Sample Business Process Worksheet Template

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Sample Business Process Worksheet Template as PDF for free.

More details

  • Words: 1,372
  • Pages: 12
LOGO Prepared By Troy GREEN

Approved By Troy GREEN

BUSINESS AREA NAME:

Business Areas:

DOC # BPD-XX

LOGISTICS (WA)

REV

Date Issued 12/20/07

PARTICIPANTS:

SESSION DATE: 1/21/08 SESSION LOCATION:

PERSON A PERSON B PERSON C TROY GREEN

LOGISTICS (WA)

Revision Date 3/19/08

ERP Office CITY, STATE

COLLECTION METHOD:

PROCESS PURPOSE & OBJECTIVES:

Interview & Walkthrough

The purpose of [Company], Inc. is to provide dependable high quality products that are consistent and manufactured in standard process. Supervision and strict control of all steps of manufacturing of [Company], Inc. products is required. In general, Logistics is responsible for insuring that available materials are available. Customers orders are shipped on time.

BUSINESS MODULE:

Page 1 of 12

CONTENTS SIPOC DIAGRAM 2 SIPOC METRICS 3 PROCESS DIAGRAM 4 PROCESS DIAGRAM 5 “INPUTS” DETAIL 6 “OUTPUTS” DETAIL 6 IMPROVEMENT OPPORTUNITIES 7 FUNCTIONAL REQUIREMENTS 8 NOTES/COMMENTS 10 FLOOR PLAN 11 ACTIONS/ISSUES 12

LOGISTICS

STAKEHOLDER

PERSON A

PROCESS TRIGGERS TRIGGER Customer returns Incoming piece parts New builds In process inspection Complete WO (unit, Sub assembly, part)

PROCESS NAME Unit repair Receiving inspection Production In process Final inspection/Shipping Inspection

ACTORS PROCESS OWNER PERSON A PERSON B PERSON C PERSON A PERSON B

Chief inspector QA inspector Technician Production supervisor

This document is confidential and remains the property of [Company], Inc. It must not be copied, used or disclosed to a third party without the written consent of [Company], Inc. If this document is watermarked "Controlled", it is controlled.

LOGO Prepared By Troy GREEN

Approved By Troy GREEN

Business Areas:

DOC # BPD-XX

LOGISTICS (WA)

REV

Date Issued 12/20/07

Page 2 of 12

Revision Date 3/19/08

SIPOC DIAGRAM SUPPLIERS LC Alliance LC Supplier Alliance LC Supplier Alliance Alliance QA LC Alliance LC Director of operations Alliance Technicians Engineers Sales Alliance Technician Sales admin Alliance LC Director of operations Alliance QA Production Alliance

INPUTS

PROCESS

OUTPUTS

CUSTOMERS

Cycle counts report

Inventory (cycle count)

Adjust inventory

SAI

Inventory

Receiving

Material Label Receive PO

Receiving inspection

Non Inventory

Receiving

Receive PO

SAI Engineers Sales Repairing Production Engineers

Inspected material Material labor

Stocking

Inventory

Receiving inspection

WO Pick list

Picking

Kit Shortage report

Material Withdrawal Tag

Withdrawal

Material with tag (comp)

Router

Work in progress

Finish goods

PO

Sales order

Pack slips

PO

Create Work Order

Kits

QA Shipping

Pack slip 8130 CFC

Shipping (packing)

Tracking # Closed sales order (partial/full)

Customer

Production Engineers Technicians Engineers Sales Alliance Customer Shipping Sales QA Production

This document is confidential and remains the property of [Company], Inc. It must not be copied, used or disclosed to a third party without the written consent of [Company], Inc. If this document is watermarked "Controlled", it is controlled.

LOGO Prepared By Troy GREEN

Approved By Troy GREEN

Business Areas:

DOC # BPD-XX

LOGISTICS (WA)

REV

Date Issued 12/20/07

Revision Date 3/19/08

Page 3 of 12

SIPOC METRICS INPUT METRICS

PROCESS METRICS

OUTPUT METRICS QUALITY PROCESS TIME

COST

This document is confidential and remains the property of [Company], Inc. It must not be copied, used or disclosed to a third party without the written consent of [Company], Inc. If this document is watermarked "Controlled", it is controlled.

LOGO Prepared By Troy GREEN

Approved By Troy GREEN

Business Areas:

DOC # BPD-XX

LOGISTICS (WA)

REV

Date Issued 12/20/07

Page 4 of 12

Revision Date 3/19/08

PROCESS DIAGRAM

Customer

Create PO

Create SO-PS

Create WO

Pick

Build

QA

Move to shipping

Ship Unit

Customer Delivery

Customer

This document is confidential and remains the property of [Company], Inc. It must not be copied, used or disclosed to a third party without the written consent of [Company], Inc. If this document is watermarked "Controlled", it is controlled.

LOGO Prepared By Troy GREEN

Business Areas:

DOC # BPD-XX

LOGISTICS (WA)

REV

Approved By Troy GREEN

Date Issued 12/20/07

Page 5 of 12

Revision Date 3/19/08

PROCESS DIAGRAM

START

Receive material goods

Inspection

Move to stock

Receive WO – Pack list

Parts available

NO

Shortage

Order parts

YES

Create Kit

Built unit

Complete Kit

YES

Submit router to LC

WIP in stock

Close WO

NO

Issue part

Create Work Router

QA Inspection

Move to shipping

This document is confidential and remains the property of [Company], Inc. It must not be copied, used or disclosed to a third party without the written consent of [Company], Inc. If this document is watermarked "Controlled", it is controlled.

LOGO Prepared By Troy GREEN

Approved By Troy GREEN

Business Areas:

DOC # BPD-XX

LOGISTICS (WA)

REV

Date Issued 12/20/07

Revision Date 3/19/08

Page 6 of 12

“INPUTS” DETAIL INPUT

FORMAT

VOLUME/TIME/FREQUENCY

SUPPLIERS

FORMAT

VOLUME/TIME/FREQUENCY

RECIPIENT

“OUTPUTS” DETAIL OUTPUT

This document is confidential and remains the property of [Company], Inc. It must not be copied, used or disclosed to a third party without the written consent of [Company], Inc. If this document is watermarked "Controlled", it is controlled.

LOGO Prepared By Troy GREEN

Approved By Troy GREEN

Business Areas:

DOC # BPD-XX

LOGISTICS (WA)

REV

Date Issued 12/20/07

Revision Date 3/19/08

Page 7 of 12

IMPROVEMENT OPPORTUNITIES ORGANIZATIONAL IMPACT OPPORTUNITY

(Individually list and describe laws [L] regulations [R], and policies [P], as well as cultural [C] considerations for each opportunity)

More users Line item memo for pox Transaction log (archiving/reporting) Multiple bill/ship to (SO) Packing requirements Bin level management

R Customizable fields

This document is confidential and remains the property of [Company], Inc. It must not be copied, used or disclosed to a third party without the written consent of [Company], Inc. If this document is watermarked "Controlled", it is controlled.

R

LOGO Prepared By Troy GREEN

Approved By Troy GREEN

Business Areas:

DOC # BPD-XX

LOGISTICS (WA)

REV

Date Issued 12/20/07

Revision Date 3/19/08

Page 8 of 12

FUNCTIONAL REQUIREMENTS Ref. #

Business Process

Step/Task or Requirement Area

Functional Requirement

Reference Document

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 This document is confidential and remains the property of [Company], Inc. It must not be copied, used or disclosed to a third party without the written consent of [Company], Inc. If this document is watermarked "Controlled", it is controlled.

LOGO Prepared By Troy GREEN

Approved By Troy GREEN

Business Areas:

DOC # BPD-XX

LOGISTICS (WA)

REV

Date Issued 12/20/07

Revision Date 3/19/08

Page 9 of 12

FUNCTIONAL REQUIREMENTS Ref. #

Business Process

Step/Task or Requirement Area

Functional Requirement

Reference Document

24 25 26 27

This document is confidential and remains the property of [Company], Inc. It must not be copied, used or disclosed to a third party without the written consent of [Company], Inc. If this document is watermarked "Controlled", it is controlled.

LOGO Prepared By Troy GREEN

Approved By Troy GREEN

Business Areas:

DOC # BPD-XX

LOGISTICS (WA)

REV

Date Issued 12/20/07

Revision Date 3/19/08

Page 10 of 12

NOTES/COMMENTS

This document is confidential and remains the property of [Company], Inc. It must not be copied, used or disclosed to a third party without the written consent of [Company], Inc. If this document is watermarked "Controlled", it is controlled.

LOGO Prepared By Troy GREEN

Approved By Troy GREEN

Business Areas:

DOC # BPD-XX

LOGISTICS (WA)

REV

Date Issued 12/20/07

Page 11 of 12

Revision Date 3/19/08

PRODUCTION REPAIR AND QC RECORDS

SERVICE QUEUE

HAZMAT SERVICE QUEUE

MRB LOCKER

REC INSPECTION

QC INSPECTION KIT STORAGE

Q INSPECTION

QC INSPECTION

QC STORAGE

PRODUCTION TEST

SERVICE SALES

SUPPLY LOCKER

PRODUCTION TEST

KIT STORAGE

RCOMM TEST

PRODUCTION TEST

REPAIR TEST

SERVICE REPAIR TEST

PRODUCTION REPAIR

FLOOR PLAN

SERVICE REPAIR TEST

ASSEMBLY

DATA CARD ASSEMBLY

PC BOARD PRODUCTION

ASSEMBLY

ASSEMBLY

STOCK ROOM

ASSEMBLY

SERVICE REPAIR TEST

This document is confidential and remains the property of [Company], Inc. It must not be copied, used or disclosed to a third party without the written consent of [Company], Inc. If this document is watermarked "Controlled", it is controlled.

LOGO Prepared By Troy GREEN

Approved By Troy GREEN

Business Areas:

DOC # BPD-XX

LOGISTICS (WA)

REV

Date Issued 12/20/07

Revision Date 3/19/08

Page 12 of 12

ACTIONS/ISSUES Ref. #

Task/Issue

Status

Owner

Due Date

1 2 3

This document is confidential and remains the property of [Company], Inc. It must not be copied, used or disclosed to a third party without the written consent of [Company], Inc. If this document is watermarked "Controlled", it is controlled.

Related Documents