REKAPITULASI BIAY PEKERJAAN

: PEKERJAAN PERENCANAAN PEMETAAN

LOKASI

: BAGAN BATU KAB. ROKAN HILIR

URAIAN

BIAYA

I.

BIAYA LANGSUNG PERSONIL

1.

Biaya Personil

II.

BIAYA LANGSUNG NON PERSONIL

II. 1.

Transportasi

Rp.

II. 2.

Biaya Operasional, Makan, Pengadaan dan Sewa-Sewa

Rp.

II. 3.

Bahan/Perlengkapan Kantor

Rp.

II. 4.

Biaya Pembuatan Laporan

Rp.

Rp.

Jumlah Dibulatkan Terbilang : = Dua Milyar Enam Ratus Sembilan Puluh Tiga Juta Dua Ratus Ribu Rupiah

Pekanbaru, 0

(....................

TULASI BIAYA

ENCANAAN PEMETAAN AIRPORT RUNWAY DI MANGGALA DUA

B. ROKAN HILIR

BIAYA

JUMLAH Rp.

682,500,000.00

Rp.

2,010,700,000.00

Rp.

2,693,200,000.00

Rp.

2,693,200,000.00

682,500,000.00

115,000,000.00 1,750,700,000.00 20,000,000.00 125,000,000.00

Dua Ratus Ribu Rupiah =

Pekanbaru, 08 Januari 2016 KONSULTAN

(...........................................) Team Teknis

RINCIAN BIAYA LANGSUNG PERSONIL DAN B PEKERJAAN

: Pemetaan Bathimetri dan Hidro-Oceanografi

LOKASI

: Kabupaten Dompu

I.

BIAYA LANGSUNG PERSONIL

No

A. 1 2 3 4 5 6 7 8

Kualifikasi Tenaga Ahli

Jumlah Orang

Tenaga Ahli Profesional Team Leader Tenaga Ahli Profesional Surveyor Asisten Surveyor Drafter Administrasi Umum Tenaga Lokal Sopir dan Nahkoda

1 2 11 20 3 1 9 5 Jumlah

II.

BIAYA LANGSUNG NON PERSONIL

II. 1. Transportasi No

1 2 3 4 5 6

Posisi

Jumlah Orang

Team Leader Tenaga Ahli Profesional Surveyor Drafter Administrasi Umum Asisten Surveyor

1 2 11 3 1 20 Jumlah

II. 2. Biaya Operasional, Makan, Pengadaan dan Sewa-Sewa No A. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Uraian

Sewa Kendaraan Roda Empat + BBM Sewa Kapal Penginapan GPS Geodetik GPS Geodetik Bathi Total Station Echosounder Handy Talky Laptop dan Printer Rambu Ukur Makan Team Leader Makan Tenaga Ahli Makan Surveyor dan Asisten Makan Tenaga Lokal BM Beton BM Kayu Pengolahan Data Topografi Jumlah Biaya Survey Topografi

Jumlah Volume 7 3 8 4 2 4 1 20 3 2 1 3 34 14 9 20 1

II.2 BIAYA SURVEY LAPANGAN II. 3. Bahan/Perlengkapan Kantor No a. 1

Uraian Bahan/Perlengkapan Kantor Bahan Kantor/ATK

Jumlah Volume 1

II.3 BIAYA BAHAN DAN PERLENGKAPAN KANTOR II. 4. Biaya Pembuatan Laporan No

Uraian

Jumlah Volume

1 2

Laporan Akhir Gambar Peta

II.4 BIAYA PEMBUATAN LAPORAN

10 10

SONIL DAN BIAYA LANGSUNG NON PERSONIL

eanografi

Jumlah Hari

120 120 60 60 60 120 90 90

Jumlah Biaya

(Rp.)

(Rp.)

Rp Rp Rp Rp Rp Rp Rp Rp

Jumlah PP 1.00 1.00 1.00 1.00 1.00 1.00

Beban Biaya

Rp Rp Rp Rp Rp Rp

750,000 500,000 250,000 200,000 200,000 150,000 100,000 50,000

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

682,500,000 90,000,000 120,000,000 165,000,000 240,000,000 36,000,000 18,000,000 81,000,000 22,500,000 682,500,000

Beban Biaya

Jumlah Biaya

(Rp.)

(Rp.) 7,500,000 Rp 5,000,000 Rp 3,000,000 Rp 3,000,000 Rp 3,000,000 Rp 3,000,000 Rp

7,500,000 10,000,000 33,000,000 9,000,000 3,000,000 60,000,000

Rp

115,000,000

Jumlah Satuan UH UH UH UH UH UH UH UH UH UH OH OH OH OH Ls Ls Ls

Jumlah

Waktu

120.00 90.00 120.00 14.00 40.00 40.00 40.00 60.00 90.00 40.00 120.00 120.00 60.00 90.00 1.00 1.00 1.00

Beban Biaya

Jumlah Biaya

(Rp)

(Rp.)

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

800,000 850,000 200,000 500,000 500,000 250,000 800,000 50,000 250,000 200,000 150,000 125,000 100,000 75,000 300,000 100,000 7,500,000

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

672,000,000 229,500,000 192,000,000 28,000,000 40,000,000 40,000,000 32,000,000 60,000,000 67,500,000 16,000,000 18,000,000 45,000,000 204,000,000 94,500,000 2,700,000 2,000,000 7,500,000 1,750,700,000

Rp

1,750,700,000

Waktu/

Beban Biaya

Jumlah Biaya

Satuan

Bulan

(Rp)

(Rp.)

Ls

4.00

Rp

5,000,000 Rp Rp

Jumlah Satuan

20,000,000 20,000,000

Beban Biaya

Jumlah Biaya

(Rp.)

(Rp.)

Exemplar Exemplar

Rp Rp

5,000,000 Rp 7,500,000 Rp

50,000,000 75,000,000

Rp

125,000,000

No

URAIAN KEGIATAN

1

Persiapan I Persiapan Administrasi a Perizinan ke pihak terkait b Perekrutan Personel II Persiapan Teknis a Orientasi Lokasi b Penyewaan Alat Pelaksanaan I Pemasangan Titik Kontrol Horizontal II Pengukuran Titik Kontrol Horizontal III Pengukuran Topografi IV Survei Bathimetri V Pengukuran Pasut VI Pengukuran Arus VII Pengukuran Sampel Dasar Laut VIII Penggambaran Peta Topografi IX Penggambaran Peta Bathimetri X Penggabungan Peta Topografi dan Bathimetri Laporan I Laporan Kemajuan Mingguan II Laporan Kemajuan Bulanan III Lapora Akhir

2

3

1

Mei 2 3

4

1

Juni 2 3

4

1

Juli 2

Juli 3

4

Agustus 1 2 3 4

Related Documents

Rab Proyek Pemipaan
April 2020 1
Rab
June 2020 33
Rab Mess.xlsx
November 2019 44
Rab Material.xlsx
October 2019 47
Contoh Rab
May 2020 30

More Documents from ""

Proposal1-1.docx
May 2020 9
Uts.docx
May 2020 5
Xing Fu De Jia.docx
May 2020 5
Matematika 2.docx
May 2020 17