Ω FK Power Solution New and used Gas-and Steam Turbines, Boilers, Power- and Industrial Plants

Used Power –and Industrial Plants for sale FK Power Solution Abt-Mauch-Str. 3 88214 Ravensburg/Germany Tel: +49 751 1807062 Mobil +49 171 752 5838 Fax: E-Mail: Internet:

Steamturbines Ref.-Nr.

Qty.

ST 103

1

Output MW 73

Pres./Flow/Temp

Description

Manufac.

Built 1973

BBC

1974

Borsig

1972

2 1 1

30 11,8 6,3

50 bar,482 °C 63 bar, 60 t/h, 470°C 89 bar,40 t/h, 525°C

Extraction-Condensing Turbine Back Pressure Turbine, including Boiler Extraction-Condensing Turbine Condensing steam turbine Condensing Turbine Back Pressure Turbine

Siemens

32

132 bar, 510°C, 350t/h 108 bar/ 520°C/ 150 t/h 89bar, 520°C

ST 110

1

42

ST 101

1

St 116 ST 112 ST 114

1976 1975 1979

ST 109

1

5

43 bar/455°C

ST 111

1

2,7-4

13 bar, 18-25 t/h

Extraction Backpressure Turbine Condensing Turbine

AEG Kanis BBC SGB/Germ any Siemens

2001

ST 115 ST 107 ST 108 ST 106

1 1 1 1

2,1 2,2 2,2 1,25

38 bar/ 495°C 15 bar/280°C 37/45bar/410°C 14 bar/330°C

Back Pressure Turbine Back Pressure Turbine Back Pressure Turbine Back Pressure Turbine

M&M/Germ any Siemens Siemens ABB Siemens

1986

1955 1989 1989 1982

Gasturbines and Power Stations Ref.-Nr.

Qty

GT 312 GT 316

1 2

Out put MW 180 126

GT 307

2

38,8

GT 303

1

30

Fuel Gas Gas, Destilate and Heavy oil Gas and Destilate Gas

Volta ge KV 15 11

Type

Manufac.

Condition

GT 13 E 2 Frame 9, 9171 E

Alsthom GE

New, Built 2008 New

11

Frame 6 B

GE

30.000 and 45.000 running hours

10,5

Siemens

1

GT 311

6

16,5

Gas

13,8

MS 5001 LA

GE

GT 313 GT 305

1 1

16,3 10

13,8 6

Frame 5 Mars 100

GE Solar

GT 310 GT 315

1 1

10 10

Gas Gas and Oil Gas Gas

15

Mars 100 Typhoon

GT 314

2

9,5

Gas

Solar Alsthom, 2 units a 5 MW, including Waste Heat Recovery Boiler, 24t/h,22 bar Solar and KKK

GT 301 GT 304 GT 318

1 1 1

4,7 4,7 4,7

Gas Gas Gas

6 10,5

Taurus Taurus Taurus

Solar Solar Solar

GT 302

1

3,8

Gas

10,5

Centaur H and Ecoair Gas Compressor

Solar and Ecoair/Ger many

GT 309 GT 308

1 1

3,8 3,3

6

Centaur H TB 4000

Solar Ruston

GT 317

1

1,2

Gas Gas and Oil Gas and Oil

10

Saturn 20

Solar

2 x Centaur H and KKK -Steam Turbine and Steam Boilers

Under 1000 running hours Non overhauled 15.000 running hours, Built 1997 32.000 running hours Only 4000 running hours since overhaul, Built in 1995

Combined Cycle Power Station, Built in 1995. Running Hour Gas Turbine 1: 25000, Gas Turbine 2: 2500 30.000 running hours Overhauled 3500 running hours, built in 1999 30.000 running hours, including Gas Compressor ( 4 to 15 bar ) and Waste Heat Recovery Boiler,15t/h, 17,5 bar 32.000 running hours Under 1000 running hours 37500 running hours, Built 1995

Boilers Ref.-Nr.

Qty.

Output t/h

Describtion

30

Pres./ Temp, bar 9

SB 503

1

SB 502 SB 504

1 1

10,5 25

10 20

Waste Heat Recovery Steam Boiler

Steam Boiler

Manu fac. Baum garte Stand ard

Built 1993 1992 1972

2

Diesel-and Gasengines Ref.-Nr.

Qty.

Fuel

Voltage

Type

Manufac.

Built

Condition

2

Out put MW 5

DG 807

Diesel

11

16 KU 30 A

Mitsubishi

1996

DG 805

2

3,9

Diesel and crude oil

34,5 KV

18V28/32 H

MAN B&W

DG 804

3

3,5

Diesel

6,3 KV

Cat

1990

DG 810

1

2,55

Gas and Diesel oil

10,5 KV

3612 DITA MBH/ Germany

M944

1996

DG 808

1

1,8

Diesel

0,4

Cat 3516A

Cat

1996

DG 806

3

1,1

Natural Gas

0,4

G 3516 B

Cat

DG 809

3

1,1

Natural Gas

0,48/ 60Hz

7100GSI

Waukesha

1996

DG 811

2

1

Deutz

Siemens

DG 802

5

0,9

Natural Gas Diesel

TAG

DG 803

3

0,9

Diesel

4008TAG 2a 3508 B

Built in 2001 2005

Cat

2001

47000 running hours Zero hour overhauled, including waste heat recovery boiler, 1,5 t/h, 7 bar Zero hours, overhauled Last overhaul in 2008 Emergency Mobile Trailer unit with 5100 running hours 1500017000 running hours, including heat recovery Boiler 19.00020.000 running hours Never used, zero hours Low running hours 12500 running hours

O,4 KV

3

Related Documents

Resale Used Power Plants
November 2019 21
Resale
November 2019 7
Steam Power Plants
May 2020 17
Hydro Power Plants
May 2020 7
Thermal Power Plants
June 2020 16
Steam Power Plants
November 2019 22

More Documents from ""

Resale Used Power Plants
November 2019 21
Math Notes.docx
December 2019 11
To.docx
December 2019 15
Researchpaper.pdf
November 2019 13
Presentation1.pptx
April 2020 6