Sepco Iii Fairmate

  • Uploaded by: Kuldeep Chakerwarti
  • 0
  • 0
  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Sepco Iii Fairmate as PDF for free.

More details

  • Words: 218
  • Pages: 1
Ref: APL / FQA / Civil /

dated: 14.02.2009

To, The General Manager [Quality Assurance], SEPCOIII, C/o APL, Mundra Sub: Liquid Admixture FairfloRM [Fairmate Chemicals Private Limited make] Vide your letter Reference No. MDR / APL– STEPC–L / LT -E 0104 dated 11.02.2009 the test certificate indicates the test results of chemical parameters of Liquid Admixture FairfloRM. There is no mention of results of physical parameters viz. IST, FST, Workability in terms of Slump and CCS of concrete [at age of 3,7,14 and 28 days] with various dosages of the Liquid admixture which shall satisfy the requirements of relevant IS Codes. Further as experienced at site, there seems to be no consistency of quality of the said product Moreover please note that liquid admixtures, enlisted below, are approved for the ongoing civil works of Power Plant at Mundra. 1. Sikament 600 HP / 2 [A] being manufactured by M/s Sika India Pvt .Ltd. 2. Rheobuild 821 EJ being manufactured by M/s BASF Construction Chemicals [India] Pvt. Ltd. 3. Conplast SP 430 MS being manufactured by M/s Fosroc Chemicals [India] Pvt. Ltd. Yours truly, [K.P.Chakerwarti] DGM [Civil] - FQA. Adani Power Limited, 5 x 660 MW TPP, Mundra. CC to VP / AVP / GM [Civil] APL Mundra. [By e-mail] The reply is made as per instruction of AVP

Related Documents

Sepco Iii Fairmate
December 2019 22
Iii
November 2019 55
Iii
April 2020 37
Iii
June 2020 31

More Documents from ""