Scope Of Work

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Scope Of Work as PDF for free.

More details

  • Words: 185
  • Pages: 1
Scope of Work & Price (GTL) Sr.No. Item Description

Qty. Unit Rate

Total Value

1

Ultrasite/Flexi - Indoor/Outdoor, Antenna Line, Power Plant & Battery, Microwave Installation upto 1.2 Mtr

1

Site

9,500.00

9,500.00

2

Ultrasite/Flexi - Indoor/Outdoor- Indoor, Antenna Line, Microwave Installation upto 1.2M

1

Site

8,500.00

8,500.00

3

Ultrasite/Flexi - Indoor/Outdoor, Antenna Line, Power Plant & Battery, Microwave Installation above 1.2 Mtr

1

Site

12,000.00

12,000.00

4

Ultrasite/Flexi - Indoor/Outdoor- Indoor, Antenna Line, Microwave Installation above 1.2M

1

Site

11,000.00

11,000.00

5

Ultrasite/Flexi - Indoor/Outdoor, Antenna Line, Power Plant & Battery

1

Site

7,000.00

7,000.00

6

Ultrasite/Flexi - Indoor/Outdoor - Indoor, Antenna Line Installation

1

Site

6,000.00

6,000.00

7

Implementation of Additional M/W link upto 1.2M

1

Site

3,000.00

3,000.00

8

Implementation of Additional M/W link above 1.2M

1

Site

5,500.00

5,500.00

9

Installation of Power Plant & Battery Bank

1

Site

2,000.00

2,000.00

10

Installation of Power Plant

1

Site

1,000.00

1,000.00

11

Installation of Battery Bank

1

Site

1,000.00

1,000.00

12

Ultra to Flexi swap inclusive survey

1

Site

8,000.00

8,000.00

13

Metro to Flexi Swap inclusive survey

1

Site

7,000.00

7,000.00

Related Documents

Scope Of Work
May 2020 7
Scope Of Work
November 2019 17
Scope Of Work
June 2020 13
Scope Of Work - Roi
June 2020 6
Brief Scope Of Work
October 2019 12
Scope Of Work For
June 2020 9