Schedule - A For Pariej Strength An Ing - 09 Dt. 20.10.09.

  • Uploaded by: Douglas Robinson
  • 0
  • 0
  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Schedule - A For Pariej Strength An Ing - 09 Dt. 20.10.09. as PDF for free.

More details

  • Words: 477
  • Pages: 3
Special Repair Pariej Regional Water Supply Scheme. Constructing Pipeline, R.C.C. U/G. Sump, Pump House & Repairing, R.C.C. E.S.R., Stair case & Repairing & Compound wall. SCHEDULE "A" Schedule showing the approximately quantity of material to be supplied to the contractor at the specified stores for work to be executed on contract & the rate at which they are to be charged. Sr. No.

1

Particulars of materials

200mm dia HDPE Pipe.

Qty

3150.0

Rate at which the materials will be charge to the contractor Rate Unit Free of cost Free of

Issue rate

Place of delivery

530.00

Pariej H/W.

2093.00

Pariej H/W.

1619.00

Pariej H/W.

1107.00

Pariej H/W.

457.00

Pariej H/W.

282.00

Pariej H/W.

120.00

Pariej H/W.

95.00

Pariej H/W.

c o s t 2

400mm dia HDPE Pipe.

500.00

Free of cost

Free of

2

355mm dia HDPE Pipe.

500.00

Free of cost

Free of

c o s t c o s t

3

315mm dia PVC 6Kg/ cm2 Pipe.

250.00

Free of cost

Free of

4

200mm dia PVC 6Kg/ cm2 Pipe.

800.00

Free of cost

Free of

5

160mm dia PVC 6Kg/ cm2 Pipe.

1600.0

Free of cost

Free of

6

110mm dia PVC 6Kg/ cm2 Pipe.

1500.0

Free of cost

Free of

90mm dia PVC 6Kg/ cm2 Pipe.

2100.0

7

1|Page

c o s t c o s t c o s t c o s t

Free of cost

Free of

c o s t

Notes : (1) The contractor submitting the tender shall see that the ratting schedule "A" are filled at time of issue of tender. (2) The contractor while submitting the tender shall provides his own arrangements at his own cost for loading unloading and transporting and safety to site of work for . (3) Material not shown in schedule "A" but available with the department will be issued on request of the contractor (for using in this contract only) at prevailing market rates or Dept. Issued rate which ever is higher. (4) All surplus material supplied by the department as mentioned in Schedule "A" should be handed over by the contractor at the store directed free of cost. (5) The material mentioned in Schedule "A" shall have to be checked for their correctness and soundness by the contractor before taking delivery of the material from the department store. (6) Clause of 12-A of the "B" form shall be applicable in case of materials to be issue free of cost to the contractor for in work The rate of free of cost materials are indicated by Dept. and in case of non return of surplus materials the recovery shall be at double the issue rate. (7) Cement is to be brought by the agency of ISI mark of approved brand. Signature of the Contractor Deputy Executive Engineer, Public Health Works Division, Gujarat W/S. & S. Board, Matar.

2|Page

3|Page