GRAN TIERRA ENERGY INC.

Daily Drilling Report Well: PROSPERIDAD 1

Report no.: 2

Report date: 2/11/2019

Wellbore No.:

Well Name: PROSPERIDAD 1

Block: EL PORTON

Active datum: U @925.0ft (above Ground Level)

Project: EL PORTON

Site: PROSPERIDAD 1

Rig Name/No.: Rig #1/5857

Event: ORIG DRILLING

Start date: 2/10/2019

End date:

AFE No.: Well.057.0001/DRI

AFE Estimator: German Bulla

Drilling Supervisor: Eric Pedersen

Spud date: 2/10/2019

Engineer: German Bulla

COSTS Daily cost: 154,187.62 (USD)

Authorized cost: 12,791,720.00 (USD)

Cumulative total: 3,011,775.23 (USD)

Expenditure: 23.54%

DEPTH DAYS MD:

1,205.0 ft

TVD:

1,204.8 ft

Progress:

705.0 ft

Avg. ROP:

68.3 ft/hr

Rotating hours:

10.32 hr

Cum Rot Hrs:

22.32 hr

DFS:

2.00 days

Est days:

MD auth:

Size: 30.00

Last Casing: 30.000 in @ 196.0 ft

Shoe Depth TVD: 196.00

16,289.0 ft

Shoe Depth MD: 196.00

STATUS Current status: Driling 26-in section with BHA No. 2 into Guayabo Fm. to 1490 ft as follows parameters: Q=1350 gpm, SPP= 2270 psi, WOB= 8-25 Klb, RS= 110 rpm, TQ= 2 -6 Klb-ft. 24 hr summary: Drilled 26-in section with BHA No. 2 into Guayabo Fm. from 500 ft to 1205 ft, as follows parameters: Q=700-1350 gpm, SPP= 1800-2270 psi, WOB= 3-25 Klb, RS= 80-110 rpm, TQ= 2 -6 Klb-ft. 24 hr forecast: To Drill 26-in section with BHA No. 2 into Guayabo Fm. from 1490 ft to 2000 ft. Pooh BHA No. 2 to surface.

WEATHER Weather: sunny day

Temperature:

ºF Comments:

SAFETY Status

Topic:

Avg. H2S:

RID cards: Comments:

Cum Stop Cards

% 62.00

Inspections/Drills Last weekly rig check:

Daily inspection done:

Last fire drill:

Last evacuation drill:

Last Csg Press Test:

Last Csg Press:

Last safety inspection:

Last safety meeting:

Last Spill Drill:

Last trip drill:

Last pit drill:

Last diverter drill:

BOP Pressure Tests Last BOP pressure test:

Next test due:

Last BOP function test:

Last BOP drill:

Standpipe manifold:

Kelly hose:

Diverter pressure:

Annular press:

Lower rams:

Kill line:

Choke line:

Choke manifold:

PERSONNEL Total No. of People: 96 Company

No. People

Company

No. People

PETREX

40

NOV CS

8

SISAM

1

AXURE

1

SCHLUMBERGER

4

NOV FLUID

5

NOV INSTRUMENTACION

2

ARCO IRIS

2

PROMOVER

2

TECSOTROL

1

FALCK SERVICE

4

MSSP

2

NOV BIT

1

COLVISEG

2

WETHERFORD MUD LOGGING

6

GTEC

9

2

CANAGUARO

4

RAMDE

HOLE SECTIONS Section Name

2/12/2019

Section type

6:51:59AM

Effective Hole Diameter (in)

MD (ft)

ID (in)

Top

version 1.5

Base

Hole section start date/time

www.grantierra.com

Hole section end date/time

1

GRAN TIERRA ENERGY INC.

Daily Drilling Report Well: PROSPERIDAD 1

Report no.: 2

Report date: 2/11/2019

Wellbore No.:

Well Name: PROSPERIDAD 1

Block: EL PORTON

Active datum: U @925.0ft (above Ground Level)

Project: EL PORTON

Site: PROSPERIDAD 1

Rig Name/No.: Rig #1/5857

Event: ORIG DRILLING

Start date: 2/10/2019

End date:

AFE No.: Well.057.0001/DRI

AFE Estimator: German Bulla

Drilling Supervisor: Eric Pedersen

Spud date: 2/10/2019

Engineer: German Bulla

HOLE SECTIONS Section type

Section Name

26

Effective Hole Diameter (in)

Open Hole

26.00

Weight/Vol. per unit

Usage

MD (ft)

ID (in)

Top

Hole section start date/time

Base

0.0

Hole section end date/time

2/9/2019 12:00AM

MATERIALS Product name

Product name

Quantity end

Quantity end

Usage

Weight/Vol. per unit

MUD Daily mud: 13,516.39 USD

Cum. mud cost: 33,126.02 USD

MMH

8.80

51.00 2/11/2019 6:00:00AM

MD check (ft) 500.0

MMH

8.80

49.00 2/11/2019 1:00:00PM

676.0

9.00

42.000

MMH

8.80

48.00 2/11/2019 6:00:00PM

832.0

9.00

43.000

Mud desc.

Density (ppg)

Viscosity (s/qt)

Date/Time

PV (cp)

YP (lbf/100f t²) 9.00 41.000

Cl(ppm)

Ca+ (ppm)

pH

Pm

10.40

0.23

1.30

1.30

0

60

10.40

0.23

1.30

1.30

0

80

10.50

0.26

1.40

1.40

Bit no.: Purpose:

Date/Time out:

BHA Length: 0.00 (ft)

Min. ID: 2.750 (in) Footage (ft)

Mf (cc)

60

BHA no.# 1 Date/Time in: 2/10/2019 9:30PM MD (ft)

Pf (cc)

Weight (Above/Below) Jars:

String Wt Up / Down / Rot (kip)

Drag (kip)

TQ On/Off (ft-lbf)

Assembly Components Component type

No. of joints

Length (ft)

OD (in)

ID (in)

Connection OD (in)

Name

Grade

Weight (ppf)

Pin Serial no. Box

Left or right spiral

Fish Neck Length (ft)

OD (in)

PUMP/HYDRAULICS No.

Make/Model 1 WIRTH / TPK 2200

Stroke (in) 14.00

2 WIRTH / TPK 2200

14.00

3 WIRTH / TPK 2200

14.00

Liner size (in)

Efficiency (%)

Pressure (psi)

SPM (spm)

Output (gpm)

Kill SPM/Pressure/Depth (spm/psi/ft)

6.500

MUD SYSTEM Gas

Volumes

Losses

Avg. conn. gas (%):

Total string vol. (bbl):

0.0 Surface total (bbl) :

Max. connection gas (%):

Total annular vol. (bbl):

0.0 Subsurface total (bbl) :

Avg. trip gas (%):

Total pit vol. (bbl):

0.0

Max. trip gas (%):

Lines (bbl):

0.0

Total system vol. (bbl):

0.0 Total (bbl):

660.0

Avg. background gas (%): Max. background gas (%):

660.0

MUD PRODUCTS Product

Units

Used

Day cost (USD)

Quantity end

AQUA FILM W

lb

5.00

200.65

210.00

CARBONATO M 200

lb

40.00

132.00

520.00

2/12/2019

6:51:59AM

version 1.5

www.grantierra.com

2

GRAN TIERRA ENERGY INC.

Daily Drilling Report Well: PROSPERIDAD 1

Report no.: 2

Report date: 2/11/2019

Wellbore No.:

Well Name: PROSPERIDAD 1

Block: EL PORTON

Active datum: U @925.0ft (above Ground Level)

Project: EL PORTON

Site: PROSPERIDAD 1

Rig Name/No.: Rig #1/5857

Event: ORIG DRILLING

Start date: 2/10/2019

End date:

AFE No.: Well.057.0001/DRI

AFE Estimator: German Bulla

Drilling Supervisor: Eric Pedersen

Spud date: 2/10/2019

Engineer: German Bulla

MUD PRODUCTS Product

Units

Used

Day cost (USD)

Quantity end

CARBONATO M 325

lb

120.00

396.00

240.00

CAUSTIC SODA

lb

1.00

24.95

117.00

MMH

lb

60.00

6,946.20

40.00

NOV FIBER F

lb

50.00

1,363.50

430.00

NOV FIBER M

lb

40.00

1,745.20

80.00

NOV GEL

lb

175.00

2,362.50

55.00

NOV XAN D

lb

3.00

345.39

111.00

OPERATION SUMMARY From

To

Dur. (hr)

Phase

Code

0:00

0:30

0.50

DRLSUR

02

Sub

Class

MD from (ft)

MD to (ft)

P

500.00

500.00

Operation Performed preoperational meeting to P/U & M/U Directional BHA No. 2 led by Schlumberger crew, with BHA No. 2 as follows: 26-in TRC Bit No. 2 (Manufacturer= NOV, Type= ST11, Jets= 4 * 20/32-in, TFA= 1.227 in²) + 25 1/2-in Near Bit String Stabilizer (w/float valve); 7 5/8 in REG PxB).

0:30

4:30

4.00

DRLSUR

01

P

500.00

500.00

P/U and assy Schlumberger tools from surface to 90 ft. as follows: Lower Saver Sub (LWD) + LWD - arcVISION 900(GR/Rest) + Lower Saver Sub (MWD) + MWD - TeleScope 950 High Flow (DnI / MVC) + Upper Saver Sub (MWD) + 9.5" NonMag Drill Collar + 25 3/4" String Stabilizer.

4:30

7:30

3.00

DRLSUR

06

P

500.00

500.00

P/U & M/U BHA No. 2 from 90 ft to 374 ft. as follows: 9 5/16-in X-O (S/N= BC41490265682-5, 7 5/8" REG PIN x 6 5/8 REG BOX) + (3) 8-in DC ( 6 5/8"REG PIN x BOX) + 6 ½-in X-O (S/N= BC41490265682-5, 6 5/8" REG PIN x NC50 BOX) + (3) 6-1/2 in DC (NC50 PIN x BOX) +6 ½-in X-O (S/N=6677344-1, NC50 PIN x XT57 BOX) + (21) 5 7/8-in HWDP (NC50 PIN x BOX). Note: -Tight spot to 260 ft. - break out single DC 6 1/2". - M/U stand HWDP 5 7/8". - Wash down from 246 ft to 338 ft.

7:30

8:00

0.50

DRLSUR

P

500.00

500.00

Rack back stand HWDP, RIH single DC 6 1/2" and RIH stand HWDP to 374 ft.

8:00

9:30

1.50

DRLSUR

P

500.00

500.00

Conected TDS and wash down from 374 ft to 500 ft, with Q: 600 gpm, 460 psi. increase pump to 700 gpm, SPP= 620 psi. Note: Take survey to 454 ft, 1.3° incl, 135° azi.

9:30

16:30

7.00

DRLSUR

P

500.00

829.00

Drilled 26- in section from 500 ft to 829 ft. with Q= 1250 gpm, SPP= 1850 psi, 80 rpm, 4-6 klb-ft Torq, 10-15 WOB, ROP= 75 ft/hr. Note: Checked annulus level after each connection.

16:30

18:00

1.50

DRLSUR

U

829.00

829.00

Performed back reaming with 70 rpm, Q= 1200 gpm, SPP= 1730 psi, from 829 ft to 554 ft. Wash back to 829 ft, with Q= 1200 gpm, 1730 psi. Note: Greased TDS wash pipe.

18:00

0:00

6.00

DRLSUR

P

829.00

1,205.00 Drilled 26-in section with BHA No. 2 into Guayabo Fm. From 829 ft to 1205 ft as follows parameters: - Between 829 ft and 1014 ft : Q=1100 gpm, SPP= 1520 psi, WOB= 8 - 20 Klb, RS= 100 rpm, TQ=3- 6 Klb-ft. - Between 1014 ft and 1205 ft : Q=1350 gpm, SPP= 2240 psi, WOB= 8-25 Klb, RS= 90-110 rpm, TQ= 2 -6 Klb-ft. Progress: 376 ft. Avg. Drilling Time= 6 Hrs. Avg. ROP= 62 ft/hr. Efec. Drilling Time= 4.9 Hrs. Efec. ROP= 76.73 ft/hr.

2/12/2019

6:51:59AM

version 1.5

www.grantierra.com

3

GRAN TIERRA ENERGY INC.

Daily Drilling Report Well: PROSPERIDAD 1

Report no.: 2

Report date: 2/11/2019

Wellbore No.:

Well Name: PROSPERIDAD 1

Block: EL PORTON

Active datum: U @925.0ft (above Ground Level)

Project: EL PORTON

Site: PROSPERIDAD 1

Rig Name/No.: Rig #1/5857

Event: ORIG DRILLING

Start date: 2/10/2019

End date:

AFE No.: Well.057.0001/DRI

AFE Estimator: German Bulla

Drilling Supervisor: Eric Pedersen

Spud date: 2/10/2019

Engineer: German Bulla

OPERATION SUMMARY From

To

Dur. (hr)

Phase

Code

Sub

Class

MD from (ft)

Operation

MD to (ft)

Last survey to 1159 ft, 1.66° incl, 130.64° azi.

REMARKS SOLIDS CONTROL EQUIPMENT -----------------------------------------------------------------------------------------------------------------------------------------NOV DAILY COST $ 8333.00 CUMM. COST $ 76980 ____________________________________________________________________________________________ ____________________________________________________________________________________________ INTEGRITY -----------------------------------------------------------------------------------------------------------------------------------------ROTATING HRS BHA No.2 CUMMULATIVE: 10 hrs WASHPIPE/SAVERSUB HRS: DAILY:24 HRS CUMMULATIV 46.5 HRS ____________________________________________________________________________________________ GEOLOGY -----------------------------------------------------------------------------------------------------------------------------------------TOP FORMATIONS FOR SECTIONS: Guayabo Fm top @ GAS Avg Conn gas: 0% Max Conn gas: 0% Avg Trip gas: 0% Max trip gas: 0% Avg BGG: 0% Max BGG: 0% Daily mud losses: 0 bbl, Total section mud losses: 0 bbl, Total well mud losses: 0 bbl ____________________________________________________________________________________________ ____________________________________________________________________________________________ UPDATE -----------------------------------------------------------------------------------------------------------------------------------------00:00 - 06:00 Drilled 26-in section with BHA No. 2 into Guayabo Fm. From 1205 ft to 1490 ft as follows parameters: Q=1350 gpm, SPP= 2270 psi, WOB= 8-25 Klb, RS= 110 rpm, TQ= 2 -6 Klb-ft. Progress: 285 ft. Avg. Drilling Time= 6 Hrs. Avg. ROP= 47 ft/hr. Efec. Drilling Time= 4.78 Hrs. Efec. ROP= 59 ft/hr. Take survey to 1350 ft, 0.75° incl, 113.19° azi

2/12/2019

6:51:59AM

version 1.5

www.grantierra.com

4

PROSPERIDAD 1 WELL FORMATION TOPS

FORMATION Guayabo Leon fm Miembro C1 Miembro C2 Miembro C3 Miembro C4 Carbonera Fm Miembro C5 Miembro C6 Falla Miembro C7 Miembro C8 Mirador fm Barco fm. Guadalupe fm. Gacheta fm. Une fm. TD

PREDICTED TOPS (*) (TVD) TVDss Tickness (FT) (FT) (FT) RTE 925.0 0 0 884.0 0 9,619.0 9,583 -8,658.0 9,619 -10,291 1,678 11,297.0 11,216 -11,145 878 12,175.0 12,070 -11,432 295 12,470.0 12,357 12,715.0 12,595 -11,670 245 12,815.0 12,693 -11,768 100 13,541.0 13,405 -12,480 726 13,718.0 13,571 -12,676 177 13,749.0 13,601 -12,676 31 14,156.0 13,997 -13,072 407 14,372.0 14,208 -13,283 216 14,855.0 14,677 -13,752 483 15,080.0 14,896 -13,971 225 15,579.0 15,380 -14,455 499 16,114.0 15,899 -14,974 535 16,289.0 16,068 -15,156 221 MD (FT)

Dips (Degs)

MD (FT)

TENTATIVE TOPS BY SAMPLES TVD TVDss Tickness (FT) (FT) (FT) RTE 925.0 925.0 925 0 925 0 925 0 925 0 925 0 925 0 925 0 925 0 925 0 925 0 925 0 925 0 925 0 925 0 925 0

STRUCTURAL DIFFERENCE

Higher (FT)

0

Lower (FT)

Related Documents

Coste Valse Op7 No02
April 2020 5
Oil Drilling
June 2020 20
Rotary Drilling
June 2020 16
Drilling Rigs
May 2020 7
Drilling Blowout.docx
May 2020 10

More Documents from "Aiman"