BASIC Price Breakdown (PBD)- CONFIDENTIAL DATE: VEHICLE LINE(S): HDT PART # : PART NAME : MODEL YEAR:
REQUEST FOR QUOTE #: GLOBAL COMMODITY CODE: PEAK DAILY : VEHICLE SALES MODEL YEAR VEHICLE SALES LIEFETIME
QUOTED CURRENCY: INR EXCHANGE RATE: SUPPLIER CODE : SUPPLIER NAME : PLANT LOCATION :
PURCHASED PARTS:
-
RAW MATERIAL:
-
LABOR (raw mat. & assy):
-
MACHINE & ASSEMBLY COST:
-
PLANT OVERHEAD:
-
SCRAP:
-
PROFIT:
-
SG&A:
-
BASE PRICE
SUPPLIER CONTACT: TITLE : PHONE : E-MAIL :
-
PACKAGING (in piece price):
-
AMORTIZATION (tooling & fixtures):
-
PARTS SEQUENCING (if applicable):
-
LOGISTICS
-
SELLING PRICE
-
TOOLING PRICE
-
NOTE: Entry needed for white cells only- grey cells contain formulas for automatic calculation.
11/30/2009
Proton Price Breakdown (PBD)- CONFIDENTIAL DATE: VEHICLE LINE(S): PART # : PART NAME : MODEL YEAR:
REQUEST FOR QUOTE #: GLOBAL COMMODITY CODE: PEAK DAILY : VEHICLE SALES MODEL YEAR VEHICLE SALES LIFETIME
QUOTED CURRENCY: EXCHANGE RATE: SUPPLIER CODE : SUPPLIER NAME : PLANT LOCATION :
INR
SUPPLIER CONTACT: TITLE : PHONE : E-MAIL :
PURCHASED PARTS (insert rows if required)
REF # PART NUMBER
SUBSUPPLIER NAME
SUB-SUPPLIER LOCATION
PART NAME
DIRECTED SOURCE (Y/N)
QUANTITY PER ASSY
COST PER UNIT
QUOTED CURRENCY
EXCHANGE RATE
PURCHASED PART SUBTOTAL
SUB-TIER TRANSPORTATION
PURCHASED PART TOTAL WITH TRANS.
0 Purchased Part Sub-Total: Purchased Parts Material Markup: Purchased Parts Grand Total:
-
RAW MATERIAL (insert rows if required) RAW MATERIAL REF # PART NUMBER PRODUCER
RAW MATERIAL PRODUCER LOCATION
PART DESCRIPTION
QUANTITY PER ASSEMBLY
MATERIAL DESCRIPTION
MATERIAL SPEC.
SIZE (Memo Only)
UNIT OF MEASURE
COST/UNIT OF GROSS USAGE PER MEASURE UNIT
RAW MATERIAL TOTAL
-
Raw Material Sub-Total: Raw Material Markup: Raw Material Total with Surcharges: RAW MATERIAL PROCESSING (insert rows if required) MACHINE COSTS REF #
OPERATION # OPERATION DESCRIPTION
MACHINE MACHINE PIECES PER MINUTE QUANTITY CYCLE TIME CYCLE (Minutes) RATE (Cost) PER ASSEMBLY
MACHINE SIZE & TYPE
OVERALL DIRECT LABOR COSTS MACHINE COSTS PER OPERATION
MACHINE INVESTMENT (MEMO)
NUMBER OF OPERATORS
DIRECT LABOR MINUTE RATE (Cost)
DIRECT LABOR COSTS PER OPERATION
PROCESSING COST TOTAL
Machine Cost Total:
-
Raw Mat. Direct Labor: Raw Material Processing Sub-Total:
-
ASSEMBLY (insert rows if required) ASSEMBLY COSTS REF # OPERATION # OPERATION / PROCESS DESCRIPTION
ASSEMBLY ASSEMBLY PIECES PER MINUTE QUANTITY CYCLE TIME CYCLE (Minutes) RATE (Cost) PER ASSEMBLY
ASSEMBLY EQUIPMENT DESCRIPTION
OVERALL DIRECT LABOR COSTS ASSEMBLY COST PER OPERATION
ASSEMBLY INVESTMENT (MEMO)
NUMBER OF OPERATORS
DIRECT LABOR MINUTE RATE (Cost)
DIRECT LABOR COSTS PER OPERATION
TOTAL ASSEMBLY COSTS
-
-
Assembly Cost Total: REMARKS:
Packaging costs (included in piece price or additionally) Import duties (included in piece price or additionally) Excise duties (included in piece price or additionally) VAT (included in piece price or additionally) List any Cost Reduction Commitments: List economic assumptions for firm labor & overhead:
NOTE: Entry needed for white cells only- grey cells contain formulas for automatic calculation.
-
Assembly Direct Labor: Assembly Sub-Total:
Manufacturing Costs Total :
-
PRODUCTION COST TOTAL: SCRAP: 0.0% PROFIT: 0.0% SG&A: 0.0% BASE SELLING PRICE :
-
PACKAGING COSTS IN PIECE PRICE: AMORTIZATION OF TOOLING & FIXTURING PARTS SEQUENCING: (if Proton requested): LOGISTICS (if Proton requested to Proton Mfg Location): TOTAL SELLING PRICE:
-
Raw Material Processing & Assembly Total: Miscellaneous Plant Overhead:
11/30/2009
Schedule 1- Scrap, Profit, SG&A, Packaging, Tooling & Fixturing Amortization, and Logistics DATE: PART #: PART NAME:
SUPPLIER CODE: SUPPLIER NAME: PLANT LOCATION:
SUPPLIER CONTACT: TITLE: PHONE:
Scrap %
Cost Per Piece
Raw Materials: Purchased Parts: Manufacturing: Total Production Scrap Costs:
-
Profit %
Cost Per Piece
Raw Materials: Manufacturing:
-
Total Profit:
Sales, General, & Administration (SG&A) Costs %
Cost Per Piece Total Part Specific
# of Total Pieces
ER&D Amount
Sales & Administration: General: ER&D (Part Specific): Other (describe below):
Number of Interest Rate Months
Total SG&A:
-
Describe Other:
Packaging Cost Per Piece Rack Investment Amortization (MCG Only): Expendable Packaging in Piece Cost: Packaging Cost Total:
Total amount
Lump Sum Number of # of Total pieces Interest Rate Payment(%) Months
-
Tooling and Fixturing Amortization Cost Per Piece Tools: Fixtures: Total:
# of Total pieces
Total amount -
Number of Months
-
Lump Sum Payment(%) 100.00% 100.00%
Interest Rate %
Maintenance %
Logistics Detail Cost Per Piece Rack Investment Amortization (CG Only):
-
Customs/Duty: Logistics to Proton Plant: Logistics - Other: Logistics Cost Total:
-
$ Total amount
# of Total pieces
Number of Interest Rate Months
0.00%
<--- Enter Customs %
-
Describe Other:
NOTE: Entry needed for white cells only- grey cells contain formulas for automatic calculation.
11/30/2009
Supplier Tooling Breakdown Part Number(s): Operation #
Tool Type
Tool Number Code(s)
Detailed Tool Description
Country of Origin for Annual Tool Capacity Tooling
Work Pattern Shift/Hours/Day
Intended Tool Source
# of Quoted Physical Tool Location: Tool Sources
Lead Time (WKS)
Total Cost
NOTE: TOOLING MUST NOT CONTAIN ANY CAPITAL EQUIPMENT!
Tooling Sub-Total
0.00
NOTE: Entry needed for white cells only- grey cells contain formulas for automatic calculation.
Fixturing Sub-Total:
0.00
GRAND Total:
0.00
11/30/2009