DATE :
September 03,2018
FOR
Mr. Romeo T. Manabat and Ms. Gianne Bildan
:
THRU :
Mr. Israel G. Orquia Vice-President for Special Operations HLDC Corporate Centre, 43-35 Don Bonifacio Ave. Pulung Maragul, Angeles City 2009
FROM :
Engr. Geizy M. Torno REE,RME Electrical Engineer
SUBJECT:
Request for Heavy Equipment Crane
With Reference to the above subject, I would like to inform your good office requesting assistance for your heavy equipment crane and Mr. Emerson Tarra, for Installation, Commissioning of Electro-Mechanical Pumping Facilities for our maintenance schedule to our well facilities located at the following sites: Fiesta Communities Calulut – Hauling of 100 KVA Diesel Generator, then mounting to genset room (September 04,2018) Fiesta Communities Castillejos – Pull Out/Change Over of Booster Pumps (Critical Status) (September 04,2018) Fiesta Communities Mining – Change-over of Sunction Pipes, Pull out of Pump and Motor (September 06,2018) Villa Sta.Barbara - Pull Out/Change Over of Pump and Motor (Critical Status) due to vibration of Pump. (September 07,2018) Fiesta Communities Mariveles – Installation of Pump and Motor, Sunction Pipes and Discharge Lines. (Sepetember 08,2018) May we request your immediate response for your confirmation to the following schedule, we understand that you also have a very tight schedule to your heavy equipment crane so I want to give my sincerest apology. The said activities will consist of pull out/install of Electrical Motors and Mechanical Pumps as the primer load and the 100 KVA Electrical Generator as Prime mover together with the Column Pipes, fittings and Discharge assemblies. It also contains wiring ins and terminations of feeder cables for electrical lines. On behalf of Villages Water Supply System Incorporated (The Company), We will look forward for this request and wait for your immediate approval.
Regards,
Geizy M. Torno REE/RME Electrical Engineer (VWSSI)