TRACKER

TP 3G Nera SuperLink Progress • The circle shown ,TP was rejected by M&E

Phase 2B Project Tracker • Update On the Nera Project Tracker

Site Visit

• Objective 

• To be familiar with installation procedure • Set the configuration of the IP address • To observe and supervise the contractor