs with 3/4" Gr B Schedule 160 pipe (for 5000 psi service) . <> Move the PRV rack to the end of the bottles typical of other stations. If bottle PRVs will be out of service for a few days…let the storage pressurebleed down to 3k psi or so in advance, and perform under a clearance.

Install new PRV+face seal assembles per the standard design on the PRVpiping worksheet. Build a new PRV rack to support

25699645.xls, Livermore

76

11/12/09

LIVERMORE

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove tees, extend to 10'+ above grade, install weather cap and tether. Dispenser - Remove 1/2" tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed, use threaded bushing wth a nipple above, with the top threads cut off.

PRV outlets are ~ 8'5", so extend to above 10'

storage bottle and priorty panel PRV stacks are already above 10' - just remove the tees

25699645.xls, Livermore

77

11/12/09

LOS BANOS

Oil Cabinet Installation - capital work item Install storage cabinet in corner. Return Knaack box to Arch Rd or Victor Nick OK

PRV STACK CHANGES No field check was done on these. Remove T-tops found on any stack outlets. Extend stacks so that the outlet it 10' or more above surrounding grade. Install water sock on stack outlet Exposed end of stack must not have threads, so when extensions are needed, use threaded bushing wth a nipple above, with the top threads cut off.

25699645.xls, LosBanos

78

11/7/09

MANTECA

NO Oil Cabinet Installation Nick OK

25699645.xls, Manteca

79

10/10/09

MARTIN SCHEDULED FOR 2010 UPGRADE, SO DEFER ALL OF THIS WORK FROM LATE 2009. ESD station installation - capital work item Resolve code requirments (5-25' 10'+ and/or 25-75') The VFA emergency manual shutoff device is located on the outside of the fleet garage and within view of the VFA but is about 60 feet from the compressor. Note: CFC 5204.6 and CFC 5204.9 require that an emergency shutdown device must be located within 75 of but not less than 25 feet from dispensers and must also be provided in the compressor area. Upon activation, the emergency shutdown shall automatically shut off the power supply to the compressor and close valves between the main gas supply and the compressor and between the storage containers and dispensers. This requirement applies to all dispensers, including VFAs, and is in conflict with the requirement stated above in the “Requirements” section.

Existing disconnect location 60' from dispensors (remeasure if this becomes an issue)

locate new ESD on fence here?

25699645.xls, Martin

80

10/16/09

MARYSVILLE

Oil Cabinet Installation - capital work item Install storage cabinet in place of small Knaack box. Return Knaack box to Arch Rd or Victor. Nick OK

25699645.xls, Marysville

81

11/25/09

MARYSVILLE

Oil Tank Removal - capital work item #2 Leave valves and 6"+ stub tubing downstream for future drain servicing Remove tank and above ground piping. Remove drain plug or valve from concrete containment, so containment will no longer trap water.

Main storage bottle drains: Cut tubing here and leave 6" for future drain service.

Cut off here, replace with tubing adapter and tubing sufficient to reach to the edge of the slab for future drain service.

25699645.xls, Marysville

82

11/25/09

MARYSVILLE

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above grade, install weather cap and tether. Dispenser - Remove tubing tee, install weather cap and tether. Tees on tops of the four 3" stacks on the corners of the compr skid are welded. Not all are fed by PRV or vent exhaust, so those not used can be left as-is. For those with supplies, the stacks will be taken out of service, and new stack clamped in place for each individual PRV (typically 3/4" or 1") which is extended up above 10' above the compr skid elevation, with caps. Exposed end of stack must not have threads, so when extensions are needed on NPT, use threaded bushing wth a nipple above, with the top threads cut off.

develop and employ a design such as this to connect the two different clamp sizes (3" for existing stack which becomes structural, and typically 3/4" or 1" for new stack

25699645.xls, Marysville

83

11/25/09

MARYSVILLE

25699645.xls, Marysville

84

11/25/09

MERCED

Oil Cabinet Installation - capital work item Install storage cabinet in place of Knaack box. Return Knaack box to Arch Rd or Victor Nick OK

25699645.xls, Merced

85

11/10/09

MERCED

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above grade, install weather cap and tether. Dispenser - Remove 1/2" tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed on NPT, use threaded bushing wth a nipple above, with the top threads cut off. Large dia stack can be cut off at 10'+ with no height extension needed. vessel currently 9'-9" up, so extend to 10'+ above grade Stack at south end of priority panel is 1.5" NPT.

Large compressor PRV stack is 3" welded. Saw off tee below weld area at 10' + height above concrete pad

vessel currently 9'-6" up, so extend to 10'+ above grade. 1" NPT for CNG storge, 3/4" NPT for quick change bottle racks

25699645.xls, Merced

86

11/10/09

MODESTO

Remove NPT tee, install rain cap and tether Exposed end of stack must not have threads, so when extensions are needed on NPT, use threaded bushing wth a nipple above, with the top threads cut off.

25699645.xls, Modesto

87

11/10/09

OAKLAND

Oil Cabinet Installation - capital work item Install storage cabinet ????? No space inside the building as far as I can see for a 43x18 footprint. Nick to field check further.

Maybe place between a bollard and the compr building wall?

25699645.xls, Oakland

88

11/11/09

OAKLAND

tr o N h

DISPENSER / ESD DISTANCES NO SCALE Install new ~20' run of conduit existing ESD button E1 to proposed new ESD button E4. Review w/MTC.

75' COMPR BUILDING

x E4 1

E1

75' 9

6

5

4

3

2

E3

1

E2 PROPOSED

46'

28.5'

63' 8' 75' Locate new E4 so that it is > 75' from dispensor #6

AUDIT: The slow fill posts 5, 2 & 1 were located either less than 25 feet or more than 75 feet from the ESD. JRG field check: Only slow fill post 6 is outside the 25-75' range (too close to E2).

75' to dispenser #6

E4

Add ESD button near top of bollard. Install 6' tall unistrut mast and mount ESD button location sign facing east. Clamp unistrut to bollard, so that ESD button is within 75' of dispenser # 6. Run 20' conduit through building wall and to ESD system

25699645.xls, Oakland

89

11/11/09

Add ESD button near top of bollard. Install 6' tall unistrut mast and mount ESD button location sign facing east. Clamp unistrut to bollard, so that ESD button is within 75' of OAKLAND dispenser # 6. Run 20' conduit through building wall and to ESD system

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above grade, install weather cap. Dispenser - Remove 1/2" tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed on NPT, use threaded bushing wth a nipple above, with the top threads cut off.

25699645.xls, Oakland

90

11/11/09

REDDING

ESD LOCATION ISSUE JRG SITE VISIT NOT CONDUCTED Because this is a single fuelmaker, ESD installation consists of the ESD button station located 5' to 25' from the fuelmaker. Install button, unistrut mast and sign on bollard > 5' from the fueling appliance.

AUDIT: The emergency electrical disconnect switch is mounted on the wall of the fleet garage about 70 feet from the dispenser. Note: CFC 5204.6 and CFC 5204.9 require that an emergency shutdown device must be located within 75 of but not less than 25 feet from dispensers and must also be provided in the compressor area. Upon activation, the emergency shutdown shall automatically shut off the power supply to the compressor and close valves between the main gas supply and the compressor and between the storage containers and dispensers. This requirement applies to all dispensers, including VFAs, and is in conflict with the requirement stated above in the “Requirements” section.

25699645.xls, Redding

91

11/11/09

SACRAMENTO CNG

Oil Cabinet Installation - capital work item #1 Install storage cabinet inside the building centered and backed up against these cross braces. Cabinet will be 5-6" out from the wall since it doesn't fit under the bracing. Nick OK

space from the cross-bracing to the edge of the skid is ~39". 18" deep cabinet 1 would fit here inside the building.

cabinet 1: 43" W X 44" H X 18" D (too tall to fit under cross bracing, but shallow enough to fit

49"

21.5" 110"

~39"

25699645.xls, SacramentoCNG

29.8 height of cross bar at edge of cabinet 1

92

11/10/09

SACRAMENTO CNG

Oil Tank Removal - capital work item #2 Remove drain plug or valve from concrete containment, so containment will no longer trap water. Leave ball valve, needle valve and 6" stub tubing downstream of each oil source for future drain servicing.

Remove tubing to oil tank

Remove blue auto dump device, install ball valve + needle valve and 6" of tubing for drain outlet here Cut off here, leave 6" of tubing and ball valve in place, add needle valve, remove the rest of the tubing above ground back to the oil tank. Confirm with TECH 25699645.xls, SacramentoCNG 93

11/10/09

SACRAMENTO CNG Cut off here, leave 6" of tubing and ball valve in place, add needle valve, remove the rest of the tubing above ground back to the oil tank. Confirm with TECH

This tubing feeds the oil tank. Replace with ball+needle valve set and drain spout

25699645.xls, SacramentoCNG

94

11/10/09

SACRAMENTO CNG

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above grade, install weather cap and tether. Dispenser - Remove 1/2" tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed on NPT, use threaded bushing wth a nipple above, with the top threads cut off.

Cut off tee 1/4" below weld. ~ 11'-6" height is fine.

Remove NPT tees

QCbottle rack stack is 3/4" welded tee at top, 8'-8" up. Replace entire stack with 3/4" with outlet above 10' from grade

25699645.xls, SacramentoCNG

95

11/10/09

SALINAS

Oil Cabinet Installation - capital work item Install storage cabinet ????? Jerry Bunker to check late October cabinet 1: 43" W X 44" H X 18" D While this location may work, the support post will interfere with one of the doors. Review with TECH.

OK to use this space for cabinet?

25699645.xls, Salinas

96

11/10/09

SALINAS

Oil Tank Removal - capital work item #2 Leave valves and 6" stub tubing downstream of each oil source for future drain servicing Remove tank and above ground piping. Remove drain plug or valve from concrete containment, so containment will no longer trap water.

Install tubing adapter and 6" tubing downstream of valve

Cut off tubing 2" above the floor for tubing runs buried in the floor and tape ends for future use. RVW W/MTC

25699645.xls, Salinas

97

11/10/09

Cut off tubing 2" above the floor for tubingSALINAS runs buried in the floor and tape ends for future use. RVW W/MTC

My notes don't address this stub which dumps into the containment review with the TECH.

Remove Tees and downstream tubing to oil tank. Leave the short tubing and valve assembly in place for future drain service.

25699645.xls, Salinas

98

11/10/09

SALINAS

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee and install weather cap and tether. Confirm heights are above 10' Dispenser - Remove tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed on NPT, use threaded bushing wth a nipple above, with the top threads cut off.

25699645.xls, Salinas

99

11/10/09

SAN RAFAEL

Oil Cabinet Installation - capital work item Install storage cabinet adjacent to existing cabinet. and return to Arch Rd or Victor

Remove Knaack box from inside of compressor building

Nick OK

25699645.xls, SanRafael

100

11/10/09

SAN RAFAEL

tr o N h

DISPENSER / ESD DISTANCES NO SCALE FAST FILL DISP

Install 110' of new conduit for new ESD button E2 1

2

3

Audit states 81' 74'

4

75'

29'

72'

E2

E1 53'

PROPOSED

26.5'

GARAGE

E3

Fenced area along edge of building. Install condit on fence. Mount ESD button 36" above grade, install ESD location sign near top of fence above ESD station.

Install conduit on inside of garage wall - this has not been field checked bury 26.5' across this open pavement area

View looking SE from dispensors towards new conduit run and ESD

E3

E1

AUDIT: One emergency shutdown device (ESD) located on the outside wall of the shop building. The two posts closest to the ESD were located within the 25 to 75 foot range; however, the third and fourth slow fill posts were both located more than 75 feet away from the ESD. The ESD nearest the fast fill dispenser was located on the outside wall of the same shop building, opposite the fast fill dispenser, and was about located about 81 feet from the dispenser. JRG field check measured 74' - no issue.

25699645.xls, SanRafael

101

11/10/09

SAN RAFAEL

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Extend to 10'+ above grade, install weather cap and tether. This will require removal of the existing stack, rethreading, and extending with a bushing and nipple Dispenser - Remove 1/2" tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed on NPT, use threaded bushing wth a nipple above, with the top threads cut off.

currently 9' 10" currently 9' 3"

25699645.xls, SanRafael

102

11/10/09

SAN RAFAEL

Install new 81S1F68-4 PRV for high bank CNG bottles.

25699645.xls, SanRafael

103

11/10/09

SAN RAMON LEARNING CENTER

Remove Dryer Assembly - capital work item Disconnect and remove dryer assembly. Install new 1 1/2" NPT piping run. Leak test at 103-110 psig for 5 minutes (MTC - WHAT IS THE OPERATING PRESSURE FOR THIS? Is this fed by Learning Center piping at 2psi or???) Salvage and delivery dryer assembly to Victor yard.

D

E

38 5/8"

If nipple B is removed and replaced with nipple A, the alignment of elbows C and D looks very close if not perfect. Length of new piping with union (reuse E?) is 38 5/8"

A B C

25699645.xls, SanRamonLS

104

11/17/09

SAN RAMON LEARNING CENTER

DISPENSER / ESD DISTANCES NO SCALE

tr o N h

A number of VFA's are outside the 25' range from ESD buttons. JRG - check with Nick for drawings, and then Al Galiso 925 866-5678 [759 1401 cell] for asbuilt electrical drawings on site. LM for Al 11/17/09 E3 System Electrical Panels

E1 25'

25'

25'

1

2

3

4

E7

5 7

6 E6

8

9

10

13

14

11

12

15

16

E5

17

18

19

20 25'

25' E4

tentative: install ESD 5, 6 & 7 conduit in planting area (no pavement breaking) as shown. Run conduit along bender board and curbing on the surface (no need to bury). MTC REVIEW E2

E3

E5

E1

E2

replace sign

E5

Install ESD station and sign on existing fire extinguisher post <<MTC>> 25699645.xls, SanRamonLS

105

11/17/09

SAN RAMON LEARNING CENTER

Install ESD station and sign on existing fire extinguisher post <<MTC>>

E2

E5

Install ESD station and sign on existing post <<MTC>>

25699645.xls, SanRamonLS

106

11/17/09

SAN RAMON LEARNING CENTER

replace sign on E6 with new sign #1

E7

E6

E4

Tie in to ESD circuit on existing electrical panels. Provide sketch on as-built drawing or here of the connection points.

25699645.xls, SanRamonLS

107

11/17/09

SANTA CRUZ

Oil Cabinet Installation - capital work item SITE VISIT WAS NOT CONDUCTED BY JRG Install storage cabinet where up against the back curb in place of little Knaack box, adjacent to the existing gig cabinet behind the card reader. Return little Knaack box to Arch Rd or Victor. Nick OK

Cabinet #!: 43" W X 44" H X 18" D use this since it is shallower?

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Extend to 10'+ above grade, install weather cap and tether. This will require removal of the existing stack, rethreading, and extending with a bushing and nipple Dispenser - Remove 1/2" tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed on NPT, use threaded bushing wth a nipple above, with the top threads cut off.

25699645.xls, SantaCruz

108

11/10/09

SANTA ROSA

Oil Cabinet Installation - capital work item #1 Install storage cabinet where ???? Inside the compressor building? Mike Glass to field check late October.

Cabinet #!: 43" W X 44" H X 18" D

25699645.xls, SantaRosa

109

11/11/09

SANTA ROSA

Oil Tank Removal - capital work item #2 Leave oil supply valves and 6" stub tubing downstream for future drain servicing. Add a needle or ball valve to the separator drains inside the building so that each drain has a ball valve and a needle valve. Remove tank and above ground piping. Remove drain plug or valve from concrete containment, so containment will no longer trap water.

plug the tubing outlet of the valve. CNG Maint will add a spout.

Add ball valve here Add ball valve here

25699645.xls, SantaRosa

110

11/11/09

SANTA ROSA

ESD BUTTON LOCATION AUDIT: Slow fill dispenser row nearest to the compressor enclosure: All slow fill dispensers are within 25 to 75 feet of an ESD with the exception of dispenser no. 1. It is located greater than 75 feet from either ESD. Slow fill dispenser row furthest from the compressor enclosure: Dispenser no. 8 is located about 18 feet from the ESD located between it and dispenser no. 7. It is also located more than 75 feet from the ESD located on the compressor enclosure. JRG FIELD CHECK Dispenser #8 is 18' from E1 (which is less than the 25' minimum separation) and 120' from E2 (which is greater than the 75' maximum separation), so the new button must accommodate D8 as well as D1

6

7

8 E1

5

4

9

10

<75' 3 E3

2

1

<75'

Existing conduit run passes by E3 location. Exacavate, open, add a junction box and add new button E3. Expect to do this without pulling new wire from E1 to E2 and only pulling new wire from the new box in pavement to E3

120'

E2 COMPRESSOR BUILDING

Add ESD button near top of bollard on inboard side so it cannot be contacted by vehicles. Install 6' tall unistrut mast and mount ESD button location sign.

Existing conduit from E2 to E1.

25699645.xls, SantaRosa

111

11/11/09

SANTA ROSA

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above grade, install weather cap and tether. Dispenser - Remove 1/2" tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed on NPT, use threaded bushing wth a nipple above, with the top threads cut off.

25699645.xls, SantaRosa

112

11/11/09

STOCKTON

Oil Cabinet Installation - capital work item Install storage cabinet where oil is sitting in photo below. Leave 4" between the back of the cabinet and the horizontal structural rail. 35" W X 35" H X 22" D Sufficient space exists to accommodate door opening with a 22" deep cabinet. Nick OK

relocate ball valves to clear oil cabinet

Access must be maintained for tubing fittings and control valve.

25699645.xls, Stockton

113

11/11/09

Access must be maintained for tubing fittings and control valve.

STOCKTON

Oil Tank Removal - capital work item #2 Leave valves and 6" stub tubing downstream for future drain servicing Remove tank and above ground piping. Remove drain plug or valve from concrete containment, so containment will no longer trap water.

Tank is supplied only from the main storage bottle drain manifold. Cut off tubing here and from downstream to tank.

25699645.xls, Stockton

114

11/11/09

STOCKTON

DISPENSER / ESD DISTANCES NO SCALE Install ~60' of buried conduit from existing ESD button E3 to proposed new ESD button E4 on bollard at slow fill station #8. Install unistrut mast and ESD location signs on bollard, facing dispensers 1 and 10.

Posts that are located greater than 75 feet from any of the ESDs include posts 2, 5, 9 and 10. In addition, posts 1 and 2 were located less than 25 feet from the ESD located nearest to post 1 E1

2

3

4

~30' 6

7

5 tr o N h

1

69' 8 E4

9

10

PROPOSED

COMPR BUILDING

60' E3

E2

75'

cooling tower

E4

E3

new buried conduit run to dispensor 8 location. New ESD E4 and 8' post AUDIT: There are 10 slow fill posts arranged in two parallel rows: row one includes posts 1 – 5 and row 2 includes posts 6 – 10. There are three ESDs that service these posts. One is located adjacent to post 1. The second ESD is mounted on the wall of the compressor enclosure (see last photo in finding no. 1). The third ESD is mounted on the light post near the cooling tower. Posts that were located greater than 75 feet from any of the ESDs include posts 2, 5, 9 and 10. In addition, posts 1 and 2 were located less than 25 feet from the ESD located nearest to post 1; however, there are no dispensers mounted on post 1 at this time. 25699645.xls, Stockton

115

11/11/09

AUDIT: There are 10 slow fill posts arranged in twoSTOCKTON parallel rows: row one includes posts 1 – 5 and row 2 includes posts 6 – 10. There are three ESDs that service these posts. One is located adjacent to post 1. The second ESD is mounted on the wall of the compressor enclosure (see last photo in finding no. 1). The third ESD is mounted on the light post near the cooling tower. Posts that were located greater than 75 feet from any of the ESDs include posts 2, 5, 9 and 10. In addition, posts 1 and 2 were located less than 25 feet from the ESD located nearest to post 1; however, there are no dispensers mounted on post 1 at this time.

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above grade, install weather cap and tether. Dispenser - Remove 1/2" tubing tee, install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed on NPT, use threaded bushing wth a nipple above, with the top threads cut off. Replace the 3" cap on the main compr building relief stack header. 2" NPT Hurricane PRV stack at QC bottle rack NPT top 8'-10" up, so extend to 10'+ above grade.

3/4" NPT

2" NPT stack at CNG storage 8'-4" tall. Extend to 10'+ above grade

This 3/4" NPT stack is 7'-4" tall, and needs to be extended 3'. Install unistrut bracing

25699645.xls, Stockton

116

11/11/09

TREAT SF

Oil Cabinet Installation - capital work item Install storage cabinet where existing small Knaack box sits, and return small Knaack box to Arch Rd or Victor. Nick OK

small Knaack box here

25699645.xls, TreatSF

117

11/11/09

TREAT SF

North

DISPENSER / ESD DISTANCES NO SCALE

Install new ~41' run of conduit overhead from existing ESD button E2 to proposed new ESD button E3. Vehicles do not drive between the row of dispensors, so overhead rigid steel conduit mounted on the dispensor stanchions should work. Tapping into conduit at E3 and intalling a traffic box would avoid a long conudit run and pulling wire, but the conduit was reported as being 3-4' deep, so the shallow trench and conduit from E2 to E3 has been chosen as easier. Install the ESD sign above the ESD button, visible from the left and right in this photo (2 signs).

Pull box location 26' ok E1

17

16

31'

15

14

13

12

11 45'

75'

10 9 E3 PROPOSED

8

7

E2

75'

E2 E3

AUDIT: There are two rows of slow fill posts. The rows are separated by a driveway. One row contains 6 posts and the other row has 11 posts. The row of 11 posts has one pole-mounted ESD at each end of the row. The row of 6 posts has one ESD located on Building E. There is also an ESD located on the garage. Row containing 11 posts - Four of 11 dispenser posts are not located within the 25 to 75 foot distance of an ESD. The three posts located nearest to the driveway are all within 25 feet of the ESD located nearest them. They are all further than 75 feet from any other ESD. The sixth post from the end closest to the three is located more than 75 feet from any ESD. Row containing 6 posts - All of the slow fill posts on the row of six are located within 25 to 75 feet of an ESD.

25699645.xls, TreatSF

118

11/11/09

TREAT SF

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above grade, install weather cap and tether. Dispenser - Remove tubing tee, extend to above 10', install weather cap and tether. Exposed end of stack must not have threads, so when extensions are needed on NPT, use threaded bushing wth a nipple above, with the top threads cut off.

QCBR 9'-8" extend to 10'+

25699645.xls, TreatSF

119

11/11/09

VACAVILLE

Oil Cabinet Installation - capital work item Install storage cabinet in place of existing small Knaack box. Return Knaack box to Arch Rd or Victor. Nick OK

25699645.xls, Vacaville

120

11/29/09

VACAVILLE

RELIEF VALVE DISCHARGE STACKS - EXPENSE General - Remove NPT tee, extend to 10'+ above grade, install weather cap and tether. Dispenser - Remove tubing tee, install weather cap and tether. Tees on tops of the four 3" stacks on the corners of the compr skid are welded. Only one is fed by a PRV (1"), so those not used can be left as-is. For the one with a 1" supply, the stacks will be taken out of service, and new stack clamped in place for each individual PRV (1") which is extended up above 10' above the compr skid elevation, with a cap.

develop and employ a design such as this to connect the two different clamp sizes (3" for existing stack which becomes structural, and 1" for new stack

25699645.xls, Vacaville

121

11/29/09

WOODLAND

Fuelmaker Removal - capital work item Access to inside of garage is limited - mechanic may only be there from noon to 8pm or so. Tom Hickman is the lead for garage personnel in this area - coordinate with him? 530 277-0941 1) Disconnect power supply and remove wiring from junction box, disconnect and fuelmaker 2) Disconnect and remove gas supply piping from meter to fuelmaker, and upstream of meter. Should we have the meter removed by a service department?

25699645.xls, Woodland

122

10/10/09

Related Documents

Station Data 112909
June 2020 2
Station Data 111509
June 2020 5
Total Station
July 2020 16
Power Station
June 2020 20
Space Station
April 2020 18