REMO INCOMPLETE CAULKING & CLEANING LOWRISE & CARPARK AREAS

12/10/2009

B04 LOWRISE 1/. Caulking to balcony party walls to be completed. 2/. Caulking to back common area HL ducting surround. 3/. Caulking to common corridor end corner HL ducting B03 LOWRISE 4/. Caulking to western end column/blockwork to be completed 5/. Complete caulking to to mid party walls balconys both sides 6/. Back common corridor HL caulking to corner blockwork adjacent to damper 7/. Complete vertical caulking to joint in blockwork adjacent to A/C riser common corridor 8/. Complete caulking to east end balcony panel 9/. Install plastic angles to block panel & seal B02 LOWRISE 10/. Complete caulking to external entrance wall from carpark to unit stairs western end 11/. Complete caulking to B02 carpark/plenum walls 12/. Complete caulking to west end panel adjacent to column. 13/. Install plastic angle to blockwork vertical 14/. Close over blockwork to eastern end panel once S/S angles installed. 15/. Complete caulking to eastern end balconys both sides 16/. Install plastic angles to inside east wall balcony panel 17/. Complete caulking to Atrium/Bedroom block wall return & tops of walls 18/. Back common corridor A/C riser caulking to complete at corner 19/. Caulking missing to all services cupboards in back common corridor B01 LOWRISE 20/. Complete caulking to west end blockwork panel 21/. Install plastic angles to west end block panel & seal 22/. Complete caulking to all mid seperation walls to balconys 23/. Close out blockwork walls to eastern end panel once S/S brackets installed 24/. Install plastic angles & seal to inside blockwork east end balcony B01 CARPARK & OTHER 25/. Upper carpark/plenum block walls to be caulked 26/. Caulking to main lobby & air supply, pool pump room blockwork 27/. Complete all caulking to access stiars upper & lower carpark areas 28/. Complete caulking to cleaners & security rooms 29/. Complete caulking to fire stairs seperation wall B02 CARPARK & OTHER 30/. Complete caulking to all upper & lower carpark areas 31/. Complete caulking to MDB blockwork B03 CARPARK & OTHER 32/. Complete caulking to carpark stair pressure risers 33/. Complete caulking to upper carpark plenum walls & vertical joints 34/. Complete caulking to lower carpark blockwork 35/. Caulking to blockwork upper/lower split level wall & return B04 CARPARK & OTHER 36/. Complete caulking to upper carpark areas 37/. Caulking to stair pressure blockwork riser adjacent to core shaft B05 CARPARK & OTHER 38/. Complete caulking to blockwork stair pressure shaft B06 CARPARK & OTHER 39/. Complete caulking to Gas meter/Water meter blockwork 40/. Complete caulking to sprinkler tank room blockwork 41/. Clean sprinkler room stairs up to plant fo all block waste & scrap walls/floors clean 42/. Lower harvesting tank room caulking to be completed 43/. Caulking to upper/lower stairs corridor blockwork 44/. Caulking to block wall store room at split level both sides

Related Documents

Incomplete Albums
November 2019 17
Expotafad Remo
November 2019 8
Incomplete Grades
April 2020 9
Project Incomplete
May 2020 8
Incomplete Records
November 2019 10

More Documents from ""

Unidad 2
April 2020 15
Calendar 2008-09
October 2019 25
Labo N9.docx
December 2019 25