Qualifying Criteria Nagrama

  • Uploaded by: Douglas Robinson
  • 0
  • 0
  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Qualifying Criteria Nagrama as PDF for free.

More details

  • Words: 360
  • Pages: 4
Special Repair Nagrama Regional Water Supply Scheme. Constructing Pipeline, R.C.C. U/G. Sump, Pump House & Repairing, R.C.C. E.S.R., Stair case. Annexure – I TECHNICAL PARAMETERS For Pre-Qualifying the bidder should have, Carried out the works related to Construction of R.C.C. U/G. Sump & ESR, laying of HDPE & PVC Pipeline, Repairing R.C.C. ESR, at least two year experience. OR Carried out the Special repair works and operation & maintenance works related to Construction of mentioned works success fully within contract period to the tune of 20% of the estimated cost put to this tender (i.e. Rs 6-50 lacs) in a year for last two consecutive year. Data given by the bidder must be supported by the work completion certificate from the officers not below the rank of Executive Engineer. Data given without such supporting certificate will not be considered. In the completion certificate the entire scope of work like length, type of works must be mentioned by authority issuing certificate not below the rank of Executive Engineer.

APPENDIX-A DETAIL OF REGISTRATION OF BIDDER / FIRM

Sr. No.

Name of the Bidder / Firm

Class of Registration

Valid upto

Registrating Authority

NOTE Documentary Evidence regarding class of registration issued by issuing authority shall be uploaded. Document Evidence regarding Income tax clearance certificate (2008-09) / income tax return filed for financial year 2008-09 along with Chartered Accountant’s Certificate shall be uploaded.

Signature of Contractor

APPENDIX-B EXPERIENCE IN WATER SUPPLY PROJECT OR SPECIAL REPAIRS, OPERATION AND MAINTENANCE OF REGIONAL WATER SUPPLY SCHEME Sr. No.

Name of the Bidder / Firm

Year

Name of Project / Contract

Estimated Cost of Project / Contract in Rs.

Cost of Project / Contract executed as per Certificate issued by competent authority in Rs.

Whether completed within original time limit Yes / No

April-2007 to March2008 April-2008 to March2009

NOTE Documentary Evidence regarding Data shall be supported by the work completion certificate from the officers not below the rank of Executive Engineer. In the completion certificate the entire scope of work mentioned in technical parameters (Annexure – I) like length of pipeline laid and type of completed work must be mentioned by authority issuing certificate.

Signature of Contractor

Related Documents

Criteria
May 2020 40
Criteria
June 2020 37
Criteria
November 2019 43
English Qualifying Test
October 2019 6

More Documents from "Anonymous 7aTLgycYO"