Ω FK Power Solution New and used Gas-and Steam Turbines, Boilers, Power- and Industrial Plants
Used Power –and Industrial Plants for sale FK Power Solution Abt-Mauch-Str. 3 88214 Ravensburg/Germany Tel: +49 751 1807062 Mobil +49 171 752 5838 Fax: E-Mail: Internet:
Steamturbines Ref.-Nr.
Qty.
ST 103
1
Output MW 73
Pres./Flow/Temp
Description
Manufac.
Built 1973
BBC
1974
Borsig
1972
2 1 1
30 11,8 6,3
50 bar,482 °C 63 bar, 60 t/h, 470°C 89 bar,40 t/h, 525°C
Extraction-Condensing Turbine Back Pressure Turbine, including Boiler Extraction-Condensing Turbine Condensing steam turbine Condensing Turbine Back Pressure Turbine
Siemens
32
132 bar, 510°C, 350t/h 108 bar/ 520°C/ 150 t/h 89bar, 520°C
ST 110
1
42
ST 101
1
St 116 ST 112 ST 114
1976 1975 1979
ST 109
1
5
43 bar/455°C
ST 111
1
2,7-4
13 bar, 18-25 t/h
Extraction Backpressure Turbine Condensing Turbine
AEG Kanis BBC SGB/Germ any Siemens
2001
ST 115 ST 107 ST 108 ST 106
1 1 1 1
2,1 2,2 2,2 1,25
38 bar/ 495°C 15 bar/280°C 37/45bar/410°C 14 bar/330°C
Back Pressure Turbine Back Pressure Turbine Back Pressure Turbine Back Pressure Turbine
M&M/Germ any Siemens Siemens ABB Siemens
1986
1955 1989 1989 1982
Gasturbines and Power Stations Ref.-Nr.
Qty
GT 312 GT 316
1 2
Out put MW 180 126
GT 307
2
38,8
GT 303
1
30
Fuel Gas Gas, Destilate and Heavy oil Gas and Destilate Gas
Volta ge KV 15 11
Type
Manufac.
Condition
GT 13 E 2 Frame 9, 9171 E
Alsthom GE
New, Built 2008 New
11
Frame 6 B
GE
30.000 and 45.000 running hours
10,5
Siemens
1
GT 311
6
16,5
Gas
13,8
MS 5001 LA
GE
GT 313 GT 305
1 1
16,3 10
13,8 6
Frame 5 Mars 100
GE Solar
GT 310 GT 315
1 1
10 10
Gas Gas and Oil Gas Gas
15
Mars 100 Typhoon
GT 314
2
9,5
Gas
Solar Alsthom, 2 units a 5 MW, including Waste Heat Recovery Boiler, 24t/h,22 bar Solar and KKK
GT 301 GT 304 GT 318
1 1 1
4,7 4,7 4,7
Gas Gas Gas
6 10,5
Taurus Taurus Taurus
Solar Solar Solar
GT 302
1
3,8
Gas
10,5
Centaur H and Ecoair Gas Compressor
Solar and Ecoair/Ger many
GT 309 GT 308
1 1
3,8 3,3
6
Centaur H TB 4000
Solar Ruston
GT 317
1
1,2
Gas Gas and Oil Gas and Oil
10
Saturn 20
Solar
2 x Centaur H and KKK -Steam Turbine and Steam Boilers
Under 1000 running hours Non overhauled 15.000 running hours, Built 1997 32.000 running hours Only 4000 running hours since overhaul, Built in 1995
Combined Cycle Power Station, Built in 1995. Running Hour Gas Turbine 1: 25000, Gas Turbine 2: 2500 30.000 running hours Overhauled 3500 running hours, built in 1999 30.000 running hours, including Gas Compressor ( 4 to 15 bar ) and Waste Heat Recovery Boiler,15t/h, 17,5 bar 32.000 running hours Under 1000 running hours 37500 running hours, Built 1995
Boilers Ref.-Nr.
Qty.
Output t/h
Describtion
30
Pres./ Temp, bar 9
SB 503
1
SB 502 SB 504
1 1
10,5 25
10 20
Waste Heat Recovery Steam Boiler
Steam Boiler
Manu fac. Baum garte Stand ard
Built 1993 1992 1972
2
Diesel-and Gasengines Ref.-Nr.
Qty.
Fuel
Voltage
Type
Manufac.
Built
Condition
2
Out put MW 5
DG 807
Diesel
11
16 KU 30 A
Mitsubishi
1996
DG 805
2
3,9
Diesel and crude oil
34,5 KV
18V28/32 H
MAN B&W
DG 804
3
3,5
Diesel
6,3 KV
Cat
1990
DG 810
1
2,55
Gas and Diesel oil
10,5 KV
3612 DITA MBH/ Germany
M944
1996
DG 808
1
1,8
Diesel
0,4
Cat 3516A
Cat
1996
DG 806
3
1,1
Natural Gas
0,4
G 3516 B
Cat
DG 809
3
1,1
Natural Gas
0,48/ 60Hz
7100GSI
Waukesha
1996
DG 811
2
1
Deutz
Siemens
DG 802
5
0,9
Natural Gas Diesel
TAG
DG 803
3
0,9
Diesel
4008TAG 2a 3508 B
Built in 2001 2005
Cat
2001
47000 running hours Zero hour overhauled, including waste heat recovery boiler, 1,5 t/h, 7 bar Zero hours, overhauled Last overhaul in 2008 Emergency Mobile Trailer unit with 5100 running hours 1500017000 running hours, including heat recovery Boiler 19.00020.000 running hours Never used, zero hours Low running hours 12500 running hours
O,4 KV
3