I. PEKERJAAN GALIAN

NO

TASKS

1.1 Pekerjaan Boplank

NO

HAZARDS

RISKS

FREQ

SEVERITY

RISK SCORE

CLASSIFIED

Existing Control

1

Tanah becek

Terpeleset

4

2

8

M

mengugunakan APD

2

Binatang berbisa

Tergigit

1

4

4

L

mengugunakan APD

FREQ

SEVERITY

RISK SCORE

CLASSIFIED

Existing Control

II. PEKERJAAN TANAH DAN PASIR

NO

TASKS

2.1 Pek. Galian tanah biasa pondasi menerus

2.2 Pek. Urugan pasir bawah lantai

NO

HAZARDS

RISKS

1

Hewan

Terigigit hewan berbisa

3

3

9

M

mengugunakan APD

2

Becek

Terpeleset

3

2

6

M

mengugunakan APD

1

Debu

Asma

2

3

6

M

mengugunakan APD

2

Material

Terpeleset

2

5

10

H

mengugunakan APD

FREQ

SEVERITY

RISK SCORE

CLASSIFIED

Existing Control

III. PEKERJAAN PASANGAN DAN PLESTERAN

NO

TASKS

3.1 Pek. plesteran dinding dan bataran

3.2 Pek. Acian dinding dan bataran

3.3 Pas. Batu bata merah

3.4 Pek. Batu kosong

NO

HAZARDS

RISKS

1

Bahan plesteran

Terkena mata/ kejatuahan bahan plesteran

3

3

9

M

mengugunakan APD

2

Ketinggian

terjatuh dari scaffolding

2

5

10

H

mengugunakan APD

1

Bahan acian

Terkena mata/ kejatuahan bahan acian

3

2

6

M

mengugunakan APD

9

Ketinggian

terjatuh dari scaffolding

9

1.5

13.5

H

mengugunakan APD

9

Bata

Kejatuhan bata saat pemasangan

9

3

27

-

mengugunakan APD

9

Material

Kejatuhan batu kosong

9

3

27

-

mengugunakan APD

9

Material

kejatuhan material saat angkat angkut

9

4

36

-

mengugunakan APD

2

Becek

Terpleset saat memasang batu kosong

4

2

8

M

mengugunakan APD

FREQ

SEVERITY

RISK SCORE

CLASSIFIED

Existing Control

IV. PEKERJAAN BETON

NO

TASKS

4.1 Pek. Beton kolom 15/35

4.2 Pek. Beton tangga

NO

HAZARDS

RISKS

1

Bahan

Kangker kulit

4

2

8

M

mengugunakan APD

2

Ketinggian

Terjatuh saat pengecoran

2

5

10

H

mengugunakan APD

1

Bahan

Kangker kulit

4

2

8

M

mengugunakan APD

2

Ketinggian

Terjatuh saat pengecoran

2

5

10

H

mengugunakan APD

FREQ

SEVERITY

RISK SCORE

CLASSIFIED

Existing Control

V. PEKERJAAN PLAPOND

NO

TASKS

NO

HAZARDS

RISKS

5.1 Pek. Plapon Gypsum

1

Material

Tertimpa plapond

3

2

6

M

mengugunakan APD

2

Ketinggian

Terjatuh saat pemasangan plapond

2

5

10

H

mengugunakan APD

FREQ

SEVERITY

RISK SCORE

CLASSIFIED

Existing Control

VI. PEKERJAAN KUSEN, PINTU DAN JENDELA

NO

TASKS

NO

6.1 Pek. kusen kayu kamfer 6/15cm

HAZARDS

RISKS

1

Material

Kejatuhan saat angkat angkut

3

3

9

M

mengugunakan APD

2

Material

Tertimpa saat pemasangan kusen

3

3

9

M

mengugunakan APD

FREQ

SEVERITY

RISK SCORE

CLASSIFIED

Existing Control

VII. PEKERJAAN PENGGANTUNG DAN PENGUNCI

NO

TASKS

NO

7.1 Engsel pintu

7.2 Engsel jendela

HAZARDS

RISKS

1

Pemahat

Tangan terkena pahatan

4

2

8

M

mengugunakan APD

2

Bor listrik

Tangan terkena bor listrik

2

4

8

M

mengugunakan APD

1

Pemahat

Tangan terkena pahatan

4

2

8

M

mengugunakan APD

2

Bor listrik

Tangan terkena bor listrik

2

4

8

M

mengugunakan APD

FREQ

SEVERITY

RISK SCORE

CLASSIFIED

Existing Control

3 3

3 3

9 9

M M

mengugunakan APD mengugunakan APD

FREQ

SEVERITY

RISK SCORE

CLASSIFIED

Existing Control

VIII. PEKERJAAN INSTALASI AIR DAN SANITER

NO

TASKS

8.1 Pas. Wastafel toto

NO 1 2

9.1

TASKS Pek. Kuda-kuda baja ringan C 0,75 surya trust

Material Material

RISKS Tertimpa Saat pemasangan wastafel Tertimpa Saat angkat angkut wastafel

PEKERJAAN PENUTUP ATAP

IX. PEKERJAAN BESI DAN ALUMINIUM

NO

HAZARDS

NO

HAZARDS

RISKS

1

Material

Terkena/Tergores material

3

3

9

M

mengugunakan APD

2

Grinda

Terkena mesin gerinda

2

4

8

M

mengugunakan APD

FREQ

SEVERITY

RISK SCORE

CLASSIFIED

Existing Control

X. PEKERJAAN PENUTUP ATAP

NO

TASKS

10.1 Pas. Atap solar gaff

NO

HAZARDS

RISKS

1

Ketinggian

Terjatuh dari ketinggian

3

3

9

M

mengugunakan APD

2

Material

Tertimpa saat angkat angkut material

3

4

12

H

mengugunakan APD

FREQ

SEVERITY

RISK SCORE

CLASSIFIED

Existing Control

4 4 4

2 2 2

8 8 8

M M M

mengugunakan APD mengugunakan APD mengugunakan APD

XI. PEKERJAAN FINISHING

NO

TASKS

11.1 Pek. Cat tembok (dulux catilac) 12.1 Pek. Polituran kusen (lasur)

NO 1 2 3

HAZARDS Cat Cat Polituran

RISKS Terkena mata saat pengecetan Gangguan pernapasan Terkena mata saat polituran

4

Polituran

Gangguan pernapasan

4

2

8

M

mengugunakan APD

Action Sepatu Kerja Sepatu Kerja, Sarung tangan

Action Helm Kerja, Sepatu Kerja Helm Kerja, Sepatu Kerja Masker Helm Kerja, Sepatu Kerja, Safety Belt, Rompi Kerja,

Action Helm Kerja, Sepatu Kerja, Rompi kerja Helm Kerja, Sepatu Kerja, Safety Belt, Rompi Kerja, Kacamata Helm Kerja, Sepatu Kerja, Safety Belt, Rompi Kerja, Helm Kerja, Rompi kerja, Safety Belt Helm Kerja, Sarung tangan Helm Kerja, Sarung tangan, Sepatu Kerja Sepatu Kerja, Helm

Action Sarung tangan, Sepatu Kerja, Helm Helm Kerja, Sepatu Kerja, Safety Belt, Rompi Kerja Sarung tangan, Rompi Helm Kerja, Sepatu Kerja, Safety Belt, Rompi Kerja,

Action

Helm Kerja, Sepatu Kerja, Safety Belt, Rompi Kerja Helm Kerja, Sepatu Kerja, Safety Belt, Rompi Kerja,

Action Helm Kerja, Helm Kerja, Rompi kerja

Action Helm Kerja, Sepatu Kerja, Safety Belt, Rompi Kerja, Sarung Tangan Karet Sarung Tangan Sarung Tangan Karet

Action Sepatu Kerja, Helm Kerja Sepatu Kerja, Helm Kerja

Action Sarung tangan, Sepatu Kerja, Helm Kerja Sarung tangan

Action Helm Kerja, Sepatu Kerja, Rompi Kerja, Safety net Sepatu Kerja, Helm Kerja

Action Masker, Sarung Tangan Masker, Sarung Tangan Kacamata

Kacamata

ANALISIS KEBUTUHAN ALAT - ALAT K3

NO

DURASI JUMLAH KERJA PEKERJA ( hari )

KELENGKAPAN K3

SATUAN VOLUME

1 5 5 5 5 -

3 3 3 3 -

9 9 9 9

Pasang Pasang Buah Buah Ls Ls Paket

Sarung tangan karet Sepatu Helm Rompi

PEKERJAAN TANAH DAN PASIR Pasang 4 1.5 Pasang 4 0.1 Buah 4 0.1 Buah 4 0.2

Sepatu Sarung tangan karet Helm

PEKERJAAN PASANGAN DAN PLESTERAN Pasang 66 0.1 Pasang 66 1.5 Buah 66 0.1

3 66 66 66

26 26 26

PEKERJAAN PESIAPAN 5 1.5 5 0.1 5 0.1 5 0.2 1 1 1 1 1 1

Sarung tangan karet Sepatu Helm Rompi Safety line Pagar pengaman Rambu K3

2 4 4 4 4

4 47 47 47 47

31 31 31 31

Rompi K3 Helm Safety Belt Sarung tangan karet

7

96 96 96 96

6 6 6

6 6 6 6

Sepatu Sarung tangan karet Helm

Helm Rompi K3 Sepatu Safety Belt

BETON 0.2 0.1 1 0.1

Buah Buah Ls Pasang

47 47 47 47

Pasang Ls Buah

BESIAN 25 0.1 25 1 25 0.1

6 25 25 25

SAFETY FACTOR

Buah Pasang Pasang Buah

PEKERJAAN PLAFOND 96 0.1 96 0.2 96 0.1 96 0.1

8

9

11

13

14

41 41 41 41

30 30

23 23 23

27 27

52 52 52 1 52

6 6 6 6

6 6

9 9 9

6 6

6 6 6 6 6

Sarung tangan karet Kaca mata Helm Sepatu

PEKERJAAN KUSEN PINTU DAN JENDELA Pasang 41 0.2 Buah 41 0.1 Buah 41 0.1 Pasang 41 0.1

Sarung tangan karet Helm

PEKERJAAN PENGGANTUNG DAN PENGUNCI Pasang 30 0.2 Buah 30 0.1

Sarung tangan karet Masker Kaca mata

PEKERJAAN PENGECETAN DAN FINISHING Pasang 23 0.1 Buah 23 1 Buah 23 0.1

Helm Sepatu

PEKERJAAN INSTALASI AIR DAN SANITER Buah 27 0.1 Pasang 27 0.1

Sarung tangan karet Kaca mata Sepatu Safety net Helm

Pasang Buah Pasang Ls Buah

PEKERJAAN ATAP 52 0.1 52 0.1 52 0.1 1 1 52 0.1

RAB K3 RAB KONSTRUKSI PORSI BIAYA K3

LAT - ALAT K3

VOLUME

HARGA SATUAN

HARGA TOTAL

PESIAPAN 7.5 0.5 0.5 1 1 1 1

12,600.00 64,800.00 22,500.00 10,800.00 59,400.00 2,500,000.00 2,000,000.00

94,500.00 32,400.00 11,250.00 10,800.00 59,400.00 2,500,000.00 2,000,000.00 4,708,350.00

6 0.4 0.4 0.8

12,600.00 64,800.00 22,500.00 10,800.00

75,600.00 25,920.00 9,000.00 8,640.00 119,160.00

64,800.00 12,600.00 22,500.00

427,680.00 1,247,400.00 148,500.00 1,823,580.00

9.4 4.7 47 4.7

10,800.00 22,500.00 48,000.00 12,600.00

101,520.00 105,750.00 2,256,000.00 59,220.00 2,522,490.00

2.5 25 2.5

64,800.00 12,600.00 22,500.00

162,000.00 315,000.00 56,250.00 533,250.00

9.6 19.2 9.6 9.6

22,500.00 10,800.00 64,800.00 48,000.00

216,000.00 207,360.00 622,080.00 460,800.00

AH DAN PASIR

N DAN PLESTERAN 6.6 99 6.6

N

N

PLAFOND

1,506,240.00

NTU DAN JENDELA 8.2 4.1 4.1 4.1

12,600.00 7,500.00 22,500.00 64,800.00

103,320.00 30,750.00 92,250.00 265,680.00 492,000.00

UNG DAN PENGUNCI 6 3

12,500.00 22,500.00

75,000.00 67,500.00 142,500.00

AN DAN FINISHING 2.3 23 2.3

12,600.00 500.00 7,500.00

28,980.00 11,500.00 17,250.00 57,730.00

AIR DAN SANITER 2.7 2.7

22,500.00 64,800.00

60,750.00 174,960.00 235,710.00

12,600.00 7,500.00 64,800.00 200,000.00 22,500.00

65,520.00 39,000.00 336,960.00 200,000.00 117,000.00 758,480.00 12,899,490.00

N ATAP 5.2 5.2 5.2 1 5.2

1,032,116,512.30 0.0124980948 1%

No

Uraian Pekerjaan

A 1

PEKERJAAN LANTAI SATU Pek. Persiapan

2

Pek. Tanah a Pek. Galian b Pek Urugan pasir dan Kembali

3

Pek. Ponadsi a Pek.Pondasi Telapak b Pek Pondasi Batu kosong c Pek Pondasi Batu kali

4 a b c d 5

6

7

8

Pek. Struktur Beton Bertulang Pek. Sloop Pek. Kolom Pek Balok Pek Plat Lanati 1

Pek. Pasangan Dinding a Pek Pas Batu bata b Pek. Plesteran 15 mm c Pek Acian Pek. Lantai a Pek.Lantai Kramik dan Plin Pek Kayu a Pek. Pasangan kusen Pintu dan jendela b Pek Pasangan Daun Pintu dan Jendela Pek. Pasangan Plafond a Pek Rangka hollo dan penutup b Pek List Plafond

10 Pek Penggantung Kunci asesoris 9 11 Pek. Finishing pengecatan

Jumlah Harga

Bobot Durasi (hari)

1,870,391.25 1,870,391.25

Err:522

3.00

1,403,821.44 4,409,215.00 5,813,036.44

Err:522 Err:522

6.00 3.00

25,603,852.00 10,046,621.00 42,991,258.00 78,641,731.00

Err:522 Err:522 Err:522

12.00 3.00 6.00

28,397,467.00 68,428,457.00 55,180,356.00 31,000,257.00 183,006,537.00

Err:522 Err:522 Err:522 Err:522

6.00 13.00 8.00 4.00

64,006,240.00 29,828,608.00 26,052,928.00 119,887,776.00

Err:522 Err:522 Err:522

10.00 4.00 3.00

90,652,997.50 90,652,997.50

Err:522

9.00

4,532,000.00 27,160,750.00 31,692,750.00

Err:522 Err:522

0.00 0.00

10,060,369.00 2,570,272.00 12,630,641.00 8,475,000.00 8,475,000.00

Err:522 Err:522

4.00 2.00

Err:522

0.00

JANUAR 1

a b

Cat Dinding Dalam dan Luar Cat Polituran JUMLAH

B PEKERJAAN LANTAI DUA 12 Pek. Struktur Beton Bertulang a Pek. Kolom b Pek Balok Ring c Pek Plat Lantai Talang air 13 Pekerjaan Atap a Pek. Kuda - Kuda Baja Ringan b Pas Genteng Penutup Atap c Pek Pas Lis plank 14 Pek. Pasangan Dinding a Pek Pas Batu bata b Pek. Plesteran 15 mm c Pek Acian 15 Pek. Lantai a Pek. Kramik dan Plint 16 Pek Kayu a Pek. Pasangan kusen Pintu dan jendela b Pek Pasangan Daun Pintu dan Jendela 17 Pek. Pasangan Plafond a Pek Rangka hollo dan penutup b Pek List Plafond 18 Pek Penggantung Kunci asesoris 19 Pek. Finishing pengecatan a Pek. Cat b Pek. Cat Polituran 20 Pek. Pekerjaan Saniter a Pasangan Saniter

JUMLAH Jumlah Rencana Kerja

26,770,800.00 3,456,478.00 30,227,278.00 562,898,138.19

Err:522 Err:522

0.00 0.00

23,599,664.25 9,618,820.50 30,226,287.00 63,444,771.75

Err:522 Err:522 Err:522

0.00 0.00 0.00

18,164,250.00 82,800,000.00 3,930,525.00 104,894,775.00

Err:522 Err:522 0.38

3.00 3.00 0.00

64,006,240.00 29,828,608.00 31,931,359.64 125,766,207.64

Err:522 Err:522 Err:522

0.00 3.00 0.00

53,873,000.00 53,873,000.00

Err:522

0.00

9,124,700.30 2,208,519.33 11,333,219.63

Err:522 Err:522

0.00 0.00

10,060,368.46 2,570,271.79 12,630,640.25 9,675,000.00 9,675,000.00

Err:522 Err:522

0.00 0.00

Err:522

0.00

35,137,482.61 3,326,662.50 38,464,145.11

Err:522 Err:522

5.00 4.00

53,067,120.00 Err:522 473,148,879.38 1,036,047,017.57 Err:522 Mingguan Komulatif

6.00 120.00 0.2374 0.237

TIME SCHEDULE PEKERJAAN LOKASI

: :

PEMBANGUNAN RUMAH TINGGAL DAN PEMONDOKAN JL GOA GONG JIMBARAN

JANUARI 2

3

4

5

FEBRUARI 6 7

MARET 8

9

10

11

1.0272 1.265

1.2292 2.494

2.7677 5.261

1.9263 7.188

3.2592 10.447

3.5465 13.993

3.4900 17.483

3.6416 21.125

3.6698 24.795

3.7208 28.516

ARET

APRIL 12

13

14

MEI 15

16

17

18

19

20

KETERANGAN

6.0503 34.566

9.1378 43.704

6.3204 50.024

7.8281 57.852

8.4525 66.305

11.4574 77.762

11.4297 89.192

6.9746 96.166

3.84 100.00

RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN

:

: PEMBANGUNAN RUMAH TINGGAL DAN PEMONDOKAN

LOKASI

:

: JL. GOA GONG JIMBARAN

No.

Uraian Pekerjaan

Sat

Volume

LANTAI 1 I. 1

5.00 5.00

5.00 5.00

122.850

5.00 II.

5.00 Pekerjaan Tanah dan Pasir

5.00

1

Pek. Galian tanah biasa pondasi menerus

m3

14.875

2

Pek. Galian tanah foot plat

m3

10.000

3

Pek. Urugan pasir bawah lantai

m3

9.700

4

Pek. Urugan pasir bawah pondasi

m3

3.200

5

Pek. Urugan tanah kembali

m3

67.400

9.00 III.

9.00

9.00

1

9.00

9.00

21.944

2

9.00

9.00

54.860

3

Pas. Tembok Bata merah

m2

368.000

4

Pek. plesteran dinding dan bataran

m2

736.000

5

Pek. Acian dinding dan bataran

m2

736.000

6

Pek. Lantai keramik granit 60x60

m2

95.000

7

Pek. Lantai keramik granit 40x40 non slip dapur & KM

m2

31.000

8

Pek. Dinding keramik granit 40x40 kamar mandi

m2

108.000

9

Pek. Plin keramik 10x60 granit

m1

139.400

10

Pek. Keramik tangga step nosing

m2

19.500

IV.

Pekerjaan Beton

1

Pek. Foot plat

m3

7.400

2

Pek. Beton kolom 15/35

m3

3.290

3

Pek. Sloof 15/30

m3

6.170

4

Pek. Beton balok induk 20/40

m3

6.890

5

Pek. Beton plat lantai

m3

12.285

6

Pek. Beton tangga

m3

1.300

7

Pek. Kolom praktis 13/13

m3

3.440

8

Pek. Rabatan lantai dasar

m3

11.434

V.

Pekerjaan Plapond

1

Pek. Plapon Gypsum T 9 mm rangka hollow

m2

115.420

2

Pas. Lis gipsum

m'

83.000

VI.

Pekerjaan Kosen, Pintu, Jendela

1

Pek. kosen kayu kamfer 6/15cm

m1

41.200

2

Pas. Pintu pvc plastik (toilet)

unit

5.000

3

Pek. Daun pintu panil

m2

27.200

4

Pek. Daun jendela kaca ( kaca bening 8mm )

m2

6.961

VII

Pekerjaan Penggantung dan Pengunci

1

Engsel pintu (solid)

bh

24.000

2

Engsel jendela (solid)

bh

39.000

3

Kait angin (solid)

bh

12.000

4

Grendel (solid)

bh

12.000

5

Pas.kunci pintu swing (solid)

set

6

pas. Kunci pintu kamar mandi (solid)

set

7

Pas. Rell sleding (solid)

set

8

Pas. Rell folding (solid)

set

9

Pas. Kunci sleding (solid)

set

10

Pas. Hendel sleding (solid)

psng

11

Pas. Hendel folding (solid)

psng

12

Pas. Grendel taman (solid)

bh

VIII

6.000

Pekerjaan Instalasi air & Saniter

1

Pas. Klosed duduk toto

bh

2

Pas. Wastafel toto

bh

6.000

3

pas. Sower toto (panas/dingin)

bh

6.000

4

Pas. Floor drain

bh

6.000

5

Pas. Kran air

bh

6.000

IX

Pekerjaan Finishing

1

Pek. Cat tembok (dulux catilac)

m2

776.940

2

Pek. Cat plafond (dulux catilac)

m2

115.420

3

Pek. Polituran kusen (lasur)

m1

41.200

4

Pek. Polituran daun pintu panil (lasur)

m2

27.200

5

Pek. Polituran daun pintu kaca (lasur)

m2

6

Pek. Polituran daun jendela kaca (lasur)

m2

6.961 TOTAL COST LANTAI 1

N PEMONDOKAN

Harga Satuan

Jumlah Harga

( Rp. )

( Rp. )

614.25

75,460.61 75,460.61

56,435.00

839,470.63

56,435.00

564,350.00

162,850.00

1,579,645.00

162,850.00

521,120.00

34,250.00

2,308,450.00 5,813,035.63

457,830.00

10,046,621.52

783,654.00

42,991,258.44

173,930.00

64,006,240.00

40,528.00

29,828,608.00

35,398.00

26,052,928.00

291,487.00

27,691,265.00

394,297.00

12,223,207.00

397,680.00

42,949,440.00

34,685.00

4,835,089.00

151,487.00

2,953,996.50 263,578,653.46

3,459,980.00

25,603,852.00

9,461,760.00

31,129,190.40

4,602,510.00

28,397,486.70

8,008,760.00

55,180,356.40

1,577,440.21

19,378,852.98

3,488,162.50

4,534,611.25

10,842,810.00

37,299,266.40

619,800.00

7,086,793.20 208,610,409.33

87,163.13

10,060,368.46

30,967.13

2,570,271.79

12,630,640.25

110,000.00

4,532,000.00

210,000.00

1,050,000.00

800,000.00

21,760,000.00

625,000.00

4,350,750.00 31,692,750.00

95,000.00

2,280,000.00

65,000.00

2,535,000.00

45,000.00

540,000.00

35,000.00

420,000.00

450,000.00

0.00

450,000.00

2,700,000.00

650,000.00

0.00

3,200,000.00

0.00

255,000.00

0.00

225,000.00

0.00

225,000.00

0.00

180,000.00

0.00 8,475,000.00

2,154,680.00

12,928,080.00

1,450,000.00

0.00

2,750,000.00

16,500,000.00

125,000.00

750,000.00

250,000.00

OTAL COST LANTAI 1

1,500,000.00 31,678,080.00

30,000.00

23,308,200.00

30,000.00

3,462,600.00

30,000.00

1,236,000.00

65,000.00

1,768,000.00 0.00

65,000.00

452,478.00 30,227,278.00 592,781,307.28

0 0 0 0 0 0

-

-

-

-

0 0 0 0 0 0 0 0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

41

30

RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN

:

: PEMBANGUNAN RUMAH TINGGAL DAN PEMONDOKAN

LOKASI

:

: JL. GOA GONG JIMBARAN

No.

Uraian Pekerjaan

Sat

Volume

Harga Satuan ( Rp. )

LANTAI 2 I.

Pekerjaan Pasangan dan Plesteran

1

Pas. Tembok Bata merah

m2

368.000

173,930.00

2

Pek. plesteran dinding dan bataran

m2

736.000

40,528.00

3

Pek. Acian dinding dan bataran

m2

798.180

35,398.00

4

Pek. Lantai keramik indogres 60x60

m2

95.000

245,000.00

5

Pek. Lantai keramik indogres 60x60 non slip teras

m2

4.000

175,000.00

6

Pek. Lantai keramik indogres 40x40 non slip kamar m

m2

27.000

175,000.00

7

Pek. Dinding keramik indogres 40x40 kamar mandi,wa

m2

108.000

175,000.00

8

Pek. Plin keramik 10x60 indogres

m1

139.400

45,000.00

9

pek. Acian plat topian

m1

25.500

40,528.00

10

Pek. Water proffing lantai kamar mandi

m2

19.600

35,000.00

11

Pek. Acian dak talang

m2

22.500

25,000.00

12

Pek. Water proffiing dak talang

m2

22.500

35,000.00

13

Pek. Acian benangan topi talang

m1

15.000

40,528.00

II.

Pekerjaan Beton

1

Pek. Kolom 15/15

m3

3.340

3,728,225.00

2

Pek. Kolom 15/35

m3

2.990

3,728,225.00

3

Pek. Balok 13/25 (ring balok)

m3

2.580

3,728,225.00

4

Pek. Beton plat talang

m3

9.500

2,767,975.00

5

Pek. Beton lisplang

m3

1.420

2,767,975.00

III

Pekerjaan Plapond

1

Pek. Plapon Gypsum T 9 mm rangka hollow

m2

115.420

87,163.13

2

Pas. Lis gipsum

m'

83.000

30,967.13

IV

Pekerjaan Kosen, Pintu, Jendela

1

Pek. Kayu kosen kayu kamfer 5/14cm

M3

0.8786

10,385,500.00

2

Pek. Daun pintu dan Jendela

M3

1.4469

496,900.00

3

Pas. Pintu pvc plastik (toilet)

unit

5.000

210,000.00

4

Pas. Kaca Jnedela ( kaca bening 8mm )

m2

3.009

146,080.00

5

Pas. Kaca mati ( kaca bening 8mm )

m2

6

Pek. Bok sleding dan folding (kamper 2/20 )

m1

7

Pek. Lisplang kamper 3/25

m1

8

Pek. Tatab kamper 3/6

m1

V

Pekerjaan Penggantung dan Pengunci

1

Engsel pintu (solid)

bh

24.000

95,000.00

2

Engsel jendela (solid)

bh

39.000

65,000.00

3

Kait angin (solid)

bh

12.000

45,000.00

4

Grendel (solid)

bh

12.000

35,000.00

5

Pas.kunci pintu swing (solid)

set

6

Pas. Rell sleding (solid)

set

6.000

650,000.00

7

Pas. Rell folding (solid)

set

8

Pas. Kunci sleding (solid)

set

9

Pas. Hendel sleding (solid)

psng

10

Pas. Hendel swing jendela (solid)

psng

11

Pas. Hendel folding (solid)

psng

12

Pas. Grendel taman (solid)

bh

VI

Pekerjaan Besi dan Aluminium

1

Pek. Kuda-kuda baja ringan C 0,75 surya trust

m2

134.550

135,000.00

2

Pek. Kusen aluminium

m1

3

Pek. Daun kerpyak aluminium

m2

m2

184.000

450,000.00

VII 1

VIII

Pekerjaan Penutup Atap Pas. Atap solar gaff

Pekerjaan Instalasi air & Saniter

5

Pas. Klosed duduk toto

bh

3.000

2,154,680.00

6

Pas. Wastafel toto

bh

4.000

1,450,000.00

7

pas. Sower toto (panas/dingin)

bh

3.000

2,750,000.00

8

Pas. Floor drain

bh

7.000

125,000.00

IX

Pekerjaan Finishing

1

Pek. Cat tembok (dulux catilac)

m2

776.940

41,256.50

2

Pek. Cat plafond (dulux catilac)

m2

83.000

37,152.50

3

Pek. Polituran kusen (lasur)

m2

27.200

103,312.50

4

Pek. Polituran daun pintu panil (lasur)

m2

5.000

103,312.50

5

Pek. Polituran daun pintu kaca (lasur)

m2

6

Pek. Polituran daun jendela kaca (lasur)

m2

7

Cotting batu alam

m2

75,000.00

8

Pek. Polituran box sleding dan folding (lasur)

m1

30,000.00

65,000.00 -

TOTAL COST LANTAI 2

65,000.00

Jumlah Harga ( Rp. )

64,006,240.00 29,828,608.00 28,253,975.64 23,275,000.00 700,000.00 4,725,000.00 18,900,000.00 6,273,000.00 1,033,464.00 686,000.00 562,500.00 787,500.00 607,920.00 179,639,207.64

12,452,271.50 11,147,392.75 9,618,820.50 26,295,762.50 3,930,524.50 63,444,771.75

10,060,368.46 2,570,271.79 12,630,640.25

9,124,700.30 718,964.61 1,050,000.00 439,554.72 0.00 0.00 0.00 0.00 11,333,219.63

2,280,000.00 2,535,000.00 540,000.00 420,000.00 0.00 3,900,000.00 0.00 0.00 0.00 0.00 0.00 0.00 9,675,000.00

18,164,250.00 0.00 0.00 18,164,250.00

82,800,000.00 82,800,000.00

6,464,040.00 5,800,000.00 8,250,000.00 875,000.00 21,389,040.00

32,053,825.11 3,083,657.50 2,810,100.00 516,562.50 0.00 0.00 0.00 0.00 38,464,145.11 437,540,274.38

C. PEKERJAAN GEDUNG NAMA PROYEK : PEMBANGUNAN RUMAH TINGGAL DAN PEMONDOKAN NILAI KONTRAK PROYEK (RP): Rp 1.032.116.512,3 JENIS PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL DAN PEMONDOKAN NO URAIAN

SAT

VOL

WAKTU

HARGA SATUAN

TOTAL SATUAN

1 a Penyiapan RK3K terdiri atas: Pembuatan Manual, Prosedur, Intruksi Kerja, Ijin Kerja Dan

Set

1

1

2,000,000.00

2,000,000.00

Org

416

1

7,000.00

2,912,000.00

b Perbuatan kartu identitas Pekerja (KIP);

4,912,000.00 Sosialiasasi dan Promosi K3 2 a terdiri atas: Induksi K3 (Safety Induction); khusus untuk pekerja baru Pengarahan K3 (safety briefing) : b Pertemuan Keselamatan (Safety talk dan/atau tool Box Meeting); setiap hari c Latihan K3; Bekerja di ketinggian K3 Perawatan Kontruksi & Penggunaan bahan Kimia (MSDS) Analysis Keselamatan Pekerjaan

d e f g 3

Perilaku Berbasis Keselamatan (Budaya K3) PK3 Simulasi K3; Spanduk (banner); Poster; Papan Informasi K3.

7,500.00

3,120,000.00

41

1 1

7,500.00

307,500.00

Org

41

1

7,500.00

307,500.00

Org

166

1

7,500.00

1,245,000.00

Org

416

1

7,500.00

3,120,000.00

Org Org Lb Lb Bh

8 416 5 5 2

1 1 1 1 1

1,750,000.00 7,500.00 150,000.00 50,000.00 500,000.00

14,000,000.00 3,120,000.00 750,000.00 250,000.00 1,000,000.00 27,220,000.00

Ls

1

1

200,000.00

200,000.00

1

59,400.00

59,400.00

Org

416

1

Org

416

1

Org Org

Alat Pelindung Kerja terdiri atas: a

Jaringan Pengaman (Safety Net); b Tali Keselamatan (Life Line); c Penahan Jauh (Safey Deck) d e

Pagar Pengaman (Guard Railing) Pembatas Area (Retricted Area)

Ls Ls Ls

1

1

2,500,000.00

2,500,000.00

Ls

1

1

59,400.00

59,400.00 2,818,800.00

4

Alat Pelindung Diri terdiri atas a

Bh

393

1

22,500.00

8,842,500.00

b Pelindung Mata (Goggles, Spectacles) c Tameng Muka (Face Shield)

Psg

116

1

7,500.00

870,000.00

d Masker Selam (Breathing Apparatus)

Bh

e Pelindung Telinga (Ear Plug, Ear Muff)

Psg

f Pelindung Pernafasan Dan Mulut (Masker)

Bh

23

1

500.00

11,500.00

g Sarung tangan (Safety Glove)

Psg

293

1

12,600.00

3,694,600.00

h Sepatu Keselamatan (Safety Shoes); untu Staf

Psg

h Sepatu Keselamatan (Rubber Safety Shoes & toe cap)

Psg

275

1

64,800.00

17,834,400.00

i Penunjang Seluruh Tubuh (Full Body Harness);

Bh

j

Bh 152

1

10,800.00

1,644,000.00

Topi Pelindung (Safety Helmet)

Jaket Pelampung (Life Vest);

k

Rompi Keselamtan (Safety Vest); l Celemek (Apron/Coveratts);

m

Pelindung Jatuh (Fall Arrester);

Bh

Bh Bh Bh

32,897,000.00 Asuransi Dan Perijinan terdiri atas :

5

a BPJS Ketenagakerjaan Dan Kesehatan Kerja; (BERDASARKAN KEPMENAKER NOMOR : KEP196/MEN-1999, untuk Tenaga harian Proyek) b c

Surat Ijin Kelayakan Alat; Surat Ijin Operator;

Surat Ijin Pengesahan Panitia d Pembina Keselamatan Dan Kesehatan Kerja (P2K3);

ts

1

1

13,943,008.00

13,943,008.00

alat/Ke nd

5

1

8,500,000.00

42,500,000.00

Lb/Alat

5

1

6,500,000.00

32,500,000.00

ts

1

1

500,000.00

500,000.00 89,443,008.00

6 a b c d

Personil K3 terdiri atas : Ahli K3 Petugas K3 Petugas Tanggap Darurat; Petugas P3K

OB OB OB OB

1 1 1 1

6 6 1 1

7,000,000.00 4,000,000.00

7,000,000.00 4,000,000.00

Ass Petugas K3/ Safety e Man/Pengatur Lalu Lintas (Flagman); f Petugas Medis

OB

1

6

OB

1 1 1

1 1 1

Ls

1

b Ruang P3K (Tempat Tidur Pasiaen, Stetoskop, Timbangan Berat Badan, Tensi Meter, dll);

Ls

c

7

Fasilitas Saran Kesehatan ; Peralatan P3K (Kotak P3K, Tandu, a Tabung Oksigen, Obat Luka, Perban, dll);

3,000,000.00

3,000,000.00

1

6,500,000.00

6,500,000.00

1

1

5,000,000.00

5,000,000.00

Peralatan Pengasapan (fogging) d Obat Pengasapan

Bh

1

1

1,500,000.00

1,500,000.00

Kali

3

6

15,000.00

45,000.00 13,045,000.00

Rambu-Rambu terdiri atas : Rambu Petunjuk; Rambu Larangan; Rambu Peringatan; Rambu Kewajiban; Rambu Informasi; Rambu Pekerjaan Sementara;

Bh Bh Bh Bh Bh Bh Bh

10 10 10 10 5

1 1 1 1 1 1

75,000.00 75,000.00 75,000.00 75,000.00 75,000.00

750,000.00 750,000.00 750,000.00 750,000.00 375,000.00

8 a b c d e f

g Tongkat Pengatur Lalu Lintas (Warning Lights Stick);

Bh

1

h

Bh

1

Bh Ls

1 1

Kerucut Lalu Lintas (Traffic Cone); i Lampu Putar (Rotary Lamp); j Lampu Selang Lalu Lintas

3,375,000.00 9

Lain-Lain Terkait Pengendalian Risiko K3 a Alat Pemadam Api Ringan (APAR); 10Kg b Sirine; c Bendera K3; d Jalur Evakuasi (Escape Route);

Bh

4

1

550,000.00

2,200,000.00

Bh Bh Ls

1 2 1

1 1 1

100,000.00 50,000.00 500,000.00

100,000.00 100,000.00 500,000.00

e Lampu Darurat (Emergency Lamp);

Bh

4

1

70,000.00

280,000.00

f Program Inpeksi Dan Audit Internal;

Org

2

1

2,000,000.00

4,000,000.00

g Pelaporan dan Penyelidikan Insiden.

Ls

1

1

500,000.00

500,000.00 7,680,000.00

DOKAN

DOKAN KET

Sesuai kebutuhan Sesuai kebutuhan Sesuai kebutuhan Sesuai kebutuhan Sesuai kebutuhan

Staff & tamu

>5m

Sesuai kebutuhan Sesuai kebutuhan

Resiko K3 Tinggi Resiko K3 Sdg/Kecil

Sesuai kebutuhan Sesuai kebutuhan Sesuai kebutuhan Sesuai kebutuhan Sesuai kebutuhan Sesuai kebutuhan Sesuai kebutuhan Sesuai kebutuhan Sesuai kebutuhan Sesuai kebutuhan

CARA PENGISIAN RISK MATRIX NO: diisi dengan nomor urut hazard yang diidentifikasi

TASKS: diisi dengan jenis pekerjaan yang sedang dinilai resikonya (seperti; angkat angkut galon) HAZARDS: diisi dengan sumber-sumber bahaya yang dapat menimbulkan resiko dari suatu pekerjaan RISKS: diisi dengan kemungkinan resiko atau dampak yang mungkin terjadi selama proses pekerjaan berlangsung FREQ: diisi dengan suatu angka yang menunjukkan tingkat keseringan/kekerapan dari suatu resiko yang mungkin terjadi; dima 1: jarang sekali, terjadi tetapi tetap ada kemungkinan terjadi 2: jarang, kemungkin jarang terjadi atau kemungkinan terjadi dalam sekali waktu 3: agak sering, kemungkinan terjadi dalam kurun waktu tertentu, msal sebulan terjadi beberapa kali 4: sering, kemungkinan terjadinya sangat sering dan berulang-ulang, misal setiap hari atau seminggu sekali terjadi

SEVERITY: diisi dengan suatu angka yang menunjukkan tingkat keparahan dari suatu resiko yang mungkin terjadi; dimana: 1: hampir terjadi cedera atau sakit sangat ringan atau tidak memerlukan perawatan medis 2: cedera ringan atau sakit ringan dan dapat segera dapat bekerja kembali atau tidak menyebabkan gangguan perm 3: cedera berat atau sakit parah dan perlu perawatan medis khusus atau diperlukan waktu beberapa haru untuk pe 4: cedera sangat berat atau menimbulkan gangguan kesehatan yang bersifat permanen atau mungkin memerlukan 5: fatal, resiko yang dapat menyebabkan kematian atau cacat permanen dan tidak dapat kembali bekerja

RISKS SCORE: nilai perkalian antara freq dan severity yang secara otomatis akan terisi sendiri apabila keduanya telah diisi denga CLASSIFIED: merupakan tingkat resiko, perlu diisi dengan kode huruf; dimana: URGENT (U): diisi dengan huruf U apabila risk score antara 15 - 20 HIGH (H): diisi dengan huruf H apabila risk score antara 10 - <15 MEDIUM (M): diisi dengan huruf M apabila risk score antara 5 - <10 LOW (L): diisi dengan huruf L apabila risk score antara 2 - <5 NONE (N): diisi dengan huruf N apabila risk score <2 ACTION: diisi dengan tindakan perbaikan yang harus segera dilakukan REMAKS: diisi dengan penjelasan tentang waktu pelaksanaan dan penyelesaian tindakan perbaikan

n berlangsung yang mungkin terjadi; dimana

eberapa kali tau seminggu sekali terjadi

ungkin terjadi; dimana:

enyebabkan gangguan permanen ktu beberapa haru untuk pemulihan atau mungkin memerlukan waktu yang cukup lama untuk dapat kembali bekerja t kembali bekerja

la keduanya telah diisi dengan angka

Related Documents

Smk3
October 2019 20
Audit Internal Smk3
April 2020 15
Matriks Jsa Smk3.docx
November 2019 29
Smk3 Multi Artha.docx
November 2019 17

More Documents from "Aerdia"

Smk3
October 2019 20