Rab Timbun Siring Hangei 11 Meter.xlsx

  • Uploaded by: Vev Guardiola
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Rab Timbun Siring Hangei 11 Meter.xlsx as PDF for free.

More details

  • Words: 7,218
  • Pages: 61
1

F.1.1

1 M3

Mengerjakan rangka bawah Kayu Belangiran / Kahui / Balau dan Ky Lanan 0.2500 Mandor 0.7500 Kepala Tukang 7.5000 Tukang Kayu 5.0000 Pekerja 1.1000 M3 Kayu Belangiran/Balau 1.1000 M3 Balok Kayu Lanan 5.0000 Kg. Paku Kayu (A) (B) (C) (D)

3

F.1a

1 M2

Mengerjakan rangka bawah ( Perancah ). 0.0250 Mandor 0.1500 Kepala Tukang 1.5000 Tukang Kayu 0.5000 Pekerja 48.0000 Btg Kayu Bulat ( biasa hutan ) 0.0100 M3 Papan Bekisting 0.0060 M3 Kayu Balok 5/7 cm Klas III 1.0000 Kg. Paku Kayu (A) (B) (C) (D)

4

F.8a

1 M2

F.8a(1) 1 M2

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Mengerjakan Dinding Papan 2/20 Kelas I 0.0100 Mandor 0.0500 Kepala Tukang 0.5000 Tukang Kayu 0.0200 Pekerja 0.0220 M3 Papan Kelas I 0.2000 Kg. Paku Kayu (A) (B) (C) (D)

5

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Mengerjakan Dinding Papan 2/20 Kelas II 0.0100 Mandor

0.0500 0.5000 0.0200 0.0220 0.2000 (A) (B) (C) (D)

6

F.8b

Kepala Tukang Tukang Kayu Pekerja M3 Papan Kelas II Kg. Paku Kayu SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

10 M2 Pekerjaan bekisting + bongkaran ( untuk 1 m3 cetakan beton ). 0.1000 Mandor 0.5000 Kepala Tukang 5.0000 Tukang Kayu 6.0000 Pekerja 0.4000 M3 Papan Bekisting Lanan 4.0000 Kg. Paku Kayu (A) (B) (C) (D)

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Untuk 1 M2 7

F.22

1 M3

Mengerjakan rangka badan Kayu Kelas II 0.4000 Mandor 2.4000 Kepala Tukang 24.0000 Tukang Kayu 8.0000 Pekerja 1.1000 M3 Balok Kayu Kelas II 3.0000 Kg. Paku Kayu (A) (B) (C) (D)

F.38

1 M2

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Lantai papan tebal 3 cm lidah / alur diserut rapi Kayu Kelas I 0.0300 Mandor 0.1800 Kepala Tukang 1.8000 Tukang Kayu 0.6000 Pekerja

0.0350 0.2000 (A) (B) (C) (D)

F.38 a 1 M2

E.13

1 M'

E.13.a 1 M'

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Tiang dipancang kedalam tanah lunak. 0.0500 Mandor 0.0010 Kepala Tukang 0.0400 Tukang Kayu 1.8000 Pekerja (A) (B) (C) (D)

9

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Lantai papan tebal 2 cm lidah / alur diserut rapi Kayu Kelas I 0.0300 Mandor 0.1800 Kepala Tukang 1.8000 Tukang Kayu 0.6000 Pekerja 0.0233 M3 Papan Kayu Kelas I 0.2000 Kg. Paku Kayu (A) (B) (C) (D)

8

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Lantai papan tebal 3 cm lidah / alur diserut rapi Kayu Kelas II 0.0300 Mandor 0.1800 Kepala Tukang 1.8000 Tukang Kayu 0.6000 Pekerja 0.0350 M3 Papan Kayu Kelas II 0.2000 Kg. Paku Kayu (A) (B) (C) (D)

F.38 a(1) 1 M2

M3 Papan Kayu Kelas I Kg. Paku Kayu

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Pemancangan Cerucuk Kayu Galam. 0.0050 Mandor

0.0001 0.0040 0.0900 0.2500 (A) (B) (C) (D)

Kepala Tukang Tukang Kayu Pekerja Potong Kayu Galam / Dolken Dia. 10 - 12 Cm SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

an / Kahui / Balau dan Ky Lanan 104,000.00 104,000.00 94,000.00 73,000.00 4,725,000.00 3,150,000.00 15,592.00

26,000.00 78,000.00 705,000.00 365,000.00

1,174,000.00

5,197,500.00 3,465,000.00 77,960.00 5,275,460.00

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

104,000.00 104,000.00 94,000.00 73,000.00 7,876.00 2,604,000.00 1,627,500.00 15,592.00

2,600.00 15,600.00 141,000.00 36,500.00

195,700.00

378,048.00 26,040.00 9,765.00 15,592.00 429,445.00

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

104,000.00 104,000.00 94,000.00 73,000.00 3,255,000.00 15,592.00

625,145.00 93,771.75 71,891.68 790,808.43

1,040.00 5,200.00 47,000.00 1,460.00

54,700.00 (B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

104,000.00

6,449,460.00 967,419.00 741,687.90 8,158,566.90

1,040.00

71,610.00 3,118.40 74,728.40

129,428.40 19,414.26 14,884.27 163,726.93

104,000.00 94,000.00 73,000.00 2,929,500.00 15,592.00

5,200.00 47,000.00 1,460.00

54,700.00

64,449.00 3,118.40 67,567.40

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

122,267.40 18,340.11 14,060.75 154,668.26

m3 cetakan beton ). 104,000.00 104,000.00 94,000.00 73,000.00 2,929,500.00 15,592.00

10,400.00 52,000.00 470,000.00 438,000.00

970,400.00

1,171,800.00 62,368.00 1,234,168.00

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

104,000.00 104,000.00 94,000.00 73,000.00 3,150,000.00 15,592.00

41,600.00 249,600.00 2,256,000.00 584,000.00

3,131,200.00 (B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

rapi Kayu Kelas I 104,000.00 104,000.00 94,000.00 73,000.00

2,204,568.00 330,685.20 253,525.32 2,788,778.52 278,877.85

3,120.00 18,720.00 169,200.00 43,800.00

3,465,000.00 46,776.00 3,511,776.00

6,642,976.00 996,446.40 763,942.24 8,403,364.64

3,255,000.00 15,592.00 234,840.00

113,925.00 3,118.40 117,043.40

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

351,883.40 52,782.51 40,466.59 445,132.50

rapi Kayu Kelas II 104,000.00 104,000.00 94,000.00 73,000.00 3,150,000.00 15,592.00

3,120.00 18,720.00 169,200.00 43,800.00

234,840.00

110,250.00 3,118.40 113,368.40

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

348,208.40 52,231.26 40,043.97 440,483.63

rapi Kayu Kelas I 104,000.00 104,000.00 94,000.00 73,000.00 3,255,000.00 15,592.00

3,120.00 18,720.00 169,200.00 43,800.00

234,840.00

75,841.50 3,118.40 78,959.90

5,200.00 104.00 3,760.00 131,400.00 140,464.00

-

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

104,000.00 104,000.00 94,000.00 73,000.00 (B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

104,000.00

520.00

313,799.90 47,069.99 36,086.99 396,956.88

140,464.00 21,069.60 16,153.36 177,686.96

104,000.00 94,000.00 73,000.00 15,750.00

10.40 376.00 6,570.00 7,476.40

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

3,937.50 3,937.50

11,413.90 1,712.09 1,312.60 14,438.59

DAFTAR HARGA UPAH : : Katingan Tengah : Katingan : Kalimantan Tengah

Desa Kecamatan Kabupaten Provinsi

NO

URAIAN

SATUAN

UPAH

1

2

3

4

1 PEKERJA 2 TUKANG 3

Orang / Hari Orang / Hari

Rp Rp

Diketahui/Disetujui Oleh : Dibuat Oleh :

132,000.00 110,000.00

PEMERINTAH KABUPATEN KATINGA KECAMATAN KATINGAN TENGAH DESA TELOK DAFTAR HARGA SATUAN BAHAN (BASIC PRICE) : Batu Badinding : Katingan Tengah : Katingan : Kalimantan Tengah

Desa Kecamatan kabupaten Provinsi No.

Jenis Bahan/ Material

1 Balok Kayu Benuas 10/10 (Kls. I) 2 Balok Kayu Benuas 5/10 (Kls. I) 3 Papan Kayu Benuas 2/20 (Kls. I) 4 Tanah Urug Pilihan 5 Besi Beugel 6 Baut dan Mur 7 Paku Ulin 8 Terpal Ex. Terpal Biotek 9 Semen PC 40 kg 10 Pasir Pasang 11 Batu Kerikil 12 Kuas Cat 13 Cat Tembok 14 Cat Glotex @5 Kg 15 Minyak Cat / Tiner

Satuan m3 m3 m3 m3 Bh Bh Kg Roll Zak M3 M3 Bh Klg Klg Ltr

Pajak

Harga PPN Rp 6,000,000.00 Rp 600,000.00 Rp Rp 6,000,000.00 Rp 600,000.00 Rp Rp 6,000,000.00 Rp 600,000.00 Rp Rp 100,000.00 Rp 8,000.00 Rp 800.00 Rp Rp 30,000.00 Rp 3,000.00 Rp Rp 18,000.00 Rp 1,800.00 Rp Rp Rp Rp Rp Rp Rp Rp

72,000.00 250,000.00 250,000.00 7,000.00 250,000.00 200,000.00 30,000.00

Rp Rp Rp Rp Rp Rp Rp

7,200.00 25,000.00 25,000.00 700.00 25,000.00 20,000.00 3,000.00

Rp Rp Rp Rp Rp Rp Rp

PPh 90,000.00 90,000.00 90,000.00 120.00 450.00 270.00 1,080.00 3,750.00 3,750.00 105.00 3,750.00 3,000.00 450.00

NGAN

Total Harga Galian C

Rp

Rp Rp Rp 4,000.00 Rp Rp Rp Rp

6,690,000.00 6,690,000.00 6,690,000.00 104,000.00 8,920.00 33,450.00 20,070.00

Rp Rp Rp Rp Rp Rp Rp

80,280.00 278,750.00 278,750.00 7,805.00 278,750.00 223,000.00 33,450.00

TABEL HARGA SATUAN UPAH DAN BAHAN BANGUNAN PROGRAM PEKERJAAN LOKASI TAHUN URAIAN 2 UPAH Tukang Kayu Pekerja (Laden Tukang Kayu) Pekerja (Timbunan) BAHAN MATERIAL Tanah Laterit/Sirtu Bubungan Genteng Metal Plat Besi Beugel Cat Kayu Mengkilat Tinner Baut dan Mur Amplas Kuas 4 Inc Paku Kayu Paku Ulin Paku Genteng Metal Cat Menie Semen PC Pasir Pasang Batu Kerikil BAHAN KAYU Balok Kayu Kls I Ulin Papan Kayu Kls I Ulin Papan Kayu Kls II Benuas

Anggaran Dana Desa Pembangunan Jalan Timbun Siring Kayu Desa Tumbang Hangei, Kecamatan Katingan Tengah, Kabupaten Katingan Kalimantan Tengah 2019 HARGA SATUAN SATUAN (Rp.) 3 4 Orang/hari Orang/hari Orang/hari

175,000.00 150,000.00 120,000.00

m3 Pcs Pcs Kg Liter lmr Pcs Kg kg Kg kg kg m3 m3

190,000.00 30,000.00 27,000.00 65,000.00 25,000.00 7,000.00 7,000.00 30,000.00 25,000.00 30,000.00 28,000.00 1,875.00 200,000.00 560,000.00

m3 m3 m3

6,000,000.00 6,500,000.00 5,500,000.00

DAFTAR ANALISA SATUAN PEKERJAAN 1

F.1.1

1 M3

Mengerjakan rangka bawah Kayu Ulin

7.5000 5.0000 1.1000 5.0000 (A) (B) (C) (D)

2

F.38

1 M2

F.8a

1 M2

(A) (B) (C) (D)

F.22

1 M3

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Mengerjakan Dinding Papan 2/20 Kelas III Meranti

0.5000 0.0200 0.0220 0.2000

3

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Lantai papan tebal 3 cm lidah / alur diserut rapi Kayu Kelas II Benuas 0.0300 Mandor 0.1800 Kepala Tukang 1.8000 Tukang Kayu 0.6000 Pekerja 0.0350 M3 Papan Kelas II 0.2000 Kg. Paku Kayu (A) (B) (C) (D)

2

Tukang Kayu Pekerja M3 Balok Kayu Ulin Kg. Paku Kayu

Tukang Kayu Pekerja M3 Papan Kelas III Kg. Paku Kayu SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Mengerjakan rangka badan Kayu Kelas II

24.0000 8.0000 1.1000 3.0000 (A) (B) (C) (D)

4

A.2.3.1.11

1 M3

A.4.6.1.15

1 M3

A.4.6.1.13.

1 M3

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Pemasangan 1 m3 konstruksi gordeng, kayu kelas III 6.7000 Tukang Kayu 20.1000 Pekerja 2.0100 Kepala Tukang 0.3350 Mandor 1.1000 M3 Balok Kayu Meranti 15.0000 Besi Strip 3.0000 Kg. Paku Kayu (A) (B) (C) (D)

1

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Pengurugan 1 m3 dengan Tanah urug 0.3000 Pekerja 1.2000 Tanah Urug (A) (B) (C) (D)

1

Tukang Kayu Pekerja M3 Balok Kayu Kelas II Kg. Paku Kayu

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II da 12.0000 Tukang Kayu 4.0000 Pekerja 1.2000 Kepala Tukang 0.2000 Mandor 1.1000 M3 Balok Kayu Benuas 12.0000 Besi Strip 5.6000 Kg. Paku Kayu (A) (B) (C) (D)

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

1

A.4.6.1.16.

1 M2

Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas III 0.1000 Tukang Kayu 0.1000 Pekerja 0.0100 Kepala Tukang 0.0050 Mandor 0.0140 M3 Kayu 5/7 0.0360 M3 Reng 2/3 Cm 0.2500 Kg. Paku Kayu (A) (B) (C) (D)

1

A.4.6.1.21.

1 M'

Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas III 0.1000 Tukang Kayu 0.2000 Pekerja 0.0200 Kepala Tukang 0.0050 Mandor 0.0108 M3 Papan Kayu KL. III 0.1000 Kg. Paku Kayu (A) (B) (C) (D)

1

A.4.6.1.26.

1 M2

A.4.5.2.32.

1 M2

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas III 0.6000 Tukang Kayu 1.8000 Pekerja 0.1800 Kepala Tukang 0.0300 Mandor 0.0070 M3 Papan Kayu KL. III (Meranti) 0.1500 Kg Paku Skrup 0.1000 Kg. Paku Kayu (A) (B) (C) (D)

1

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Pemasangan 1 m2 genteng metal 0.2000 Tukang Kayu 0.1000 Pekerja 0.0100 Kepala Tukang 0.0010 Mandor

1.0200 0.2000 (A) (B) (C) (D)

1

A.4.5.2.36.

1 M'

A.4.6.1.5.

1 M2

A.4.6.1.6.

1 M2

A.4.6.1.19.

1 M2

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Pembuatan dan pemasangan 1 m2pintu dan jendela kaca, kayu kelas I at 0.8000 Tukang Kayu 2.4000 Pekerja 0.2400 Kepala Tukang 0.0400 Mandor 0.0240 M3 Papan Kayu KL. II (Palepek, Banuas) 0.3000 Kg Lem Kayu (A) (B) (C) (D)

1

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II 1.0000 Tukang Kayu 3.0000 Pekerja 0.3000 Kepala Tukang 0.0500 Mandor 0.0400 M3 Papan Kayu KL. II (Palepek, Banuas) 0.5000 Kg Lem Kayu (A) (B) (C) (D)

1

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Pemasangan 1 m’ nok genteng metal 0.2500 Tukang Kayu 0.1500 Pekerja 0.0150 Kepala Tukang 0.0130 Mandor 1.0000 BH/Atap Bubungan Zinculome collor (Sakur 0.0500 Kg Paku Anti Karat (Paku genteng multi colo (A) (B) (C) (D)

1

BH/Atap Zinculome collor (Multi Roof) Kg Paku Anti Karat (Paku genteng multi colo

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Pemasangan 1 m2rangka langit-langit (50 x 100) cm, kayu kelas II atau

0.1500 0.3000 0.0300 0.0750 0.0154 0.2000 (A) (B) (C) (D)

1

A.4.5.1.7a

1 M2

A.4.6.1.24.

1 M2

A.4.7.1.5.

1 M2

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Pemasangan 1 m2dinding pemisah teakwood rangkap, rangka kayu kelas 0.1500 Tukang Kayu 0.4500 Pekerja 0.0450 Kepala Tukang 0.0080 Mandor 0.0280 M3 Balok Kayu KL. II (Palepek, Banuas) 0.8600 Lembar/ Teakwood 4 mm untuk pintu 0.5600 Lem Kayu/Kg 0.1500 Kg Paku (A) (B) (C) (D)

1

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Pemasangan1 m2 langit-langit ukuran, tebal 3 mm 0.1000 Tukang Kayu 0.0500 Pekerja 0.0050 Kepala Tukang 0.0050 Mandor 0.3640 Uk. 3 mm / Nusa board 0.1100 Kg Paku Kait/Scrub (A) (B) (C) (D)

1

Tukang Kayu Pekerja Kepala Tukang Mandor M3 Kayu 5/7 Kg Paku Kayu

SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 la 0.0700 Tukang Kayu 0.1050 Pekerja 0.0040 Kepala Tukang 0.0030 Mandor 0.2000 Cat Menie

0.1500 0.1700 0.3500 0.0100 0.0300 0.2000 (A) (B) (C) (D)

1

F.1.1

1 M3

Plamur Cat Dasar Cat Penutup Kuas Pengencer Amplas SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

Mengerjakan rangka bawah Kayu Benuas Klas II

7.5000 5.0000 1.1000 5.0000 (A) (B) (C) (D)

Tukang Kayu Pekerja M3 Balok Kayu Kls II Kg. Paku Kayu SUB JUMLAH KEUNTUNGAN DAN OVERHEAD (15%) PPn 10% JUMLAH SATUAN HARGA PEKERJAAN

AFTAR ANALISA TUAN PEKERJAAN

175,000.00 150,000.00 6,000,000.00 30,000.00

1,312,500.00 750,000.00

2,062,500.00

6,600,000.00 150,000.00 6,750,000.00

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

8,812,500.00 1,321,875.00 1,013,437.50 11,147,812.50

pi Kayu Kelas II Benuas

175,000.00 150,000.00 Err:509 30,000.00

315,000.00 90,000.00

405,000.00

Err:509 6,000.00 Err:509

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

175,000.00 150,000.00 Err:509 30,000.00

87,500.00 3,000.00

90,500.00 (B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

Err:509 Err:509 Err:509 Err:509

Err:509 6,000.00 Err:509

Err:509 Err:509 Err:509 Err:509

175,000.00 150,000.00 Err:509 25,000.00

4,200,000.00 1,200,000.00

5,400,000.00

Err:509 75,000.00 Err:509

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

150,000.00 100,000.00

45,000.00 120,000.00 165,000.00

-

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

175,000.00 150,000.00 Err:509 27,000.00 25,000.00

4,187,500.00

Err:509 405,000.00 75,000.00 Err:509

Err:509 Err:509 Err:509 Err:509

2,100,000.00 600,000.00 -

2,700,000.00 (B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

165,000.00 24,750.00 18,975.00 208,725.00

1,172,500.00 3,015,000.00 -

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

nvensional, kayu kelas I, II dan III 175,000.00 150,000.00 Err:509 27,000.00 25,000.00

Err:509 Err:509 Err:509 Err:509

Err:509 324,000.00 140,000.00 Err:509

Err:509 Err:509 Err:509 Err:509

mik, kayu kelas III 175,000.00 150,000.00 Err:509 Err:509 25,000.00

17,500.00 15,000.00 -

32,500.00

Err:509 Err:509 6,250.00 Err:509

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

Err:509 Err:509 Err:509 Err:509

m, kayu kelas III 175,000.00 150,000.00 Err:509 25,000.00

17,500.00 30,000.00 -

47,500.00

Err:509 2,500.00 Err:509

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

Err:509 Err:509 Err:509 Err:509

papan kayu kelas III 175,000.00 150,000.00 Err:509 28,000.00 25,000.00

105,000.00 270,000.00 -

375,000.00 (B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

175,000.00 150,000.00 -

35,000.00 15,000.00 -

Err:509 4,200.00 2,500.00 Err:509

Err:509 Err:509 Err:509 Err:509

190,000.00 28,000.00 50,000.00

193,800.00 5,600.00 199,400.00

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

175,000.00 150,000.00 30,000.00 28,000.00

43,750.00 22,500.00 -

66,250.00

30,000.00 1,400.00 31,400.00

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

u panel, kayu kelas I atau II 175,000.00 150,000.00 5,500,000.00 30,000.00

220,000.00 15,000.00 235,000.00

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

100) cm, kayu kelas II atau III

860,000.00 129,000.00 98,900.00 1,087,900.00

140,000.00 360,000.00 -

500,000.00 (B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

97,650.00 14,647.50 11,229.75 123,527.25

175,000.00 450,000.00 -

625,000.00

jendela kaca, kayu kelas I atau II 175,000.00 150,000.00 5,500,000.00 30,000.00

249,400.00 37,410.00 28,681.00 315,491.00

132,000.00 9,000.00 141,000.00

641,000.00 96,150.00 73,715.00 810,865.00

175,000.00 150,000.00 Err:509 25,000.00

26,250.00 45,000.00 -

71,250.00

Err:509 5,000.00 Err:509

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

175,000.00 150,000.00 Err:509 28,000.00

17,500.00 7,500.00 -

25,000.00

Err:509 3,080.00 Err:509

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

rangkap, rangka kayu kelas II 175,000.00 150,000.00 Err:509 Err:509 30,000.00 25,000.00

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

26,250.00 67,500.00 -

93,750.00 (B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

lamuur, 1 lapis cat dasar, 3 lapis cat penutup) 175,000.00 12,250.00 150,000.00 15,750.00 -

Err:509 Err:509 16,800.00 3,750.00 Err:509

Err:509 Err:509 Err:509 Err:509

7,000.00 65,000.00 30,000.00 25,000.00 7,000.00 28,000.00

22,750.00 300.00 750.00 1,400.00 25,200.00

(B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

175,000.00 150,000.00 Err:509 25,000.00

1,312,500.00 750,000.00

2,062,500.00 (B) = (A) x 15% (C) = (A + B) x10% (D) = (A) + (B) + (C)

53,200.00 7,980.00 6,118.00 67,298.00

Err:509 125,000.00 Err:509

Err:509 Err:509 Err:509 Err:509

REKAPITULASI ANALISA NO

URAIAN PEKERJAAN 1 PEKERJAAN PENDAHULUAN Err:509 Pek. Pembersihan lokasi dan Bongkar Jembatan lama 2 PEKERJAAN RANGKA BAWAH Pek. Balok Tiang Pondasi Induk 10/10 Err:509 Pek. Balok penahan dinding(Gelegar 5/10) Pek. Balok Suai 5/10 3 PEKERJAAN PAPAN DINDING SIRING Pek. Dinding Siring Papan 2/20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 4 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 5 LAIN-LAIN Err:509 Err:509 6 Err:509 Err:509 Err:509 Err:509 7 Err:509 Err:509 Err:509 Err:509

ANALISA

UPAH

BAHAN

Err:509 Ls

Rp Rp

BOW F.1a Err:509 BOW F.1a BOW F.1a

Rp Rp Rp Rp

2,062,500.00 Rp 2,062,500.00 2,062,500.00 405,000.00

BOW F.8b Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Rp Rp Rp Rp Rp Rp

5,400,000.00 90,500.00 5,400,000.00 5,400,000.00 5,400,000.00 625,000.00

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Rp Rp Rp Rp Rp Rp Rp Rp

2,700,000.00 4,187,500.00 4,187,500.00 32,500.00 50,000.00 66,250.00 375,000.00 47,500.00

Err:509 Err:509

Rp Rp

71,250.00 25,000.00

Err:509 Err:509

Rp Rp

28,000.00 28,000.00

Err:509 Err:509 Err:509

Rp Rp Rp

50,000.00 100,000.00 500,000.00

JUMLAH

300,000.00 8,500.00

Rp Rp

Rp Rp

6,750,000.00 Rp Err:509 Err:509 Err:509

8,812,500.00 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 235,000.00 Rp 100,000.00

Err:509 Err:509 Err:509 Err:509 Err:509 860,000.00

Err:509 Err:509 Err:509 Err:509 199,400.00 Rp 31,400.00 Rp Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 249,400.00 97,650.00 Err:509 Err:509

Err:509 Err:509

Rp Rp

Err:509 Err:509

25,200.00 Rp 25,200.00 Rp

53,200.00 53,200.00

Rp Rp Rp

50,000.00 100,000.00 500,000.00

DAFTAR ANALISA HARGA SATUAN P

( WILAYAH KABUPATEN KATING PROGRAM

:

Anggaran Dana Desa

PEKERJAAN

:

Pembangunan Jalan Timbun Siring

LOKASI

:

Desa Tumbang Hangei, Kec. Katingan Tengah. Kab.Ka Kalimantan Tengah

:

TAHUN ANGGARAN

2019

ANALISA

URAIAN PEKERJAAN

1

2 ANALISA BOW

BOW F.1a

1 M3 0.2500 0.7500 7.5000 5.0000 1.1000 5.0000

Pekerjaan Rangka Bawah Kayu Klas I Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Balok Kayu Klas I Kg Paku Kayu

BOW F.22

1 M3 0.4000 2.4000 24.0000 8.0000 1.1000 3.0000

1 M3 MENGERJAKAN RANGKA BADAN Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Balok Kayu Klas I Kg Paku Kayu

BOW F.8b

1 M2

Menggergaji & Mengerjakan Papan Dinding Siring Kayu Kls. I Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Papan Kayu Klas I Kg Paku Kayu

0.0100 0.0500 0.5000 0.2000 0.0200 0.2000 BOW F.38b

1 M2

Lantai papan tebal 3 cm lidah / alur tanpa serut Kayu Kela Siring Kayu Kls. I 0.0300 Oh Mandor

0.1800 0.5000 0.2000 0.0350 0.2000

Oh Oh Oh

M3 Kg

Kepala Tukang Kayu Tukang Kayu Laden Tukang Kayu Papan Kayu Klas I Paku Kayu

ANALISA SNI A.2.3.1.14a

1 M3 0.3000 0.0100 1.2000

Pengurugan 1 m3 sirtu padat Pekerja Oh Mandor Oh m3 Sirtu Sungai Setempat

GA SATUAN PEKERJAAN

ATEN KATINGAN )

an Tengah. Kab.Katingan

HARGA SATUAN (Rp.) 3

175,000.00 150,000.00 6,000,000.00 30,000.00

175,000.00 150,000.00 6,000,000.00 30,000.00

175,000.00 150,000.00 6,500,000.00 30,000.00

UPAH (Rp.) 4

BAHAN (Rp.) 5

JUMLAH (Rp.) 6

### 750,000.00 ###

6,600,000.00 150,000.00 6,750,000.00

1,312,500.00 750,000.00 6,600,000.00 150,000.00 8,812,500.00

### ### ###

6,600,000.00 90,000.00 6,690,000.00

4,200,000.00 1,200,000.00 6,600,000.00 90,000.00 ###

87,500.00 30,000.00 117,500.00

130,000.00 6,000.00 136,000.00

87,500.00 30,000.00 130,000.00 6,000.00 253,500.00

-

-

-

pa serut Kayu Kelas I

175,000.00 150,000.00 6,500,000.00 30,000.00

120,000.00 190,000.00

87,500.00 30,000.00 117,500.00

227,500.00 6,000.00 233,500.00

87,500.00 30,000.00 227,500.00 6,000.00 351,000.00

36,000.00 36,000.00

228,000.00 228,000.00

36,000.00 228,000.00 264,000.00

PERHITUNGAN VOLUME PROGRAM PEKERJAAN LOKASI

: : :

Anggaran Dana Desa Pembangunan Jalan Timbun Siring Desa Tumbang Hangei, Kec. Katingan Tengah. Kab.Katingan Kalimantan Tengah

TAHUN ANGGARAN

:

2019

NO

URAIAN PEKERJAAN Panjang

1 1 I II

III

Lebar

2 Pembangunan Jalan Timbun Siring Kayu PEKERJAAN PENDAHULUAN 1 Pek. Pembersihan lokasi dan Bongkar Jembatan lama PEKERJAAN RANGKA BAWAH 1 Pek. Balok Tiang Pondasi Induk 10/10 2 Pek. Balok Tiang Suai Dalam 10/10 3 Pek. Balok penahan dinding(Gelegar 5/10) 4 Pek. Balok Suai 5/10 PEKERJAAN PAPAN DINDING SIRING 1 Pek. Dinding Siring Papan 2/20

Uraian Perkalian Tinggi 3

Jumlah

Banyak

Jumlah 4

1.00

x

1.00

x

1.00

x

1.00

x

1.00

1.00 Keg

38.00 7.50 11.00 4.00

x x x x

0.10 0.10 0.10 0.10

x x x x

0.10 0.10 0.05 0.05

x x x x

0.38 0.08 0.06 0.02

x x x x

2.00 1.00 6.00 5.00

0.76 m3 0.08 m3 0.33 m3 0.10 m3

9.00 2.00

x x

1.00 1.00

x x

1.00 0.50

x x

9.00 1.00

x x

2.00 2.00

18.00 m2 2.00 m2 20.00 m2

IV

V

VI

PEKERJAAN RANGKA BADAN 1 Pek. Pasang Balok Pagar 5/10 2 PEKERJAAN TIMBUNAN 1 Pek. Timbunan Laterit/sirtu

LAIN-LAIN 1 Baut dan Mur 2

11.00

x

0.10

x

0.05

x

0.06

x

4.00

0.22 m3

9.00 2.00

x x

4.00 4.00

x x

0.80 0.40

x x

28.80 3.20

x x

1.00 1.00

28.80 m3 3.20 m3 32.00 m3

1.00

x

1.00

x

1.00

x

1.00

x

119.00

119.00 Bh

RENCANA ANGGARAN BIAYA PROGRAM PEKERJAAN LOKASI

: : :

TAHUN

:

NO 1

2 I

P3MD Pembangunan dan Peningkatan Jalan Desa Desa Napu Sahur, Kecamatan Katingan Tengah, Kabupaten Katingan Kalimantan Tengah 2017 URAIAN PEKERJAAN

VOLUME

ANALISA

3

4

1.00 Keg

Ls

2 PEMBUATAN JEMBATAN KAYU ULIN P=18 L=3,7 meter PEKERJAAN PENDAHULUAN 1 Pek. Pembersihan lokasi dan Bongkar Jembatan lama

HARGA SATUAN (Rp) 5

Rp

JUMLAH HARGA (Rp) 6

859,000.00 Rp JUMLAH

II

PEKERJAAN RANGKA BAWAH 1 Pek. Balok Tiang Pondasi Induk 10/10 2 Err:509 3 Pek. Balok penahan dinding(Gelegar 5/10) 4 Pek. Balok Suai 5/10 5 Err:509

0.76 m3 Err:509 Err:5 0.33 m3 0.10 m3 Err:509 Err:5

BOW F.1a BOW F.1a BOW F.1a BOW F.1a BOW F.1a

Rp Rp Rp Rp Rp

859,000.00

Rp

859,000.00

8,812,500.00 Rp 8,812,500.00 8,812,500.00 Rp 8,812,500.00 Rp 8,812,500.00

6,697,000.00 Err:509 2,908,000.00 881,000.00 Err:509

JUMLAH III

PEKERJAAN PAPAN DINDING SIRING 1 Pek. Dinding Siring Papan 2/20 2 $

-

18.00 m2 20.00 m2

BOW F.22 BOW F.22

Rp Rp

Err:509

JUMLAH

IV

PEKERJAAN RANGKA BADAN 1 Pek. Pasang Balok Pagar 5/10 2 -

0.22 m3 0.00 0

Err:509 Err:509

Rp Rp

-

Rp

-

Err:509

Err:509 Err:509

Err:509 JUMLAH

V

LAIN-LAIN 1 Err:509 2 Err:509 3 Err:509 4 Err:509 5 Baut dan Mur 6 -

Err:509 Err:5 Err:509 Err:5 Err:509 Err:5 Err:509 Err:5 119.00 Bh 0.00 0

Ls Ls Ls Ls Ls Ls

Rp Rp Rp Rp Rp Rp

Err:509

65,000.00 65,000.00 25,000.00 30,000.00 7,000.00 Rp 27,000.00 Rp

Err:509 Err:509 Err:509 Err:509 833,000.00 -

JUMLAH

Err:509

TOTAL HARGA 2

3 I

PEMBUATAN JEMBATAN KAYU ULIN P=16 L=3,7 meter ( 2 Unit ) PEKERJAAN PENDAHULUAN 1 Pek. Pembersihan lokasi dan Bongkar Jembatan lama

1.00 Keg

Ls

Rp

863,000.00 Rp JUMLAH

II

PEKERJAAN RANGKA BAWAH 1 Pek. Balok Tiang Pondasi Induk 10/10 2 Err:509 3 Pek. Balok penahan dinding(Gelegar 5/10) 4 Pek. Balok Suai 5/10 5 Err:509

0.80 m3 0.28 m3 0.15 m3 0.28 m3 0.05 m3

BOW F.1a BOW F.1a BOW F.1a BOW F.1a BOW F.1a

Rp Rp Rp Rp Rp

8,812,500.00 8,812,500.00 8,812,500.00 8,812,500.00 8,812,500.00 JUMLAH

III

PEKERJAAN PAPAN DINDING SIRING 1 Pek. Dinding Siring Papan 2/20 2 $

-

22.20 m2 7.00 kpg

BOW F.22 BOW F.22

Rp Rp

JUMLAH

IV

Err:509

PEKERJAAN RANGKA BADAN 1 Pek. Pasang Balok Pagar 5/10 2 -

0.22 m3 0.00 0

863,000.00

Rp

863,000.00

Rp Rp Rp Rp Rp

7,050,000.00 2,467,000.00 1,321,000.00 2,467,000.00 440,000.00

Rp

13,745,000.00

Rp Rp

-

Rp

-

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

JUMLAH V

LAIN-LAIN 1 Err:509 2 Err:509 3 Err:509 4 Err:509 5 Baut dan Mur 6 -

Err:509 Err:5 Err:509 Err:5 Err:509 Err:5 Err:509 Err:5 119.00 Bh 0.00 0

Ls Ls Ls Ls Ls Ls

Rp Rp Rp Rp Rp Rp

65,000.00 65,000.00 25,000.00 30,000.00 7,000.00 Rp 27,000.00 Rp JUMLAH Harga/Unit TOTAL HARGA 3

4 I

Err:509 Err:509 Err:509 Err:509 833,000.00 Err:509 Err:509 Err:509

PEMBUATAN JEMBATAN KAYU ULIN P=10 L=3 meter PEKERJAAN PENDAHULUAN 1 Err:509

Err:509

Err:5

Ls

Rp

500,000.00 JUMLAH

II

Err:509

Err:509 1 Err:509 2 Err:509 3 Err:509 4 Err:509

Err:509 Err:509 Err:509 Err:509

Err:5 Err:5 Err:5 Err:5

BOW F.1a BOW F.1a BOW F.1a BOW F.1a

Rp Rp Rp Rp

8,812,500.00 8,812,500.00 8,812,500.00 8,812,500.00

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

5 Err:509

Err:509

Err:5

BOW F.1a

Rp

8,812,500.00 JUMLAH

Err:509 Err:509

III

Err:509 1 Err:509 2 Err:509 3 Err:509

Err:509 Err:509 Err:509

Err:5 Err:5 Err:5

BOW F.22 BOW F.22 BOW F.22

Rp Rp Rp

-

Err:509 Err:509 Err:509

JUMLAH IV

Err:509 1 Err:509 2 Err:509

Err:509 Err:509

Err:5 Err:5

Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

JUMLAH V

Err:509 1 Err:509 2 Err:509 3 Err:509 4 Err:509 5 Err:509 6 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Ls Ls Ls Ls Ls Ls

Err:5 Err:5 Err:5 Err:5 Err:5 Err:5

Rp Rp Rp Rp Rp Rp

Err:509

65,000.00 65,000.00 25,000.00 30,000.00 7,000.00 27,000.00

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH TOTAL HARGA 4

5 I

Err:509 Err:509

PEMBUATAN SEMeNISASI JALAN / RABAT BETON P=55 L=3 T=0,15 meter PEKERJAAN PENDAHULUAN 1 Pembuatan Papan Nama Kegiatan 2 Pembersihan Lokasi

Ls Ls

1.00 bh 1.00 Keg

Rp Err:509

300,000.00 Rp

JUMLAH II 1 2 3 4

PEKERJAAN COR BETON Pasang Papan Bekisting Pek. Rabat Beton Pek. Plesteran/Acian Sewa Molen

75.00 kpg 169.65 m3 1131.00 m2 1.00 bh

Ls 0 BOW F.38b Ls

Rp Rp Rp Rp

48,000.00 253,500.00 264,000.00 2,900,000.00

3,600,000.00 43,006,000.00 298,584,000.00 2,900,000.00

JUMLAH Rp TOTAL HARGA 5 TOTAL HARGA (2+3+4+5 )

348,090,000.00 Err:509 Err:509

April 2017

Di Setujui Oleh : Tim Pelaksana Kegiatan (TPK)

Di buat Oleh: Konsutan Perencana Ahli Teknik Jalan

ISMAN FIRDAUS Ketua

NILA ASTARIA, ST Konsultan Individu

AHMADI

Err:509

Rp Rp Rp Rp

Napu Sahur,

Mengetahui/Menyetujui Oleh : Kepala Desa Napu Sahur

300,000.00 Err:509

RENCANA ANGGARAN BIAYA PROGRAM PEKERJAAN LOKASI

: : :

TAHUN

:

NO

URAIAN PEKERJAAN

1

2 Pembangunan Jalan Timbun Siring Kayu

1 I

Anggaran Dana Desa Pembangunan Jalan Timbun Siring Kayu Desa Tumbang Hangei, Kecamatan Katingan Tengah, Kabupaten Katingan Kalimantan Tengah 2019

PEKERJAAN PENDAHULUAN 1 Pek. Pembersihan lokasi dan Bongkar Jembatan lama 2 Papan Nama Kegiatan

VOLUME

ANALISA

3

4

1.00 Keg 1.00 bh

Ls Ls

HARGA SATUAN (Rp) 5

Rp Rp

2,500,000.00 Rp 300,000.00 Rp JUMLAH

II 1 2 3 4

PEKERJAAN RANGKA BAWAH Pek. Balok Tiang Pondasi Induk 10/10 Pek. Balok Tiang Suai Dalam 10/10 Pek. Balok penahan dinding(Gelegar 5/10) Pek. Balok Suai 5/10

0.76 m3 0.08 m3 0.33 m3 0.10 m3

BOW F.1a BOW F.1a BOW F.1a BOW F.1a

Rp Rp Rp Rp

PEKERJAAN PAPAN DINDING SIRING 1 Pek. Dinding Siring Papan 2/20

20.00 m2

BOW F.8b

Rp

2,800,000.00

Rp Rp Rp Rp

6,715,000.00 660,000.00 2,908,000.00 881,000.00

Rp

11,164,000.00

253,500.00 Rp

5,070,000.00

8,812,500.00 8,812,500.00 8,812,500.00 8,812,500.00

JUMLAH IV

PEKERJAAN RANGKA BADAN 1 Pek. Pasang Balok Pagar 5/10

0.22 m3

BOW F.22

Rp

Rp

5,070,000.00

12,090,000.00 Rp

2,659,000.00

JUMLAH V

PEKERJAAN TIMBUNAN 1 Pek. Timbunan Laterit/sirtu

32.00 m3

A.2.3.1.14a

Rp

Rp

2,659,000.00

253,500.00 Rp

8,112,000.00

JUMLAH VI 1 2 3 4 5

LAIN-LAIN Baut dan Mur Cat Kayu Mengkilat Tinner Kuas Cat

119.00 Bh 2.00 klg 1.00 ltr 2.00 bh

Ls Ls Ls Ls

Rp Rp Rp Rp

2,500,000.00 300,000.00

Rp

JUMLAH III

JUMLAH HARGA (Rp) 6

7,000.00 65,000.00 25,000.00 10,000.00 JUMLAH

Rp

8,112,000.00

Rp Rp Rp Rp

833,000.00 130,000.00 25,000.00 20,000.00

Rp

1,008,000.00

TOTAL HARGA Rp

30,813,000.00

Tiga Puluh Juta Delapan Ratus Tiga Belas Ribu Rupiah Tumbang Kalemei, Januari 2019

Mengetahui/Menyetujui Oleh : Kepala Desa Tumbang Hangei

OSKARNIUS

Di buat Oleh: TPK Desa Tumbang Hangei

JUMIATI Ketua

RENCANA ANGGARAN BELANJA (RAB) BAHAN PROGRAM PEKERJAAN LOKASI

Anggaran Dana Desa Pembangunan Jalan Timbun Siring Kayu Desa Tumbang Hangei, Kecamatan Katingan Tengah, Kabupaten Katin Kalimantan Tengah 2019

TAHUN

No Uraian

Volume

Satuan Harga (Rp)

3

4

1 2 1 Pembangunan Jalan Timbun Siring Kayu A UPAH Tukang Kayu Pekerja (siring) Pekerja (Timbunan) Pek. Pembersihan lokasi dan Bongkar Jemba

25.00 12.00 10.00 1.00

Orang/hari Orang/hari Orang/hari Keg

Rp Rp Rp Rp

175,000.00 150,000.00 120,000.00 2,500,000.00

B BAHAN Baut dan Mur Paku Ulin Cat Kayu Mengkilat Tinner Kuas Cat

119.00 11.00 2.00 1.00 2.00

Bh kg klg ltr bh

Rp Rp Rp Rp Rp

7,000.00 30,000.00 65,000.00 25,000.00 10,000.00

C MATERIAL KAYU DAN SIRTU Balok Tiang Utama Kayu Kelas I 10/10 Balok Tiang Dalam Kayu Kelas I 10/10 Balok Kayu Kelas I 5/10 Papan Kayu Kelas I 2/20 Sirtu Sungai Setempat

0.80 0.08 0.70 0.400 38.00

m3 m3 m3 m3 m3

Rp Rp Rp Rp Rp

6,000,000.00 6,000,000.00 6,000,000.00 6,500,000.00 190,000.00

D BIAYA LAIN-LAIN Papan Nama Kegiatan

1.00

bh

Rp

300,000.00

TOTAL A+B+C+D Tiga Puluh Juta Delapan Ratus Tiga Belas Ribu Rupiah

Mengetahui/Menyetujui Oleh : Kepala Desa

Di buat Oleh: TPK Desa Tumbang Hangei

Tumbang Hangei

OSKARNIUS

JUMIATI Ketua

BAHAN

u ngan Tengah, Kabupaten Katingan

Jumlah Harga (Rp) 5

Rp Rp Rp Rp Rp

4,375,000.00 1,800,000.00 1,200,000.00 2,500,000.00 9,875,000.00

Rp Rp Rp Rp Rp

833,000.00 330,000.00 130,000.00 25,000.00 20,000.00

Rp

1,338,000.00

Rp Rp Rp Rp Rp Rp

4,800,000.00 480,000.00 4,200,000.00 2,600,000.00 7,220,000.00 19,300,000.00

Rp Rp

300,000.00 300,000.00

Rp

30,813,000.00

u Rupiah Tumbang Kalemei, Januari 2019 Di buat Oleh: TPK Desa Tumbang Hangei

JUMIATI Ketua

REKAPITULASI RENCANA ANGGARAN BELANJA (RAB) PROGRAM PEKERJAAN LOKASI

: : 1 2 :

TAHUN

:

No

Uraian

1

2

Anggaran Dana Desa Pembangunan Jalan Timbun Siring Kayu Timbunan Jalan dengan Sirtu dan Siring Cor Beton Desa Tumbang Hangei, Kecamatan Katingan Tengah, Kabupaten Katingan Kalimantan Tengah 2019

1 Pembangunan Jalan Timbun Siring Kayu 2 Timbunan Jalan dengan Sirtu dan Siring Cor Beton - Jalan Gg. Putri Manunggal P=68 m L=3 m - Jalan Gg. RT. 02 (P=50 m L=3 m) - Jalan Gg. RT. 02 (P=50 m L=3 m) TOTAL

Seratus Lima Belas Juta Seratus Delapan Puluh Satu Ribu Rupiah Mengetahui/Menyetujui Oleh : Kepala Desa Tumbang Hangei

Di buat Oleh: TPK Desa Tumbang Hangei ### ###

OSKARNIUS

JUMIATI Ketua

### ###

###

AB)

abupaten Katingan

Jumlah Harga (Rp) 3 Rp

30,813,000.00

Rp Rp Rp

50,027,000.00 34,341,000.00 34,341,000.00

Rp

115,181,000.00

Rupiah

Di buat Oleh: PK Desa Tumbang Hangei

JUMIATI Ketua

DAFTAR ANALISA HARGA SATUAN PE

( WILAYAH KABUPATEN KATINGA KEGIATAN

:

PEKERJAAN

:

LOKASI

:

TAHUN ANGGARAN

:

ANALISA

URAIAN PEKERJAAN

1

2 ANALISA BOW

BOW E.1

BOW E.4

BOW E.7

1 Bh 0.0050 0.0250 0.2500 0.1000

Tiang Pancang Dilancipkan Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh

1 Pas. Membuat Pen & Lobang Pada Tiang dan Balok 0.6000 Oh Kepala Tukang Kayu 0.0600 Oh Tukang Kayu 1 M' 0.0130 0.0600 0.6000 0.3000

Mengerjakan Papan Siring/Bendung Dengan Sambungan Lidah & Alur Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh

BOW E.9

1 M'

Mengerjakan Papan Siring/Bendung Tanpa Sambungan Lidah & Alur 1/3 x Anl. E.07

BOW E.13

1 M'

Tiang Dipancangkan Kedalam Tanah Lunak (Dihitung Bagian Yang Masuk) Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh

0.0130 0.0040 0.0400 1.8000

BOW F.1

1 M3 0.2500 0.7500 7.5000 5.0000 1.1000 5.0000

Pekerjaan Rangka Bawah Kayu Klas I Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Balok Kayu Klas I Kg Paku Ulin

BOW F.1a

1 M3 0.2500 0.7500 7.5000 5.0000 1.1000 5.0000

Pekerjaan Rangka Bawah Kayu Klas II Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Balok Kayu Klas II Kg Paku Kayu

BOW F.1b

1 M3 0.2500 0.7500 7.5000 5.0000 1.1000 5.0000

Pekerjaan Rangka Bawah Kayu Ulin Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Balok Kayu Ulin Kg Paku Ulin

BOW F.3

1 M3 0.4000 2.4000 24.0000 8.0000 1.1000 5.0000

Pekerjaan Balok Pemikul, Sandaran dan Pelancar Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Balok Kayu klas I Kg Paku Ulin

BOW F.8

1 M2

Menggergaji & Mengerjakan Papan Lantai Jembatan Kayu Klas I Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Papan Kayu Klas I Kg Paku Ulin

0.0100 0.0500 0.5000 0.2000 0.0250 0.2000 BOW F.8a

1 M2

Menggergaji & Mengerjakan Papan Lantai Jembatan Kayu Klas II 0.0100 Oh Mandor 0.0500 Oh Kepala Tukang Kayu 0.5000 Oh Tukang Kayu

0.2000 Oh 0.0250 M3 0.2000 Kg BOW F.21

1 M2 0.0140 0.0800 0.8000 0.2800 0.0250 0.1000

BOW F.21a

1 M2

BOW F.22

1 M3

Laden Tukang Kayu Papan Kayu Klas II Paku Kayu

Pekerjaan Listplank/Papan Rambu/Papan Dinding Kayu Klas Dengan Lidah Alur Serta Diketam Sebelam Menyebelah Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Papan Kayu Klas I Kg Paku Ulin

Pekerjaan Papan Kayu Klas II Tebal 2 Cm Diketam Halus Sebelah Menyebelah Dengan Lidah Alur 0.7500 Upah F.21 0.0250 M3 Papan Kayu Klas II 0.1000 Kg Paku Kayu

0.4000 2.4000 24.0000 8.0000 1.1000 3.0000

Mengerjakan Rangka Kap Biasa/Kanopy (Kayu Klas Kuat II ) Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Balok Kayu Klas II Kg Paku Kayu

BOW F.22a

1 M3 0.4000 2.4000 24.0000 8.0000 1.1000 6.0000

Mengerjakan Rangka Badan Kayu Klas I Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Balok Kayu Klas I Kg Paku Ulin

BOW F.22b

1 M3 0.4000 2.4000 24.0000 8.0000 1.1000 6.0000

Mengerjakan Rangka Badan Kayu Klas II Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Balok Kayu Klas II Kg Paku Kayu

BOW F.22c

1 M3

Mengerjakan Rangka Badan Kayu Ulin

0.4000 2.4000 24.0000 8.0000 1.1000 6.0000

Oh Oh Oh Oh

BOW F.38

1 M2 0.0300 0.1800 1.8000 0.6000 0.0300 0.2000

Pek. Lantai Papan Kayu Klas I Tebal 2,5 Cm Diserut Rapi Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Papan Kayu Klas I Kg Paku Ulin

BOW F.38a

1 M2 0.0300 0.1800 1.8000 0.6000 0.0233 0.2000

Pek. Lantai Papan Kayu Klas I Tebal 2 Cm Diserut Rapi Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Papan Kayu Klas I Kg Paku Ulin

BOW F.38b

BOW F.38c

BOW F.38d

M3 Kg

Mandor Kepala Tukang Kayu Tukang Kayu Laden Tukang Kayu Balok Kayu Ulin Paku Ulin

Upah 1/2 1 M2 Pek. Lantai Papan Kayu Klas II Tebal 2,5 Cm Diserut Rapi 0.0300 Oh Mandor 0.1800 Oh Kepala Tukang Kayu 1.8000 Oh Tukang Kayu 0.6000 Oh Laden Tukang Kayu 0.0300 M3 Papan Kayu Klas II 0.2000 Kg Paku Kayu Upah 1/2 1 M2 Pek. Lantai Papan Kayu Klas II Tebal 2 Cm Diserut Rapi 0.0300 Oh Mandor 0.1800 Oh Kepala Tukang Kayu 1.8000 Oh Tukang Kayu 0.6000 Oh Laden Tukang Kayu 0.0233 M3 Papan Kayu Klas II 0.2000 Kg Paku Kayu Upah 1/2 1 M2 Pek. Lantai Papan Kayu Ulin Tebal 2,5 Cm Diserut Rapi 0.0300 Oh Mandor 0.1800 Oh Kepala Tukang Kayu

1.8000 0.6000 0.0300 0.2000

BOW F.38e

BOW F.38f

1 M2

1 M2 0.0300 0.1800 1.8000 0.6000 0.0233 0.2000

BOW F.38h

M3 Kg

Tukang Kayu Laden Tukang Kayu Papan Kayu Ulin Paku Ulin

Upah 1/2 1 M2 Pek. Lantai Papan Kayu Ulin Tebal 2 Cm Diserut Rapi 0.0300 Oh Mandor 0.1800 Oh Kepala Tukang Kayu 1.8000 Oh Tukang Kayu 0.6000 Oh Laden Tukang Kayu 0.0233 M3 Papan Kayu Ulin 0.2000 Kg Paku Ulin

0.0300 0.1800 1.8000 0.6000 0.0233 0.2000

BOW F.38g

Oh Oh

1 M2 0.0300 0.1800 1.8000 0.6000 0.0233 0.2000

Upah 1/2 Pek. Dinding Papan Kayu Klas I Tebal 2 Cm Diserut Rapi Dengan Sambungan Lidah Alur Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Papan Kayu Klas I Kg Paku Ulin

Pek. Dinding Papan Kayu Klas II Tebal 2 Cm Diserut Rapi Dengan Sambungan Lidah Alur Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Papan Kayu Klas II Kg Paku Kayu Upah 3/4 Pek. Dinding Papan Kayu Ulin Tebal 2 Cm Diserut Rapi Dengan Sambungan Lidah Alur Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh M3 Papan Kayu Ulin Kg Paku Ulin Upah 3/4

BOW F.45

1 M2

Tangga Kayu Lebar 1 M

0.0500 0.3000 3.0000 1.0000 0.1250 0.1250 0.0500 0.0500

BOW F.46

1 M2 0.1000 0.6000 6.0000 2.0000 0.2500 0.2500 0.1000 0.1000

BOW L.7

1 M2

BOW L.8

1 M2

BOW L.9

1 M2

Tangga Kayu Lebar 2 M Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh Kg Paku Ulin Kg Paku Kayu M3 Kayu Klas I M3 Kayu Klas II

Membongkar Atap Seng Berikut Pembersihannya 0.0100 Oh Mandor 0.0500 Oh Laden Tukang Kayu

1 M2 0.0100 0.0060 0.0600 0.2000

BOW L.12

Kg Kg M3 M3

Mandor Kepala Tukang Kayu Tukang Kayu Laden Tukang Kayu Paku Ulin Paku Kayu Kayu Klas I Kayu Klas II

Membongkar Atap Sirap/Genteng Berikut Pembersihannya 0.0100 Oh Mandor 0.0200 Oh Laden Tukang Kayu

0.0050 0.0025 0.0250 0.1000 BOW L.11

Oh Oh Oh Oh

1 M3

Membongkar Kasau dan Reng Berikut Pembersihannya Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh Membongkar Dinding Kayu/Lantai Jembatan Berikut Pembersihannya Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh Membongkar balok Plafond/Kuda-Kuda/

0.2000 0.6000 6.0000 4.0000 BOW L.14

1 M3 0.2000 1.2000 12.0000 4.0000

Gelagar/Balok Jembatan Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh Membongkar balok Plafond/Kuda-Kuda/ Gelagar/Balok Jembatan Mandor Oh Kepala Tukang Kayu Oh Tukang Kayu Oh Laden Tukang Kayu Oh

GA SATUAN PEKERJAAN

PATEN KATINGAN )

HARGA SATUAN (Rp.) 3

Upah 1/2 x E.07

UPAH (Rp.) 4

BAHAN (Rp.) 5

JUMLAH (Rp.) 6

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Pelancar

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

n Dinding Kayu Klas I am Menyebelah

m Diketam Halus -

Upah 3/4 x F.22

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Cm Diserut Rapi

Upah 1/2 x F.38 m Diserut Rapi

Upah 1/2 x F.38a Cm Diserut Rapi

Upah 1/2 x F.38b m Diserut Rapi

Upah 1/2 x F.38c m Diserut Rapi

Upah 1/2 x F.38d Diserut Rapi

Upah 1/2 x F.38e Cm Diserut Rapi

Upah 3/4 x F.38f Cm Diserut Rapi

Upah 3/4 x F.38g m Diserut Rapi

Upah 3/4 x F.38h

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Untuk Kayu Klas I Untuk Kayu Klas II

-

-

-

Untuk Kayu Klas I Untuk Kayu Klas II

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

PERHITUNGAN VOLUME Program Desa

: Batu Badinding

Kecamatan

: Katingan Tengah

Kabupaten

: Katingan

Provinsi

: Kalimantan Tengah

No. Uraian I.

: P3MD 2017

Perhitungan

Pekerjaan Siring Kayu Ulin Penahan Tanah Uk. P=50 m T=4,5 m

A. Rangka Bawah 1 2

Balok Tiang Induk 10/10 Balok Sokong Luar 10/10

((6.6*0,1*0,1)*33)

3

Balok Tiang Suai 10/10

((6.5*0,1*0,1)*33)

4

Balok Suai Dalam 10/10

((3*0.1*0,1)*33)

5

Balok Gelagar 5/10

6

Besi Beugel

7

Baut dan Mur

((4*0,1*0,1)*33)

((50/4)*8)*(4*0,05*0,1)

B. Pasang Papan Siring 1

Papan Ulin 2/20

2

Lapisan Siring Ex. Terpal Biotek

(3,5*50)

C. Rangka Badan 1

Balok Pagar 5/10

((50/4)*3)*(4*0,05*0,1)

D. Pekerjaan Tumbunan 1

Timbunan Tanah Urug Pilihan

(1*2*50)+((((1+0,2*2)/2)*50))

Jumlah

2.18 m3 1.32 m3 2.15 m3 0.99 m3 2.00 m3 Bh Bh

175.00 m2

0.67 m3

135.00 M3

REKAPITULASI RAB Desa

: Batu Badinding

No. RAB

Kecamatan

: Katingan Tengah

Program

kabupaten

: Katingan

Jenis Kegiatan

Provinsi

: Kalimantan Tengah

No.

Uraian Pekerjaan

Analisa

Volume

Satuan

I

Pekerjaan Siring Kayu Penahan Tanah Uk. P=232 m T=3,5 m

1

Pembersihan Lokasi

Ls

1

Ls

2

Papan Nama Kegiatan

Ls

1

Ls

3

Pek. Rangka Bawah

SUPL. 3

32.10

m3

4

Pasang Papan Siring

F.8a

812.00

m2

5

Pek. Rangka Badan

SUPL. 8a

2.32

m3

6

Pek. Timbunan Laterit

A.2.3.1.11

626.40

m3

7

Besi Beugel

Ls

bh

8

Baut/Mur

Ls

bh

9

Terpal Ex. Terpal Biotek

Ls

Roll

II

Pekerjaan Jembatan Kayu P=2,5 m L=4 m T=1,5 m

1

Papan Nama Kegiatan

2

Ls

1

Pek. Rangka Bawah

SUPL. 3

0.66

Ls m3

3

Pasang Papan Lantai

F.8a

16

m2

4

Pek. Rangka Badan

SUPL. 8a

0.07

m3

5

Besi Beugel

Ls

bh

6

Baut/Mur

Ls

bh

III

Pekerjaan Timbunan Jalan

1

Pek. Pembersihan Lokasi

2 3

Ls

1

Ls

Pek. Timbunan Laterit RT. ....

A.2.3.1.11

270

m3

Pek. Timbunan Laterit RT. ....

A.2.3.1.11

113

m3

IV

PEKERJAAN BOX CULVERT

1 2

1

3 4 5 6

Tota Dana Bidang Pembangunan

Terbilang " ..........................................................................................

Mengetahui,

CV. UNIK

TPK Desa Telok

PUSAT

SALUNDIK Ketua

:: P3MD 2017 : 1. Siring Kayu Penahan Tanah : 2. Jembatan Kayu : 3. Semenisasi Harga Satuan

Jumlah Biaya

( Rp. )

( Rp. )

1,000,000.00

1,000,000.00

250,000.00

250,000.00

7,545,379.20

242,206,000.00

210,820.00

171,185,000.00

11,145,000.00

25,856,000.00

164,400.00

102,980,000.00 -

Total I

543,477,000.00

250,000.00

250,000.00

7,545,379.20

4,979,000.00

210,820.00

3,373,000.00

11,145,000.00

780,000.00 0.00

Total II

9,382,000.00

1,000,000.00

1,000,000.00

164,400.00

44,388,000.00

164,400.00

18,495,000.00

Total III

63,883,000.00

0.00 41,204,740.00

41,204,000.00 0.00 0.00 0.00 0.00

Total IV

41,204,000.00

Total I + II + III + IV mbangunan (70% dari DD)

657,946,000.00 -

SILPA

-657,946,000.00

.........................."

CV. UNIKA CITRA MANDIRI PUSAT PALANGKA RAYA,

KRISWANDI, ST Direktur

Pagu Perencanaan (4% dari Nilai Fisik) Pos Pembagian :

Rp

-

BPMD (1,5% dari Nilai Fisik)

Rp Rp Rp Rp Rp

3,500,000 3,500,000

Pajak Perencanaan (PPN 10%+PPh 1,5%) DED & RAB (1 % dari Nilai Fisik) Pee Perusahaan (SewaPerusahaan)