OPIS

Propunerea tehnica „Extindere retea de canalizare în satele Manolea si Boura"

1) Prezentarea modului de realizare a lucrarilor si tehnologiile aplicate.aspectele de 2-140

ordin operational ale lucrarilor existente ce trebuie mentinute. 2) Graficul de îndeplinire a contractului.

141-156

3) Prezentarea organigramei propusa pentru îndeplinirea contractului 157-337 - modalitatea de asigurare a accesului la specialisti 4) Prezentarea resurselor ce vor fi disponibilizate in cadrul contractului de lucrari respectiv : a) identificarea si prezentarea surselor pentru materialele principale (betoane de ciment, nisip, balast, conducte, fitinguri, armaturi) cu detalierea analizei traseelor (sursa – santier) care urmeaza a fi parcurse pentru aprovizionarea cu materiale in 338-345

zona santierului. b) identificarea si prezentarea utilajelor/ echipamentelor/ mijloacelor de transport strict necesare indeplinirii contractului c)

prezentarea

modului

de

dispunere/asigurare

a

laboratoarelor

/utilaje/echipamente necesare a fi utilizate in cadrul contractului 5) Liste de cantitati de lucrari pe categorii de lucrari

346-519

6) Extrasele cu consumurile de resurse materiale (cu indicarea furnizorului)

520-537

7) Declaratie privind termenul de garantie acordat lucrarilor executate, termen care nu trebuie sa fie mai mic de 60 luni.

538

8) Se vor respecta conditiile de mediu, social si cu privire la relatiile de munca pe toata durata de îndeplinire a contractului de lucrari.

539

9) Prezentarea conditiilor contractuale raportat la modelul de contract propus de autoritatea contractanta (Formular 14)

540-555

DESCRIEREA ORGANIZARII DE SANTIER SI ASIGURAREA UTILITATILOR PENTRU „Extindere retea de canalizare în satele Manolea si Boura"

a.ADECVAREA LA CONSTRANGERILE FIZICE IMPUSE DE AMPLASAMENT a.1. Limitele instalatiilor Limitele extinderilor retelelor de canalizare menajera le reprezinta punctul de bransare in canalizarile existente. Limitele instalatiilor electrice le reprezinta punctele de bransare a instalatiilor statiilor de pompare a apelor uzate la reteaua publica de transport a energiei electrice, asa cum au fost definite in proiect si in avizele de la operatorul local de profil. Limitele laterale ale desfacerii sistemului rutier sunt definite in planurile de situatie, profilele transversale si avizele de la autoritatile locale. Pozitionarea pe verticala (limitele verticale ale lucrarii) sunt precizate in profilele transversale si longitudinale ale proiectului. Distantele limita fata de retelele existente si/sau fata de alte constructii sunt definite in plasa atasata prezentei. Organizarea de şantier va fi instalată cu scopul de a constitui un suport pentru îndeplinirea obiectivului propus şi va fi amplasată într-o zonă cât mai accesibilă. Criteriile de alegere a locaţiei sunt: acces uşor; vecinătatea centrului de gravitaţie a şantierului; aprobarea dată de Autoritatea Contractantă. Pentru construirea organizarii de santier, Antreprenorul va avea in vedere urmatoarele: Montarea echipamentelor, mobilei, ansamblurilor şi materialelor pe Amplasament. Amenajarea drumului de acces pentru vehicule, zone de parcare, aleilor, gardurilor, plăcuţelor de avertizare şi direcţionare. Asigurarea securitatii santierului Asigurarea spatiilor de depozitare a materialelor si echipamentelor Asigurarea utilitatilorconectarea la utilitati a.2. Cladiri Pe perioada executarii lucrarilor, asocierea intocmeste un plan de executie astfel incat cladirile aflate in apropierea santierului sa nu fie afectate si totodata sa se asigure functionalitatea acestora cu un grad minim de disconfort. Antreprenorul ia măsurile pe care Beneficiarul le consideră rezonabile şi necesare pentru diminuarea neplăcerilor rezultate din existenţa prafului, zgomotului, mirosului etc.

Page 2 of 556

Acolo unde Antreprenorul execută lucrări în apropierea unor zone locuite, se asigura că nivelul zgomotului şi al vibraţiilor de pe şantier este minim. Înainte de executarea lucrărilor, Antreprenorul va trimite Beneficiarului o listă cu tipul de echipament, nivelul zgomotului emis, perioada de folosire a acestuia şi metodele pe care le va folosi în cazul echipamentelor pneumatice, a pompelor şi a echipamentului de generare a curentului electric si va propune metode de diminuare a zgomotului şi vibraţiilor rezultate.

a.3. Zonele de depozitare In cadrul organizarii de santier sunt prevazute zone de depozitare tevi, reziduri lemn, plastic, PVC, resturi conducte cat si depozit de materiale care sa asigure suficiente spatii de depozitare a tuturor materialelor ce vor fi aduse pentru buna functionare a lucrarilor pe santier. Pentru fiecare din reziduurile mai sus mentionate se preved containere de depozitare. Pentru santierele mobile se prevad atat zone de depozitare a materialelor necesare realizarii lucrarilor pentru ziua de lucru respectiva cat si zone de depozitare a resturilor ramase in urma executiei. Antreprenorul este responsabil pentru curăţenia pe şantier şi va înlătura cu promptitudine toate gunoaiele şi deşeurile. Toate materialele şi echipamentele vor fi stocate sau poziţionate ordonat. Antreprenorul va face aranjamentele necesare pentru înlăturarea surplusului rezultat din excavare, aranjamente ce vor trebui aprobate de către Inginer. Nu este permisă înlăturarea neautorizată a deşeurilor. Deseurile menajere rezultate in urma activitatii desfasurate, dupa darea in functiune a obiectivului vor fi colectate, transportate si neutralizate, de catre societatea de salubrizare in baza unui contract incheiat intre parti. Deseurile vor fi depozitate numai in recipienti Tip amplasati in locuri special amenajate.

a.4. Accese in santier Antreprenorul va avea acces permanent pe un drum clar determinat necesar pentru a ajunge pe santier. Avand in vedere ca lucrarile vor fi amplasate in interiorul localitatilor se vor folosi drept cai de acces strazile interioare localitatilor si drumurile comunale, judetene sau nationale. Antreprenorul si Beneficiarul vor conveni asupra drumului de acces la amplasarea Lucrarilor. Antreprenorul va pastra drumul de acces suficient de liber pentru a permite accesul pietonilor si al vehiculelor. Daca sunt necesare imbunatatiri ale drumului de acces pentru echipamentele proprii, Antreprenorul le va realiza pe cheltuiala proprie. Locurile de trecere pentru oameni peste gropi si santuri se amenajeaza cu podete, avand o latime de cel putin 0,8 m, cu balustrade cu inaltimea de 1,0 m pe ambele parti si cu scanduri pe margine de cel putin 10 cm latime. Accesul in organzarile de santier vor fi prevazute atat cu zone de acces pentru masini cat si cu zone pentru accesul pietonal. Inainte de inceperea oricarei parti a lucrarilor, Antreprenorul va face cai temporare de acces, daca acestea sunt necesare, incluzand si drumuri provizorii de ocolire, care pot fi necesare din cind in cind, cu aprobarea Angajatorului. Antreprenorul va intretine aceste cai de acces in conditii adecvate pentru siguranta si trecerea usoara a echipamentelor si vehiculelor pana la terminarea lucrarilor.

Page 3 of 556

Antreprenorul îşi va restricţiona lucrul pe şantierele alocate lui şi va păstra şantierele, drumurile de acces, - curate şi libere. a.5. Lucrari temporare Asocierea va intocmi un program de lucrari temporare pentru distributia apei din sectiunile conductelor in timpul executarii bransamentelor si racordurilor cat si cuplarea acestora la reteaua existenta. Pentru realizarea bransamentelor si racordurilor, se va opta pentru executarea de by- pass in zona cuplarilor sau alte solutii agreate astfel incat sa fie cat mai putin afectati consumatorii existenti. Imbinările care se vor executa după proba de presiune, pentru cuplarea consumatorilor la reţeaua existentă, se vor verifica la presiunea de lucru din conductă. Pompele si conductele temporare, impreuna cu toate elementele ajutatoare necesare, vor fi furnizate pentru a transfera apa in aval de sectiunea de retea afectata. Lucrări de protecţie, susţinere, deviere temporară sau definitivă a reţelelor de utilităţi aflate în zona de influenţă a lucrărilor executate. organizarile de santier mobile organizarea de santier ,cu toate utilitatile, imprejmuirile si portile temporare; drumurile de acces. Podete, imprejmuiri ale escavatiilor Toate imprejmuirile si portile temporare de pe Santier vor ramane pe pozitie pana cand vor fi inlocuite cu garduri si porti permanente sau Lucrarile sunt intr-o faza suficient de avansata pentru a permite ca acea parte a Santierului sa fie pusa in functiune. Excavatiile pentru conducte, aflate intr-o zona accesibila publicului, vor fi prevazute cu protectie din bariere de plastic. După terminarea lucrărilor, Antreprenorul va fi responsabil pentru aducerea şantierului la starea iniţială. Lucrările vor fi planificate şi executate în aşa fel încât alimentarea cu apă si colectarea apei uzate vor funcţiona în continuare doar cu scurte întreruperi şi doar cu aprobare scrisă de catre Beneficiar. Antreprenorul va lua toate măsurile necesare pentru a asigura cooperarea continuă cu Beneficiarul, permiţându-i acestuia să opereze şi să întreţină reteua de distributie a apei, reteaua de canalizare si staţiile de pompare existente pe toată perioada implementării lucrărilor. Antreprenorul va fi responsabil pentru localizarea serviciilor existente şi raportarea eventualelor avarii în cadrul serviciilor existente, care vor funcţiona atat in timpul cat şi după perioada de implementare a lucrărilor, rezultând din lucrări. Înaintea începerii lucrărilor Antreprenorul se va coordona în scris cu Beneficiarul şi alte companii de utilităţi importante pentru a localiza toate cablurile şi conductele de utilităţi. b. ASPECTE DE ORDIN OPERATIONAL ALE LUCRARILOR/SERVICIILOR/UTILITATILOR PUBLICE EXISTENTE CE TREBUIE MENTINUTE (ACOLO UNDE ESTE CAZUL)

b.1. Preambul Prin termenul de lucrari existente in cazul acestei lucrari se intelege: - servicii;

Page 4 of 556

utilitati publice; cladiri sau constructii particulare. Prin servicii se intelege accesul autovehiculelor de Politie, Pompieri, Ambulanta, a mijloacelor de transport in comun si a mijloacelor de curierat. Pentru aceste specificatii utilitatile publice inseamna: retele de apa (incluzand camine de apometru, camine de vane, hidranti de incendiu, etc.); retele de cabluri subterane si supraterane (cabluri telefonice, stalpi pentru cabluri electrice, trasee de cabluri etc.); retele electrice aeriene de transport energie electrica – inalta si joasa tensiune (stalpi de tensiune); iluminare stradala; indicatoare de trafic; retele de canalizare (incluzand camine, guri de deversare, sifoane, etc.); retele de gaze naturale; rigole, traversari de ape; linii de fibre optice; panouri publicitare amplasate pe domeniul public; toate celelalte accesorii si obiecte apartinand utilitatilor, in limitele lucrarilor de constructii propuse. Inainte de inceperea lucrarilor, se vor identifica si consemna in Procesul Verbal de predare-primire a amplasamentului, intocmit impreuna cu beneficiarul si cu alti operatori de utilitati pe care ii convoaca beneficiarul in conformitate cu avizele de la certificatul de urbanism, toate cablurile si conductele care sunt amplasate pe teritoriul santierului, deasupra sau sub nivelul solului. Dupa informarea de catre furnizorii de utilitati a existentei si pozitiei aproximative a retelelor subterane, identificarea traseelor exacte si caracteristicilor acestor retele se va face prin sondaje executate in zonele in care lucrarile vor fi adiacente. b.2. Mentinerea accesului rutier si pietonal Accesul autovehiculelor de Politie, Pompieri, Ambulanta, a mijloacelor de transport in comun si a mijloacelor de curierat va fi asigurat prin masurile si metodele de lucru propuse la cap. 1.2. Nu se va bloca accesul pe o strada fara a asigura in prealabil o cale de acces alternativa pe durata lucrarilor care va fi presemnalizata corespunzator. Accesul pietonal la proprietati, institutii si alte locatii de interes public se va asigura prin montarea podetelor provizorii prevazute cu balustazi si corect semnalizate, deasemeni. b.3. Mentinerea in functiune pe timpul executiei lucrarilor a utilitatilor care au retele subterane In aceasta categorie intra retelele subterane de alimentare cu apa, canalizare menajera/pluviala, telefonie, transmisie date (fibra optica), retea electrica iluminat stradal, gaze naturale. In cazul in caree executia lucrarilor se face intr-o zona adiacenta unei retele subterane, se va anunta in prealabil cu minim 48 ore furnizorul serviciului/proprietarul retelei, care va trimite un reprezentant la fata locului. Acesta va decide daca se impune intreruperea furnizarii serviciului sau devierea retelei existente pe zona respectiva. Inainte de atacarea lucrarii se vor executa sondaje pentru a identifica exact pozitia retelei subterane. Sapatura in zona in care se banuieste a fi reteaua se va executa manual, cu mare grija pentru a nu se deteriora reteaua.

Page 5 of 556

In cazul intreruperii programate (pentru executie sau pentru deviare) sau accidentale (avariere pe parcursul executiei) a furnizarii serviciului, se va da tot concursul pentru reducerea duratei de intrerupere. In cazul intreruperii accidentale, se va anunta urgent furnizorul serviciului/proprietarul retelei pentru a intrerupe furnizarea. Actiunile de remediere pot incepe numai dupa ce s-au luat toate masurie de securitate atat pentru personalul de executie, cat si pentru bunurile umane si materiale din zona limitrofa. Toata raspunderea consecintelor avariei si costurile de remediere a acesteia revin constructorului. In cazul cablurilor sau conductelor existente care se vor subtraversa de conductele ce urmeaza a fi montate, acestea se vor dezgoli manual si se vor sustine inainte de continuarea sapaturii sub nivelul lor. La realizarea umpluturilor pentru aducerea terenului la starea initiala se va avea grija ca in timpul compactarii sa nu se avarieze reteaua existenta. b.4. Mentinerea in functiune pe timpul executiei lucrarilor a utilitatilor care au retele supraterane In aceasta categorie intra: retele electrice aeriene de transport energie electrica, stalpi iluminat stradal, panouri publicitare amplasate pe domeniul public, indicatoare de trafic, elemente supraterane ale retelelor de gaze naturale (rasuflatori sau capace fonta). Si in cazul executiei lucrarilor in zone limitrofe acestora se va anunta furnizorul serviciului respectie pentru a trimite un reprezentant pentru a stabili eventualele masuri ce trebuie luate (protectie, intreruperea furnizarii serviciului sau devierea/mutarea retelei in acea zona). In cazul stalpilor pentru diferite utilitati (iluminat, transport energie electrica, telefonie, publicitate) se va avea grija ca sapaturile sa nu puna in pericol stabilitatea acestora, drept care se vor lua – cu acordul reprezentantului furnizorului serviciului – toate masurile de protectie (sprijinire, sustinere, ancorare). In cazul executiei lucrarilor in apropierea sau sub retele aeriene, se va avea grija ca acestea sa nu fie avariate de utilajele de constructii (ex. macara, excavator). Pentru acest lucru utilajele vor fi dirijate de o persoana instruita si dotata corespunzator cerintelor legale. La refacerea carosabilului in urma executiei lucrarilor se va avea grija sa nu se acopere si sa se aduca la cota elementele vizibile ale retelelor subterane (capacele de fonta ale rasuflatorilor de gaze, gurile de scurgere ale canalizarii pluviale, capacele de fonta ale caminelor diferitelor retele existente). Hidrantii de incendiu vor trebui sa fie accesibili oricand. Pompierilor si niciun fel de material nu va trebui depozitat pe o raza de 5 metri fata de fiecare hidrant. c) Asigurarea si paza santierului Asigurarea si paza santierului revin in sarcina Constructorului.

d) Planul detaliat pentru toate lucrarile temporare necesare pentru pastrarea functiunilor lucrarilor existente:

Page 6 of 556

Cap. 1 DATE DE RECUNOAŞTERE A INVESTIŢIEI Cap. 2 DESCRIEREA LUCRARILOR PROVIZORII Cap. 3 ASIGURAREA SI PROCURAREA DE MATERIALE SI ECHIPAMENTE Cap. 4 ASIGURAREA RACORDARII PROVIZORII LA RETEAUA DE UTILITATI URBANE DIN ZONA AMPLASAMENTULUI 4.1. Alimentarea cu apa - Organizare de santier 4.2. Canalizarea menajera si pluviala exterioara - Organizare de santier 4.3. Alimentarea cu energie electrica - Organizare de santier Cap. 5 PRECIZARI CU PRIVIRE LA ACCESE SI IMPREJMUIRI Cap.6 PRECIZARI PRIVIND PROTECTIA MUNCII 6.1. Reguli privind SSM in santier 6.2. Primul ajutor 6.3. Prevenirea incendiilor

Cap. 1 1.1

DATE DE RECUNOAŞTERE A INVESTIŢIEI

Denumirea lucrării: „Extindere retea de canalizare în satele Manolea si Boura" 1.2 1.3 Amplasament: LOCALITATILE Manolea, Boura, com. Forasti In organizarea de santier se vor cuprinde lucrarile si serviciile referitoare la: mobilarea, serviciile, transportul, montarea, intretinerea si, daca este necesara mutarea temporara a instalatiilor, masinariilor, vehiculelor si schelelor, ale intregului echipament de constructie, al echipamentului auxiliar, al materialelor, personalului si instrumentelor de lucru, toate instalatiile temporare sau permanente, atelierele, cladirile pentru birouri, laboratoarele, magaziile, cantinele, spatii pentru primul ajutor, imprejmuiri aferente, anumite drumuri pentru accesul temporar, incluzand aprovizionarea si toate celelalte facilitati necesare pentru personalul Antreprenorului sau in legatura cu construirea de lucrari si pentru indeplinirea obligatiilor Antreprenorului. Toate facilitatile descrise mai jos vor fi indepartate la terminarea perioadei indicate mai jos. Antreprenorul va fi responsabil pentru ingrijirea si mentinerea facilitatilor de santier in buna conditie de functionare iar la cererea Beneficiarului va executa prompt reparatii si imbunatatiri.

Cap. 2 DESCRIEREA LUCRARILOR Montarea utilajelor, echipamentelor şi a materialelor, utilizate la realizarea investitiei, vor avea caracteristicile corespunzătoare standardelor, normativelor şi normelor în vigoare şi vor satisface condiţiile tehnice impuse de acestea, se vor realiza prin executarea următoarelor lucrări principale de construcţii-montaj: lucrări pregătitoare pentru începerea execuţiei; lucrări de construcţii şi instalaţii; procurare echipamente şi instalaţii anexe.

Page 7 of 556

Montarea conductelor aferente reţelelor şi racordurilor exterioare, se vor realiza prin executarea următoarelor lucrări principale de construcţii-montaj: lucrări pregătitoare pentru începerea execuţiei (organizare de şantier, eliberare amplasament); lucrări de construcţii şi instalaţii pentru conductele clasice; procurare şi montaj conducte, accesorii. Lucrările de execuţie se pot realiza în perioade cu temperaturi de peste +5 şC. În timpul desfăşurării lucrărilor de execuţie, muncitorii executanţi vor fi instruiţi să respecte cu stricteţe măsurile şi normele de protecţie a muncii şi de prevenire şi stingere a incendiilor specifice activităţilor de construcţii-montaj. Lucrările din cadrul acestei investiţii se vor executa astfel încât să nu se blocheze căile de acces pietonale şi pentru circulaţia maşinilor PSI în zonele de execuţie.

Pe teren se vor amplasa următoarele: 1. BARACA CONTAINER - SEDINTE 2. BARACA CONTAINER - CONSTRUCTII 3. GRUP SANITAR - ECOLOGIC 4. RAMPA SPALARE AUTO 5. PLATFORMA BALASTATA 6. PORTI AUTO DE ACCES 7. IMPREJMUIRE DIN PANOURI DE SANTIER 8. PANOU PENTRU IDENTIFICARE LUCRARE 9. STALPI PENTRU ILUMINAT SANTIER 10. TABLOU ELECTRIC PENTRU ORGANIZARE DE SANTIER Pentru realizarea organizării de şantier se va nivela terenul cu buldozer pe şenile iar pământul rezultat va fi depozitat, şi se va aşterne un strat de pietriş de minim 20 cm grosime pe suprafaţa organizării şi în special în zonele carosabile. Reţeaua de alimentare cu apă Apa potabilă necesară pentru uzul curent al şantierului se va asigura dintr-un branşament la reţeaua de alimentare cu apă din localitate. Distribuţia apei se va face cu ajutorul unei reţele de incintă. Apa de băut se va asigura prin „watercooler” prevăzut cu butelie rezervor Deşeurile se colectează în pubele din PVC amplasate pe o platformă de colectare selectivă si vor fi transportate in regie proprie sau in baza unor contracte comerciale cu agenti economici specializati in transportul si depozitarea deseurilor. Materialele si echipamentele vor fi procurate de catre constructor si vor fi aduse la santier in limita fortei de munca ori de cate ori este nevoie.

Cap. 3 ASIGURAREA SI PROCURAREA DE MATERIALE SI ECHIPAMENTE Montarea utilajelor, echipamentelor şi a materialelor, utilizate la realizarea investitiei, vor avea caracteristicile corespunzătoare standardelor, normativelor şi normelor în vigoare şi vor satisface

Page 8 of 556

condiţiile tehnice impuse de acestea, se vor realiza prin executarea următoarelor lucrări principale de construcţii-montaj: lucrări pregătitoare pentru începerea execuţiei; lucrări de construcţii şi instalaţii; procurare echipamente şi instalaţii anexe. Montarea conductelor aferente reţelelor şi racordurilor exterioare, se vor realiza prin executarea următoarelor lucrări principale de construcţii-montaj: lucrări pregătitoare pentru începerea execuţiei (organizare de şantier, eliberare amplasament); lucrări de construcţii şi instalaţii pentru conductele clasice şi preizolate; procurare şi montaj conducte preizolate, accesorii. În timpul desfăşurării lucrărilor de execuţie, muncitorii executanţi vor fi instruiţi să respecte cu stricteţe măsurile şi normele de protecţie a muncii şi de prevenire şi stingere a incendiilor specifice activităţilor de construcţii-montaj. Lucrările din cadrul acestei investiţii se vor executa astfel încât să nu se blocheze căile de acces pietonale şi pentru circulaţia maşinilor PSI în zonele de execuţie.

Cap. 4 ASIGURAREA RACORDARII PROVIZORII LA RETEAUA DE UTILITATI URBANE DIN ZONA AMPLASAMENTULUI 4.1. Alimentarea cu apă - Organizare de Santier În vederea asigurării condiţiilor igienico-sanitare şi a nevoilor gospodăreşti, aceasta necesită alimentarea cu apă rece. În cadrul obiectivului, apa rece va fi utilizată pentru consumul menajer, pentru nevoile igienico- sanitare şi gospodăreşti si pentru prepararea apei calde menajere. Alimentarea cu apă a obiectivului se va face prin intermediul unui bransament din polietilena de inalta densitate cuplat la conducta de distribuţie existenta in zona sau prin realizarea unui rezervor din polietilena. Reţelele de alimentare cu apa se vor poza sub adâncimea de îngheţ (h = 1,00 m). La execuţia lucrărilor exterioare de alimentare cu apă se vor respecta cu stricteţe măsurile specifice de protecţia muncii şi PSI, conform normelor şi normativelor în vigoare. Canalizarea menajera si pluviala exterioara - Organizare de Santier Obiectivul propus necesită asigurarea evacuării la canalizare a apelor menajere si pluviale de la consumatorii obiectivului. Reteaua de canalizare a obiectivului se va face prin intermediul unui bransament din PVCKG cuplat la conducta de canalizare existenta sau se va realiza un bazin vitanjabil Apele uzate produse în cadrul obiectivului provin de la grupurile sanitare ,lavoare. Alimentarea cu energie electica - Organizare de santier Alimentare cu energie electrica a obiectivului pentru organizarea de santier se va face coform solutiei date printr-un aviz tehnic de racordare dupa emiterea autorizatiei de construire organizarii de santier.

Page 9 of 556

Bransamentul trifazat se va realiza subteran, racordat direct la tabloul de joasa tensiune, format din cablu tip ACYABY, echipat cu intreruptor tetrapolar. BMPT se va monta pe un suport independent, langa postul de transformare, si se va lega la o priza de pamant artificiala, cu valoarea rezistentei de dispersie de 4 ohmi. In varianta in care in zona pusa la dispozitie de catre beneficiar nu se poate realiza racordarea la reteaua existenta in zona se poate opta la bransarea tabloului electric general la un generator de curent. Cap. 5 PRECIZARI CU PRIVIRE LA ACCESE SI IMPREJMUIRI Pe perioada executiei lucrarilor se propune doua accese(unul principal si unul secundar) in zona santierului.Accesul secundar se afla in vecinatatea organizarii de santier. In incinta santierului se propune amenajarea unei imprejmuiri in lungime de 140 ml si o zona de platforma balastata. Pentru organizarea circulatiei se prevad doua indicatoare verticale cu semnificatia « Cedeaza Trecerea », din care unul la intersectia cu strada. Inainte de a parasii santierul toate autoturismele, masinile si utilajele vor fi spalate astfel incat acestea sa nu genereza praf si noroi pe strazile adiacente santierului. Cap. 6

PRECIZARI PRIVIND PROTECTIA MUNCII

6.1. REGULI PRIVIND SSM IN SANTIER Sub incidenţa legislaţiei de Securitate si Sănătate in Munca avem responsabilitatea de a avea grija de siguranţa si protecţia noastra personala si a celorlati participanţi la lucru, care pot fi afectaţi de acţiunile noastre sau din neglijenta noastra. In îndeplinirea activităţilor întreg personalul care isi desfăşoară activitatea pe şantier trebuie sa participle la instructajul de securitate si sănătate in munca; Accesul si deplasarea in şantier se vor face numai pe la traseele de circulaţie premise, indicate/marcate special; Echipamentul Individual de Protectie(EIP) corespunzator trebuie purtat in permanenta; EIP minim necesar pe santier: casca de protectie pentru constructii(castile de genul miner nu sunt permise); incaltaminte pentru constructii(bombeu metalic si talpa cu lamele antiperforatie); haine adecvate(salopete); Persoanelor gasite fara EIP li se va interzice accesul pe santier; Trebuie urmate indicatiile si semnele de siguranta; Alcoolul si drogurile sunt interzise in totalitate pe santier.Nici o persoana ce a consumat alcool sau droguri si care sa poata sa aiba inca urme in circulatia sanguina nu va fi admisa pe santier.Beneficiarul este indreptatit sa verifice acest lucru facand teste la intamplare.Orice persoana care nu trece testul sau care refuza sa fie testate va fi data afara din santier. Intreg personalul din şantier trebuie sa-si desfăşoare activitatea procedurilor de lucru. Este interzisa folosirea radiourilor cu tranzistori sau a casetofoanelor/walkman-urilor. Utilajele si echipamentele nu trebuie manipulate/conduse decât de către o persoana calicata corespunzător si care este in posesia unui certificate de copetenta valabil. Se vor utilize numai schelele/platforme de lucru complet echipate. Toate scările de acces trebuie legate de eşafodaj. Toate platformele schelelor trebuie sa fie dotate cu balustrade,

Page 10 of 556

balustrade intermediara si rebord. Toate elementele platformei trebuie asigurate împotriva mişcărilor accidentale sin u trebuie sa aibă goluri. Schelele trebuie montate doar de către personae competente si trebuie sa respecte cerinţele standardelor in vigoare. Este interzis lucrul de pe capre de lemn, butoaie, cărămizi sau alte improvizaţii. Pentru prevenirea căderilor in gol toate zonele in care exista acest risc trebuie sa fie protejate cu balustrade/bariere corespunzătoare. Lucrul la inaltime de peste 2rm se considera lucru la inaltime si este obligatoriu purtarea hamurilor de siguranţa fixate/asigurate corespunzător, pentru a împiedica căderea. Nici o persoana neautorizata nu va face conectări sau deconectări la reateaua electrica. Nu sunt premise modificări ale alimentarii temporare cu energie electrica. Improvizaţiile electrice pentru iluminat, gătit, incalzire, etc. nu sunt premise. Toate accidentele trebuie inregistrate in registrul de evidenta al accidentelor din cadrul firmelor la care sunt angajaţi. Aceasta este o cerinţa legala. Raportaţi toate incidentele, situaţiile sau acţiunile persiculoase. Mâncarea trebuie consumata numai in cabinele destinate pentru masa. Accesul vizitatorilor in şantier este permis numai insotiti. Oricine umbla in mod nejustificat cu echipamentele de stingere a incendiilor (stingatoare de incendiu) va fi dat afara de pe şantier si este posibil sa fie luate masuri legale impotriva sa. Fumatul pe şantier este permis numai in zonele special amenajate. Fotografiatul si filmatul pe şantier sunt premise numai cu aprobarea prealabila a Beneficiarului. In caz de incendiu sau urgenta se intrerupe orice activitate si tot personalul se aduna intr-un loc special marcat(loc de adunare in caz de urgenta). 6.2.PRIMUL AJUTOR Asocierea trebuie sa se asigure ca primul ajutor poate fi acordat, si ca se poate apela la personalul instruit in orice moment. Asocierea va instrui un numar suficient de persoane care sa acorde primul ajutor in caz de accident, in functie de numarul de persoane care lucreaza pe santier Toti cei care sunt instruiti pentru acest scop trebuie sa aiba un semn pe casca, astfel incat sa fie identificati cat mai repede atunci cand este nevoie. Se va organiza cel putin un punct de prim ajutor dotat cu toate materiale necesare: medicamente, dezinfectante, targa pentru transportul ranitilor etc. Echipamentul de prim ajutor trebuie sa fie disponibil in toate locurile unde este cerut de conditiile de lucru. Acest echipament trebuie sa fie marcat corespunzator si usor accesibil. Urmatoarele informatii trebuie sa fie disponibile pe santier (afisate in toate birourile, la aviziere si langa telefoane): Lista numerelor de urgenta Lista la zi cu cei care acorda primul ajutor, Lista cu echipamentul de prim-ajutor si/sau echipamentul medical de pe santier si schema cu amplasarea acestora. Se vor instrui toti angajatii cu privire la conduita pe care trebuie sa o adopte in caz de accident si cui sa se adreseze. Numarul de Urgenta este 112 Nici o persoana ranita nu va fi transportata cu masini particulare, numai serviciul abilitat poate face acest lucru.

Page 11 of 556

Orice accident va fi anuntat imediat catre : serviciul de urgenta – punct de prim ajutor /112 seful direct Seful direct va anunta imediat coordonatorul pe linie de securitate si sanatate in munca al unitatii respective. Acesta va anunta imediat: conducerea unitatii respective; managerul de proiect; coordonatorul pe linie de securitate si sanatate in munca la nivelul lucrarii; coordonatorul de securitate trafic 6.3. PREVENIREA INCENDIILOR Coordonatorul SSM impreuna cu reprezentantii Antreprenorului vor desemna un numar corespunazator de angajati drept responsabili in caz de incendiu precum si zonele pentru care sunt raspunzatori vor fi introdusi in lista de prevenire a incendiilor afisata in zonele corespunzatoare. Lista va cuprinde de asemenea si numărul de telefon al celei mai aproiate Grupare a Pompierilor Militari. Responsabilii in caz de incendiu vor fi informaţii asupra locurilor in care exista pericol de incendiu si vor fi instruiţi in ceea ce priveşte utilizarea extinctoarelor portabile (in conformitate cu C300 - numărul de prevenire si stingere a incendiilor pe durata executării lucrărilor de construcţii si instalaţii aferente acestora). Personalul angajat la birourile şantierului va fi instruit asupra procedeelor importante de prevenire si stingere a incendiilor, ca parte a instructajului introductiv. Toate facilităţile de pe şantier cum ar fi birouri, magazii, ateliere, tabere si barăci vor fi dotate cu extintoare adecvate si un număr suficient, amplasate in locuri strategice. Dotări similare vor fi făcute in zonele de depozitare unde sunt păstrate substanţele , inflamabile. Planul de evacuare in caz de urgenta va fi elaborate si afişat in zonele importante ale şantierului. Acesta va fi revizuit funcţie de evoluţia lucrărilor. Antreprenorul are următoarele obligaţii: sa prezinte situaţia cu numărul de presoane in situaţia unei evacuări a şantierului. Sa asigure necesarul de extintoare si alte masuri preventive pentru lucrările cu foc deschis. Sa prevină orice incidente poluante pentru mediu. Sa lucreze pe baza permiselor pentru:  activităţi cu foc deschis;  spatii limitate;  sa participle cu personal si utilaje, la cerere, in caz de urgenta pentru evacuarea/salvarea  personalului şantierului;  sa menţină caile de evacuare libere in permanenta;  sa depoziteze in locuri speciale substanţele combustibile: solvenţi, vopsele, tuburi cu acetilena, oxIgen, etc.  sa utilizeze materiale rezistente la foc pentru protecţiile temporare. Lista telefoanelor de urgenta va fi afişată in locuri vizibile din şantier si din birouri IN CAZ DE URGENTA Pentru situaţiile de urgenta (incendii, calamităţi naturale, accidente) planul de evacuare va trebui sa curpinda:

Page 12 of 556

modul de alarmare/alertare. Taseele de evacuare si locul de adunare. Poziţia elementelor de inchidere a apei, gazului, curentului sau a altor sisteme tehnologice. Spatiile de depozitare vor fi amplasate la distante corespunzătoare de alte clădiri administrative, tinand seama de natura materialelor depozitate (pulberi cu diferite grade de inflamabilitate ,explozii,etc) Toate birourile,magaziile,atelierele si alte cladiri sau stabilimente vor fi dotate cu panouri de avertizare cum sunt: fumatul interzis,iesire in caz de incendiu,etc,ce vor fi afisate. j). Lucrari permanente In aceasta categorie sunt cuprinse toate lucrarile proiectului care raman dupa finalizarea lucrarilor si sunt verificabile, masurabile si functionale. Toate lucrarile permanente sunt cuprinse in Listele de cantitati din Propunerea financiara.

Ofertant, SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI S.R.L

Page 13 of 556

Organizarea de santier propusa aratand diversele facilitati de care dispune ofertantul

Santierul inseamna o suprafata de teren detinuta de Beneficiar, care este necesara sau practicabila pentru constructia lucrarilor si asigurarea organizarii de santier. In acest sens Antreprenorul nu va folosi Santierul pentru nici un alt scop care nu este prevazut in contractul de execuţie a lucrărilor. In organizarea de santier care se va realiza conform prevederilor HG 28/2008 punctele 5.1.1 si 5.1.2 si a prevederilor relevante ale Ordinului 863/2008, se vor cuprinde lucrarile si serviciile referitoare la: mobilarea, serviciile, transportul, montarea, intretinerea si, daca este necesara mutarea temporara a instalatiilor, masinariilor si vehiculelor, ale intregului echipament de constructie, al echipamentului auxiliar, al materialelor, personalului si instrumentelor de lucru, toate instalatiile temporare sau permanente, atelierele, cladirile pentru birouri, laboratoarele, magaziile, spatii pentru primul ajutor, imprejmuiri aferente, anumite drumuri pentru accesul temporar, incluzand aprovizionarea si toate celelalte facilitati necesare pentru personalul Antreprenorului sau in legatura cu construirea de lucrari si pentru indeplinirea obligatiilor Antreprenorului. Toate facilitatile descrise mai jos vor fi indepartate de catre Antreprenor la terminarea perioadei de execuţie a lucrărilor. Antreprenorul va fi responsabil pentru ingrijirea si mentinerea facilitatilor de santier in buna conditie de functionare iar la cererea Inginerului va executa prompt reparatii si imbunatatiri. Organizarea de şantier se va amplasa in incinta unui teren pus la dispoziţie de beneficiar, respectiv UAT . Lucrările provizorii necesare organizării incintei constau în împrejmuirea terenului pus la dispoziţie, care este prevăzută cu o poarta de acces pentru traficul pietonal si o poarta de acces pentru traficul auto, amenajarea de platforme pentru depozitarea materialelor necesare realizarii investitiei, montarea de baracamente pentru personalul administrativ din şantier si pentru muncitori. In cadrul organizarii de santier, se va amenaja o locatie care va cuprinde facilitati pentru Dirigintele de santier si pentru personalul Antreprenorului, prevazute cu bransamente de energie electrica, mobilate corespunzator desfasurarii activitatii de urmarire si supraveghere a lucrărilor, dotate cu mijloace de comunicare adecvate pentru menţinerea legaturii permanente si rapide cu beneficiarul lucrarii si cu celelalte institutii implicate in executia lucrărilor. Materialele de construcţii se vor depozita în incinta proprietăţii în aer liber in spatii special amenajate in prealabil, luandu-se măsuri de protecţie pentru a nu fi degradate si pentru a nu avea impact asupra mediului. Materialele de construcţie care necesită protecţie contra intemperiilor se vor depozita pe timpul execuţiei lucrărilor de construcţie în incinta organizarii de şantier in magazii provizorii de tip euroconatiner. Obiecte provizorii sunt: magazia provizorie cu rol de depozitare materiale, vestiar muncitori şi depozitare scule ; punct PSI (în imediata apropiere a sursei de apă); platou depozitare materiale. Se vor prevedea vestiare si sali pentru servirea mesei pentru personalul Antreprenorului care isi va desfasura activitatea in cadrul lucrarii, grupuri sanitare ecologice vidanjabile, o gospodarie locala de apa formata din doua rezervoare de apa cu capacitatea de 1 mc fiecare de la care sunt alimentate cismelele pentru spalat, containere pentru deseuri si pichete de incendiu. Se va dota şantierul cu toalete ecologice mobile, in numărul corespunzător personalului si amplasamentelor in lucru; puncte volante de luat masa, dotate cu echipamentul necesar (mese, scaune, apa, etc.), vestiar volant mobil pentru echipare, spatii mobile pentru unelte si scule, etc. -

Inainte de inceperea oricarei parti a lucrarilor, se vor asigura drumuri de acces temporare, incluzand toate devierile in partea implicata a Santierului, toate cu aprobarea Dirigintelui de santier. Antreprenorul va mentine aceste drumuri de acces intr-o conditie adecvata pentru o trecere in siguranta a utilajelor si vehiculelor pana cand nu mai sunt necesare scopului contractului. Antreprenorul va încheia un proces-verbal cu Beneficiarul privind starea oricaror suprafete private de teren sau oricaror suprafete publice prin intermediul carora se realizeaza accesul la Santier inainte de începerea oricarei lucrari, pentru a le face adecvate accesului. Antreprenorul va mentine aceste suprafete intr-o stare de Page 14 of 556

curatenie rezonabila si le va repara in timpul executiei lucrarilor. La terminarea folosirii de catre Antreprenor a acestor cai de acces, el va trebui sa aduca suprafetele la o conditie cel putin egala cu cea dinaintea folosirii lor. Se vor lua măsuri preventive cu scopul de a evita producerea accidentelor de lucru sau incendiilor.Pentru a preveni declanşarea unor incendii se va evita lucrul cu şi în preajma surselor de foc. Dacă se folosesc utilaje cu acţionare electrică, se va avea în vedere respectarea măsurilor de protecţie în acest sens, evitând mai ales utilizarea unor conductori cu izolaţie necorespunzătoare şi a unor împământări necorespunzătoare. Se vor monta panouri de avertizare si indicatoare de atentionare asupra pericolului de accidentare si/ sau semnale luminoase de avertizare in cazul lucrărilor de excavaţii si a oricăror denivelări care pot genera accidente. In cadrul acestui Contract, toate drumurile de acces, trotuarele, platformele si alte lucruri asemanatoare care nu fac parte din Lucrarile permanente, dar sunt cerute de catre Antreprenor sau de catre Dirigintele de santier pe sau aproape de Santier direct sau indirect in legatura cu lucrarile prevazute in contract, vor fi denumite Drumuri de Serviciu. Aceste drumuri vor fi considerate ca Lucrari Temporare. Antreprenorul va construi toate Drumurile de Serviciu, care vor trebui sa fie in conformitate cu standardele, astfel incat sa poata fi folosite normal si in siguranta in orice conditii climatice fiind semnalizate corespunzator. Se vor ridica si se vor mentine imprejmuiri temporare si porti pentru a inchide aria lucrarilor de efectuat, si orice alte suprafete de teren care pot fi necesare pentru executia lucrarilor. Nici o persoana neautorizata nu va putea intra pe Santier. Antreprenorul va trebui sa instruiasca toate persoanele sa evite si sa previna abuzurile in conformitate cu Conditiile Generale ale Contractului.

Fazele de execuţie a organizarii de şantier A. Trasarea lucrărilor In baza raspunsului primit la cererea de amplasare a locatiei pentru organizarea de şantier se trece la trasarea perimetrului acestora. Se va marca perimetrul zonei ce va fi ocupata de Organizarea de santier si principalele zone ce vor forma acest amplasament pentru amenajarea corespunzatoare a acestora. B. Executia platformelor si drumurilor de acces Se realizeaza decaparea stratului de suprafata vegetal (daca acesta exista) mecanizat prin sapatura cu buldozerul urmat de depozitarea acestuia in vederea utilizarii la refacerea amplasamentului la finalizarea lucrărilor. Daca materialul sapat este necorespunzator (contine deseuri sau moloz) acesta se va incarca si transporta la locurile de depozitare indicate de catre Beneficiar. Dupa decapare se realizeaza o suprafata plana pe care se va executa platforma organizarii de şantier. Se va urmari ca platforma sa aiba inclinarea naturala a terenului pentru a permite usor scurgerea apelor din precipitatii de pe aceasta. Se asterne un strat de balast cu o grosime de aproximativ 20 cm in vederea executiei platformei organizarii de şantier. Aceasta se va face mecanizat cu utilaje adecvate in asa fel incat platforma rezultata sa fie plana si nedeformabila la solicitarile din exploatare. Stratul de balast se va compacta cu vibrocompactoare mecanice, in straturi succesive, pana la atingerea unui grad de compactare acceptabil scopului propus. In vederea atingerii gradului de compactare dorit se poate utiliza si piatra concasata, care formeaza o suprafata calitativ superioara balastului. Pentru acces se va executa balastarea drumului existent cu latimea de 6 m executata in aceleasi conditii ca si platforma balastata.Se va avea in vedere ca sa se evite baltirea in zona drumului sau a platformei executate prin inaltarea acesteia fata de terenul din imediata apropiere sau prin creerea de santuri de drenare a apelor de suprafata. C. Executia imprejmuirilor Se marcheaza pe teren conturul suprafetelor de imprejmuit, se trece la saparea gropilor pentru stalpii gardului de imprejmuire si de iluminat urmat de montarea acestora in gropi betonate sau pentru o mai buna stabilitate a gardului. Dupa intarirea betonului se monteaza panourile metalice de gard prin imbinari Page 15 of 556

demontabile. Pentru acces se va prevedea o poarta de acces auto cu deschiderea de 6m si o poarta de acces pietonal cu deschiderea de 1 m. D. Amplasarea birourilor Se trece la aducerea si amplasarea containerelor pentru birouri si magazii conform planului de organizare de şantier. Acestea se transporta cu auto si se descarca si monteaza cu ajutorul macaralei. Pentru montaj se marcheaza locul unde se amplaseaza dupa care se aseaza suportii de montaj pe teren pe care se aseaza containerele. Acestea sunt cu structura metalica si se pot racorda la energie electrica. Suprafata unui container este de 15mp putand fi folosit ca vestiar de pana la 10 muncitori. Montarea se va face in asa fel incat containerele sa aiba spatii de circulatie intre ele si sa fie asigurat un iluminat natural pe timpul zilei. Deasemeni trebuie sa existe spatiu de interventie in caz de necesitate. Se va executa legarea la pamant a carcasei containerului pentru evitarea accidentelor prin electrocutare. E. Mobilarea si utilarea organizarii de şantier Se vor monta obiecte de mobilier in functie de destinatia fiecarui container pentru asigurarea unui confort optim. Acest mobilier trebuie sa satisfaca conditiile de sanatate si securitate impuse de normele in vigoare. Pentru personalul ce isi desfasoara activitatea la acest punct de lucru se vor amenaja vestiare, spatii de servire a mesei, spatii de spalare si mentinere a igienei proprii si grupuri sanitare. Vestiarele vor fi echipate corespunzator cu mobilier adecvat acestui scop (scaune, banci, cuiere, dulapuri). Rolul acestora este de a pastra hainele si echipamentul muncitorilor in bune conditii. Vestiarele trebuie sa aibă dotări care să permită fiecărui lucrător să îşi usuce imbrăcămintea de lucru, dacă este cazul, precum şi vestimentaţia şi efectele personale şi să le poată păstra încuiate. În toate locurile de lucru, personalul muncitor va fi dotat cu echipament de protecţie specific (cască, centură de siguranţă, mănuşi de palmare, salopetă, pantofi/bocanci, etc.), pe care este obligat sa-l poarte în tot timpul lucrului şi până la părăsirea teritoriului şantierului. Spatiile de servire a mesei vor fi echipate cu mese si banci si dulapuri pentru pastrarea hranei. Spatiul de spalare si mentinere a igienei se va amenaja prin executarea unei Gospodarii de apa formata din doua rezervoare de apa cu capacitatea de 1 mc fiecare de la care sunt alimentate cismele pentru spalat. Rezervoarele se vor umple periodic, functie de consumul necesar, prin intermediul unei cisterne. Aceasta sursa de apa nu va fi folosita in scop alimentar. Se va amenaja deasemeni si un grup sanitar format din WC-uri ecologice vidanjabile, ce se vor goli si spala periodic de catre societati specializate cu care se vor incheia contracte de prestari servicii. Locurile din apropierea surselor de apă sau a locurilor pentru servitul mesei vor fi menţinute în permanenţă în stare de curăţenie perfectă, prin grija utilizatorilor acestora. Pe exterior se vor amplasa pichete de incendiu dotate conform normelor in vigoare care se vor folosi de personalul de execuţie desemnat si instruit in acest sens in caz de necesitate. Personalul ce le va utiliza se va instrui periodic privind pericolele existente in organizarea de santier si modul de actiune in caz de necesitate. Numarul acestora va trebui sa asigure necesarul functie de suprafata organizarii de şantier. Pentru colectarea deseurilor se vor amplasa containere metalice inscriptionate in functie de tipul de deseu ce se colecteaza. Acestea trebuie sa fie in cantitate suficienta pentru asigurarea colectarii deseurilor. Periodic acestea se vor goli prin colectarea deseurilor de catre societatile specializate cu care se vor incheia contracte de prestari servicii. Carburanţii si substantele periculoase vor fi depozitate in spatii speciale in scopul evitării poluării platformelor adiacente, produsele chimice trebuie stocate in celule etanşe. Spaţiul ocupat de organizarea de şantier va fi limitat la strictul necesar. Organizarea de şantier va fi echipata cu facilitatile sanitare pentru muncitori in scopul reducerii poluării cu ape uzate. F. Semnalizari si marcaje Pe perioada executiei lucrărilor aferente organizarii de santier se vor monta indicatoare de semnalizare a executiei lucrărilor functie de necesitatile zonei. Se vor realiza imprejmuiri ale zonei de lucru fie cu banda Page 16 of 556

semnalizatoare, fie cu panouri de imprejmuire in functie de durata lucrărilor in zona si de complexitatea lucrărilor. Acolo unde se desfasoara lucrări in zona carosabila se vor obtine intai avize de la autoritatile competente si tot cu acestea se va stabili si tipul de marcaje si semnalizari ce se vor amplasa. Toate aceste semnalizari si marcaje care se monteaza se vor mentine pe toata durata de execuţie a lucrărilor si au drept scop evitarea producerii accidentelor si a evenimentelor nedorite. Se va monta panoul de identificare cu dimensiunile de 60 x 90 cm care va preciza urmatoarele: datele si informaţiile legate de investitie; număr de valabilitate autorizatie de construire, denumire proiect, beneficiar, investitor, finantatori, proiectant, antreprenor, termene, etc. conform prevederilor Legii nr. 50/1991, actualizata. Se vor lua toate masurile necesare privind prevenirea si stingerea incendiilor pe durata execuţiei lucrărilor. G. Laboratoare Societatea are contract de colaborare cu Laborator autorizat a efectua incercari , pentru lucrarile de gr II. H. Necesarul de materiale si echipamente Pentru execuția lucrărilor este necesară aprovizionarea șantierului cu următoarele tipuri de materiale:  BANDA AVERTIZOARE TRASEU CONDUCTE;  CONDUCTA PEHD PE80 PN6 DN 63 MM  Teava poliet inalta dens diam ext 110mm  Fitinguri PEHD  TUB CANALIZARE GOFRAT CU MUFA SH8 D.250 MM  Capac cu rama fonta pentru cam.viz  Oțel-beton;  Nisip  Ciment  Cabluri energie  CONDUCTA PROTECTIE PENTRU SUBTRAVERSARE 500X5MM  Confectii metalice diverse  Cherestea  Tuburi beton pentru camine Scule care trebuie să se găsească in dotarea șantierului:  cazmale ;  lopeți ;  târnăcoape;  roabe;  topoare (mari și mici);  ciocane medii;  tesle;  clești de tăiat oțel, normali;  fierăstrău dulgher;  cozi de lemn de rezervă;  foarfecă de tăiat fier beton cu mânere de min 90cm;  mănuși constructive;  nivelă lungă min.100 cm;  colțar unghi de 90 grade;  rulete de 3m și 5m profesionale;  furtun nivel min. 20 m transparent . Toate aceste scule vor fi depozitate intr-un vagon . Page 17 of 556

Scule electrice :     

mașină de găurit (ciocan rotopercutor) ; flex min.25 mm + discuri oțel (20 buc); ochelari de protective; Cabluri electrice lungi (2-3) buc Aparate sudura

De asemeni și aceste scule vor fi depozitate intr-un vagon . Utilaje : sunt dislocate in momentul in care este nevoie la punctul de lucru pentru executarea lucrărilor specific și pe perioada derulării lucrărilor sunt depozitate după cum urmează:             

Autocisterna de apa de 5-8 t cu dispozitiv de stropire Automacara 5 tf, Hmax = 6,5m deschidere max= 5,5m Betoniera cu cadere libera actionata electric 101-250 l Buldozer pe senile 65-80CP Convertizor sudura (inclus consum energie electrica) 1-14kw Excavator pe pneuri motor termic (buldoexcavator) 0,21-0,39mc Excavator pe senile cu o cupa cu motor termic 0,40-0,70mc Grup termic de sudura 28-35kw Mai mecanic cu motor termic de 6cp 150-200kgf Malaxor pt mortar,actionat electric,150 l Motopompa 6- 8cp Troliu electric 1 tf Vibrator de ext actelectric 0,25-1,1kw Acestea vor fi depozitate pe platforma din incinta amenajată a șantierului.

La inceperea organizării de șantier se elaborează grafice diferențiale si integrale de aprovizionare, consum și stocare pentru principalele materiale.

Page 18 of 556

Descrierea lucrarilor

Proiectul tehnic pentru sistemul de canalizare a fost structurat din punct de vedere tehnic pe trei obiecte majore, fiecare cu subobiectele aferente: Acestea sunt: Reţeaua de canalizare  Extindere retea de canalizare în sat Manolea  Extindere retea de canalizare în sat Boura Alimentare cu energie electrică  Lucrari racordare la energie electrica Din punct de vedere tehnologic, lucrările prevăzute in prezentul proiect au ca scop colectarea integrala a apelor uzate menajere din satele Manolea si Boura, com Forasti.

Descrierea constructivă a reţelei de canalizare menajere care se executa in cadrul prezentei investitii Obiectul nr. 1 - Extindere reţea de canalizare in satul Manolea In componenta acestui obiect sunt cuprinse următoarele categorii de lucrări: Reţea de canalizare Dn 250 mm L = 3378 m (planşa H1+H4 si profilele longitudinale PL1+PL4; PL1-1, PL2-1, PL3-1); Golire si aerisire traversare- conducta refulare; Subtraversare drum in săpătura deschisa L =249,5 m; -

Bazin (SP1 AU, SP2AU, SP3AU, SP4AU)

Cămin gratar; Instalaţii hidraulice, instalaţii electrice, instalaţii hidromecanice; Drum acces si sistematizare verticala; împrejmuire; By pass, varsare, By pass SP; Conducta refulare-pompare. Pe traseul reţelei de canalizare s-au prevăzut cămine de vizitare, construcţii anexe pe reţeaua de canalizare. Sunt construcţii verticale, care realizează legătura intre colectorul de canalizare si strada. Diferenţa dintre cămine, este de maxim 60 m (conform profilelor longitudinale). In documentaţie s-au preferat tuburi de canalizare, cu peretele intern „lis” tip B. Pe traseul canalizării s-au prevăzut un număr de 4 statii de pompare. Staţiile de pompare sunt executate in cheson cu Di - 3,00 m. Toate staţiile de pompare de pe traseu sunt executate in cheson, cu diametrul interior Di = 3,00 m, prevăzute cu cos gratar, in amonte de fiecare statie se prevede un cămin cu gratar manual, prezentat in planşele R10 si R11. Echipamentul generator de presiune (electropompa), porneşte automat la nivelul maxim presetat si se opreşte automat, la nivelul de oprire presetat. Staţiile de pompare SP1AU, SP2AU, SP3AU, SP4AU, ar fi corect sa fie echipate de furnizorul utilajului, impreuna cu instalaţia automata de pornire si oprire. Agregatul din staţiile de pompare, va fi de tip tocător. Page 19 of 556

Toate staţiile de pompare au prevăzute instalaţii de ventilaţie, pentru evacuarea gazelor precum si senzori de sesizare a prezentei gazului (NPl33-13/4.2.7.2(6)b). In caz de avarie a statiei de pompare este necesara izolarea statiei prin deschiderea vanei by pass, care are radierul cu minm 30 cm mai jos, decât accesul in căminul gratat. Obiectul nr. 1 - Extindere reţea de canalizare in satul Boura In componenta acestui obiect sunt cuprinse următoarele categorii de lucrări: Reţea de canalizare din PVC GOFRAT Dn 250 mm SN8 L = 1574 m; Subtraversare drum in săpătură deschisa L = 64 m. Canalul colector străbate principala uliţa sateasca din localitatea Boura si este proiectat si prezentat in planul de situaţie H5 si H6 si in profilul longitudinal P15 si P16, iar pentru deservirea locuitorilor de pe partea opusa a colectorului principal, sunt prezentate profilele longitudinale PL5-1 si P16-1. H5

Descărcarea canalizării proiectate, se realizează in căminul existent CVI 19, prezentat in planul de situaţie

si PL5. Pe traseul canalizării s-au prevăzut construcţii anexe, cămine de vizitare. Căminele de vizitare sunt de tip vertical, amplasate la distanta de maxim 60 m, in zonele de schimbare a pantei, la intersecţiile de uliţe.

a) Tehnologia de execuţie pentru reţeaua de canalizare Reţeaua de canalizare se va executa prin săpătura deschisa. Execuţia săpaturilor se va face din aval către amonte se se vor executa cu sprijinirea malurilor. Latimea transeei va fi in conformitate cu STAS 3051 si normele de protecţia muncii. Depozitarea pământului rezultat din săpătura se va face de regulă numai pe o parte. Înainte de inceperea lucrărilor de săpătura se va face trasarea reţelei de canalizare. Trasarea se va face materializând axul reţelei prin tăruşi aşezaţi de o parte si de alta a axei reţelei. Tehnologia de execuţie pentru reţeaua de canalizare se face respectând următoarele operaţii •

Trasarea reţelei de canalizare



Desfacerea imbracamintii rutiere a străzii



Executarea săpăturii



Epuizarea apelor din săpătura (daca este cazul)



Nivelarea(politura) fundului transeei



Executarea patului de pozare



Lansarea conductei in tranşee



îmbinarea tuburilor din PP



Executarea căminelor de vizitare



Executarea probelor de etanşeitate si remedierea defecţiunilor daca este cazul



Executarea racordurilor



Executarea umpluturilor Page 20 of 556



Transportul excedentului de pamant

Conditii impuse privind calitatea materialelor. Tevile din PP, vor trebui sa aiba caracteristici in conformitate cu STAS 6675/1, privind absorbtia de apa, variatia dimensiunilor la T = 150° C, rezistenta la presiunea interioara, rezistenta la soc la 20 ° C, punctul de inmuiere, etc. Nu se vor folosi materiale neagrementate in Romania. Tevile vor trebui sa prezinte rezistenta chimica la actiunea agresiva a substantelor din sol, la actiunea sarurilor si a substantelor caustice, a solutiilor acide apoase.

Transportul si depozitarea conductelor Transportul si depozitarea conductelor si accesoriilor se va face în conformitate cu cerintele furnizorilor si respectând Normele Generale de Protectia Muncii. Tevile se vor transporta cu vehicule corespunzatoare, luandu-se masuri de siguranta la incarcare si descarcare. Cand transportul se efectueaza la temperaturi scazute, aproape de inghet se vor preveni socurile. Depozitarea se va face in stive care nu trebuie sa depaseasca inaltimea de 2 metri. Din loc in loc se vor prevedea suporti pentru a impiedica deformarea tevilor. Se vor lua masuri pentru ca sa nu intre diverse componente in interiorul tevilor. De asemenea se va evita intrarea in contact cu substante ce ataca PP-ul (combustibili pentru motoare, solventi, etc). Tevile nu se vor tiri pe sol si se vor feri de socuri puternice.

Trasarea canalelor La trasarea canalelor sAe vor respecta STAS 9824/5 si 3051 Trasarea este esentiala pentru canalizare, functionarea ulterioara a instalatiei fiind absolut dependenta de realizarea trasarii corecte si de respectarea cu strictete a pantelor din proiect. Se va executa o trasare de precizie atat de planimetrie cat si de nivelment. Integritatea reperilor cade in sarcina executantului pe toata durata executiei lucrarilor.

a.1) Lucrari de terasamente Inainte de inceperea sapaturii se aprovizioneaza intreaga cantitate de tuburi pentru tronsonul respectiv. Lucrarile de terasamente pentru executarea transeelor sunt urmatoarele: -

Se executa desfacerea pavajului pe o latime mai mare ca latimea transeei în care se vor monta conductele cu cate 30-40 cm de fiecare parte. - Materialele rezultate din desfacerea pavajelor care se pot refolosi se depozitează la marginea trotuarului astfel încât să nu împiedice scurgerea apei din rigole. - Tuburile se vor aşeza toate în zona de lucru pe aceeaşi parte a transeii, în aşa fel incat să nu sprijine pe mufe sau pe capătul liber. - Se executa sapatura. Ultimii 30 de cm deasupra cotei de fundare se executa manual si numai inainte de lansarea tuburilor. Latimea transeei va fi de minimum Dn conducta+0.50 m. - Transeele pentru pozarea conductelor se executa vertical cu sprijiniri pe intreaga suprafata. - Pamantul rezultat din sapatura se va depozita de cealalta parte a transeei, asigurandu-se o banchetă libera de 0,5 m. Baza transeei trebuie sa asigure rezemarea conductei uniform pe toata lungimea sa pe un strat de nisip de minim 10 cm. Conductele se vor monta întotdeauna sub adancimea de inghet (STAS 6054). Pe toata durata executiei lucrarilor, in lungul canalelor se asigura o zona de lucru si o zona de circulatie.

Page 21 of 556

a.2) Montajul conductelor si accesoriilor Tuburile vor fi verificate: - la sosirea in santier; - la depozitarea de-a lungul santului. Tuburile verificate se lanseaza mecanizat (excavator, macara). Se toarnă fundatiile caminelor la cotele reprezentate in profilul longitudinal şi se realizeaza rigolele de pe radiere la cotele din proiect. Se verifică din nou cota fundului transeei, se asterne patul de nisip pentru pozarea conductei si se reverifica cota de pozare a tuburilor. Se montează tuburile care patrund în camine asigurandu-se reazem continuu pentru a nu induce eforturi suplimentare în tuburi. Tuburile se asează cu mufele orientate contra sensului scurgerii. In dreptul mufelor se adânceşte săpătura cu câte o groapă având dimensiunile L x h = 90 x 15 cm. Patul de rezemare va asigura unghiul la centru de 90° având o grosime constanta pe tot traseul conductei.

a.3) Imbinarea si etansarea Imbinarea tuburilor se face conform „Caietului de sarcini“. Etansarea imbinarilor se realizeaza conform indicatiilor furnizorului. Se verifica în permanenta panta canalului (care trebuie să coincida cu cea din proiect) si calitatea imbinarii.

a.4) Verificarea si probarea canalelor Verificarea pe parcursul executiei a fost deja descrisa la succesiunea operatiilor descrisa mai sus. Aceasta verificare reflecta cantitatea si calitatea lucrarilor ce raman ascunse. Tronsoanele se verifica pe toată lungimea într-o etapa. Abaterea pantei nu va depăşi 3 cm la 100 m lungime de canal. Verificarea finala consta în verificarea parametrilor de functionare ai canalului in vederea punerii în functiune. Proba de etanseitate pentru canale se va efectua între camine consecutive, înainte de efectuarea umpluturilor, dupa ce imbinarea a ajuns la rezistenta proiectata. Se va executa inchiderea etansa a tuturor orificiilor, blocarea capetelor canalelor si a tuturor punctelor susceptibile de deplasare în timpul probelor. Umplerea canalului cu apa se face din capatul aval, aerul evacuandu-se prin capatul amonte. Probele de etanseitate nu se vor executa la temperaturi sub 0º C.

Presiunea de proba masurata în capatul aval al tronsonului se va considera 0,5 bari. Durata probei va fi de minim 20 minute. În timpul probei se va mãsura apa pierdutã mãsurându-se cantitãtile adãugate. Daca pierderile de apa depasesc limita admisibilă pentru tronsonul respectiv, se va face revizia conductei, urmata de reparatie sau inlocuire, dupa caz, si se va relua proba. Inlaturarea pierderilor de apa punctiforme sau la punctele de îmbinare se va realiza prin repararea corespunzãtoare a acestor zone. In cazul unor defectiuni mai grave, se va inlocui tubul sau se va solicita proiectantul pentru modul de remediere al defectiunii.

a.5) Executarea umpluturilor. Inainte de efectuarea probei de etanseitate transeea se va umple partial pana la 20–30 cm deasupra partii superioare a tubului, lasandu-se mufele libere. Pamantul care se aseaza deasupra tubului nu trebuie sa contina pietre mai mari de 7 cm.

Page 22 of 556

Umplutura va fi bine compactata în straturi de 10 cm grosime. La compactare tubul se va feri de lovituri. Compactarea umpluturii în jurul tubului se va face manual, simultan pe ambele parti, pentru evitarea deplasarilor laterale ale tubului. În zonele de umplutura situate deasupra conductei nu se vor folosi dispozitivele de compactare mecanica. Dupa cel putin 40 cm grosime pamant de umplutura deasupra crestei canalului, compactarea se va realiza cu mijloace mecanice putandu-se folosi în acest scop: - ciocan batator (greutatea discului 2,7 daN, presiunea de batere 4 – 6 at ); cm );

- maiuri mecanice (greutatea cca 100 daN, productivitatea 150 m3/ ora, adancimea de compactare 35 - maiuri vibrante; - cilindru compactor vibrant, etc.

in functie de volumul umpluturii si dotarea cu utilaje a contractantilor.

Verificarea privind gradul de compactare al umpluturilor se va face prin extragerea de probe din stratul compactat conform STAS 2914. In partea finala a zonei de pozare a canalelor se amplaseaza si elementele de marcare a conductelor conform STAS 9570/1; Se va reface suprafata pavajelor; Capacele cãminelor se pozeazã la nivelul îmbrãcãmintii definitive;

1.

Protecţia muncii

La întocmirea documentatiei s-au prevăzut datele tehnice obligatorii pentru ca lucrarea să poată fi executată cu respectarea tuturor măsurilor privind protecţia muncii (sprijinirea malurilor, parapete de-a lungul santului, sustinerea cablurilor si a conductelor de gaze în săpătură, etc.), în conformitate cu măsurile prevăzute în normele specifice de protectia muncii. Intrucat lucrările de pozare a canalelor se vor executa în conditiile existentei si a altor retele tehnice edilitare este necesară convocarea reprezentantilor intreprinderilor de retele, pentru a fi identificate pe teren intersectiile si punctele periculoase. La executia lucrarilor, se vor respecta conditiile impuse prin avizele emise de toate intreprinderile detinatoare de retele din zona.

Executantul (contractantul) va lua masurile necesare pentru respectarea măsurilor de securitate a muncii: 2. Date privind recepţia lucrărilor, efectuarea probelor şi punerea în funcţiune a conductelor Receptia lucrarilor consta în verificarea executiei si a functionării canalului la parametrii proiectati. La receptia lucrarilor participa beneficiarul lucrarii si executantul (contractantul). Proba de etanşeitate se va face între cămine consecutive, înainte de finalizarea umpluturilor. Se închid etanş ieşirile din respectivele cămine şi se blochează toate punctele susceptibile de deplasare în timpul probei. Umplerea cu apă se face începând din capătul aval până la cel puţin 1 m deasupra crestei canalului. Pentru realizarea absorbţiei în tub canalul se lasă plin cu apă cel puţin 24 de ore. Presiunea de încercare la capătul aval este 0,5 bari. Durata probei este de minimum 20 de minute. Pierderile nu vor depăşi 0.64 cm3/1m lungime pentru fiecare mm din diametru. În timpul probei se măsoară cantităţile de apă ce trebuie adăugate pentru menţinerea nivelului la care a început proba (echivalentul apei pierdute). Se raportează la lungimea tronsonului încercat şi în cazul când se depăşesc limitele admise explicitate anterior se detectează locurile pe unde au loc pierderile şi se iau masurile necesare.

Page 23 of 556

Dacă după aceste remedieri şi refacerea probei de etanşeitate se constată din nou valori ale pierderilor peste limita admisă se vor înlocui eventualele tuburi defecte (prin nerespectarea instrucţiunilor de transport, depozitare, manipulare, etc). Proba de etanşeitate se reface de câte ori este nevoie. După efectuarea probelor parţiale se trece la umplerea tranşeei. Se vor întocmi procese verbale semnate obligatoriu de beneficiar pentru următoarele lucrări: - predarea amplasamentului (trasarea); - adâncimea efectivă a tranşeii; - panta fundului şi natura terenului; - montarea tuburilor; - proba de etanşeitate; - execuţia umpluturilor; - refacerea carosabilului. Executia lucrarilor de canalizare se realizeaza totdeauna din aval spre amonte. Tronsoanele de canal se pot da in folosinta imediat ce au fost terminate, in avans fata de termenul de receptie. Acest lucru implica preluarea de catre Beneficiar a unei parti din lucrare inainte de terminarea intregii lucrari prevazute in contract. In acest caz se va incheia un proces verbal de predare – primire intre executant si Beneficiar, in care se va consemna starea partii de lucrare in cauza, masurile de conservare, precum si cele de protectie reciproca a desfasurarii activitatii celor doua parti. Toate riscurile si pericolele pentru partea preluata trec temporar asupra beneficiarului cu exceptia viciilor ascunse si a celor care decurg dintr-o executie necorespunzatoare. Procesul verbal incheiat in aceste conditii nu este un proces verbal de receptie pentru partea de lucrare in cauza, dar investitorul poate trece inscrierea in procesul verbal de receptie intocmit la terminarea lucrarii in intregime, a viciilor pe care le-a constatat cu ocazia predarii primirii si le-a consemnat in procesul verbal respectiv. Pentru partea de lucrare preluata de Beneficiar, perioada de garantie pentru viciile care nu tin de siguranta constructiei incepe de la data terminarii remedierilor. (Art. 31 – HGR 273/1994). Pentru beneficiar, perioada de garanţie începe de la terminarea lucrărilor. Branşarea consumatorilor se va face cu avizul Unitatii de Exploatare în condiţiile impuse de aceasta şi nu face obiectul prezentului proiect.

La recepţia finală beneficiarul va solicita Contractantului (Constructorului) lucrărilor cartea tehnică a lucrării în care va fi explicitată execuţia lucrării cu cea mai mare precizie. După recepţia finală care se va efectua în conformitate cu Ordonanţa Guvernului nr.2/94 şi cu Regulamentul de recepţie a lucrărilor aprobat prin H.G. nr. 766/97, canalul va fi preluat în exploatare şi întreţinere de Unitatea de Exploatare.

b) Staţii de pompare apă uzată (SPAU) 2.1.

Descrierea produsului

Instalația de ridicare a apei reziduale este fabricată cu cea mai mare atenție și este supusă unui control permanent al calității. În cazul unei instalări și întrețineri corecte, se asigură o funcționare fără defecțiuni.

Page 24 of 556

2.2.

Utilizare conformă și domenii de aplicare

Stațiile de pompare prefabricate sunt adecvate pentru colectarea si pomparea:  apelor uzate şi reziduale din domeniul casnic şi comunal;  apelor uzate care conţin materii fecale pentru evacuarea apei din localităţi sau cartiere ale oraşelor;  apelor reziduale industriale;  apelor pluviale. ÎNTREŢINEREA STAŢIILOR DE POMPARE SP1AU; SP2AU; SP3AU; SP4AU  întreţinerea staţiilor de pompare cuprinde totalitatea operaţiunilor care se efectuează asupra construcţiilor şi instalaţiilor respective, pentru ca acestea să-şi menţină (sau în cazul avariilor să-şi restabilească) capacitatea de pompare, în condiţii tehnice şi sanitare corespunzătoare.  Operaţiile de întreţinere se execută în mod planificat, pe bază de grafice elaborate din timp, cu excepţia avariilor, care se înlătură imediat ce apar.  Operaţiile de întreţinere se execută fără scoaterea din funcţiune a staţiei de pompare, cu luarea măsurilor pentru ca executarea acestora să nu influenţeze funcţionarea normală a staţiei, atât din punct de vedere a capacităţii de pompare, prin izolarea zonei sau a instalaţiei care lucrea  ză. în caz de necesitate se va apela la folosirea conductei de by pass - numai cu avizul Agentiţei de Mediu.  întreţinerea staţiilor de pompare se referă la întreţinerea agregatelor şi a instalaţiilor de pompare şi cuprinde următoarele operaţiuni:  - inspecţia şi revizia preventivă;  - reparaţiile curente;  - reparaţiile medii;  - reparaţiile capitale.  - în cadrul inspecţiei şi reviziei preventive se urmăresc următoarele:  - etanşeitatea presetupelor şi a flanşelor;  - temperatura lagărelor pompelor şi a electromotoarelor;  - se detectează anumite zgomote anormale;  - se urmăresc indicaţiile aparatelor de control (manometre, vacuumetre etc.);  - dacă se constată nereguli, pompa este oprită şi eventual înlocuită cu pompa de rezervă;  Tot ca lucrări de întreţinere sunt:  - ungerea (la fiecare 3 luni se schimbă uleiul la caseta de rulmenţi - dacă firma constructoare nu prevede altfel - operaţie care nu se execută când sunt în rotire (mişcare);  - vopsirea (care se face anual) în culorile convenţionale a părţilor metalice;  - strângerea presetupelor - care se face ori de câte ori este nevoie.  90  întreţinerea instalaţiilor hidraulice constă din:  - verificarea şi înlocuirea garniturilor la vane;  - verificarea etanşeităţii pieselor de trecere prin pereţi;  - verificarea etanşeităţii la toate armăturile, flanşele şi îmbinările instalaţiei.  Inspecţia şi revizia preventivă a instalaţiilor electrice şi de automatizare se face la  preluarea serviciului de tură, se verifică funcţionarea tuturor instalaţiilor făcându-se o probă a funcţionării agregatelor de rezervă.  La tabloul dispecer se verifică semnalizarea optică, a releelor de semnalizare precum şi funcţionarea semnalizării acustice preventive şi de avarii.  în afara verificărilor menţionate, se controlează instalaţiile de ventilare şi încălzire, precum şi lucrările de construcţii, dacă nu au apărut fisuri, tasări etc.  - Reparaţiile curente - sunt reparaţiile de scurtă durată (5 + 10 ore), care pot fi executate de către personalul staţiei.  Efectuarea lucrărilor de remediere se va face pe cât posibil fără oprirea staţiei de pompare, cu respectarea în mod obligatoriu a soluţiilor tehnice adoptate iniţial, nefiind admisă reducerea Page 25 of 556

     

   

  

          

diametrelor conductelor, înlocuirea unor materiale cu altele de calitate inferioară, încât să nu se prejudicieze capacitatea staţiei de pompare ca debit sau presiune, siguranţă în exploatare etc. - Reparaţiile medii - sunt cele care necesită 30 ^90 ore de lucru şi se execută de către personalul de serviciu ajutat de personal din afară. Remedierea avariilor se efectuează de regulă în mod continuu, indiferent de câte schimburi sunt necesare în acest scop, nefiind admis a se întrerupe lucrul între schimburi sau în timpul nopţii, ori în zilele nelucrătoare. - Reparaţiile capitale - se execută în ateliere specializate, după demontarea completă a agregatului respectiv. Verificarea şi revizuirea instalaţiilor electrice de forţă şi de automatizare se execută simultan cu reparaţiile agregatelor respective, astfel încât să nu fie necesară oprirea acestora decât la termenele stabilite. 91 PROTECŢIA MUNCII 1. Măsuri de protecţia muncii în exploatarea şi întreţinerea obiectivului ’’Extindere reţea de canalizare în satele Manolea şi Boura” se vor aplica “Normele specifice de securitate a muncii canalizare a localităţilor şi pentru nevoi tehnologice” emise de Ministerul Muncii şi Protecţiei Sociale precum şi alte acte care conţin prevederi ce au tangenţă cu specificul lucrărilor care se efectuează. Normele se aplică tuturor activităţilor desfăşurate de către persoanele juridice şi fizice care exploatează instalaţiile de canalizare. în cadrul Regulamentului de exploatare şi întreţinere, se va insista în mod deosebit asupra regulilor privind: circulaţia în jurul grupurilor de pompare, a tablourilor electrice, nefiind admisă depozitarea în jurul lor a materialelor care să stânjenească operaţiile de control, de demontare - remontare, revizii etc.; marcarea locurilor periculoase; protejarea golurilor din planşee cu parapete, dacă nu au capace corespunzătoare; ungerea pieselor în mişcare numai după oprirea agregatelor respective; manipularea agregatelor cu mijloace de ridicat adecvate; utilizarea echipamentului de protecţie şi de lucru (mănuşi şi cizme de cauciuc); accesul personalului în spaţii închise (cămine de vane, staţii de pompare etc) se va face după ventilarea adecvată a spaţiilor respective şi verificarea absenţei gazelor nocive; manipularea şi transportul substanţelor corozive sau toxice; iluminarea corespunzătoare a tuturor spaţiilor circulate, iar în medii cu grad ridicat de umiditate, se vor folosi lămpi alimentate la tensiuni nepericuloase; manevrarea vanelor activitatea pe timp friguros, care comportă măsuri privind îndeosebi circulaţia unde accesul poate deveni periculos. De asemenea, se va preciza modul în care se face instructajul de specialitate, împrospătarea periodică a acestuia, afişarea la locurile de muncă a principalelor reguli de securitate.

Page 26 of 556

1 1.1

CONDIŢII TEHNICE Condiţii generale 1) Executarea lucrarilor se va face cu respectarea prevederilor legale in vigoare privind protectia mediului si a conditiilor impuse de toate avizele prealabile emise pentru aprobarea investitiei. 2) Se va executa decaparea stratului de sol vegetal înainte de inceperea lucrarilor si se va executa depozitarea acestuia in scopul reutilizarii. 3) Depozitarea materialelor necesare executarii lucrarilor, al solului fertil decapat, precum si a materialelor rezultate in timpul executiei lucrarilor se va face fara afectarea altor suprafete de teren, a circulatiei pietonale sau rutiere. 4) Colectarea selectiva a materialelor ramase in urma executiei lucrarilor si evacuarea in functie de natura lor pentru depozitarea sau valorificarea conform O.U. nr. 195 din 22.12.2005 privind regimul deseurilor. 5) Se vor realiza lucrări de refacere ecologica a zonelor afectate prin executarea lucrarilor.

1.2

Specificaţii tehnice pentru execuţia lucrărilor

1.2.1 Generalităţi Prin instrucţiunile tehnice cuprinse în Caietul de Sarcini se stabilesc condiţiile tehnice minime ce trebuiesc îndeplinite pentru realizarea în condiţii de calitate corespunzătoare a lucrărilor de construcţii din cadrul obiectului de investiţii. Prezentele instrucţiuni tehnice sunt specifice lucrărilor necesare pentru realizarea sistemului de canalizare in Orasul Livada. 1.2.2 Măsuri premergătoare execuţiei lucrărilor Beneficiarul, Proiectantul si Contractorul vor respecta prevederile legii 50/91, cu toate completările şi modificările ulterioare, privitoare la calitatea lucrarilor de constructii, precum si normele metodologice în vigoare la ora actuală pentru aplicarea legii 50/91. Contractorul lucrării numeste responsabilul tehnic, atestat conform legii, ce va răspunde de realizarea nivelului de calitate corespunzător exigenţei de performanţă a lucrării.

Beneficiarul va asigura controlul calitatii lucrarilor prin diriginţi de santier atestaţă pentru aceste categorii de lucrari, conform legii. După însuşirea documentaţiei tehnice de execuţie, Contractorul va asigura transmiterea tuturor informaţiilor către toţi factorii participanţi la realizarea lucrării. În programul de stabilire a fazelor determinante, se vor considera obligatoriu cel puţin următoarele faze determinante: a. verificare cote fundaţii; b. verificare teren de fundare; c. probă de presiune Contractorul va convoca în scris Proiectantul şi Beneficiarul si reprezentantul ISC, pentru verificarea şi recepţionarea fazelor determinante cu minim cinci zile înainte de termenul fazei determinante respective. Pe tot parcursul derulării lucrărilor, Beneficiarul va asigura prin diriginţii de specialitate, atestaţi, verificarea executării corecte a lucrărilor. Pentru fazele de lucrări ce devin ascunse, Beneficiarul şi Contractorul vor lua măsuri de întocmire a “Registrului de procese-verbale pentru verificarea calităţii lucrărilor ce devin ascunse”, întocmind în acest sens procese-verbale pe fazele analizate. Conţinutul verificării calităţii lucrărilor de construcţii ce devin ascunse, consemnate în procese-verbale, cât şi fazele obligatorii la care acestea se întocmesc, sunt prevăzute în normativele C056/85 şi C056/02..

Page 27 of 556

Şeful punctului de lucru va deţine obligatoriu următoarele acte: 1. 2. 3. 4.

registrul de procese-verbale cu lucrări ascunse; registrul cu dispoziţii de şantier; principalele norme ce reglementează tehnologia de execuţie; documentaţia completă de execuţie.

1.2.3 Activitatea de control şi verificări Procesele verbale pentru verificarea lucrărilor ce devin ascunse se încheie între beneficiar şi antreprenor. Nu se admite trecerea la noua fază de execuţie înainte de închiderea procesului verbal referitor la faza anterioară. Verificarea calităţii lucrărilor se va face pe parcursul următoarelor operaţii: − executarea cofrajelor; − calitatea şi montarea armăturilor; − calitatea betonului livrat de staţia de betoane; − condiţiile de turnare şi compactare a betonului; − decofrarea elementelor. Eventualele remedieri ale elementelor se vor executa conform normativului C149/87 – „Instrucţiuni tehnice privind procedeele de remediere a defectelor pentru elementele de beton şi beton armat”. Se vor urmări: − Abaterile de la geometrie să fie în limitele admise de normativele NE 012/2007 şi C056/85. − Betonul la decofrare să nu prezinte segregări sau alte vicii de turnare. − Respectarea pe parcursul execuţiei, a programului de control. Executarea lucrărilor trebuie supusă atenţiei continuu a doi factori:

− reprezentantul beneficiarului; −

reprezentantul compartimentului de calitate al executantului.

Lucrările se execută pe baza fişelor tehnologice de execuţie, corespunzând cerinţelor din normativele de execuţie, NTSM, PSI, a instrucţiunilor tehnice ale proiectului şi a furnizorilor de materiale, fiind obligatoriu respectarea acestora de către executant şi beneficiar.

La controale se vor verifica: − − − − − − − − −

concordanţa dintre dimensiunile interioare ale cofrajelor cu dimensiunile elementelor din proiect; folosirea clasei de beton conform proiect; poziţionarea corectă a armăturilor şi a pieselor ce urmează a fi înglobate în beton; tratarea corespunzătoare a rosturilor de turnare a betonului; realizarea acoperirii cu beton a armăturilor conform proiect; poziţionarea corectă a mustăţilor de armătură pentru elementele ce se vor turna ulterior; tratarea corespunzătoare a betonului după turnare (compactare, menţinerea în stare umedă pe perioada de întărire); aderenţa tencuielii hidrofuge pe suprafaţa de beton; calitatea lucrărilor de hidroizolare.

Activitatea de verificare şi control se va face cu respectarea următoarelor principale normative: −

NE 012/1-2007, NE 012-1/2007 –“Cod de practică pentru executarea lucrărilor din beton, beton armat şi beton precomprimat”;

Page 28 of 556

− − −

1.2.4

C169/88 – ”Normativ privind executarea şi recepţionarea lucrărilor de terasamente pentru fundarea construcţiilor”; C56/2003 – ”Normativ pentru verificarea calităţii şi recepţia lucrărilor de construcţii şi instalaţii aferente”; C112/86 –”Normativ pentru proiectarea şi executarea hidroizolaţiilor din materiale bituminoase la lucrările de construcţii”;

Recepţia lucrărilor

Recepţia lucrărilor se va face conform Legii nr. 10/1995 privind calitatea în construcţii, ”Regulamentul de recepţie a lucrărilor de construcţie şi instalaţii aferente acestora” (HGR nr. 273/94), Normativului pentru verificarea calităţii şi recepţia lucrărilor de construcţii şi instalaţii aferente C56-2003 şi prevederilor Normativului NE 012/1-2007.

Etapele de realizare a recepţiei sunt:

− recepţia la terminarea lucrărilor prevăzute în contract. −

1.2.5

recepţia finală – după expirarea perioadei de garanţie prevăzute.

Instrucţiuni de exploatare

1.2.5.1 Generalităţi Prezentul manual cuprinde instrucţiunile de intretinere si exploatare pentru sistemul de canalizare din zonă. Pentru lucrările de exploatare este necesar ca: a) să se lucreze numai cu personal calificat; b) personalul să aibă echipament de protecţie şi de muncă adecvat; c) să fie asigurate condiţiile necesare de prevenire a accidentelor de muncă; d) în cazul intervenţiei la colectoare în funcţiune, durata de intervenţie să fie cât mai mică, utilizânduse schimburi succesive pe perioade scurte de timp. Personalul de interventie are obligatia de a purta in tot acest timp echipamentul de protectie prevazut in normele de protectie a muncii, masca de gaze, cizme, manusi, centura de siguranta, franghie. Pe planseul construcţiilor aferente sistemului de canalizare se vor monta placute de avertizare pentru prevenirea accidentelor prin intoxicarea cu gaze, pe care sa scrie: “Atentie, pericol de moarte prin asfixiere! Accesul in interior se va face numai dupa 30 minute de la pornirea instalatiei de ventilatie mobile! Se va folosi obligatoriu masca de gaze!” In exploatare, instalatiile de ventilatie mobile se vor mentine permanent in stare de functionare. Prezentele instructiuni nu sunt limitative, ele trebuind completate de beneficiar, in functie de condiţiile existente si de modul de organizare al societatii.

În cursul exploatării tehnice a obiectivului se pot distinge următoarele perioade care diferă între ele: 1.

Recepţia şi darea în exploatare

2.

Primii ani de funcţionare

Page 29 of 556

3.

Exploatarea tehnică normală

1.2.5.2 Recepţia lucrărilor Recepţia lucrărilor se va face conform Legii nr. 10/1995 privind calitatea în construcţii, ”Regulamentul de recepţie a lucrărilor de construcţie şi instalaţii aferente acestora” (HGR nr. 273/94), Normativului pentru verificarea calităţii şi recepţia lucrărilor de construcţii şi instalaţii aferente C56-2003 şi prevederilor Normativului NE 012/1-2007.

Etapele de realizare a recepţiei sunt:

− recepţia la terminarea lucrărilor prevăzute în contract. −

recepţia finală – după expirarea perioadei de garanţie prevăzute.

1.2.5.3 Probe tehnologice Verificările, încercările şi probele se execută respectand cerintele de calitate cuprinse in legea 10/1995, privind calitatea construcţiilor, Regulamentul de recepţie a lucrărilor de construcţii şi instalaţii aferente acestora (HG nr. 273/94), precum şi cu prevederile normativului C56/85 si C56/2002 – ”Normativ pentru verificarea calităţii şi recepţia lucrărilor de construcţii şi instalaţii aferente” şi SR 6819/97;

Proba de etanseitate pentru canale se va efectua între camine consecutive, înainte de efectuarea umpluturilor, dupa ce imbinarea a ajuns la rezistenta proiectata. Se va executa inchiderea etansa a tuturor orificiilor, blocarea capetelor canalelor si a tuturor punctelor susceptibile de deplasare în timpul probelor. Umplerea canalului cu apa se face din capatul aval, aerul evacuandu-se prin capatul amonte. Probele de etanseitate nu se vor executa la temperaturi sub 0º C.

Presiunea de proba masurata în capatul aval al tronsonului se va considera 0,5 bari. Durata probei va fi de minim 20 minute. În timpul probei se va mãsura apa pierdutã mãsurându-se cantitãtile adãugate. Daca pierderile de apa depasesc limita admisibilă pentru tronsonul respectiv, se va face revizia conductei, urmata de reparatie sau inlocuire, dupa caz, si se va relua proba. Inlaturarea pierderilor de apa punctiforme sau la punctele de îmbinare se va realiza prin repararea corespunzãtoare a acestor zone. In cazul unor defectiuni mai grave, se va inlocui tubul sau se va solicita proiectantul pentru modul de remediere al defectiunii.

1.2.5.4 Exploatarea tehnică 1.2.5.5 Controlul periodic al retelelor de canalizare Controlul periodic interior si exterior al constructiilor si instalatiilor, precum si a calitatii apelor uzate are ca scop asigurarea functionarii normale a colectoarelor si a constructiilor aferente de pe reţeaua de canalizare. Controlul cantitativ al apelor uzate consta in determinarea debitelor din reţeaua de conducte, in scopul verificarii capacitatii de curgere, lucru care se face prin determinarea inaltimii apei in canalele calibrate si a vitezei apei. Debitele stabilite astfel nu trebuie sa difere cu mai mult de 15% fata de cele stabilite in proiect. Controlul calitativ al apelor uzate se refera in primul rand la verificarea calitatii apelor uzate care intra in reteaua de canalizare si daca la evacuare ele corespund cu prevederile normativelor in vigoare privind

Page 30 of 556

stabilirea limitelor de descarcare a apelor uzate in reteaua publica de canalizare si a limitelor de descarcare in receptorii naturali. Apele uzate evacuate în sistemele de canalizare trebuie să respecte condiţiile precizate prin avizul de racordare la canalizare, respectiv prin contractul de prestare a serviciului, precum şi pe cele impuse prin reglementările tehnice în vigoare, astfel încât, prin natura, cantitatea ori calitatea lor, să nu conducă la: -

sa nu fie agresive pentru materialul din care este executata reteaua;

-

sa nu conducă la degradarea construcţiilor şi instalaţiilor componente ale sistemelor de canalizare

-

sa nu conducă la diminuarea capacităţii de transport a reţelelor şi a canalelor colectoare

-

sa nu fie nocive sau sa emita gaze toxice, vatamatoare pentru personalul de exploatare;

sa nu conducă la apariţia unor pericole pentru igiena şi sănătatea populaţiei sau a personalului de exploatare a sistemului -

sa nu prezinte pericol de incendiu si de explozie;

sa nu creeze dificultati in realizarea proceselor de preepurare si de epurare si sa nu contina substante care sa precipite in contact cu apa uzata din reteaua de canalizare; sa nu conducă la perturbarea funcţionării normale a staţiei de epurare prin depăşirea debitului şi a încărcării sau prin inhibarea proceselor de epurare sa nu contina materii in suspensie, care sa corodeze peretii canalului sau sa se depuna si sa provoace infundari; sa nu contina corpuri plutitoare, sa nu contina hidrocarburi, uleiuri si grasimi care sa adere la peretii canalului, etc. Astfel, in scopul protejarii retelelor de canalizare si instalatiilor de epurare, se va urmării respectarea cu strictete a limitelor maxim admisibile prevazute de NTPA 002 "Normativ privind conditiile de evacuare a apelor uzate in retelele de canalizare ale localitatilor si direct in statiile de epurare". Valorile normate servesc atat pentru aprecierea calitatii apelor existente si stabilirea prioritatii lucrarilor de protectie a constructiilor sistemului de canalizare cat si la stabilirea de conditii limitative pentru calitatea apelor uzate evacuate de la fiecare unitate industriala sau comerciala, conditii care se precizeaza in avizele si autorizatiile de functionare prin care organele de gospodarirea apelor reglementeaza evacuarea apelor uzate.

Controlul exterior se face trimestrial de catre o echipa formata din minim trei persoane (1 sef si 2 muncitori), care efectueaza parcurgerea traseului canalelor aferente reţelei de canalizare, desfac capacele caminelor de vizitare si a gurilor de scurgere verificand starea lor precum si daca sunt infundate; se verifica eventualele denivelari ale traseului sau pavajul in jurul caminului, precum si starea capacelor, a canalelor de racord, etc. In cazul terenurilor macroporice se verifica in mod deosebit existenta si cauza unor eventuale tasari produse sau a unor surse de exfiltratii a apei din canale in exteriorul acestora. In cazul controlului exterior nu se coboara in camine, evitandu-se astfel posibilitatea producerii unor accidente, echipa nefiind dotata cu echipamentul adecvat pentru a intra in canale. Controlul interior se efectueaza o data pana la de patru ori pe an si are ca scop verificarea modului de functionare a canalizarii şi a camerei deversoare (a modului cum se face curgerea) in vederea stabilirii necesitatii curatirii, spalarii sau de efectuare a altor reparatii. În cazul canalelor nevizitabile, controlul interior se poate face cu ajutorul oglinzilor observandu-se atat eventualele defectiuni sau depuneri, precum si cu ajutorul camerelor de televiziune sau prin fotografiere cu

Page 31 of 556

ajutorul unor aparate de fotografiat sau camere de luat vederi amenajate special si cuplate cu o sursa de lumina. In cadrul controlului, la toate categoriile de canale, se urmareste influenta retelei de canalizare asupra nivelului apelor freatice atat in ceea ce priveste drenarea, cat si eventualele exfiltratii datorate unor neetanseitati. La canalele situate in terenuri macroporice sensibile la inmuiere acestei operatii trebuie sa i se acorde o atentie deosebita. In general operatiile de intretinere se realizeaza cu mentinerea in functiune a retelei de canalizare.

1.2.5.6 Controlul periodic Controlul interior al construcţiilor se efectueaza o data pana la de patru ori pe an si are ca scop : − verificarea modului de functionare a construcţiilor (a modului cum se face curgerea) in vederea stabilirii necesitatii curatirii, spalarii sau de efectuare a altor reparatii; − Verificarea depunerilor în canalele amonte şi aval de constructie, precum şi în interiorul construcţiilor, în vederea stabilirii măsurilor necesare pentru asigurarea funcţionării hidraulice în condiţii normale; − Verificarea stării pragurilor deversoare la camerele deversoare − Verificarea stării pereţilor interiori şi ai tencuielilor − Verificarea stării acceselor (capac, trepte, galerie, etc) ; − Verificarea funcţionării sistemului de ventilaţie

1.2.5.7 Spalarea si curatirea canalelor Spalarea si curatirea canalelor şi a construcţiilor se efectueaza ori de cate ori rezulta ca necesar, aceasta stabilindu-se in urma controlului. In general, o retea de canalizare, in special in procedeul unitar, nu ar necesita spalare. Deoarece insa debitele sunt variabile, iar forma sectiunii si panta canalului nu asigura intotdeauna realizarea vitezei de autocuratire, este necesar a se stabili tronsoanele, necesitatea si frecventa de curatire si spalare, operatie care se face de obicei in primul an de functionare. Spalarea se aplica in general la canalele nevizitabile si se poate face cu apa din reteaua de alimentare cu apa potabila, industriala sau chiar cu apa uzata. Sistemul cel mai simplu este de a inchide cu ajutorul unor clapete orificiile de intrare si de iesire din caminul de vizitare amplasat in amontele tronsonului care trebuie spalat. In caminul astfel izolat se introduce apa cu ajutorul unui furtun pe o inaltime cat mai mare (in general de cca 2,0 m) si dupa umplere, se deschide brusc clapeta aval creandu-se o "fuga de apa" cu viteze mari care asigura o buna spalare. Dupa spalare, furtunul trebuie retras din camin pentru a nu exista o legatura permanenta intre reteaua de canalizare si reteaua de alimentare cu apa potabila. Aceeasi operatiune se poate face prin acumularea de apa uzata la inchiderea clapetei aval, insa dureaza un timp mai indelungat si se poate ca remuul provocat in amonte sa duca la inundarea unor racorduri si subsoluri. Un sistem eficient de spalare se realizeaza prin folosirea unor masini speciale cu autojet, care realizeaza punerea sub presiune a apei dintr-o cisterna si evacuarea acesteia prin intermediul unui furtun in tronsonul de canalizare care necesita spalare. Curatirea canalelor este necesar a se face atunci cand prin spalare nu se pot indeparta depunerile intarite, eventualele deseuri etc., sau radacinile patrunse prin fisurile sau imbinarile retelei de canalizare. Curatirea canalelor nevizitabile, se efectueaza manual din amonte spre aval, cu ajutorul unor piese si unelte de curatit de diferite forme pentru a realiza desprinderea, taierea si transportul materialului depus pana la caminul din aval. Introducerea si actionarea pieselor de curatire se face cu ajutorul unor trolii fixate pe macaralele amplasate la cele doua camine de la extremitatea tronsonului ce se curata. Tot ca mijloace de curatire se foloseste bila de gheata care se introduce in canal si este impinsa de apa. In cazul ca se blocheaza si nu poate disloca depunerile, se topeste; in mod asemanator se foloseste un balon de cauciuc care, de asemenea, se poate dezumfla prin intepare, daca se blocheaza.

Page 32 of 556

1.2.5.8 Desfundarea canalelor. Cand se produce o infundare, aceasta actioneaza ca un dop care poate impiedica partial sau total curgerea provocand ridicarea nivelului apei din canal in amonte, uneori chiar pana la nivelul terenului, fapt ce poate produce inundarea racordurilor si instalatiilor de canalizare situate la cote mai joase. Din cauza acestor inconveniente este necesar ca desfundarea canalelor sa se faca cat mai operativ. O metoda mult utilizata consta din introducerea unei sarme groase sau a unor tuburi flexibile sau prajini ori bastoane articulate, la capatul carora se fixeaza diferite piese metalice de tip sfredel, lance etc., care, prin invartire patrund si disloca depozitul format. Operatia se incearca a se efectua atat din amonte cat si din aval. Tot ca metoda de desfundare se pot folosi dispozitive hidraulice de mare presiune care sunt prevazute cu un furtun cu cap autopropulsat care asigura inaintarea lui si spalarea depozitului. In cazul extrem in care nici una dintre aceste metode nu da rezultate, se determina, cu ajutorul bastoanelor articulate, cat mai exact pozitia portiunii infundate si se executa o sapatura deschisa, pentru desfundare fiind necesara deci spargerea si inlocuirea tuburilor respective. Curatirea lucrarilor anexe este necesar a se efectua periodic pentru a se asigura buna lor functionare. Astfel, gurile de scurgere (cu depozit) se curata in mod obisnuit de doua ori pe luna cu autovidanjoarele. De asemenea, caminele de vizitare cu depozit este necesar a fi curatite cand se constata umplerea lor, cu ocazia controlului.

1.2.6

Intretinerea reţelei de canalizare

Lucrările principale de întreţinere sunt reprezentate de lucrările de întreţinere la construcţiile şi instalaţiile aferente reţelei de canalizare, cînd este necesar. Intretinerea retelei de canalizare se realizeaza prin urmatoarele operatii principale:

1) Inspectii preventive, efectuate trimestrial, prin parcurgerea a 4-6 km/zi de catre o echipa compusa de obicei din 3 oameni, verificandu-se toate partile componente de constructii si instalatii vizibile ale retelelor de pe traseu. Se efectueaza parcurgerea traseelor canalelor aferente nodului hidrotehnic, se desfac capacele caminelor de vizitare şi de acces si a gurilor de scurgere verificand starea lor precum si daca sunt infundate; se verifica eventualele denivelari ale traseului sau pavajul in jurul construcţiilor, precum si starea capacelor, a canalelor de racord, etc.

2) Revizii preventive efectuate de 2 ori pe an la constructiile si instalatiile retelei, verificandu-se pe langa starea acestora si modul de functionare. 3) Reparatii curente planificate la intervale la 4-5 ani. In cazul reparatiilor curente, daca dupa efectuarea curatirii conductelor de canalizare se constata o marire a rugozitatii datorita depunerilor care nu au putut fi îndepărtate complet, sau este necesara consolidarea conductei, se recurge la captusirea ei interioara. 4) Reparatii curente pentru inlaturarea unor defectiuni constante. Aceste reparatii trebuie efectuate imediat ce au fost semnalate. Deplasarea echipei de interventii se va face in cel mai scurt timp cu o autoutilitara dotata cu toate aparatele, utilaje si materiale necesare efectuarii reparatiei. 5) Masuri speciale pentru pregatirea exploatarii pe timpul iernii.

Principalele defecte care pot apare în funcţionarea reţelei de canalizare În primii ani de funcţionare a reţelei se consatată adeseori numeroase defecţiuni. În funcţie de modul în care se intervine pentru repararea lor, perioada se poate limita la 1-2 ani, sau, în cazul unei exploatări defectuaoase ea se extinde pe o durată mult mai mare. Principalele defecte care pot aparea in aceasta perioada depinde de materialele folosite la execuţia reţelei de canalizare, de calitatea executiei, de modul de exploatare si se pot grupa astfel: 1.2.7

Page 33 of 556



• • • • •

La conductele de PVC poate fi azvârlit din mufă garnitura de etanşare, din cauză că montarea tuburilor nu au fost bine executată, din cauza diferenţei de compactae a umpluturii şi fundaţiilor, etc; unele tuburi se pot rupe din cauza unor sprijiniri defectuoase pe fundaţie sau din lipsa unor ancoraje circulaţia apei se face defecuos din cauza unor corpuri străine (bucăţi de lemn, pământ su agregate rămase pe conductă) defecţiuni provocate din lipsa sau greşita amplasare sau calitatea necorespunzătoare a unor lucrări accesorii. umplutura prea afânată sau compactarea insuficientă ce provoacă spargerea tuburilor prin acţiunea sarcinilor mobile de asemenea pot apare defectiuni la partea carosabilă sau trotuare a caror reparatie revine beneficarului retelei

In aceasta perioada, sarcina care revine intreprinderii de exploatare este de a urmari prin controale intense depistarea defectiunilor care duc la functionarea defectuasă a reţelei de canalizare si repararea lor in timpul cel mai scurt posibil si in bune conditii. Exploatarea tehnica normala trebuie sa corespunda organizatoric si tehnic modului de alcatuire si functionarea retelei; sa asigure intretinerea si repararea preventiva a construcţiilor şi a colectoarelor, depistarea defectelor si repararea lor in cel mai scurt timp, in conditii tehnice, sanitare si economice avantajoase.

1.2.8

Mijloace pentru exploatarea si intretinerea retelei de canalizare Mijloacele pentru exploatarea si intretinerea funcţionării colectoarelor reţelei de canalizare, trebuie sa corespunda marimii, naturii si starii retelei si trebuie sa cuprinda:

1) Cadre calificate. 2) Aparate si utilaje de reparatii. 3) Materiale corespunzatoare. Asigurarea cadrelor de ingineri, tehnicieni si muncitori calificati constituie preocuparea principala si o conditie pentru intretinerea retelelor si asigurarea unei distributii economice. Actualmente, functionarea unei retele de canalizare fara utilaje si aparate de vizualizare, control şi curăţare nu este de conceput din punct de vedere tehnic si economic. Din punct de vedere tehnic ele asigura functionarea retelei prin posibilitatea determinarii sectorului in care se produc colmatările şi avariile, permitind astfel scurtarea timpului necesar depistarii lor. Inspectarea aparatelor de control trebuie facuta cel putin odata pe luna. Utilajele necesare reparatiilor se pot grupa in trei categorii: de transport, de constructie şi de curăţare. Utilajele de transport trebuie sa cuprinda unitati rapide, usoare si mobile. Utilaje de constructie sunt de tip usor, unelte terasiere manuale, unelte pentru repararea conductelor de tip mijlociu. Utilajele de curăşare constau din hidrocurăţitoare, de diverse capacităţi. Materialele pentru reparatii trebuie sa se gaseasca in cantitati stabilite conform normativelor ofiale si corespunzatoare celor din care este construita reteaua de canalizare.

1.2.9

Remedierea defectiunilor si avariilor

Retelele de canalizare sunt supuse unor solicitari care variaza in limite foarte largi, insasi natura solicitarilor la care sunt supuse conductele şi construcţiile din care sunt alcatuite retele de canalizare fiind de mare diversitate. Ca urmare a acestor multiple conditii in care sunt obligate sa lucreze conductele şi construcţiile, ele sufera numeroase defectiuni, care atunci cand se amplifica pot deveni adevarate avarii. Experienta arata ca nu exista retea de canalizare in functiune la care sa nu se constate defectiuni.

Page 34 of 556

Masurile care trebuie luate privesc intreaga perioada de existenta a retelelor de canalizare, de la o faza de proiectare trecand prin faza de executie si apoi o deosebita atentie in timpul exploatarii retelelor care constituie perioada lor cea mai lunga de existenta. Clasificarea cauzelor este importanta deoarece ea trebuie sa permita justa incadrare a defectiunii si prin aceasta adoptarea masurilor celor mai corespunzatoare de remediere, dând totodata posibilitatea unei analize mai complexe pentru cazururile cind defectiunea ar fi rezultatul suprapunerii mai multor cauze.

Urmarea acestor conditii, se alege o clasificare care sa tina seama de:

1) Materialele din care sunt construite conductele şi construcţiile. 2) Etapele de existenta ale conductelor (proiectare, constructie exploatare) 3) Fenomenele de durata indepedente de exploatare care intervin in mod deosebit la defectarea conductelor de canalizare (depuneri, înfundări, etc). 4) Fenomene accidentale(cutremure, inundaţii, etc).

Se analizeaza cauzele de care produc defectiunile si avariile din conducta sau construcţie dupa urmatoarea schema: 1) Defecte cauzate de greseli de proiectare. 2) Executia necorespunzatore, cauza celor mai numeroase defectiuni ale conductelor de canalizare, incărcari asupra conductelor 3) Reducerea capacitatii de transport a conductelor. 4) Alte cauze de defectiuni si avarii ale canalelor 5) Depistarea pierderilor de apă sau infiltraţiilor pe retelele de canalizare 6) Exploatarea tehnica defectuoasa si intretinerea insuficienta, cauza a agravarii defectelor initiale ale conductelor de canalizare. Cunoasterea cauzelor este hotaritoare pentru luarea masurilor de corectare a defectiunilor si avariilor. Uneori aceste cauze sunt evidente, astfel incit masurile se pot lua imediat; aceasta situatie este caracteristica in general defectiunilor. Astfel insa, si mai ales in cazul defectiunilor mai mari si avarilor, cauzele care au produs nefuncţionarea sau nefuncţionarea corectă nu pot fi depistate cu usurinta fie din cauza complexitatii efectelor acestora, fie din lipsa de experienta a tehnicienilor respectivi sau chiar din cauza duratei cercetarilor care trebuie intreprinse pentru stabilirea lor corecta. In cercetarea cauzelor defectiunilor intervine cu mare influenta: 1) Existenta unui plan de situatie corect a retelelor de canalizare si a amplasamentelor in profilul transversal al strazilor. 2) Utilajul pentru depistarea defectelor si utilajul pentru desfacerea pavajelor si a altor zidarii, pentru sapaturi si epuismente de tipurile cele mai corespunzatoare constructiei retelelor de canalizare si conditiilor in care acestea trebuie sa lucreze, cu productivitate cit mai mare, astfel cit mai scurta, in scopul reducerii timpul de remediere si a interdictiei de circulatie cauzata de lucrarile de reparatii. 3) Personalul tehnic de exploatare(muncitori, tehnicieni, ingineri) care sa cunoasca bine reteua de canalizare, punctele ei mai slabe, consumatorii mai importanti a caror functionare dau debite mai importante in retea, mijloacele de depistare rapida a defectiunilor etc. 4) O buna evidenta a defectiunilor constante in demersul exploatarii tehnice retelei, cu precizarea locurilor, a cauzelor care le-a produs si a masurilor de remediere.

Page 35 of 556

Degradarea sau avarierea retelei de canalizare poate avea cauze multiple, de la o exploatare sau intretinere defectuoasa pana la calamitati naturale cum ar fi cutremure, ploi torentiale, inundatii, surpari de terenuri etc. Ca urmare a unei exploatari necorespunzatoare se pot mentiona degradarile produse asupra tuburilor de canalizare de catre agresivitatea apelor evacuate de unele industrii care nu respecta conditiile de calitate, necontrolarea la timp a etanseitatii canalelor, necuratirea corespunzatoare etc. Reparatiile curente constau din schimbarea gratarelor la gurile de scurgere si a capacelor defecte la caminele de vizitare, fixarea treptelor dislocate, repararea pieselor uzate ale utilajelor, repararea tencuielilor, zidariilor si a altor elemente de constructie. Reparatiile capitale constau in general din lucrari de refacere sau consolidare a unor portiuni sau tronsoane de canal care, fie ca au fost deteriorate datorita actiunii agresive a apelor uzate, a tasarilor de teren datorita exfiltratiilor, fie este necesara consolidarea lor ca urmare a schimbarii conditiilor de trafic, de sistematizare, etc. Uneori este necesara repararea unor tronsoane distruse sau prezentand fisuri care pot evolua in timp si pot duce la prabusiri in caz ca nu se intervine. Repararea avariilor trebuie facuta in cel mai scurt timp posibil (necesitand lucru continuu in trei schimburi) deoarece prin obturarea sectiunii de curgere, ca si in cazul infundarilor, tronsoanele din amonte intra sub presiune si pot provoca inundarea subsolurilor, a retelelor si galeriilor subterane invecinate. De asemenea, in cazul unor exfiltratii mari in terenul inconjurator, se poate produce infectarea panzei freatice sau pot fi periclitate ca stabilitate, cladirile invecinate. Repararea avariilor se face de regula, cu materiale avand aceleasi caracteristici tehnice si dimensiuni cu cele din care este executata canalizarea. In nici un caz nu este admis a se diminua capacitatea de transport a canalizarii pe portiunea respectiva prin montarea unor tuburi cu sectiunea mai mica. Devierea apelor uzate pe perioada interventiilor este una din problemele cele mai dificile ce trebuie rezolvata la executarea reparatiei retelelor de canalizare in cazul avariilor sau a unor degradari importante, deoarece in majoritatea situatiilor intalnite in practica nu se poate opri functionarea tronsoanelor din amonte. Uneori nu este posibil - la canalele prevazute cu deversor - sa se devieze partial debitele ce vin din amonte. De asemenea, la retelele de canalizare in procedeu unitar este posibil ca pe unele tronsoane sa se astupe temporar gurile de scurgere, pentru a impiedica patrunderea apelor meteorice in canal. In orice caz se vor analiza toate posibilitatile pentru a reduce la minim debitul de apa ce urmeaza a fi deviat. Daca portiunea pe care se face devierea cuprinde racorduri, trebuie avuta in vedere colectarea temporara a apelor uzate respective pe perioada in care se face interventia. La canalele nevizitabile (circulare sau ovoidale) devierea apelor se face de obicei intre doua camine prin izolarea totala a tronsonului unde urmeaza a se face reparatia. Unul dintre cele mai eficiente sisteme consta in folosirea unui obturator expandabil (elastic) din cauciuc care asigura atat etansarea sectiunii in care acesta se monteaza, cat si aspiratia printr-un furtun legat la o pompa. Pompa asigura refularea debitului de apa uzata din tronsonul unde se va interveni intr-o retea invecinata sau in tronsonul din aval, prin caminul respectiv. Dupa efectuarea reparatiei, spre exemplu pentru inlocuirea unor tuburi distruse - operatie ce se executa prin sapatura deschisa numai in portiunea aferenta - obturatorul este dezumflat si scos prin plutire, iar apoi este ridicat prin tragere la nivelul strazii. In cazul ca este necesar a se face reparatia prin inlocuirea sau repararea etansarii (imbinarilor) unui numar mai mare de tuburi, se va face o sapatura deschisa de obicei intre cele doua camine iar, devierea se va face printr-un jgheab paralel cu canalul existent care va conduce apa uzata dintr-un camin in celalalt. In unele situatii, devierea se face pe portiuni mai scurte prin montarea in sant a unor tuburi cu ramificatie. In aceste solutii jgheabul poate fi executat din lemn captusit cu tabla sau carton bitumat, sau din tuburi metalice ori din beton. Si la acest sistem de deviere este necesara realizarea legaturii racordurilor de canalizare existente pe portiunea respectiva.

Page 36 of 556

1.2.10 Urmărirea comportării în timp a construcţiei 1.2.10.1 Instrucţiuni de urmărire curentă. Activitatea de urmarire curenta se va desfasura in conformitate cu prevederile “Regulamentului privind urmarirea comportarii in exploatare, interventiile in timp si postutilizarea constructiilor”, cuprins in HGR 766/1997 (anexa 4) si cu “Normele metodologice privind urmarirea comportarii constructiilor”, inclusiv supravegherea curenta a starii tehnice a acestora, indicativ P130-97. Operatiunile de urmarire curenta a comportarii se realizeaza pe parcursul exploatarii constructiei prin observarea directa si cu ajutorul unor mijloace de urmarire de uz curent in urmatoarele situatii: Verificari periodice obligatorii care se vor efectua trimestrial in primul an de la punerea in functiune a constructiilor; Verificari operative care se vor efectua obligatoriu dupa producerea unor fenomene naturale sau evenimente, care pot afecta constructia: seism, explozii, inundatii, etc. Verificarile operative reiau verificarile periodice imediat dupa producerea unor fenomene speciale, de tipul celor descrise mai sus. In cazul constatarii unor defectiuni, se va anunta proiectantul, care va decide asupra masurilor de investigare si de remediere necesare.

1.2.10.2 Acte normative Actele normative care reglementeaza urmarirea comportarii in timp a constructiilor sunt: •

STAS 2745/90 “Urmarirea tasarii constructiilor prin metode topografice”



STAS 10493/76 “Marcarea si sistematizarea punctelor pentru supravegherea tasarii si deplasarii constructiilor si terenurilor”

1.2.10.3 Scopul urmaririi in timp Urmarirea in timp a comportarii constructiei este necesara pentru cunoasterea continua a aptitudinilor pentru exploatare cat si pentru cunoasterea raspunsului constructiei la solicitarile din exploatare. Aceste date sunt folositoare si pentru perfectionarea metodelor de calcul si proiectare. De asemenea, se pot lua masuri pentru eliminarea sau oprirea eventualelor fenomene care ar putea duce la avarierea sau distrugerea constructiei.

1.2.10.4 Modul de urmarire a comportarii in timp Urmarirea comportarii in exploatare a constructiilor se face periodic si obligatoriu de catre beneficiar. Responsabilii cu urmarirea comportarii in exploatare a constructiei pot sa aiba o pregatire tehnica cel putin de nivel mediu. Trebuie sa cunoasca cartea tehnica a constructiei si sa tina la zi jurnalul evenimentelor.

1.2.10.5 Organizarea activitatii de urmarire a comportarii in timp Pe reteaua de canalizare şi pe construcţiile din staţia de epurare se vor instala 3 puncte de măsură, dotate cu reperi de tasare. În staţia de epurare va fi montat un debitmetru pe fluxul tehnologic, deasemeni pentru urmărirea comportării în timp a debitului de apă epurată. Pe aspiraţiile şi refulările de la pompe se vor monta manometre pentru urmărirea comportării în timp a parametrilor de funcţionare a pompelor. Parametrii reprezentativi pentru caracterizarea starii si comportarea in timp a constructiei sunt: •

cota acoperişului modulelor de epurare;



deplasarile pe orizontala sau verticală a marcilor de pe capacele construcţiilor;

Page 37 of 556



cotele capacelor căminelor de vane şi căminelor de vizitare;

Citirile marcilor enuntate mai sus se vor face in comparatie cu citirile a doi reperi amplasati in afara zonei de influenta a lucrarii. Reperii vor fi inglobati in borne de beton conform STAS 4294/73. Prima serie de masuratori se va executa la terminarea lucrarilor (receptie), iar urmatoarele se vor efectua trimestrial in primul an, semestrial in al doilea an de exploatare. La orice degradare importanta se vor face propuneri pentru controlul de detaliu de catre personalul de specialitate.

1.2.11 Măsuri pentru securitatea muncii Măsurile de protecţia muncii se referă atât la operaţiunile de execuţie a lucrărilor cât şi pentru activitatea de exploatare. În toate operaţiile de execuţie se vor respecta cerinţele esenţiale referitoare la protecţia, siguranţa şi igiena muncii. Principalele măsuri şi acţiuni pentru asigurarea protecţiei, siguranţei şi igienei muncii sunt: − Luarea măsurilor tehnice şi organizatorice pentru asigurarea condiţiilor de securitate a muncii. − Realizarea instructajelor de protecţie a muncii a întregului personal de exploatare şi întreţinere şi consemnarea acestora în fişele individuale sau formulare specifice, semnate individual. − − −

Controlul aplicării şi respectării normelor specifice de către întregul personal. Verificarea periodică a personalului privind cunoaşterea normelor şi a măsurilor de protecţie a muncii. Pe toată durata execuţiei, în zona lucrărilor trebuie asigurată o zonă de lucru şi de protecţie. Lăţimea acestor zone se stabileşte funcţie de tipul lucrărilor şi de condiţiile locale.În interiorul zonei de lucru şi de protecţie nu este permis accesul persoanelor şi al utilajelor străine de şantier.

Ridică probleme de protecţia muncii folosirea de substanţe toxice cum sunt unii acceleratori de priză, adezivi etc. Executarea săpăturilor se realizează cu respectarea normelor de protecţie a muncii pentru lucru de terasamente, iar incintele săpate se vor împrejmui, fiind adoptate măsuri de protecţie diferenţiate în funcţie de natura şi morfologia terenului. Lucrările, fiind în zone accesibile publicului, semnalizarea privind interdicţia accesului în zonă trebuie să fie foarte vizibilă atât ziua cât şi noaptea.

1.3

Date privind clasa de importanţă a construcţiilor proiectate

În conformitate cu HGR 766/1997 modificata si completata prin H.G. nr. 675/2002, categoria de importanţă globală a lucrărilor ce constituie obiectul documentaţiei, stabilita conform Ordin MLPAT nr. 31/N-1995, este ,, C ’’ (importanţă normală).

În conformitate cu STAS 4273/1983, lucrările de alimentare cu apă şi canalizare în localităţi rurale se încadrează în clasa IV de importanţă specifică (construcţii definitive de importanţă principală). Din punct de vedere al criteriilor: − − −

Social economice, categoria de importanţă este 4 (alimentare cu apă) Durata de exploatare, construcţia este definitivă (permanentă) Rolul funcţional, construcţia este de importanţă principală

Page 38 of 556

1.4

Criterii de exigenţă privind calitatea în construcţii la proiectare

Exigenţele esenţiale, conform Legii nr. 10/1995 privind calitatea in construcţii, corespunzatoare directivei C.E.E. nr. 89/106 privind calitatea produselor pentru construcţii, ce trebuie realizate şi menţinute pe intreaga durată de existenţă a construcţiilor sunt:

-

A – Rezistenţa şi stabilitatea la solicitări statice, dinamice, inclusiv cele seismice ; B – Siguranţa in exploatare; C –Siguranţa la foc; D – Igiena şi sănătatea oamenilor, refacerea şi protecţia mediului; E – Protecţia termică, hidrofugă şi economia de energie;

-

F – Protecţia impotriva zgomotului.

Conform clasificarii cuprinse in „Regulamentul de verificare si expertizare tehnica de calitate a proiectelor, a executiei lucrarilor si contructiilor”, aprobat cu H.G. 925/20.11.1995, constructiile şi instalaţiile se incadreaza in categoria de verificare A1, B9, Is şi Ie. Verificarea se face de catre verificatori atestati MLPTL pentru domeniile: Pentru constructii si arhitectura A1 - Rezistenta si stabilitate pentru constructii civile, industriale, agrozootehnice; energetice; telecomunicatii; miniere; edilitare si de gospodarie comunala cu structura din beton, beton armat, zidarie, lemn; B9 - Siguranta in exploatare la constructii edilitare si de gospodarie comunala; D - Igiena, sanatatea oamenilor, refacerea si protectia mediului pentru toate domeniile; Pentru instalatii o Is - Instalatii sanitare, care cuprind:

pentru specialitatile:

• instalatii sanitare interioare; • instalatii exterioare de alimentare cu apa; • instalatii exterioare de canalizare; • instalatii de stingere a incendiilor; Ie - Instalatii electrice, care cuprind: • • • • •

instalatii electrice, inclusiv pentru curenti slabi; instalatii de protectie la descarcari atmosferice; instalatii de automatizare si semnalizare pentru instalatii sanitare, termice si de gaze; instalatii de avertizare si de prevenire a incendiilor; instalatii de telecomunicatii si de transmitere a informatiilor.

conform Ordinului 777/2003 publicat in Monitorul Oficial, Partea I nr. 397 din 09.06.2003 pentru aprobarea Reglementarii tehnice " Indrumator pentru atestarea tehnico-profesionala a specialistilor cu activitate in constructii".

1.5

Criterii de exigenţă privind calitatea în construcţii la execuţie

Calitatea lucrărilor executate va fi asigurată prin respectarea prevederilor din: Page 39 of 556



Legea 10/1995 – a calităţii lucrărilor cu toate reglementările ce decurg din aceasta;



HG 925/1995 – privind responsabilul tehnic cu asigurarea calităţii lucrărilor;



Buletinul construcţiilor 4/1996-prescripţii tehnice pentru verificarea calităţii lucrărilor, inclusiv controlul pe faze determinante.

Astfel, se vor satisface cerinţele de rezistenţă şi stabilitate, siguranţa în exploatare şi protecţia mediului.

1.6

Standarde şi normative

Proiectarea s-a facut conform următoarelor standarde şi normative: - privind evaluarea încărcărilor: NP-082-04 - Cod de proiectare. Bazele proiectării şi acţiuni asupra construcţiilor. Acţiunea vântului. CR 0-2005 - "Cod de proiectare. Bazele proiectării structurilor în construcţii" CR 1-1-3-2005 - "Cod de proiectare. Evaluarea acţiunii zăpezii asupra construcţiilor", STAS 10101/1-78. Greutăţi tehnice şi permanente.

- privind evaluarea solicitarilor din seism: Normativul P100-1/2006 pentru proiectarea antiseismica a constructiilor de locuinte, social culturale, agrozootehnice si industriale.

- privind lucrarile de fundatii si terenul de fundatie: Normativul NP 112-04. Normativ privind proiectarea structurilor de fundatii directe; STAS 3300/1,2-85. Terenul de fundare. Principii generale de calcul; calculul terenului in cazul fundarii directe.

- privind dimensionarea constructiilor din beton: STAS 10107/0-90. Calculul si alcatuirea elementelor structurale din beton, beton armat si beton precomprimat STAS 4165-88. Rezervoare de beton armat si beton precomprimat - privind legislatia in vigoare: Legea 10/95. Legea calitatii in constructii. HG 767/97 privind incadrarea in categorii de importanta. HGR nr.925 / 11 - 95

Regulament de verificare şi expertizare tehnică de calitate a proiectelor, execuţia lucrărilor şi a construcţiilor cu

completările şi modificările ulterioare. HGR.nr.273 / 06 - 94

Regulament de recepţie a lucrărilor de construcţii şi instalaţii aferente acestora. Page 40 of 556

HG nr.940/19.07.2006 pentru modificarea şi completarea Regulamentului de recepţie a lucrărilor de construcţii şi instalaţii aferente acestora, aprobat prin Hotărârea Guvernului nr. 273/1994

Page 41 of 556

2

CAIETE DE SARCINI GENERALE

2.1 2.1.1

Lucrari de terasamente Date generale

Contractantul va raspunde de toate excavatiile si umpluturile si de imprastierea materialului excavat dupa cum este necesar pentru construirea lucrarilor, si mentionate aici ca terasamente. Nu vor fi incepute nici un fel de lucrari pâna ce Contractantul nu a luat toate masurile de siguranta, inclusiv prevederea de bariere si masuri de control ale traficului, unde este cazul.

Standardele romanesti care vor fi respectate: P10-86 - proiectarea si executia lucrarilor pentru fundatiile de cladiri; C169-88

- executarea terasamentelor pentru realizarea fundatiilor la cladirile civile si industriale;

C16-84 - realizarea in anotimpul rece, de lucrari de constructie si instalatii.

2.1.2

Notificarea lucrărilor de terasamente

Inaintea inceperii oricaror lucrari de terasamente de pe santier, Contractantul îi va trimite Şefului de Proiect, cu cel putin 7 zile inainte, o notificare cu data propusa pentru inceperea lucrarilor. In aceasta perioada, Contractantul va face o inregistrare a cotelor de teren si a topografiei trimise spre stiinta Şefului de Proiect pentru masurarea Lucrarilor.

2.1.3 Cota de teren Pentru utilizarea Specificatiilor, termenul de "cota de teren" se va folosi pentru a desemna suprafata de teren de dinaintea inceperii lucrarilor de terasamente, si dupa orice curatire generala a santierului. 2.1.4 Aria excavatiilor Aria excavatiilor va fi aceea care, dupa parerea Şefului de Proiect, reprezinta un minim practicabil pentru construirea Lucrarilor. Exacavarea santurilor pentru conducte se va limita in orice moment la lungimea conductelor aprobate anterior in scris de catre Seful de proiect. Cu exceptia acordului scris anterior al Şefului de Proiect, lucrarile de conducte de orice lungime aprobata, se vor incheia cu acordul Şefului de Proiect, inaintea inceperii lucrarilor la orice alta lungime de conducte. 2.1.5 Excavarea materialului de teren instabil Daca materialul terenului intalnit de Contractant la baza oricarei sapaturi este, dupa parerea acestuia, instabil, acesta il va informa imediat pe Seful de proiect. Seful de proiect, imediat ce este practic posibil, va timite instructiuni scrise pentru a confirma daca materialul terenului urmeaza sa fie considerat instabil. Daca se confirma ca materialul terenului este instabil, atunci Contractantul, avand acordul Şefului de Proiect, va indeparta materialul si va umple golurile astfel create cu material granular corespunzator, cu acordul Şefului de Proiect. Misiunea Şefului de Proiect de a da instructiuni nu il va scuti pe Contractant de nici o responsabilitate privind defectele lucrarii, daca, anterior construirii, Contractantul nu va fi solicitat in scris acordul Şefului de Proiect pentru efectuarea inspectiei fundatiei expuse. 2.1.6 Siguranta excavatiilor si constructiilor anexe Contractantul va asigura sprijinul necesar pentru asigurarea stabilitatii excavatiilor si drumurilor si constructiilor anexe.

Page 42 of 556

2.1.7

Alunecari, caderi si excavatii excedentare.

Contractantul va lua toate precautiunile necesare pentru prevenirea alunecarilor si caderilor de materiale de pe pantele excavatiilor si umpluturilor. In cazul alunecarilor sau caderilor care se produc la excavatii, si acolo unde excavatiile efectuate depasesc dimensiunile specificate, atunci orice material necorespunzator care a intrat in excavatii va fi indepartat din sapatura, si se va executa umplutura suplimentara care poate fi necesara folosind materialul excavat selectat sau importat, si compactat cu acordul Şefului de Proiect. Aceasta umplutura suplimentara se va executa pe cheltuiala Contractantului. Acolo unde au loc alunecari si caderi, sau daca excavatiile sunt excedentare fata de dimensiunile specificate, care, dupa opinia Şefului de Proiect pot afecta stabilitatea solului ce sustine Lucrarile, si constructiile si anexele, Contractantul va umple golul cu beton. Aceasta lucrare auxiliara se va efectua pe cheltuiala Contractantului.

2.1.8 Demolarea si demontarea Contractantul va demola, demonta si/sau indeparta orice diverse constructii existente, cladiri sau parti ale acestora care ocupa sau obstructioneaza lucrarile permanente, totul asa cum se arata in planuri, descrise in memorii, sau la indicatia Şefului de Proiect. Materialele necorespunzatoare din demolari si demontari vor fi indepartate de o maniera si intr-un amplasament aprobat de Seful de proiect. Acolo unde este necesara demolarea partiala a constructiilor, Contractantul va manifesta cea mai mare atentie sa nu avarieze nici o parte a constructiei care urmeaza sa ramana pe loc. Daca se produce o astfel de avariere, Contractantul va repara si remedia partea avariata pe cheltuiala sa. Daca nu exista alte specificatii ale Şefului de Proiect, golurile sau deschizaturile vor fi umplute sau compactate comform clauzei "Umpluturi pentru constructii". 2.1.9 Golirea In lipsa unui acord, si acest acord se va da numai in cazuri exceptionale, Contractantul va scoate apa din orice sapatura de constructie si conducte indiferent de sursa apei, astfel incat efectuarea lucrarilor sa se faca in conditii uscate. Metoda de a mentine uscate excavatiile, golirea si indepartarea apei se va efectua cu acordul Şefului de Proiect. Contractorul se va asigura ca pe santier exista o statie de rezerva pentru a se evita in orice imprejurare orice intrerupere a continuitatii golirii. Pentru golire nu se va face o plata separata, iar costurile aferente acestei activitati se vor considera ca fiind incluse in cotele pentru excavatiile de constructii sau cotele pentru conducte sau pentru toate cotele in general. 2.1.10 Rambleu si umplutura Materialul de rambleu amplasat fata de lucrarile permanente va fi selectionat si fara bolovani, cabluri, fragmente de roca si altele asemanatoare mai mari de 50 mm marimea nominala. Materialul folosit pentru rambleu si umplutura va fi un material excavat selectionat, dimensiunea particulelor nedepasind 75 mm. Dupa ce Seful de proiect isi va da acordul pentru inceperea rambleului sau umpluturii, operatia va incepe cu un minim de intarziere pana la terminarea lucrarii la partea de Lucrari pentru care s-a obtinut acordul. Nu se va efectua nici un rambleu pana nu se obtine acordul Şefului de Proiect. 2.1.11 Materiale de umplutura sortat Materiale sortate de umplutura vor cuprinde urmatoarele: a) Pietris - 7-15 mm pietris conform STAS 1667-76. b) Nisip - 0-7 mm nisip conform STAS 1667-76. c) Bolovani de rau - 8-15 mm bolovani de rau conform STAS 1667-76. 2.1.12 Compactarea umpluturii si rambleului Daca nu exista alte indicatii, Contractantul va depozita umplutura rambleului in straturi cu o adancime uniforma care nu depaseste 200 mm grosime, si o va compacta prin astfel de metode şi prin folosirea unor utilaje adecvate dupa cum este necesar pentru realizarea gradului de compactare specificat. Daca Page 43 of 556

nu exista alte specificatii, necesitatile standard de compactare vor fi de 95% densitatea uscata maxima comform STAS 1913/13-83. Contractantul va uda, daca e necesar, materialul de umplutura inainte si in timpul compactarii pentru a ajuta la realizarea gradului de compactare specificat. 2.1.13 Amplasarea gropilor de imprumut Contractantul va determina amplasarea gropilor de imprumut de la santier sau alte zone, cu acordul scris al Şefului de Proiect. 2.1.14 Indepartarea surplusului de material Contractantul va transporta si indeparta tot materialul excavat care nu este necesar pentru lucrari. Amplasamentele propuse de Contractant pentru indepartarea sau depozitarea materialelor excavate, fie temporar sau permanent, vor fi supuse acordului Şefului de Proiect. 2.1.15 Roca si betonul masiv Inaintea inceperii excavatiei in roca, sau betonul masiv, Contractantul va demonstra Şefului de Proiect imposibilitatea sa de a excava fara scule cu percutie grea echipate cu sape percutante, pene hidraulice sau puscare. Materialele, inclusiv betonul masiv, nu vor fi clasificate ca roca decat daca Seful de Proiect este de acord cu aceasta clasificare inaintea excavatiei. Acordul Şefului de Proiect este supus rezervarilor in functie de suprafata rocii astfel clasificate, iar suprafata excavatiei de roca se va determina dupa examinarea mastilor excavate. Excavatiile unde s-a gasit roca si au fost clasificate ca atare, nu vor fi umplute inaintea examinarii zonelor excavate de catre Seful de Proiect pentru a ajuta la determinarea suprafetei excavatiei de roca. Exacavatia rocii se va face utilizand concasorul pneumatic/hidraulic greu si/sau echipamentul de taiere sau orice alt echipament aprobat de Seful de proiect. Nu va fi permisa excavarea rocii prin folosirea explozivilor.

2.1.16 Localizarea si ajutorul serviciilor si obstructionarile Inaintea excavarii, Contractantul va obtine permisiunea si acordul total al tuturor companiilor utilitare trimitând notificari de intentie pentru inceperea lucrarilor dupa cum poate fi necesar, conform cu intreaga legislatie si regulamente. Suplimentar, Contractantul va obtine toate informatiile disponibile de la aceste companii utilitare si altele dupa cum este necesar, facând referire la pozitia tuturor serviciilor cunoscute pe traseele tuturor conductelor care se vor amplasa. Contractantul va raspunde de localizarea exacta a serviciilor pe durata lucrarilor si va lua toate precautiunile necesare pentru a evita avarierea serviciilor. Unde este necesar serviciile vor fi sustinute provizoriu pe durata excavatiei. Comform instructiunilor Şefului de Proiect se va asigura sustinerea permanenta a serviciilor care traverseaza conductele. Daca serviciile sunt avariate pe parcursul Lucrarilor, atunci Contractantul va raspunde de contactarea autoritatilor responsabile si aranjarea reparatiilor serviciului respectiv. Contractantul va suporta toate cheltuielile de reparatii ale serviciului, fie prin asigurare, fie prin finantare proprie. Daca pe traseul unei conducte se intalneste un serviciu sau obstructionare, Contractantul il va informa imediat pe Seful de Proiect despre prezenta acestuia, si va prezenta detaliile, inclusiv tipul de serviciu, sau obstructiune, dimensiunile, adancimea de sub cota terenului. Seful de Proiect il va consilia asupra masurilor care trebuie luate.

Page 44 of 556

2.2 2.2.1

Betoane, cofraje si armaturi Generalitati

Betoanele vor fi produse, transportate şi evaluate conform normativelor şi standardelor româneşti corespunzãtoare din punct de vedere al calitãţii materialelor şi execuţiei. La execuţia lucrărilor se vor aplica prevederile normativului NE012/1-2007 şi NE012/2-2009

2.2.2

Cimentul

Cimentul destinat betoanelor s-au ales ţinând cont de clasele de expunere raportat la condiţiile de mediu ale betoanelor. Cimentul care se va folosi la lucrări va fi de clasă conform normativelor şi standardelor româneşti corespunzătoare ( NE 012/1-2007). Contractantul va efectua încercări pe ciment conform prevederilor normativului NE 012/1-2007 şi va asigura certificatul de încercare pentru fiecare doză de ciment primită de la betonieră. Controlul calităţii cimentului se va face: -

la aprovizionare, inclusiv prin verificarea certificatului de calitate/garanţie emis de producător sau de baza de livrare - înainte de utilizare, de către un laborator autorizat Normativele şi standardele româneşti sunt urmãtoarele: -

2.2.3

NE 012-1: 2007 –“ Cod de practică pentru executarea lucrărilor din beton, beton armat şi beton precomprimat. Partea 1: producerea betonului”; NE 012 – 2:2009 - Normativ pentru producerea betonului şi executarea lucrărilor de construcţii din beton, beton armat şi beton precomprimat. Partea 2: executarea lucrărilor. C56/85 –“Normativ pentru verificarea calităţii şi recepţia lucrărilor de construcţii şi instalaţii aferente”; C56/02 –“Normativ pentru verificarea calităţii şi recepţia lucrărilor de instalaţii aferente construcţiilor”; SR EN 206-1:2002 „Beton. Partea 1: Specificaţie, performanţă, producţie şi conformitate” cu amendamentele SR EN 206-1:2005/A1 şi SR EN 206-1:2006/A2 şi erata SR EN 206-1/C91:2008 SR 3011: 1996 Cimenturi cu căldură de hidratare limitată şi cu rezistenţă la agresivitatea apelor cu conţinut de sulfaţi SR 7055:1996 Ciment Portland alb STAS 10092-78 Ciment pentru drumuri şi piste de aeroporturi

Agregate

Agregatele vor fi obţinute dintr-o sursă autorizată şi vor respecta cerinţele normativului NE 012-1: 2007 si NE 012 – 2:2009 Pentru prepararea betoanelor cu densitate aparentă normală (2001-2500 kg/mc) se vor utiliza agregate naturale cu densitate normală (1201-2000 kg/mc) provenite din sfărîmarea naturală şi/sau concasarea rocilor, care să satisfacă cerinţele prevăzute în reglementările tehnice specifice, cu următoarele cerinţe suplimentare: -

agregatele să provină din roci stabile, nealterabile la aer sau apă şi negelive; nu se admite utilizarea de agregate provenite din roci feldspatice sau şistoase; - nisipul va fi de natură silicoasă şi va proveni din balastiere; nu se admite utilizarea nisipului de concasaj; - conţinutul în părţi levigabile a nisipului va fi de maxim 2% şi a pietrişului se limitează la maxim 0,5 %; - în amestecul total de agregate se vor utiliza trei sorturi de granulare (0÷3; 3÷7; 7÷31 mm); se interzice folosirea pietrişului cu granule mai mari decât cele indicate la pe mărci de betoane.

Page 45 of 556

Agregatele trebuie depozitate pe platforme betonate, având pante şi rigole de evacuare a apelor. Pentru depozitarea separată a diferitelor sorturi se vor crea compartimente cu înălţimi corespunzătoare evitării amestecării cu alte sorturi. Nu este admisă depozitarea direct pe pământ sau pe platforme balastate. Depozitele vor avea amenajate drumuri de acces care să evite antrenarea de noroi şi impurificarea agregatelor. Pentru controlul calităţii agregatelor se vor respecta prevederile normativului NE 012-1: 2007 si NE 012 – 2:2009, iar metodele de verificare sunt reglementate de SR EN 1097. Pe timpul derulării Contractului, la cererea Şefului de Proiect, Antreprenorul va furniza monstre de agregate şi va executa teste în conformitate cu standardele şi normativele relevante. Normativele şi standardele româneşti în vigoare sunt urmãtoarele: -

2.2.4

NE 012-1: 2007 –“ Cod de practică pentru executarea lucrărilor din beton, beton armat şi beton precomprimat. Partea 1: producerea betonului”; NE 012 – 2:2009 - Normativ pentru producerea betonului şi executarea lucrărilor de construcţii din beton, beton armat şi beton precomprimat. Partea 2: executarea lucrărilor. Normativ C 56 – 85 - Normativ pentru verificarea calitãţii şi recepţiei lucrãrilor de construcţii şi instalaţii STAS 1667-76 - Agregate naturale grele pentru betoane şi mortar cu aditivi minerali. STAS 4606-80 - Agregate naturale grele pentru mortar şi betoane cu aditivi minerali. Metode de încercare. STAS 662-89 - Lucrări de drumuri. Agregate naturale de balastieră. SR EN 1097-1: 1998 Încercări pentru determinarea caracteristicilor mecanice şi fizice ale agregatelor. Partea 1: Determinarea rezistenţei la uzură (micro-Deval) SR EN 1097-2: 1998 Încercări pentru determinarea caracteristicilor mecanice şi fizice ale agregatelor. Partea 2: Metode pentru determinarea rezistenţei la sfărâmare SR EN 1097-3: 2002 Încercări pentru determinarea caracteristicilor mecanice şi fizice ale agregatelor. Partea 3: Metode pentru determinare masei volumice în vrac şi a porozităţii intergranulare SR EN 1097-6: 2002 Încercări pentru determinarea caracteristicilor mecanice şi fizice ale agregatelor. Partea 6: Determinarea masei reale şi a coeficientului de absorbţie a apei SR EN 1992: 2006 Proiectarea structurilor de beton SR EN 933-1 :2002 Încercări pentru determinarea caracteristicilor geometrice ale agregatelor. Partea 1: Determinarea granulozităţii. Analiza granulometrică prin cernere

Apa

Apa folositã pentru fabricarea şi tratarea betonului poate fi o sursã de apã potabilã ( din reţeaua publicã de alimentare cu apã) sau din altã sursã admisã. Dacã se va utiliza altã sursã admisã, Contractantul va demonstra Şefului de Proiect cã aceste surse corespund prevederilor STAS 790 –84. Se interzice utilizarea apei minerale la prepararea betoanelor. Normativele şi standardele româneşti în vigoare sunt urmãtoarele: -

2.2.5

SR EN 1008: 2003 Apa de preparare pentru beton – Specificaţii pentru prelevare, încercare şi evaluare a aptitudinii de utilizare a apei, inclusiv a apelor recuperate din procese ale industriei de beton, ca apă de preparare pentru beton

Aditivi

Aditivii utilizaţi vor respecta cerinţele normativului NE 012-1: 2007 si NE 012 – 2:2009 Se vor utiliza obligatoriu următoarele tipuri de aditivi : Page 46 of 556

- aditivi întârzietori pentru betoane turnate pe timp călduros - aditivi antiîngheţ+accelerator de priză pentru betoane turnate pe timp friguros Este interzisă folosirea clorurii de calciu ca aditiv. Betoanele vor fi alcãtuite conform cerinţelor din Proiectul Tehnic. Nu se vor amesteca nici un fel de alte ingrediente impreunã cu betoanele fãrã acordul scris preliminar al şefului de proiect. Stabilirea compoziţiei betoanelor şi verificarea nivelelor de performanţă în cazul utilizării combinaţiilor de aditivi se va face pe baza studiului realizat de un laborator autorizat. Normativele şi standardele româneşti în vigoare sunt urmãtoarele: -

2.2.6

STAS 8573-78 - Aditiv impermeabilizator pentru mortare de ciment. STAS 8625-90 - Aditiv plastifiant mixt pentru betoane. SR EN 934-2:2003 Aditivi pentru beton, mortar si pasta. Partea 2: Aditivi pentru beton. Definiţii, condiţii, conformitate, marcare şi etichetare

Amestecuri de betoane

Pentru producerea, transportul, punerea în operă şi verificarea calităţii betonului, se vor respecta în totalitate prevederile normativului NE 012-1: 2007 SI NE 012 – 2:2009. Betoanele care se vor folosi la lucrãri sunt de clase diferite dupã cum se aratã în Planuri sau se indicã în Lista de Cantitãţi. Condiţiile de amestec pentru fiecare clasã de betoane care poate fi folositã sunt în conformitate cu prevederile normativului NE 012-1: 2007 SI NE 012 – 2:2009 Cu excepţia altor specificaţii, amestecul, ingrediente de beton, fabricarea, testarea şi calitatea execuţiei vor corespunde procedurilor normativelor şi standardelor româneşti corespunzãtoare. Modificãri ale proporţiilor la betoane se vor face pe durata contractului dacã, dupã pãrerea Şefului de Proiect, aceste modificãri sunt necesare. Contractantul nu va modifica nici proporţile amestecului, nici sursa de furnizare a ingredientelor fãrã sã fie obţinut în prealabil acordul Şefului de Proiect. Reţelele se vor stabili, corecta şi definitiva în funcţie de rezultatele încercărilor preliminare de laborator privind:

- umiditatea agregatelor; - granulozitatea sorturilor;

- densitatea aparentă a betonului proaspăt; - lucrabilitatea betonului. Compoziţia de beton adoptată va fi permanent corectată în privinţa cantităţii de apă, în funcţie de umiditatea agregatelor, astfel încât să se respecte raportul A/C specificat în planşele de armare. Lucrabilitatea betonului proaspăt va fi verificată atât la staţia de betoane, cât şi la locul de punere în operă.

2.2.7

Amestecuri de încercare şi testarea lucrãrilor

În vederea asigurării calităţii lucrărilor de beton şi beton armat este obligatorie efectuarea unui control operativ şi adoptarea unor măsuri conforme cu Normativul NE 012/1-2007. Contractantul va realiza amestecuri preliminare de încercare pentru fiecare clasã de beton în 3 zile diferite, folosind echipamentul, care clase vor fi folosite în cadrul lucrãrilor. Pentru fiecare clasã de betoane , se va pregãti minim 3 cilindri/cuburi de încercare din fiecare amestec de încercare care se vor testa la o vârstã de 7 zile, şi 3 cilindri/cuburi la o vârstã de 28 zile.

Contractantul nu va începe betonarea Lucrãrilor pânã ce rezultatele testelor pe amestecurile preliminare de încercare pentru fiecare clasã de betoane nu vor fi prezentate spre aprobare Şefului de Proiect. Contractantul, pe durata contractului, va furniza, întreţine şi opera aparatura necesarã, pentru pregãtirea mostrelor şi testarea betoanelor dupã cum se aratã mai jos şi pentru realizarea de mostre, pregãtirea şi Page 47 of 556

testarea cimentului, agregatelor şi apei conform normativelor sau standardelor româneşti respective. Similar acesta va furniza termometrele necesare pentru mãsurarea temperaturilor betoanelor, materialelor de betonare şi atmosferei. Contractantul va ţine evidenţa încercărilor pe betoane în formulare tip, conform NE 012-1: 2007 SI NE 012 – 2:2009 şi le va prezenta apoi Şefului de Proiect în 3 exemplare cât de curând e practic posibil dupã realizarea fiecãrei încercãri . Testele de sfãrâmare a cilindrilor/cuburilor de beton se vor efectua într-un laborator de încercãri admis de Seful de proiect. Contractantul va face toate aranjamentele necesare şi va asigura transportul şi forţa de muncã pentru transportarea cuburilor de beton la laboratorul desemnat. Se va asigura pe şantier un ţarc de protecţie a betonului în care se vor depozita cuburile care aşteaptã sã fie transportate la laborator.

Dacã încercãrile pe monstre aratã cã rezistenţa necesarã şi lucrabilitatea mostrelor sunt sub cerinţele Caietului de sarcini, atunci Contractantul îl va informa pe Seful de proiect, va investiga cauza eşecului şi va lua toate mãsurile necesare pentru redresarea situaţiei pentru satisfacerea Şefului de Proiect.

Standarde şi normativele româneşti în vigoare: -

2.2.8

NE 012-1: 2007 –“ Cod de practică pentru executarea lucrărilor din beton, beton armat şi beton precomprimat. Partea 1: producerea betonului”; NE 012 – 2:2009 - Normativ pentru producerea betonului şi executarea lucrărilor de construcţii din beton, beton armat şi beton precomprimat. Partea 2: executarea lucrărilor. Normativ C 56 – 85 - Normativ pentru verificarea calitãţii şi recepţiei lucrãrilor de construcţii şi instalaţii STAS 1667-76 - Agregate naturale grele pentru betoane şi mortar cu aditivi minerali. STAS 4606-80 - Agregate naturale grele pentru mortar şi betoane cu aditivi minerali. Metode de încercare. STAS 662-89 - Lucrări de drumuri. Agregate naturale de balastieră. SR EN 1097-1: 1998 Încercări pentru determinarea caracteristicilor mecanice şi fizice ale agregatelor. Partea 1: Determinarea rezistenţei la uzură (micro-Deval) SR EN 1097-2: 1998 Încercări pentru determinarea caracteristicilor mecanice şi fizice ale agregatelor. Partea 2: Metode pentru determinarea rezistenţei la sfărâmare SR EN 1097-3: 2002 Încercări pentru determinarea caracteristicilor mecanice şi fizice ale agregatelor. Partea 3: Metode pentru determinare masei volumice în vrac şi a porozităţii intergranulare SR EN 1097-6: 2002 Încercări pentru determinarea caracteristicilor mecanice şi fizice ale agregatelor. Partea 6: Determinarea masei reale şi a coeficientului de absorbţie a apei SR EN 1992: 2006 Proiectarea structurilor de beton SR EN 933-1 :2002 Încercări pentru determinarea caracteristicilor geometrice ale agregatelor. Partea 1: Determinarea granulozităţii. Analiza granulometrică prin cernere Normativ C 26- 85 - Normativ pentru încercarea betonului prin metode nedistructive.

Transport, turnare şi compactare

2.2.8.1 Date generale Transportul şi punerea în operă a betoanelor vor respecta prevederile normativului NE 012-1: 2007 SI NE 012 – 2:2009. Toate betoanele vor fi transportate de la betonierã şi turnate în cadrul lucrãrilor cât de repede este practic posibil prin metode care vor preveni segregarea sau pierderea oricãror ingrediente, şi vor menţine lucrabilitatea necesarã. Acestea vor fi depozitate cât de aproape este practic posibil de amplasamentul final şi se vor menţine curate toate echipamentele folosite la transportul betoanelor. Contractantul va trimite Şefului de Proiect o notificare preliminarã asupra intenţiei sale de începere a betonãrii.

Page 48 of 556

Betoanele vor fi compactate în totalitate în amplasamentul final prin metode mecanice sau manuale, conform NE 012-1: 2007 SI NE 012 – 2:2009.

2.2.8.2 Betoanele gata amestecate Se va permite folosirea betoanelor gata amestecate dacã sunt fabricate în staţii de betoane admise şi transportate pe şantier cu autocamioane aprobate. Timpul şi distanţa maximã de livrare de la staţia de betoane la şantier va fi respectatã cu stricteţe dupã cum se specificã în Normativul NE 012-1: 2007 SI NE 012 – 2:2009 . Betoanele care nu respectã aceste condiţii nu vor fi admise.

2.2.9

Betonarea sub apă

Dacă apa nu poate fi evacuată complet şi pe fundul gropii rămâne un strat de apă de cca. 10 – 15 cm grosime, se admite, în mod excepţional, turnarea betonului în apă. În acest caz betonarea se va începe de la un colţ al fundaţiei turnându-se un prim strat de beton care iese deasupra nivelului apei şi care se extinde treptat pe întreaga suprafaţă. Betonarea straturilor următore se va face în uscat.

2.2.10 Betonarea în condiţii nefavorabile 2.2.10.1 Condiţi de vreme rece Betonarea în condiţii de vreme rece sub 20 C poate fi realizatã numai dacã existã urmãtoarele condiţii: (i) agregatele şi apa folosite la amestec nu vor conţine zãpadã, gheaţã şi îngheţ ; (ii) înaintea turnãrii betonului,cofrajele, armãturile şi oricare suprafeţe cu care va intra în contact betonul proaspãt, nu vor conţine zãpadã, gheaţã şi îngheţ şi vor fi la o temperaturã mai mare de 20 C; (iii) temperatura iniţialã a betonului în momentul turnãrii va fi de cel puţin 50 C (iv) temperatura de la suprafaţa betonului se va mãsura acolo unde se aşteaptã temperatura cea mai joasã. Contractantul îşi va lua mãsuri de a preveni ca temperatura oricãrui tip de beton sã nu scadã la 00 C în timpul primelor 5 zile dupã turnare. 2.2.10.2 Vreme caldã Temperatura rezultantã a materialelor combinate din orice dozaj de beton în punctul şi la momentul livrãrii în cadrul Lucrãrilor nu va depãşi 6 0 C peste temperatura la umbrã când aceasta din urmã este peste 21 0C. Contractantul nu va permite nici unui tip de beton sã vinã în contact cu apa la o temperaturã mai mare de 600 C. Acolo unde temperatura betonului proaspãt poate depãşi 320C, nu va fi permisã betonarea, decât dacã se iau mãsuri pentru a menţine temperatura sub nivel. Standarde şi normative româneşti în vigoare: Normativul C 16 – 84 - Normativ pentru realizarea pe timp friguros a lucrărilor de construcţii şi a instalaţiilor aferente.

2.2.11 Protecţia/tratarea betonului Contractantul va proteja betonul pentru nu mai puţin de 7 zile. Protecţia se va realiza conform specificaţiilor din NE 012-1: 2007 SI NE 012 – 2:2009. Acoperirea suprafeţelor expuse ale betonului se va face cu materiale aprobate de Seful de proiect, materiale care vor fi în contact continuu cu betonul şi se vor menţine umed spre satisfacerea Sefului de Proiect. Pe timp ploios, betonul va fi protejat cu prelate sau folii de polietilenă.

Page 49 of 556

În cazul temperaturilor mai mici de +5o , betonul nu va mai fi stropit, şi se vor aplica materiale sau pelicole de protecţie, avizate de Şeful de Proiect.

2.2.12

Beton prefabricat

Toate materialele şi lucrabilitatea betonului prefabricat vor corespunde celorlalte condiţii aplicate din Caietul de Sarcini, decât dacă nu există alte specificaţii ale Şefului de Proiect. Toate lucrările preturnate vor fi turnate având lungimi adecvate pentru manipularea cu urechi sau cabluri de ridicare corespunzătoare, decât dacă nu există alte specificaţii.

- Cod de practică pentru executarea lucrărilor din beton, beton armat şi beton precomprimat; STAS 1799-88 - Construcţii de beton, beton armat şi beton precomprimat.Tipul şi frecvenţa verificării calităţii materialelor şi betoanelor destinate executării lucrărilor de construcţii din beton, beton armat şi beton precomprimat. STAS 3622- 86 - Betoane de ciment – clasificare. STAS 6657 / 1-89 - Elemente de beton, beton armat şi beton pretensionat. Condiţii tehnice generale de calitate STAS 6657 / 2- 89 - Elemente de beton, beton armat şi beton pretensionat. Reguli şi metode de verificare a calitãţii. NE 012/1-2007 –

STAS 6657/ 3- 89

- Elemente de beton, beton armat, beton pretensionat. Procedurile şi dispozitivele pentru verificarea caracteristicilor geometrice

STAS 7009-79

- Construcţii civile şi industriale. Toleranţe şi asamblarea în construcţii - Toleranţe geometrice. Terminologie

STAS 7384- 85 STAS 7721 – 76 STAS 10107 /0 –90

- Cofraj metalic pentru elemente de beton, beton armat şi beton pretensionat. Condiţii tehnice de calitate - Construcţii civile şi industriale. Calculul şi alcătuirea elementelor din beton, beton armat şi beton precomprimat.

Dacã nu existã pânã acum alte specificaţii, durata şi metodele de ridicare, depozitare şi transportare a unitãţilor sau secţiunilor prefabricate vor fi responsabilitatea contractantului şi vor fi aprobate de Seful de proiect, şi vor fi astfel încât unitãţile şi secţiunile preturnate sã fie protejate de şocuri puternice, nu vor fi avariate şi supuse la eforturi inadecvate. Se va ţine o evidenţã exactã a fiecãrui element de beton prefabricat care se va marca clar la specificaţia Şefului de Proiect. Sunt necesare certificate de încercare pentru elementele de beton prefabricat conform normativului sau standardului respectiv.

2.2.13

Construirea cofrajelor

2.2.13.1 Generalitati Cofrajele şi susţinerile vor respecta prevederile normativului NE 012-1: 2007 SI NE 012 – 2:2009, pct.11. Manipularea, transportul şi depozitarea cofrajelor se va face astfel încât să se evite deformarea şi degradarea lor.

Page 50 of 556

Este interzis depozitarea cofrajelor direct pe pământ sau depozitarea altor materiale pe stivele de panouri de cofraje. Se vor respecta deasemeni prevederile normativului C11-74 – „Instrucţiuni tehnice privind alcătuirea şi folosirea în construcţii a panourilor din placaj pentru cofraje”.

2.2.13.2 Materiale Se vor folosi cofraje din panouri refolosibile.Cofrajele se vor construi din lemn, metal sau plastic conform normativelor şi standardelor româneşti corespunzãtoare. Cofrajele de lemn vor fi de cherestea conform STAS 1949 – 86, Calitatea C sau placaj la lucrãrile exterioare conform STAS 7004 – 89, Tip A, Calitatea 1 din B sau 15 mm grosime, sau placaj pentru vagoane bune CF STAS 8841- 90. Suruburile cu cap îngopat pentru lemn vor corespunde STAS 1452 – 80 sau cuiele cu filet STAS 21 11- 90 , Tip B sau cuie din sârmã de oţel Tip D. Cofrajele metalice se vor realiza din oţel de construcţii, conform STAS 500 /1 – 89 şi 500 / 3 – 80. Dupã curãţire se va folosi urmãtoarea “ emulsie” SIN “: - parafinã 20 - 25% - sãpun 1,5 – 2% - apã 78,5 – 73% 2.2.13.3 Construcţia Cofrajele vor fi astfel alcătuite încăt să asigure realizarea formelor, dimensiunilor şi a suprafeţei perfect plane a elementelor conform părţii desenate din proiect. Se va urmări etanşeitatea şi rezistenţa panourilor de cofraj, astfel încât să nu permită pierderea laptelui de ciment şi să asigure preluarea încărcărilor ce apar în proiectul de execuţie şi menţinerea poziţiei corecte, formei şi dimensiunilor lucrãrii terminate. Alcătuirea cofrajelor trebuie să ţină seama şi de posibilitatea unei decofrări simple şi să permită preluarea treptată a încărcării de către elementele care se decofrează.. Cofrajele vor fi capabile de a realiza o calitate corespunzãtoare a suprafeţei finisate dupã cum se specificã ( calitate la îmbãtrânire). Acolo unde sunt necesare orificii în cofraje pentru acomodarea armãturilor de protecţie, se vor fixa dispozitive sau atele şi se vor lua mãsuri de prevedere pentru a preveni pierderea matricei de mortar. Cofrajele vor permite accesul pentru pregãtirea suprafeţelor de îmbinare înaintea întãririi betonului. Metoda de construire a cofrajelor va permite folosirea de suprafeţe pentru cofrajele noi care sã rãmânã pe loc pânã se realizeze condiţiile pentru spargerea cofrajelor.

2.2.14

Decofrarea

Decofrarea betoanelor va respecta prevederile normativului NE 012-1: 2007 SI NE 012 – 2:2009, pct.14. Cofrajele se vor scoate fãrã şocuri sau deranjarea betonului. Cofrajele la suprafeţele verticale nu vor fi scoase pânã când betonul nu a atins o rezistenţã de 2,5 N / mm2 dupã cum este confirmat de testele pe cuburi tratate în condiţii reprezentative. Cofrajele de la intradosurile de grinzi şi plãci şi suporţii grinzilor şi plãcile se vor scoate conform Normativului NE 012/99 şi STAS 1275 – 88. Contractantul va umple toate orificiile lãsate dupã scoaterea cofrajelor cu mortar de ciment. Contractantul va repara pe cheltuiala sa orice suprafaţe avariate supã scoaterea cofrajelor, spre satisfacerea Şefului de proiect. Standarde şi Normative româneşti în vigoare: NE 012/1-2007 –

- “Cod de practică pentru executarea lucrărilor din beton, Page 51 of 556

beton armat şi beton precomprimat”; Normativ C 162 – 73

- Normativ pentru alcătuirea, executarea şi folosirea frajelor metalice plane pentru pereţii din beton nolit la clădiri.

Normativ C 11 – 74

- Instrucţiuni tehnice privind alcătuirea şi folosirea în construcţii a panourilor din placaj pentru cofraje.

Normativul C 16 – 84

- Normativ pentru realizarea pe timp friguros a crărilor de construcţii şi a instalaţiilor aferente.

STAS 1949 –86

- Clasele de calitate la cherestea

STAS 7004 – 89

- Placaje pentru lucrãri exterioare

STAS 500 / 1- 89

- Oţel general pentru construcţii

STAS 500/ 2- 80

- Oţel general pentru construcţii. Marcaje

STAS 500 / 3-80

- Oţel general pentru construcţii rezistent la coroziune. Marcaje

STAS 2111- 90

- Cuie din sârmã de oţel

STAS 1452- 80

- Suruburi pentru lemn. Suruburi cu cap îngropat. Dimensiuni

2.2.15

Armãturi

2.2.15.1 Generalitati Armarea betonului va respecta prevederile normativului NE 012-1: 2007 SI NE 012 – 2:2009, pct.10. Pentru armarea elementelor din beton se utilizează bare laminate la cald din oţel beton rotund neted OB37 şi din beton cu profil periodic PC52, ce trebuie să îndeplinească condiţiile tehnice din STAS 438. Livrarea, depozitarea şi controlul calităţii armăturilor se vor realiza cu respectarea prevederilor normativului NE 012/99. Standarde şi Normative româneşti în vigoare:

STAS 438/ 1-89

Oţel beton laminat la cald.

STAS 438/ 2- 91

Sîrmă rotundă profilată.

STAS 438 / 3- 98

Plase sudate.

STAS 438 / 4- 98

Sîrmă cu profil periodic obţinută prin deformare plastică la rece.

Normativ C 28 - 83

Instrucţiuni tehnice pentru sudarea armãturilor de oţel beton.

Page 52 of 556

Normativ NE 012/99

Normativ pentru execuţia lucrãrilor de beton şi beton armat

Contractantul va furniza Şefului de Proiect certificate de la fabricant care sã demonstreze respectarea normativelor sau standardelor respective. Armãturile în momentul încorporãrii în lucrãri vor fi curate şi fãrã defecte, ulei sau unsoare şi neruginite. Armãturile de oţel vor fi depozitate la distanţã de sol şi sprijinite pentru a preveni deformarea.

2.2.15.2 Taierea şi îndoirea armãturilor Armãturile vor respecta strict Planurile şi Caietul de sarcini, sau indicaţiile Şefului de Proiect. Fasonarea barelor, confecţionarea şi montarea carcaselor de armătură se va face în strictă conformitate cu prevederile proiectului.Contractantul va calcula armãturile necesare, va pregãti planurile de lucru şi graficele de fasonare necesare pentru execuţia corectã a lucrãrilor. Graficele de fasonare a armãturilor vor fi întocmite de Contractant şi vor arãta dimensiunile , mãrimile , numerele şi greutãţile tuturor armãturilor folosi la Lucrãrile Permanente. Acestea vor fi supuse acordului Şefului de Proiect . Nu vor fi incluşi suporţi de oţel, etc. Armăturile care se fasonează trebuie să fie curate şi drepte. Eventualele impurităţi de pe suprafaţa barelor se vor îndepărta. Pentru a se evita erodarea oţelului se recomandă montarea şi betonarea armăturilor în maxim 15 zile de la fasonare. Barele de armare se vor tãia şi îndoi conform normativelor şi standardelor româneşti corespunzãtoare, şi la dimensiunile specifice în standardele de îndoire. Se interzice fasonarea armăturilor la temperaturi sub –100 C. barele cu profil periodic cu diametru mai mare de 25 mm se vor fasona la cald.

2.2.15.3 Fixarea armãturilor 2.2.15.3.1 Date generale Contractantul va amplasa şi fixa armãturile de oţel cu precizie pe poziţiile indicate în Planuri, şi se va asigura cã acestea rãmân rigide în aceste poziţii pe durata turnãrii betonului. La montarea armăturilor se vor lua măsuri pentru asigurarea menţinerii poziţiei prevăzute în proiect: -

crearea spaţiilor necesare care să permită pătrunderea liberă a betonului sau a furtunelor prin care se descarcă betonul; - crearea spaţiilor necesare pătrunderii vibratorului pentru compactare; - asigurarea acoperirii cu beton armăturii, prin folosirea distanţierilor. Contractantul nu va turna betonul pînă cînd armãturile nu vor fi inspectate şi aprobate de Seful de proiect.

2.2.15.3.2 Sârmã de oţel pentru legare Sârma de oţel pentru legarea armãturilor va corespunde normativelor şi standardelor româneşti corespunzãtoare, şi va avea diametrul de 3 – 4 mm.

Page 53 of 556

2.2.15.3.3 Acoperirea armãturilor Acoperirile de beton sunt prevăzute cele din Planşe. Se vor respecta acoperirile de beton prevăzute în STAS 10107/90 şi NE 012/99.

2.2.15.3.4 Înădirea armăturilor Sistemului de înădire va respecta prevederile proiectului, şi în cazul cînd nu este specificat se vor respecta prevederile STAS 10107/90. Se vor respecta specificaţiile prevăzute în Normativul NE 012/99. Utilizarea sistemelor de înădire prin dispozitive mecanice (manşoane metalo-termice, prin presare sau alte procedee) este admisă numai pe baza reglementărilor tehnice specifice sau agrementelor tehnice.

2.2.15.3.5 Înlocuirea armăturilor În cazul cînd nu se dispune de sortimentele şi diametrele prevăzute în proiect, se poate proceda la înlocuirea acestora numai cu avizul Şefului de proiect.

2.2.16

Rosturi

2.2.16.1 Rosturi de lucru Rosturile de lucru ale betoanelor vor respecta prevederile normativului NE 012/99, pct.13. Cu excepţia celor specificate în proiect, Contractantul va obţine acordul Şefului de Proiect pentru poziţiile şi detaliile tuturor rosturilor de lucru înaintea începerii oricãrei lucrãri, dacă nu sunt specificate în planuri. Rândurile de rosturi se vor dispune pentru a coincide oriunde este posibil cu caracteristicile lucrãrilor terminate. Betonarea se va realiza continuu pânã la rosturile de lucru. Armãturile vor fi continue prin rosturile de lucru. Betonarea nu va fi permisã sub o grosime mai micã de 50 mm. Rosturile verticale se vor cofra faţã de o placã de oprire care este fixatã corespunzãtor pentru a acomoda armãturile. Suprafaţa superioarã a fiecãrui strat de beton va fi dreaptã şi la nivel, cu excepţia altor suprafeţe menţionate în proiect. Acolo unde se foloseşte mortar , acesta va fi de cel puţin 70 mm înãlţime şi va fi încorporat în betonul anterior. Rosturile de lucru ale betoanelor se vor trata conform prevederilor normativului NE 012-1: 2007 SI NE 012 – 2:2009, pct.15. Suprafaţa oricãrui tip de beton peste care se va turna un nou beton se va curăţa de laptele de ciment, şi suprafaţa va fi buciardatã astfel încât agregatele mai mari sã fie expuse fãrã a fi deranjate. Suprafaţa rostului de lucru se va trata cu jet de apă şi aer înainte de betonare. Rosturile vor fi tratate înainte de întărirea betonului, după sfîrşitul prizei betonului.

2.2.16.2 Rosturi de deplasare Rosturile de deplasare se vor realiza aşa cum se aratã în Planuri, conform indicaţiilor Şefului de Proiect, şi propunerii Contractantului cu aprobarea Şefului de Proiect.

Page 54 of 556

Detaliile şi poziţia rosturilor de deplasare vor fi prezentate Şefului de Proiect spre aprobare înaintea efectuãrii oricãrei turnãri.

2.2.16.3 Umplutura rostului de deplasare. Umpluturile rosturilor de deplasare vor avea mãrimea şi poziţiile reprezentate în Planuri. Ele vor consta dintro placã de fibrã impregnată cu bitum sau polistiren conform BS 3837 sau un material similar aprobat de Şeful de proiect.

2.2.16.4 Elemente de etanşare pentru rosturi Elementele de etanşare pentru rosturi vor fi reprezentate în Planuri sau un alt tip care are aprobarea Şefului de Proiect. Elementele de etanşare se vor aplica conform instrucţiunilor şi normativelor fabricantului. Nu se va permite utilizarea bitumului ca element de etanşare cu excepţia rosturilor care sunt permanent sub apã.

2.2.16.5 Tole de etanşare Tolele de etanşare vor avea dimensiunile şi profilele respective în Planuri sau dupã cum indicã Seful de Proiect, şi se verificã în poziţie dupã cum se aratã în Planuri. Metodele de construire şi îmbinare a tolelor de etanşare vor fi aprobate de Şeful de Proiect. Toate rosturilor de lucru şi de mişcare care trebuie sã excludã apa sub presiune dintr-o parte, vor fi prevãzute cu tole de etanşare tip aprobate. Tolele de etanşare se vor obţine de la fabricanţi cu aprobarea Şefului de Proiect, şi se vor depozita , fixa şi îmbina conform instrucţiunilor de fabricaţie. Acestea vor fi fabricate ca unităţi, practic cele mai lungi, complete cu unghiuri şi rosturi în fabrica fabricantului şi vor fi continue în toată construcţia sub nivelul cel mai ridicat al apei, şi dupã cum se aratã în Planuri. Propunerile Contractantului pentru îmbinarea tolelor de etanşare vor fi aprobate de Şeful de Proiect. Rosturile de cauciuc vor fi vulcanizate. Tolele de etanşare vor fi menţinute cu atenţie în poziţia indicatã în Planuri şi vor fi protejate corespunzãtor împotriva avarierii şi efectele negative ale luminii şi cãldurii pe durata tuturor etapelor de construcţie. Betonul va fi compactat cu atenţie sub şi în jurul tolelor de etanşare astfel încât sã nu rãmânã cavitãţi.

2.2.16.6 Bare prevãzute cu ştifturi Vor fi prevãzute bare cu ştifturi prin rosturile de deplasare şi vor fi bare rotunde de oţel moale cu capete tãiate din cherestea conform STAS 438 / 1-89. La rosturile de dilataţii, partea barei care va fi liberã să se mişte, va fi încastratã într-un manşon metalic rigid şi echipat cu o camerã compresibilã cu unsoare sau alt materiale aprobat de Seful de proiect. Capãtul liber al barei cu ştifturi se va cãptuşi cu un compus de rupere cu îmbinare de bitum care este admis. Diametrul manşonului va fi minim necesar pentru a permite o mişcare liberã de alunecare a barei dupã betonare.

2.2.17

Finisaje de suprafeţe

2.2.17.1 Suprafeţe realizate fãrã cofraje Se intenţioneazã aplicarea a trei tipuri de finisaje de suprafaţã pentru suprafeţe realizate fãrã cofraje ( suprafeţe superioare la dale etc.)

Finisaj grosier Este necesar acolo unde, suprafeţele urmeazã sã primeascã un tratament suplimentar sau, nu au importanţã vizualã. Betonul se va nivela pentru a se realiza o suprafaţã uniformã simplã sau aplatizatã dupã cum este necesar. Suprafeţele nu vor mai fi prelucrate numai dacã alte tipuri de finisaje de suprafaţã sunt în stadiul primar.

Finisaj de lemn

Page 55 of 556

Este necesar acolo unde se solicitã un finisaj obişnuit, iar aspectul nu are o importanţã primordialã. Finisajul grosier va fi de lemn, la presiune micã pentru a elimina neregularitãţile.

Finisaj cu mistrie metalicã Este necesar acolo unde aspectul are importanţã. Unde a dispãrut stratul de umezealã şi betonul s-a întãrit suficient pentru a se preveni ca suprafaţa sa sã lucreze, suprafaţa finisajului de lemn va fi executatã folosind o mistrie metalicã sub o presiune fermã pentru a se realiza o suprafaţã netedã uniformã, fãrã urme de mistrie. Acolo unde nu este dat tipul finisajului de suprafaţã, acesta va fi finisat din lemn plutitor.

2.2.17.2 Suprafeţe realizate cu cofraje Se intenţioneazã aplicarea a trei tipuri de finisaje de suprafaţă pentru suprafeţele realizate cu cofraje ( grinzi, pereţi, coloane, etc).

Finisaj brut Este necesar pentru suprafeţe aproape de sol sau al cãror aspect nu are importanţã. Acest finisaj se va obţine prin folosirea mulajelor sau cofraje special proiectate, cu scânduri bine îmbinate. Suprafaţa nu va avea goluri importante, structurã de fagure sau alte defecte majore.

Finisajul îngrijit Este necesar pentru utilitatea şi stabilitatea structuralã şi fãrã importanţã vizualã, se va obţine din cofraje proiectate pentru a realiza o suprafaţã durã, netedã. Vor fi permise numai defecte foarte minore ale suprafeţei, dar nu pãtarea şi decolorarea lor. Orice protuberanţe vor fi îndepãrtate şi suprafaţa va fi îndreptatã.

Finisajul bine lucrat Este necesar pentru suprafeţele care vor reţine lichidele apoase şi alte suprafeţe de beton de bunã calitate. Este necesar pentru utilitatea suprafeţelor, stabilitatea structuralã şi aspectul vizual. Acest finisaj se va realiza efectuându-se mai întâi un finisaj îngrijit şi apoi umplerea tuturor suprafeţelor cu defecte cu ciment proaspãt special pregãtit şi pastã de agregate fine, în timp ce betonul este încã umed, dacã e posibil. Dupã ce betonul a fost tratat corespunzãtor, feţele se vor freca, dacã e necesar, pentru a se obţine o suprafaţã netedã şi regulatã. Dacã suprafaţa va fi expusã în cadrul lucrãrilor finale, se vor depune toate eforturile pentru ca betonul sã aibã o culoare corespunzãtoare. Acolo unde nu se dã tipul de finisaj de suprafaţã , acesta va fi finisaj bine lucrat.

2.2.18 Toleranţe Abaterile de la geometrie sunt cele prevăzute în normativele NE 012-1: 2007 SI NE 012 – 2:2009 anexa III.1 şi C56/2000. Nu se admit abateri de la calitatea betonului şi a tipului de oţel beton. Suprafeţele de beton din cadrul lucrãrilor finale nu vor avea nici un fel de neregularitate care sã fie observate cu ochiul liber. In scopul acoperirii necesare cu beton a armãturilor, celelalte abateri faţã de suprafeţele descrise în contract nu vor fi mai mari decât urmãtoarele mãrimi permise: Abaterea de la dimensiunea liniarã de nivel, verticalã, Tipul de finisaj

Page 56 of 556

transversalã ( mm) Finisaje grosiere sau brute Toate celelalte finisaje

sau

lungime

± 10 ±5

2.2.19 Verificari Se vor face verificările prevăzute în normativele NE 012/99 anexa VI.2, pe parcursul excuţiei, consemnându-se în documentele: Proces verbal al lucrărilor ascunse (PVLA) şi Proces verbal recepţie calitativă (PVRC), cât şi la recepţia finală a stadiului fizic. Verificarea etanşeităţii se va face conform prevederilor STAS 4165/81 Cap.3.

2.2.20 Controlul calitatii lucrarilor Controlul calităţii lucrărilor va respecta prevederile normativului NE 012-1: 2007 SI NE 012 – 2:2009, pct.17. Fazele procesului de execuţie a lucrărilor de beton şi beton armat constituie, în majoritate, lucrări care devin ascunse. Procesele verbale pentru verificarea lucrărilor ce devin ascunse se încheie între Beneficiar şi Contractor. Nu se admite trecerea la noua fază de execuţie înainte de închiderea procesului verbal referitor la faza anterioară. Verificarea calităţii lucrărilor se va face pe parcursul următoarelor operaţii: 1. executarea cofrajelor; 2. calitatea şi montarea armăturilor; 3. calitatea betonului livrat de staţia de betoane; 4. condiţiile de turnare şi compactare a betonului; 5. decofrarea elementelor. Eventualele remedieri ale elementelor se vor executa conform normativului C149/87 – „Instrucţiuni tehnice privind procedeele de remediere a defectelor pentru elementele de beton şi beton armat”.

2.3 2.3.1

Constructii metalice Date generale

Aceste prevederi se vor aplica daca sunt necesare proiecte de detaliu pentru lucrări din oţel, în ceea ce priveşte confecţionarea, verificarea şi încercarea, transportul pe şantier, descărcarea, depozitarea, montarea, încercarea după montaj şi punerea în funcţiune, toate aceste etape urmând a fi efectuate cu acordul Şefului de Proiect.

2.3.2

Standarde de materiale si calitatea executiei

Dacă nu există altă specificaţie, construcţiile din otel si alte metale vor corespunde urmatoarelor standarde:

STAS 333-87

Oţel laminat la cald. Oţel rotund.

STAS 334-88

Oţel laminat la cald. Oţel patrat.

STAS 395-88

Oţel laminat la cald. Oţel lat.

STAS 424-91

Oţel laminat la cald. Oţel cornier cu aripi egale.

STAS 425-80

Oţel laminat la cald. Oţel cornier cu aripi neegale.

STAS 500/1-89

Oţeluri de uz general pentru construcţii.

Page 57 of 556

Condiţii tehnice generale de calitate. STAS 500/2-80

Oţeluri de uz general pentru construcţii. Mărci.

STAS 500/3-80

Oţeluri de uz general pentru construcţii, rezistent la corodarea atmosferică. Mărci.

STAS 564-86

Oţel laminat la cald. Oţel U.

STAS 767/0-88

Construcţii civile, industriale şi agro-zootehnice. Construcţii metalice. Condiţii tehnice generale de calitate.

STAS 767/2-88

Construcţii civile, industriale şi agricole. Imbinări nituite şi îmbinări cu şuruburi la construcţii din oţel. Prescripţii de execuţie.

STAS 1125/1-91

Sudura metalelor. Electrozi înveliţi pentru sudura cu arc electric. Condiţii tehnice generale de calitate.

STAS 7084/2-82

Defecte ale rosturilor sudate sub presiune. Clasificare.

SR EN ISO

Defecte ale rosturilor sudate.

6520-1:1999

Fisuri. Clasificare.

STAS 7194-79

Sudabilitatea oţelurilor Elemente de bază.

STAS 10702/1-83

Protecţia contra coroziunii a construcţiilor din oţel supraterane. Acoperiri protectoare. Condiţii tehnice generale.

STAS 8796/1-80

Organe de ansamblare de înalta rezistenţă folosite cu pretensionare la îmbinarea structurilor din oţel. Şuruburi IP. Dimensiuni.

STAS E

Protecţia anticorozivă a construcţiilor din oţel supraterane.

10702/2-80

Acoperiri protectoare pt c-ţii situate în medii neagresive, slab agresive şi cu agresivitate medie.

C150-84

Codul practicii calitatii rosturilor de otel sudate ale constructiilor.

STAS 437-87

Tabla de otel Page 58 of 556

STAS 565-80

Otel laminat la cald. Otel profil I

STAS 6220 STAS 1338 Confecţionarea şi montajul pe şantier vor fi făcute conform cu aceleaşi standarde ca şi în condiţii uzinale.

2.3.3

Materiale

2.3.4

Otel

Daca nu se specifică în alt mod, pentru toate piesele din otel-beton, se va utiliza oţel marca OL37, protejat prin zincare. Se pot folosi cu acordul prealabil al Şefului de Proiect, oţeluri echivalente. Efortul limită de rupere la întindere nu va fi mai mic de 370 N/mm2 ,iar efortul de curgere nu va fi mai mic de 210 N/mm2.

2.3.5

Profile

Profilele metalice pot fi formate la rece sau laminate la cald.

2.3.6

Piuliţe, bolţuri şi electrozi de sudură

Dacă nu se specifică altfel, şuruburile şi piuliţele vor avea capete hexagonale, cu filet ISO metric conform STAS 6220 şi vor avea gradul 4.6 sau din OL 37 zincat. Şuruburile cu frecare de înaltă rezistenţă vor fi de gradul 8.8 sau 10.9 şi vor corespunde STAS 8796/1. Lungimea şuruburilor trebuie să fie suficientă pentru a permite ca piuliţa să fie complet înşurubată când este strînsă în poziţia finală. Acolo unde prinderea în şuruburi este incompatibilă cu materialul care se fixează, se vor folosi şaibe de izolare şi manşoane potrivite. Şaibele metalice vor corespunde STAS 1388. Toate şuruburile de ancoraj care se vor turna în beton nu vor fi mai mici de M16. Şuruburile pentru construcţiile din oţel nu vor fi mai mici de M12. Electrozii de sudură a oţelului-beton vor satisface prevederile STAS 7194-79. Vor fi de tipul cu hidrogen redus si vor corespunde cu prevederile STAS 1125/1-91.

2.3.7

Planuri le desenate si descrierea tehnologiei

Înainte să înceapă fabricarea, Contractantul va prezenta Şefului de Proiect spre aprobare calculele de proiectare, planşele desenate şi părţile scrise pentru lucrările din oţel sau din alte metale, ce urmează a fi furnizate în conformitate cu contractul. El va prezenta Şefului de Proiect spre aprobare şi descrierea detaliată a tehnologiei de fabricaţie pe care o va folosi. Contractantul va răspunde pentru corectitudinea detaliilor, pentru potrivirea pieselor la fabricare şi la montaj pe şantier.

2.3.8

Sudura

Sudura va fi electrică conform cu C151-84. Toate sudurile vor fi continue, dacă nu exista alte specificaţii. Caracteristicile cordonului de sudura vor fi corelate cu grosimea piesei celei mai subţiri din pachet. Toate muchiile vor fi sanfrenate corespunzător pentru sudură. Sudura se va efectua numai sub conducerea unui maistru experimentat si cu competenţa legală în domeniu. Vor fi folosiţi numai sudori autorizaţi pentru clasa de lucru corespunzătoare.Procedeele de sudare vor fi astfel alese încât eforturile reziduale să fie minime şi să se evite distorsionarea pieselor sudate.

Page 59 of 556

Toate sudurile se vor testa cu ultrasunete, pentru detectarea fisurilor, sau cu alte mijloace de control permise. Pentru toate confecţiile metalice, Contractantul va suporta costul verificării radiografice a sudurilor. Cordoanele ce se verifică şi poziţiile care se vor examina vor fi indicate de către Şeful de Proiect.

2.3.9

Indoirea

Nu este permisă îndreptarea sau aplatizarea pieselor prin îndoire sau prin utilizarea căldurii fără acordul Şefului de Proiect şi, dacă există acest acord, îndreptarea sau aplatizarea se va face conform specificaţiilor Şefului de Proiect.

2.3.10 Taierea Forfecarea sau decuparea sunt permise numai pentru tăierea fâşiilor şi plăcilor cu grosimea mai mică de 12 mm. Nu este permisă taierea manuală cu flacara. Neregularităţile rezultate din tăiere se vor îndepărta prin sudură sau polizare.

2.3.11 Găurirea Găurirea se va executa cu maşina de găurit (bormaşina), dacă nu există alte indicaţii ale Şefului de Proiect. Toate găurile pentru şuruburi vor fi mai mari cu 2 mm decât diametrul şurubului. Numai cu aprobarea Şefului de Proiect se pot folosi toleranţe mai mari. Toate găurile trebuie să nu aibă bavuri.

2.3.12 Îmbinările cu şurub Daca nu există alte specificaţii, suruburile vor fi din oţel moale, cu filet ISO metric. Piuliţele si şuruburile vor fi strânse sigur, pentru a preveni slăbirea din cauza vibraţiilor, îmbinările fiind prevazute cu şaibe elastice, contrapiuliţe de siguranţa, pene de siguranţă sau orice alte mijloace aprobate. Între piulite si piesele metalice trebuie să se folosească o şaibă normală. Dacă Şeful de Proiect consideră necesar, şaibele se pun atât sub piuliţă cât şi sub capul şurubului. Şuruburile, piuliţele şi şaibele din oţel inoxidabil se vor folosi pentru îmbinarea tuturor pieselor înlocuite sau din oţel inoxidabil. Contractantul va avea în folosinţa o cheie dinamometrica pe şantier pentru verificarea strângerii şuruburilor.

2.3.13 Protectia si vopsirea pieselor metalice 2.3.14 Generalitati Toate confecţiile metalice vor fi protejate conform STAS 10702/1-83 si STAS 10702/2-80, cu excepţia pieselor înglobate în beton. Contractantul va prezenta certificatele de calitate obţinute la achiziţionarea vopselei de la fabricanţii autorizaţi, care trebuie să confirme că vopseaua corespunde standardelor relevante, specificaţiilor tehnice din proiect, corespunzătoare climatului local şi compatibile suprafeţei de aplicare. Fabricantul şi tipurile de vopsea se pot schimba numai cu acordul prelabil al Şefului de Proiect. Inaintea vopsirii, suprafaţa se va curăţa de rugină, praful, grăsime şi alte materiale. Dacă nu există alte specificaţii, se vor aplica urmatoarele sisteme de acoperire de protectie:

2.3.15 Pentru otelul in contact cu apa: Un strat de grund epoxi, dublu îmbogăţit cu zinc, cu o peliculă uscată de 25 microni grosime. Doua rânduri a câte două straturi de vopsea epoxi, gudronata puternic, fiecare strat având o grosime minimă a peliculei uscate de 200 microni.Pentru toate celelalte cazuri se va folosi următorul sistem: -

Un strat de grund epoxi dublu îmbogăţit cu zinc cu o pelicula uscată de 25 microni grosime. Page 60 of 556

-

Unul sau două straturi de acoperire epoxi pigmentată cu oxid de fier cu mică, iar fiecare strat va avea o grosime minimă uscată de 150 microni. Doua straturi de email epoxi de o culoare care se va specifica, pelicula minimă uscată având grosimea în stare uscată de 50 microni

2.3.16 Montajul lucrărilor La cererea Şefului de Proiect, piesele din oţel şi alte confecţii metalice se vor ansambla provizoriu la locul de fabricaţie pentru a da posibilitatea de verificare Şefului de Proiect şi, dacă este cazul pentru încercare înainte de trimiterea pe şantier (livrare).

Page 61 of 556

Lucrări de conducte din PVC SI PP

2.4 2.4.1

Generalităţi

Tuburile de PVC si PP sunt fabricate utilizând tehnologia de turnare sub presiune, care este în continuă dezvoltare şi reprezintă o tehnologie de vârf în fabricaţia conductelor din materiale noi, neconveţionale. La fabricarea produselor PVC se prepară un amestec corespunzător, care, pe lângă pulberea PVC, conţine diferiţi adezivi şi materiale auxiliare necesare unei prelucrări optime (cunoscut fiind faptul că felul şi cantitatea aditivilor influenţează proprietăţile produsului).

2.4.2

Proprietăţile tuburilor şi pieselor de legătură din PVC

1. Densitatea……………………………………………………………1,38 – 1,53 g/cm˛; 2. Rezistenţa la înconvoiere…………………………………………….90 – 100 N/mm˛; 3. Coeficientul de dilatare lineară……………………………………..…0,08 mm/m°C; 4. Coeficientul de transmitere a căldurii…………………………………...0,15 W/m°K; 5. Modulul de elasticitate…………………………………………………~ 3000 N/mm˛; 6. Alungirea la rupere…………………………………………………………..10 – 60 %; 7. Rezistenţa la rupere …………………………………………………....45 – 55N/mm˛; 8. Duritatea de suprafaţă (metoda Brinell)…………………………………120 N/mm˛; Proprietăţile mecanice depind de viteza de deformare şi de temperatură. La viteză mică de deformare, (încărcare treptată), PVC-ul se comportă plastic, iar la viteză mare de deformare (încărcare cu şocuri) ca un material cu comportare elastică. În privinţa termodependenţei PVC-ului, se poate afirma ca acesta are o comportare plastică la temperaturi înalte şi elastică la temperaturi joase. Limita inferioară a temperaturii de utilizare este +1°C (sub această temperatură, PVC-ul dur este casant, devenind sensibil la solicitări mecanice, sub formă de lovituri). Limita superioară a temperaturii de utilizare este de 60 °C. Între 40°C şi 60°C caracteristicile mecanice scad. Peste 60°C poate fi solicitat 2 – 3 minute, iar peste 80°C, PVC-ul dur devine moale. Rezistenţa la intemperii: câteva luni produsele de PVC dur pot fi depozitate în aer liber, dar ferite de razele soarelui. Tuburile de PVC nu sunt atacate de bacterii sau de alte microorganisme şi nici de rozătoare. Acestea sunt rezistente faţă de săruri, acizi şi substanţe alcaline diluate, uleiuri, (vegetale, animale sau minerale) rezistenţa la agenţii chimici depinzând de temperatură.

2.4.3 1.

Caracteristicile tuburilor de canalizare şi pieselor de legătură din PVC Durata de viaţă:

În cazul unei utilizări optime, durata de viaţă proiectată, este de 50 ani. 2.

Greutatea:

Fiind de 20 de ori mai uşor decât betonul, se poate transporta şi manevra mai uşor. 3.

Montare rapidă:

Datorită greutăţii mici şi simplităţii îmbinării, se pot executa în timp scurt reţele de canalizare, fără a fi necesară o calificare superioară. 4.

Lungimi mari de montare:

Datorită greutăţii mici şi lungimii de 5-6 m, se pot finaliza foarte rapid tronsoane lungi de canalizare. Conductele de canalizare din tuburi PVC, realizează îmbinări perfect etanşe la infiltraţii din stratul freatic şi rezistente la pătrunderea rădăcinilor copacilor din zona respectivă.

Page 62 of 556

Tuburile de PVC au o foarte bună rezistenţă chimică la substanţele aflate în componenţa apelor uzate şi freatice. Datorită valorii foarte mici a rugozităţii pereţilor tuburilor de PVC, capacitatea de transport a acestor colectoare este mult mai mare şi depunerile de pe pereţii acestora sunt mult mai mici, comparativ cu tuburile de beton sau azbociment.

2.4.4

Tuburi şi piese de legătură, pentru canalizare, din PVC. Mod de prezentare şi domenii de utilizare

Tuburile de canalizare executate din PVC au rolul de a colecta şi evacua apele uzate menajere şi/sau pluviale. Gama de diametre pentru realizarea reţelei de canalizare, cu scurgere gravitaţionala sau sub presiune, (pres. max. 4 bar) este foarte mare, între Dn 100 mm – 500 mm. Tuburile din PVC, pentru canalizare, se fabrică cu următoarele lungimi: 1, 2, 3, 5 sau 6 m pentru diametre până la 500 mm. Sunt realizate cu mufă de turnare la un capăt, iar etanşarea lor se execută cu garnituri de cauciuc elastomeric (inele de etanşare profilate pentru Dn < 200 mm şi inele de etanşare şi fixare pentru Dn > 200 mm). Colectoarele de canalizare executate din tuburi de PVC, împreună cu garniturile de etanşare, au o rezistenţă foarte bună la acţiunea electrochimică a substanţelor aflate în apele uzate şi a celor din stratul freatic respectiv.

2.4.5

Prelucrarea tuburilor din PVC

2.4.6

Pilire pentru rectificare

Tuburile din PVC se pot prelucra bine cu scule atât manual cât şi mecanic. La prelucrarea manuală se poate folosi, cu bune rezultate, pila, în timpul operaţiei de pilire, impunându-se curăţarea suprafeţei conductei, de bavură. Operaţiile de pilire şi rectificare se pot executa cu maşina de rectificat, cu diametrul pietrei de 250 mm, cu turaţie de circa 300-400 rot/min, în condiţii asemănătoare prelucrării metalelor uşoare. Trebuie evitată apăsarea puternică a ţevii pe piatră.

2.4.7

Debitarea cu fierăstrăul

Tuburile din PVC se pot debita, atât manual - când se poate folosi fierăstrăul cu pânză pentru metale (bomfaierul) – pentru diametre mici - cât şi mecanic.

2.4.8

Deformarea la cald

Deformarea la cald este o tehnologie specială şi se bazează pe proprietatea PVC-ului, care, în urma solicitărilor mecanice la o temperatură mai mare decât cea de vitrificare, se deformează plastic, ireversibil. Cu această metodă se realizează lărgirea capetelor ţevilor si curbarea ţevilor drepte. Temperatura optimă pentru deformare la cald este între 130°C şi 140°C. Dacă temperatura de deformare este sub această valoare, sau neomogenă, iau naştere tensiuni în secţiunea ţevii, care o deteriorează în aceste zone. Se recomandă ca aceste operaţii să fie executate de firma producătoare sau să se preia tehnologia de execuţie cu prescripţiile corespunzătoare.

2.4.9

Lipirea

Cea mai bună metodă de îmbinare nedemontabilă a ţevilor PVC dur este lipirea. La montare ţevile PVC se asamblează împreună cu piesele de legătură fără lipire şi se marchează între ele, iar pe o axă paralelă cu axa conductei se vor marca lungimile de intrare. În acest fel se controlează lungimea de intrare a capătului ţevii şi zona de ungere cu soluţia de lipit. Înainte de asamblare, capătul ţevii se va tăia în unghi drept, se va curăţa de bavuri, iar muchiile se vor teşi la 45°. Se vor îndepărta impurităţile de pe suprafaţa exterioară a capătului ţevii şi se va degresa cu vată îmbibată în solvenţi organici uscaţi (dicloretan, toluen, etc). După evaporarea soluţiei de degresat, se va unge cu adeziv atât interiorul piesei de legătură cât şi capătul ţevii, ungerea făcându-se, cu pensula în direcţia axului, eliminându-se astfel pericolul formării de noduri (Se va folosi doar pensulă din păr

Page 63 of 556

natural şi coadă de lemn, pentru evitarea deteriorării acesteia în contact cu solventul organic din adeziv). Suprafeţele unse cu adeziv trebuie asamblate repede, înaintea evaporării solventului din soluţie. După ungere, cele două piese unse cu adeziv, se vor monta după semnele făcute înainte, prin introducere directă, fără rotire, până când se atinge umărul mufei şi se ţine în poziţie fixă, nemişcată câteva secunde. Apoi soluţia în exces, rămasă în exterior, se va şterge cu vată. Se va proceda cu atenţie sporită ca pe parcursul acestor operaţii, cele două suprafeţe care se asamblează să fie perfect uscate, deoarece umiditatea poate periclita perfecţiunea îmbinării. În funcţie de tipul adezivului folosit, indicat de furnizorul pieselor din PVC, îmbinarea, ajunsă la maturitate, poate fi supusă verificărilor vizuale, mecanice şi hidraulice. După terminarea operaţiilor de lipire la mai multe ansambluri, pensula folosită se va curăţa de adeziv cu vată şi solvent organic uscat.

Condiţii de executare a lipiturilor: 1. Lipirea conductelor din PVC la temperaturi sub 5°C este interzisă; 2. Operaţiile de lipire trebuiesc executate în atmosferă cu umiditate normală; 3. În adeziv nu trebuie să ajungă apă, deoarece, în aceste condiţii acesta se depreciază; 4. Este interzisă reducerea timpului de lipire prin încălzirea ansamblului; 5. Este interzisă ungerea cu un strat prea gros de adeziv, deoarece după îmbinare şi “uscare”, surplusul de adeziv rămas în interiorul ţevii, va micşora secţiunea ţevii şi va conduce la depunerea de sedimente în zona respectivă; 6. Cutiile cu adeziv se vor ţine deschise atâta timp cât se va lucra cu ele (cât mai scurt cu putinţă) pentru evitarea evaporării solventului, îngroşarea acestuia şi chiar deteriorarea calităţilor sale. 2.4.10 Transport şi depozitare În timpul transportului tuburile trebuie să se sprijine pe toată lungimea lor. Se interzice încărcarea lor folosind piese cu muchii ascuţite. În cazul depozitării tuburilor şi fitingurilor în aer liber, pe o perioadă mai mare de 2-3 luni, acestea se vor proteja contra razelor solare, prin acoperire. La depozitarea în vrac, înălţimea de aşezare în stivă nu va depăşi 1,5 m. La depozitarea tuburilor, trebuie asigurată aşezarea acestora pe toată lungimea lor. Ţevile din PVC sunt uşor inflamabile, (clasa C4) ard încet, dar se autosting. Se recomandă ca produsele să nu fie depozitate în apropierea substanţelor inflamabile sau care iau foc repede. Garniturile de etanşare, din cauciuc elastomeric, se vor depozita în locuri uscate şi ferite de lumina soarelui şi se vor proteja împotriva contactului cu substanţe chimice, precum uleiurile sau combustibilii. Produsele din PVC sunt livrate în ambalaj special de protecţie, recomandându-se depozitarea lor pe suprafeţe plane şi rigide. Manipularea conductelor din GRP se face cu multa atentie deoarece acest gen de material este foarte sensibil la socuri.

2.4.11 Trasare şi nivelment Stabilirea traseului reţelei de canalizare şi fixarea reperelor de nivelment a căminelor de trecere, camerelor de intersecţie, căminelor de rupere de pantă, căminelor de racord, căminelor de spălare şi căminelor de control a apelor, se va efectua împreună cu inspectorul de şantier, din partea beneficiarului şi cu responsabilul cu calitatea, din partea executantului. Operaţia de trasare se va executa în următoarea ordine: 1) Se pichetează axul canalului; 2) Se execută nivelmentul de precizie în raport cu reperele topografice permanente (capace cămine, construcţii, etc.)

Page 64 of 556

3) Se montează o riglă de nivelment (scândură), deasupra fiecărui cămin fixată prin doi stâlpi bătuţi în pământ, verificându-se din când în când respectarea cotelor de nivel fixare. După montarea riglelor, se fixează pe acestea axul canalului, printr-un cui bătut în ele. În cazul în care săpătura tranşeelor se face cu utilaje, fixarea riglelor se face după terminarea lucrărilor mecanizate, dar înaintea începerii finisajului săpăturii, care se va executa manual. Tot în cadrul operaţiunii de trasare se va materializa - prin ţăruşi - şi poziţia intersecţiilor canalului care se execută, cu alte reţele existente sau noi, din zonă. Pentru identificarea traseelor exacte ale reţelelor existente, se vor executa sondaje în prezenţa deţinătorilor de reţele, conform avizelor. În timpul executării căptuşirii canalului se vor respecta întocmai - de către antreprenor - condiţiile prevăzute în avizele deţinătorilor de reţele, din zona lucrărilor, pentru a se evita deteriorarea acestora sau producerea de accidente.

Page 65 of 556

2.5 2.5.1

Lucrari de conducte PEID Generalităţi

Prezentul caiet de sarcini este întocmit pe baza standardelor, prescripţiilor, prevederilor şi normativelor în vigoare şi conţine proceduri minime pentru execuţia, montarea, repararea şi verificarea conductelor de distribuţie. În sensul prezentelor prevederi, prin termenul de conductă (linie) se înţelege ansamblul format din elemente componente: ţevi, fitinguri (coturi, teuri, reducţii, capace), flanşe, armături ( inclusiv cişmele, hidranti), aparate de măsură şi control (montate pe conductă). Conducta serveşte la transportul apei între două echipamente, între un echipament şi o conductă, între două conducte. Astfel, aceasta poate avea două extremităţi şi este limitată la capete de către o altă conducta sau un echipament.

2.5.2

Domeniul de aplicare

Prezentele proceduri se aplică tuturor conductelor de transport al apei netratate de la sursa de captare până la gospodăria de apă, precum şi reţelei de distribuţie a apei potabile.

Nu fac obiectul prezentelor prevederi: conductele aferente instalaţiilor de la captarea sursei de apă, staţiilor de pompare sau clorare; conductele care intră în componenţa echipamentelor; conductele aferente aparaturii de măsură şi control, care servesc la transmiterea impulsurilor. conductele aferente instalaţiilor sanitare şi de canalizare

2.5.3

Consideratii generale

Cerinţa de bază pe care trebuie să o satisfacă proiectarea, execuţia, montarea, exploatarea, repararea şi verificarea conductelor sub presiune este asigurarea funcţionării acestora în condiţii de siguranţă.

Execuţia lucrărilor va fi facută numai cu mijloace tehnice corespunzătoare de execuţie, montaj şi verificare, cu procedee tehnologice şi cu o calitate a produselor în conformitate cu prevederile proiectului de execuţie şi a prevederilor legale în vigoare.

Deţinătorul instalaţiei răspunde de exploatarea, întreţinerea şi repararea conductelor în conformitate cu cerinţele SR 4163-3 şi ale prezentului proiect de execuţie.

În cazul unor abateri de la prevederile prezentelor instrucţiuni, firma de proiectare, sau firma de execuţie sau reparatoare, cu avizul prealabil al proiectantului, vor putea stabili soluţii compensatoare, motivate corespunzător din punct de vedere tehnic, care să nu afecteze siguranţa în funcţionare aconductelor sub presiune. Părţile care au stabilit aceste soluţii le vor supune avizării principalilor factori interesaţi (proiectant, executant, montor sau reparator, deţinătorul instalaţiei ).

Problemele nereglementate prin prezentele instrucţiuni se vor rezolva prin proiectare, conform legislatiei si normativelor in vigoare.

Page 66 of 556

Prezentele instrucţiuni reprezintă condiţii minimale şi completează SR 4163-1,3, precum şi „Normativul pentru proiectarea şi executarea conductelor de aducţiune şi a reţelelor de alimentare cu apă şi canalizare ale localităţilor” I 22 – 99.

La aplicarea prezentelor instrucţiuni se vor avea în vedere prevederile normativelor republicane şi profesionale (departamentale) de securitate şi igienă a muncii.

2.5.4

Materiale şi produse

Materialele şi produsele folosite pentru execuţia sau repararea conductelor şi elementelor de conductă trebuie să fie alese conform normelor tehnice în vigoare, să corespundă condiţiilor tehnice de recepţie şi marcare prevăzute în standardele române, în normele de fabricaţie, precum şi proiectului de execuţie .

Materialele şi produsele trebuie să fie însoţite de certificate de calitate conform standardelor române şi/sau de firmă, precum şi prevederilor proiectelor de execuţie. În cazul în care certificatele de calitate existente nu conţin toate datele prevăzute în standardul sau norma de produs, sau aceste certificate lipsesc, deţinătorul instalaţiei poate proceda la completarea lor, pe baza verificărilor şi încercărilor efectuate de unităţI autorizate.

Este interzisă utilizarea materialelor pentru care nu există certificate de calitate. Utilizarea altor materiale, în afara celor specificate în proiect, se va face numai cu avizul proiectantului, care va stabili şi condiţiile de acceptare . Dacă în proiect nu se specifică altfel, certificatele de calitate sunt emise şi semnate de către producător.

Conductele de polietilenă vor fi în general pentru Pn 6, clasa PE 80, putînd fi utilizate pentru apa netratată şi tratată, respectiv apă potabilă. Conductele Pn 10 se vor utiliza în cazurile necesare. Vanele, hidranţii, cişmelele şi fitingurile din alte materiale (fontă, oţel, etc), vor fi utilizate în concordanţă cu conductele şi fitingurile de polietilenă. Toate aceste vane şi fitinguri vor fi compatibile între ele ca mărime şi ca metode de îmbinare cu conductele şi fitingurile de polipropilenă.

Cumpărătorul poate asista la verificările şi încercările la care sunt supuse materialele şi produsele conform documentaţiei de fabricaţie. Atunci când se constată că materialele şi produsele livrate nu corespund specificaţiilor de comandă, acestea nu vor fi utilizate şi se vor înlocui în conformitate cu legislaţia de contractare în vigoare. Componentele de conducte (ţevi, fitinguri, armaturi, etc) vor fi în conformitate cu cerinţele proiectului. Procurarea lor se va face corespunzător specificaţiilor tehnice.

Materialele procurate din import vor fi în conformitate cu standardele străine respective şi vor satisface cel puţin cerinţele enunţate mai sus. Procurarea acestora se va face pe baza unui agrement tehnic.

Page 67 of 556

2.5.5

Prescripţii privind transportul, manipularea şi depozitarea componentelor de conductă

Elementele componente ale conductelor se protejează împotriva deteriorărilor ce pot apărea în timpul transportului, depozitării şi manipulării. Se va avea în vedere că polietilena este expusă deteriorărilor prin zgâriere fiind foarte sensibila la contactul cu obiecte ascuţite. În acest sens se vor lua măsuri corespunzătoare, având în vedere că se acceptă adâncimi de zgârieturi pâna la 10% din grosimea peretelui de ţeavă. La încărcarea sau descărcarea din mijloacele de transport se vor folosi numai dispozitive de manevră adecvate. Transportul, manipularea şi depozitarea vor fi în conformitate şi cu recomandările furnizorilor de materiale.

2.5.6

Transport

Materialele neambalate se vor transporta în vehicule amenajate, cu platformele de aşezare plate, curate, fără obiecte tăioase sau ascuţite care pot produce deteriorări.

Se are în vedere ca în timpul transportului ţevile să fie ferite de orice sursă de căldură sau emanaţii de gaze. Tuburile din polietilenă de dimensiuni mai mari de 110mm, livrate în bare drepte, se transportă în poziţie orizontală, asigurate în pachete înrămate în cherestea. Ţevile de dimensiuni mici sunt livrate în colaci sau pe tambur şi se transportă atât în poziţie orizontală, cât şi verticală, asigurate împotriva oricăror pericole de deteriorare, inclusiv de răsturnări, loviri, etc. Fitingurile, armăturile, precum şi alte materiale mărunte se vor transporta în ambalajele originale, cu respectarea tuturor măsurilor de protecţie anterior enunţate. În cazul transporturilor locale între depozitele de pe şantier sau către locul de muncă, conductele trebuie să fie transportate şi mânuite cu grijă şi atenţie, folosind mijloace de transport adecvate.

2.5.7

Manipulare

La manipularea ţevilor şi pieselor din polietilenă se vor utiliza mijloace şi echipamente corespunzătoare, fără lanţuri sau cârlige metalice. Se recomandă folosirea benzilor late, nemetalice, sau a frânghiilor. Pachetele de ţevi de dimensiuni mari se vor manipula cu motostivuitoare, corespunzător dotate. Se interzice târârea sau rostogolirea tuburilor din polietilenă.

2.5.8

Depozitarea în vrac

Depozitarea materialelor din polietilenă în depozitele principale sau zonale se va face în conformitate cu recomandările producătorilor. Materialele care prezintă defecte sau deteriorări trebuie depozitate separat de celelalte materiale. Defectele de acest gen trebuie raportate furnizorului. Depozitarea se va face corespunzător, ţinându-se seama de pericolul deteriorării (deformări ale secţiunii transversale, ovalizări), precum şi de influenţa variaţiilor de temperatură sau a acţiunii directe a radiaţiilor solare.

Depozitarea se face ţinându-se seamă de dimensiuni şi tip de material, precum şi de durata depozitării, Se va asigura accesul la materiale în ordinea achiziţionării acestora, pentru a evita perioade mari de staţionare şi degradare în timp prin fenomenul de “îmbătrânire”. Tuburile trebuie depozitate în zone stabile şi plate, lasându-se căi de acces pentru scoaterea materialului.

Page 68 of 556

Ţevile livrate în colaci se depozitează corespunzător evitării oricăror deformări, iar pentru a se evita contactul cu solul, se vor utiliza bârne din lemn pentru a crea un pat de aşezare. Polietilena de culoare albastră se va depozita acoperită, protejată de radiaţiile solare. Tuburile albastre de polietilenă au o perioadă de expunere la mediul extern, de până la 12 luni, dar trebuie totuşi acoperite cu folii opace. Tuburile negre de polietilenă pot fi depozitate în aer liber. Fitingurile se vor depozita în spaţii acoperite, în ambalajele cu care au fost livrate. Materialele din polietilena se depozitează în spaţii ferite de acţiunea surselor de căldură, solvenţilor, produselor petroliere sau a oricăror agenţi chimici. Stivele de legături nu trebuie să depăşească o înălţime de 3m. Colacii de conducte pot fi depozitaţi pe orizotală, şi înclinaţi dacă sunt bine sprijiniţi. Conductele libere pot fi depozitate şi sub forma de piramide cu înălţimi de până la 1m. Rafturi cu puncte adecvate de sprijin, pot fi utilizate pentru depozitarea conductelor. Conductele şi fitingurile trebuie să fie depozitate departe de: • surse de căldură • uleiuri hidraulice sau lubrefianţi • benzină • solvenţi • alte chimicale cu reacţie agresivă

2.5.9

Depozitarea pe şantier

Pe şantierele locale, conductele şi fitingurile trebuie să fie depozitate într-o manieră care să asigure păstrarea acestora fără a le deteriora şi să fie accesibile livrări lesnicioase la locul de muncă.

2.5.10 Execuţia reţelei de distribuţie Reţeaua trebuie realizată în conformitate cu prevederilor proiectului, a normelor de protecţie şi igienă a muncii, precum şi a condiţiilor de teren. Deoarece tuburile de polietilenă au mare flexibilitate, pozarea conductelor prezintă o deosebită importanţă, în sensul ca aceasta să fie efectuată corespunzător pentru asigurarea repartiţiei uniforme a eforturilor, stabilităţii conductelor şi reducerii la minim a riscurilor de deteriorare. Calitatea materialului şi a operaţiunilor angajate în pregătirea şanţurilor, executarea patului şi compactarea trebuie să fie corespunzătoare, astfel încât deformarea conductelor să fie limitată. Se vor avea în vedere condiţiile locale (stabilitatea terenului, caracteristicile solului şi cele ale apelor subterane, eventuale reţele subterane amplasate în zonă, etc.); natura şi destinaţia terenului; eventuale traversări de ape; etc. Conductele pot fi instalate în şanţuri excavate sau în sistem “fără săpătură”, cum ar fi cazul forării orizontale şi al tragerii conductelor. În cazul şanţurilor excavate, conductele se montează în linie, prin îmbinarea colacilor, a barelor şi fitingurilor în afara şanţurilor,urmată de coborârea acestora în şanţ. Toate operaţiile trebuie controlate şi executate într-o manieră care să confere siguranţa şi care să prevină riscul rănirii persoanelor sau afectării proprietăţii.

Majoritatea operaţiilor de instalare a conductei se desfaşoară în imediata vecinătate a drumurilor publice, drept pentru care trebuie luate toate măsurile necesare de dirijare a traficului şi de protecţie a sanţurilor.

Page 69 of 556

2.5.11 Trasarea Trasarea pe teren a reţelei subterane de distribuţie a apei se va face în conformitate cu STAS 9821/5. Pentru trasarea configuraţiei reţelei se vor respecta planurile de conducte cu coordonatele punctelor caracteristice.

Pentru pozarea conductelor în şanţuri înguste, trasarea este deosebit de importantă şi este prevăzută în cadrul lucrărilor ce fac parte din programul controlului calităţii.

2.5.12 Excavare în şanţuri Şanţurile vor fi executate cu ajutorul maşinilor de excavat, excavatoarelor mecanice sau manuale în funcţie de locaţie şi de resursele disponibile ale firmei executante. În principal se va adopta metoda şanţurilor înguste. Pentru pozarea în şanţuri înguste, lăţimea şanţului va fi egală cu diametrul exterior al ţevii la care se adaugă 100 mm, dar nu mai puţin de 300 mm. În acest caz, toate operaţiile pregătitoare se vor desfăşura la sol. Şanţurile trebuie săpate până la nivelul cerut prin proiect, astfel încât să se respecte acoperirea minimă a conductei la îngheţ. Materialul excavat trebuie să fie depozitat de-a lungul traseului conductelor şi să se folosească, unde este posibil, pentru lucrări de umplutură. Este esenţială pozarea conductelor pe suport neted şi continuu. În terenuri adecvate, acest lucru se obţine prin finisarea manuală a fundului de şanţ, îndepărtarea oricăror puncte proeminente şi înlocuirea lor cu material de umplutură de granulaţie fină. Când această egalizare nu poate fi executată cu uşurinţă, denivelările mici pot fi depasite prin amplasare şi compactare cu material de pe şantier selectat sau cu material cu granulaţie fină, într-un strat cu o grosime de cel puţin 50mm. Materialul care înconjoară conducta formează de fapt elementul de fundare în cazul lucrărilor de refacere, drept pentru care trebuie să ofere un suport adecvat în cazul restaurării şi să fie capabil să transmită încărcarea impusă către stratul de sub conductă sau celelalte dispozitive. Materialele adecvate pentru realizarea patului şi pentru umplutură includ nisip de drenaj, pietriş şi sol de natură friabilă. Granulaţia nu trebuie să depaşească 10mm la patul conductei. Prezenta ocazionala a unor particole cuprinse între 20 si 40mm este acceptata în procente foarte mici pentru zona de umplutură. În cazul în care exista si particole peste 40mm, materialul trebuie refuzat. Nu se vor folosi drept suport temporar pentru conducte bucăţi de cărămida sau alt material dur.

2.5.13 Tehnologia de instalare “fără săpătură” a conductelor Tehnologia de pozare “fără săpătură” a conductelor se utilizează în situaţiile în care metodele tradiţionale de excavare nu sunt adecvate, în primul rând pentru subtraversări de râuri, căi ferate şi drumuri principale, precum şi în alte locuri unde prezenţa unor galerii subterane sau a altor obstacole face imposibilă instalarea conductelor prin metoda tradiţională, cu execuţia de sanţuri. Operaţia de pozare “fără săpătură” a conductelor va fi executată de firme specializate, dotate cu utilaje adecvate. Toate lucrările de acest fel vor fi executate în conformitate cu standardele şi normele româneşti în vigoare.

În general, se vor utiliza utilaje de forare pentru execuţia de galerii, lărgirea lor şi montarea apoi a segmentului de conductă. Conducta va fi apoi îmbinată cu restul conductei pozate în tranşee deschise. 2.5.14 Îmbinarea conductelor Conductele se îmbină prin următoarele procedee: •

sudură cap la cap, Page 70 of 556

• electrofuziune • îmbinare mecanică Cel mai economic mod de a valorifica avantajele tehnice pe care le prezintă un sistem integrat din PE, capabil să preia sarcini de capăt, constă în electrofuziunea conductelor. Sudura cap-la-cap este probabil cea mai frecvent utilizată metodă, deşi electrofuziunea ar putea fi preferată în cazurile în care sudarea cap la cap nu poate fi aplicată, de pildă din cauza lipsei de spaţiu. Îmbinarea conductelor prin fuziune se execută de personal calificat, cu echipamente adecvate şi prin metoda corespunzătoare materialelor de asamblat. Procedurile corecte de asamblare a elementelor realizate din materiale diferite şi având grosimi diferite ale pereţilor sunt indicate în Figura 1 de mai jos.

CORECT

Elemente din materiale diferite şi având grosimi diferite ale pereţilor pot fi asamblate

CORECT

Numai elemente din materiale similare şi cu pereţi de aceeaşi grosime pot fi asamblate prin

prin intermediul armăturilor fixate prin

sudarea cap la cap

electrofuziune

GRESIT

GRESIT

Nu este permisă asamblarea elementelor

Nu este permisă asamblarea elementelor

cu grosimi diferite ale pereţilor prin sudură cap la cap

din materiale diferite prin sudură cap la cap

Fig. 1. Asamblarea prin sudură

2.5.15 Sudarea cap la cap Sudarea cap la cap se va aplica doar pentru asamblarea elementelor din materiale similare şi având grosimi ale pereţilor asemănatoare. Conductele şi armăturile pot fi asamblate prin sudarea cap la cap, utilizându-se o placă încălzită electric. La aceasta tehnologie este esenţială capacitatea de verificare independentă a temperaturii la suprafaţă. Sudarea cap la cap este adecvată pentru asamblarea tuburilor şi armăturilor cu diametre mai mari de 63 mm. Totuşi, numai conductele şi armăturile având acelaşi diametru, SDR şi realizate din acelasi tip de polietilenă pot fi asamblate prin această metodă.

Tuburile cu grosimea peretelui mai mică de 20 mm pot fi asamblate prin sudare cap la cap, utilizând echipamente manuale cu funcţionare într-un singur ciclu, sau complet automatizate, cu ciclu dublu de funcţionare. Page 71 of 556

Tuburile cu grosimea peretelui de 20 mm sau mai mare TREBUIE asamblate numai cu ajutorul tehnologiei de sudare cap la cap, prin intermediul echipamentelor cu ciclu dublu de funcţionare.

Procedeul de îmbinare cap la cap prin presiune

Pentru asamblarea cap la cap a elementelor din PE100 si PE 80 se vor respecta instrucţiunile producătorului echipamentelor de sudură. Mai jos sunt enunţate etapele procedurii general-valabile de sudare cap la cap prin presare (manuală); aceste prescripţii nu au decât caracter orientativ.

Etapa

1. Se verifică dacă echipamentul este complet, curat, fără defecţiuni şi în stare de funcţionare.

2. Prima sudură va fi una de încercare. Pentru diametre mai mari de 180 mm se execută două suduri de încercare. Astfel se asigură faptul ca placa de încălzire este curată. 3. Se verifică dacă tuburile (sau tubul şi armătura) ce urmează să fie asamblate au acelaşi diametru interior, presiune de calcul şi sunt realizate din acelaşi material. 4. Se curăţă tuburile (sau tubul şi armătura care urmeză să fie asamblate)

Colier de

Dispozitiv de

Colier de

fixare

taiere

fixare

5. Se separă complet colierele de fixare şi se pozitioneză echipamentul de tăiere. 6. Se poziţionează tuburile (sau tubul şi armătura) chiar în dreptul lamei echipamentului de tăiere şi se strâng colierele de fixare.

Conducta

Lama de taiere

Conducta

7. Se pune în funcţiune echipamentul de tăiere şi se presează capetele tuburilor (sau ale tubului şi armăturii) contra lamei dispozitivului, până ce extruziunea începe Colier de Colier de să se detaşeze continuu din ambele componente de asamblat. Conducta fixare fixare 8. Se continuă tăierea, pe măsură ce tuburile (sau tubul şi armătura) se separă. Se opreste echipamentul de tăiere şi se îndepărtează, după ce lamele de tăiere s-au oprit. 9. Se îndepărtează bavurile. Nu se ating capetele tuburilor (sau ale tuburii şi armăturii). Se verifică dacă diferentele sunt în limite acceptabile.

Page 72 of 556

Capetele sunt in contact

Conducta

10. Se aduc în contact capetele tuburilor (sau ale tuburii şi armăturii) şi se verifică dacă între ele nu este un interstitiu vizibil. Piesele se reajustează, dacă este necesar. Se verifică dacă diferentele sunt în limite acceptabile. 11. Se verifică nivelul combustibilului în generatorul electric. 12. Se pune în functiune generatorul şi se asteaptă ca placa de încălzire să ajungă la temperatura de operare. Colier de

Placa de

Colier de

fixare

incalzire

fixare

13. Se selectează regimul adecvat de creştere a presiunii de sudare. Se presează tuburile sau tubul şi armătura contra plăcii de încălzire, utilizand acest nivel de presiune. 14. Se verifică dimensiunea initială a bordurii de sudat. 15. După bordurarea initială, presiunea din sistem trebuie adusă la nivelul corespunzător termofuziunii. Capetele tuburilor (sau ale tuburii şi armăturii) trebuie să rămână în contact cu placa de încălzire pe o durată corespunzătoare timpului de termofuziune.

16. Se deschid colierele, se îndepărtează placa de încălzire şi se verifică dacă pe ea a rămas material topit. Dacă se constată existenta acestuia, nu se efectuează îmbinarea. 17. Dacă placa de încălzire este curată, cele doua capete se aduc imediat în contact, timp de 10 secunde, printro miscare lină. Materialul topit trebuie să se ruleze în mod uniform înapoi, fată de linia de contact.

Colier de

Colier de

fixare

fixare

18. Se lasă îmbinarea să se răcească pe durata specificată, mentinand-o în tot acest timp la presiunea de răcire. 19. După răcire (temperatura sudurii trebuie să fie mai mică de 40°C), se desfac colierele. 20. Se scot din coliere tuburile asamblate. 21. Se verifică îmbinarea. 22. Dacă este necesar, după răcire se îndepărtează materialul în exces. 23. Se îndepărtează orice impuritate de pe fetele de încălzire.

2.5.16 Îmbinarea prin electrofuziune Fitingurile pentru electrofuziune sunt prevăzute cu manşoane ce conţin fire electrice, care atunci când sunt conectate la o sursă de curent corespunzătoare, topesc manşonul în tub fără a fi nevoie de echipamente suplimentare de încălzire. Page 73 of 556

Este foarte important ca cei care efectuează asamblarea să acorde o mare atenţie procedurilor de asamblare astfel încât acestea să fie riguros repectate şi, ca: • •

• •

Suprafaţa oxidată a tubului peste adâncimea manşonului să fie înlăturată cu ajutorul unei raclete. Toate părţile îmbinării trebuie menţinute curate şi uscate înainte ca acestea să fie asamblate, pentru că orice impuritate poate conduce la o asamblare defectuasă. Tubul se poate şterge cu “Hycare”, iar sudura cu “Voltflux”astfel încât orice particole care ar putea contamina zona raclată a tubului sau de fuziune a fitting-urilor să fie înlăturate. Dacă se foloseste procedeul de stergere, este foarte important să se asigure ca suprafata care urmează să fie asamblată este uscată. Clemele trebuie să fie folosite corect pentru a nu exista deplasări în timpul procesului de îmbinare şi a ciclului de încălzire şi răcire. Protectiile pentru sudură sunt utilizate pentru a se asigura că praful şi ploaia nu vor contamina îmbinarea, ferind-o de umezeală.

Este posibil să se asambleze tuburi de polietilenă realizate din materiale şi la grosimi de perete diferite. De exemplu, un tub de polietilenă PE 80 poate fi asamblată cu o conductă de polietilenă PE100 cu aceeasi plajă de valori ale presiunii, folosindu-se elemente de cuplare prin electrofuziune cu presiuni adecvate. Elementele de cuplare prin electrofuziune pot ajunge la dimensiuni de pană la 400mm, dimensiuni mai mari fiind în curs de realizare. NOTĂ: Uneori ţevile livrate în colaci (în special cele de 160 şi 180 mm SDR 11 şi SDR 17.6) pot avea o ovalitate prea mare pentru a se potrivi în elementele de cuplare, sau coturile tuburilor pot face ca alinierea capetelor să fie imposibilă. Solutiile de abordare în acest caz pot fi: (i) (ii)

Utilizare sculelor mecanice de îndreptare sau rotunjire de capete de tuburi sau fitinguri; Îmbinarea prin fuziune a unei drepte de tub în capătul colacului înainte de îmbinare.

1. Fitinguri pentru electrofuziune – proceduri de îmbinare.

Dispozitiv manual de aschiere

Îmbinarea prin electrofuziune este un process continuu.

1a. Se îndreaptă prin tăiere capetele de conductă în vederea îmbinării.

1b. Se curăţă capetele tuburii pe o portiune de aprox. 500 mm folosind o cârpă curată.

Conducta Adancime de insertie 1c. Se marchează zona de pe care stratul oxidat de suprafaţă trebuie înlăturat, adică deasupra adâncimii de insertie de pe fiecare tub unde va avea loc îmbinarea, prin plasarea manşonului necesar fixării, de-a lungul capătului de tub unde vaavea loc îmbinarea. Se trasează o linie în jurul circumferinţei la o distanţă adecvată de capătul tubului, folosind un marker potrivit. ÎN ACEST STADIU, NU SE SCOATE ÎNCĂ FITTINGUL DIN AMBALAJUL SĂU

2. 2a

Cu ajutorul unui dispozitiv de aşchiere mecanic se îndepărtează în mod uniform materialul de pe întreaga suprafaţă a tubului, pană la o adancîme de 0,2 – 0, 4 mm, preferabil în forma unui strat repartizat continuu pe suprafaţa identificată, adică materialul aflat în exces faţă de adâncimea de inserţie.

2b

Se asigură faptul că tot materialul de PE în exces a fost îndepărtat. Page 74 of 556

2c

Nu se ating suprafeţele aşchiate.

2d

Cu ajutorul unei oglinzi se verifică dacă şi suprafeţele inferioare de la extremitatea tubului fix au fost aşchiate complet.

3. 3a

Se scoate dispozitivul de cuplare din ambalaj şi se verifică eticheta, ca asigurare a faptului că a fost aleasă dîmensiunea corectă.

3b

Se potriveşte dispozitivul de cuplare pe extremitatea tubului mobil. Se marcheză pe tub adancîmea de penetrare, cu capătul tubului aliniat la semnul de mijloc.

3c

Se îndepărtează dispozitivul de cuplare şi se poziţionează din nou pe extremitatea tubului fix. Se marcheză pe tub adancîmea de penetrare, cu capătul tubului aliniat la semnul de mijloc.

4. 4a 4b

Cleme de fixare Cleme de fixare

Se pozitionează, făra a o strange, clema de prindere, pe tubul fix. Se poziţionează tubul mobil în dispozitivul de cuplare.

Conducta

Manson de electrofuziune

4c

După ce se verifică faptul că dispozitivul de cuplare este centrat cu clema de fixare şi că tuburile sunt introduse în dispozitiv până la adancîmea de penetrare, se strânge clema complet.

4d

Se roteşte uşor dispozitivul de cuplare, pentru a verifica dacă tuburile sunt corect aliniate.

5. 5a

Se verifică dacă există suficient combustibil în generator, pentru întreaga perioadă de fuziune. Se verifică dispozitivul de control şi cablurile pentru a nu prezenta defecţiuni.

5b

Se îndepărtează, dacă este necesar, capacele terminalelor electrice de pe dispozitivul de cuplare.

5c

Se conectează cablurile la bornele dispozitivului de cuplare.

Cleme de Cablul generatorului

Timp introdus

fixare

Dispozitiv de comanda

Etapa 5: Se introduce timpul de fuziune in

5d

Se verifică timpul de fuziune indicat pe etichetă şi se introduce în timer-ul dispozitivului de control.

5e

Se apasă butonul de pornire al dispozitivului de control şi se asigură faptul că ciclul de fuziune este parcurs în întregime.

6.

Page 75 of 556

6a La sfârşitul ciclului de încălzire, indicatorii de topire trebuie să aibă o valoare crescută. Dacă nu se constată nici o modificare vizibilă a acestora, îmbinarea trebuie tăiată şi se va executa o nouă îmbinare.

Spre dispozitivul de comanda

Indicatori ai starii de topire

6b Se aşteaptă ca ansamblul să se răcească, respectându-se timpul de răcire indicat pe etichetă. 6c fixare.

Se îndepărtează cablurile şi clemele de

Clema de

Manson de

Clema

Fitinguri de branşament pentru electrofuziune

Fitingurile de branşament pentru electrofuziune sunt disponibile pentru majoritatea dimensiunilor principale până la 400 mm. Aceste fitinguri sunt estimate ca rezistând până la 16 bar. Ele sunt indicate pentru conducte la presiuni de 10 şi 16 bar (PE100) şi tuburi de 6/7.5 bar,10/12 bar (PE80).

1. 1a 1b

2. 2a

Se curăţă impurităţile, etc. de pe tub cu o cîrpă curată. Fără a scoate fitingul din ambalaj, se pune în poziţia recomandată pe tubul principal. Se trasează conturul în mod clar şi continuu în jurul suportului, cu un marker rezistent.

Se foloseşte o racletă pentru a îndepărta un strat de suprafaţă de pe tubul de 0,2 – 0,4 mm, pe întreaga suprafaţă marcată.

2b

Se asigură că toate resturile de PE au fost îndepărtate.

2c

A nu se atinge suprafaţa curăţată.

3. 3a

Se îndepărtează fitingul din ambalaj, nu se atinge suportul de contact.

3b

Se verifică eticheta dacă mărimea corectă a fost aleasă.

3c

Se îndepărtează capacul şi se asigură că lama tăietoare e dreaptă.

3d

Se răzuieşte zona de contact pe întreaga suprafaţă de conexiune.

3e

Se asigură că toate proeminenţele sunt îndepărtate.

3f

Nu atingeţi suprafaţa răzuită.

3g

Nu răzuiţi sau contaminaţi suportul de contact.

4. 4a

Se asigură că şurubul de prindere de pe clama cu suport este complet desşurubat. Page 76 of 556

4b

Se prinde fitingul în clamă.

4c

Capacele terminalelor electrice se îndepărtează după fixarea acestora.

4d

Se îndepărtează protecţia suportului după fixare.

4e

Nu se atinge nici o zonă de fuziune.

5. 5a

Se verifică dacă pe suprafaţa curătată nu impurităţi.

5b

Se fixează fitingul pe suprafaţa pregătită tubului.

5c

Se fixează clema conform instrucţiunilor producătorului.

5d

6. 6a

apar

Dispozitiv de fixare

a

Suport EF Suprafata

Se învârte şurubul de strângere al clemei când e indicată presiunea corectă.

Se taie drept tubul de branşament, la lungimea corectă.

până

Conducta

Etapa 5: Fixarea fitingului pe conducta pregatita si

6b

Se curăţă lângă capătul tubului o porţiune de cel putin 50 mm pentru a asigura îndepărtarea oricăror resturi de PE. A nu se atinge zona “răzuită”.

6c

Fitingul de branşament se scoate din ambalaj; după fixare se scot capacele terminalelor electrice.

6d

Fitingul de branşament se poziţionează pe conductă, marcându-se poziţia corectă.

6e

Fitingul de branşament se fixează pe ramificaţie, se marchează poziţia corectă, după care se poziţionează tubul în fitingul de branşament . Dispozitiv de fixare

6f

Se reglează lejer dimensiunea clemei folosite.

6g

Se verifică poziţionarea corectă a tubului şi ramificaţiei în elementul de cuplare (atenţie la marcaje), apoi se strânge clema complet.

7. 7a

Se verifică dacă există combustibil suficient în generator pentru întreaga perioadă de fuziune. Se verifică de asemenea şi cutia de control şi cablurile pentru eventuale defecte.

Cutie de

Suport EF

Etapa 7: Legarea la cutia de control si

7b

Cablurile se conectează la terminale pe suport.

7c

Se verifică timpul de fuziune indicat pe etichetă şi se introduce acest timp în timer-ul cutiei de control.

Page 77 of 556

7d

Se apasă butonul de pornire al cutiei de control, asigurându-se că ciclul de fuziune este complet.

7e

Se îndepărtează cu grijă cablurile fără a se deranja fitingul.

7f

Se conectează cablurile la terminale şi se repetă de (7c) la (7e).

Dispozitiv de fixare

la Suport EF Indicator

8. 8a

Se respectă timpul de răcire indicat pe etichete

8b

Se îndepărtează sculele

8c

Se inspectează vizual îmbinările, asigurându-se că indicatorii de fuziune nu sunt în relief

8d

Se reasează capacul pe teu şi se termină înstalarea tuburii de bransament.

2.5.17 Îmbinări şi fitinguri mecanice Există o gamă largă de îmbinări şi fitinguri mecanice de metal şi plastic omologate. Toate aceste fitinguri trebuie asamblate în conformitate cu instructiunile producătorului, iar fitingurile metalice trebuie livrate asigurându-se o protecţie anticorozivă corespunzătoare. Cele mai uzuale tipuri de fitinguri metalice asociate cu polietilenă sunt: • • • •

adaptoarele cu flansă şi alte tipuri de adaptoare; dispozitive de cuplare mecanice; fittinguri de bransament cu mufe inele de metal

Pentru trecerea de la tevile de polietilenă la fitingurile de metal cu flanşă se vor folosi, fie ţevi de îmbinare cu inele metalice, fie adaptoare mecanice cu flanşă. Garnitura de etanşare şi lungimea şuruburilor folosite, trebuie să fie potrivite tipului de adaptor. Nu se va folosi nici un fel de substanţă de etanşare. La etansarea flanselor de polietilenă trebuie avută în vedere generarea unui efort de torsiune uniform, în limitele specificate de producător. Se recomandă imperativ folosirea unei chei de torsiune.

2.5.18 Pozarea tuburilor în tranşee Înainte de pozarea conductelor, transeea se va verifica din punctul de vedere al siguranţei. Tubul va fi verificată pentru descoperirea eventualelor defecte, iar, în cazul îmbinării prin electrofuziune, se va verifica dacă gradul de răcire al tuburii este satisfăcător. Nu se vor poza în santuri nici un fel de elemente nesatisfăcătoare. Conducta (ţeavă, fitinguri etc) se va verifica prin confruntarea cu proiectul înainte de instalare, din punct de vedere al dimensiunilor, material, etc. Conductele vor fi coborâte în mijlocul şantului, având grijă să nu fie deteriorate. Schimbări ale direcţiei tronsonului de conductă de PE pot fi permise de capacitatea de îndoire a tuburilor, dar trebuie făcute eforturi pentru a menţine tubul pozitionat central în şant prin compactarea corectă a materialului de umplutură de pe margine.

Page 78 of 556

Tuburile pot fi “îndoite la rece” în conformitate cu recomandările producătorului, în funcţie de diametre. În nici un caz nu trebuie să se încerce “îndoirea la cald” a tuburilor pe amplasament. Dacă este necesară realizarea îmbinărilor în interiorul şantului, trebuie asigurat un mediu de lucru propice în ceea ce priveşte spaţiul, temperatura şi protecţia împotriva intemperiilor, conform cerinţelor. Este necesară ţinerea unei evidenţe complete şi clare a instalării înainte de acoperirea conductelor.

2.5.19 Realizarea umpluturilor Materialul excavat adecvat va fi repus în şant pentru a acoperi conducta. În cazul în care este necesar, se va folosi material suplimentar cum ar fi nisip sau pietriş cu particule până la 20 mm pentru a acoperi conducta până la 100 mm deasupra crestei conductei. Materialul excavat va fi returnat în şant în straturi şi compactat folosindu-se echipamente de compactare adecvate (manuale sau mecanice).

2.5.20 Refacerea terenului şi aducerea lui la forma iniţială În locurile în care este permis acest lucru, cum ar fi câmpurile, tranşeele vor fi umplute în surplus, pentru a se permite reaşezarea naturală în timp a materialului. În cazul drumurilor şi al zonelor circulate, se va folosi echipament de compactare adecvat pentru a asigura compactarea satisfăcătoare a tranşeelor. Suprafaţa drumurilor va fi refăcută provizoriu cu un strat de piatră spartă (0-20 mm). În alte locuri sau în cazul drumurilor nepavate, materialul de suprafaţă existent, va fi înlocuit sau se va putea folosi un material similar. Pe drumurile publice sau căile de acces asfaltate sau betonate, suprafaţa se va reface provizoriu cu un strat de piatră spartă (0-20 mm). Cota materialului de umplutura poate fi mai mare decât cea generală pentru a se permite reaşezarea materialului. Refacerea permanentă a drumurilor va fi în sarcina autoritătilor competente.

2.5.21 Traversarea căilor ferate Traversarea căilor ferate se va face în conformitate cu normele româneşti în domeniu şi poate fi realizată folosind tehnologia de forare direcţională. Pentru fiecare caz în parte sunt prevăzute detalii de execuţie, şi vor fi obţinute avizele necesare de la autorităţile competente înaintea obţinerii autorizaţiei de construcţie.

2.5.22 Testare După instalare, conducta va fi testată prin probă de presiune hidraulică pe secţiuni, în funcţie de amplasament. În general se verifică sectiuni între 500 şi 2000 m. Secţiunile vor fi izolate şi fixate pentru a preveni mişcarea datorită reacoperirii. Îmbinările vor fi lăsate la vedere pentru a uşura verificarea existenţei eventualelor scurgeri. Blocurile de reazem necesare pentru secţiunile cu îmbinări mecanice, vor fi de asemenea instalate. Modalitatea standard de testare a conductelor pentru apă, fabricate din alte materiale, nu e valabilă şi în cazul conductelor de PE din cauza relaxării tensiunii, caracteristică acestui tip de material. Conductele vor fi testate la 1,5 x presiunea de lucru; prin urmare conductele PN6 vor fi testate la 9 bar.

Page 79 of 556

Procedura de testare începe prin ridicarea şi menţinerea presiunii de testare timp de 30 de minute, prin pompare aditionala, pentru a susţine destinderea conductei PE. Prin deschiderea supapei de control se reduce presiunea la valoarea nominală, înainte de reînchiderea supapei. “Revenirea” presiunii din conductă este semnul unei conducte corespunzătoare.

2.5.23 Procedura de testare Îndepărtarea aerului din conductă este vitală pentru acurateţea rezultatelor testului şi, prin urmare, umplerea conductei trebuie să se facă de o maniera controlată, cu îndepărtarea aerului în timpul procesului de umplere şi presurizare. Se aplică presiunea de testare aleasă şi se menţine această presiune prin pompare suplimentară conform cerinţelor, timp de 30 de minute. În acest timp se realizează inspectarea conductei pentru identificarea unor eventuale scurgeri, la această presiune, din tronsonul testat. Presiunea trebuie redusă apoi prin eliberarea rapidă a unei cantităţi de apă din conductă, până la obţinerea unei presiuni nominale de 2 bar - de exemplu, la manometrul de control. Se închide supapa de control pentru a izola tronsonul. Valorile indicate de manometru vor fi citite şi notate la următoarele intervale: • • •

0 -10 min – citire la intervale de 2 minute 10- 30 min – citire la intervale de 5 minute 30- 90 min – citire la intervale de 10 minute

Presiunea trebuie să crească datorită răspunsului elasto-plastic al materialului conductei. Graficul rezultat pentru un tronson bine etanşat ar trebui să aibă un profil caracteristic asemănător cu cel din graficul de mai jos.

Presiunea selectată este menţinută prin pompare suplimentară timp de 30 min

Gradul în care fluajul materialului afectează graficul de presiune şi timpul de răspuns la reducerea presiunii sunt influenţate de:

Page 80 of 556

• • • •

lungimea secţiunii testate diametrul conductei prezenţa aerului calitatea stratului de pozare şi a compactării

În decursul a 90 de minute ar trebui să fie posibilă o indicare corespunzătoare. Dacă în cursul acestei perioade există o cădere de presiune, aceasta indică o scurgere pe acea secţiune. Este de preferat ca fitingurile mecanice să fie verificate înainte de inspecţia vizuală a îmbinărilor sudate. Orice defect al instalaţiei pus în evidentă de către test va trebui, evident, remediat, iar testul va fi repetat după ce se va acorda un timp pentru stabilizarea conductei. După un test satisfăcător, secţiunea de conductă nu va mai fi supusă unor operaţiuni de sudare, deformare la rece sau la cald.

2.5.24 Spălare şi clorare Înainte de recepţia sistemului de conducte, conducta va fi curăţată în conformitate cu prevederile I22, pentru o calitate a apei în conformitate cu STAS 1342. Conducta este spălată cu jet de apă pentru a îndepărta orice impurităţi sau corpuri străine din sistem. Nu se are în vedere necesitatea curăţirii mecanice interioare pentru a îndepărta corpurile străine sau impurităţi. Conducta se umple cu apă clorată având o concentraţie de minimum 25-30 mg de clor activ per litru de apă. Apa clorată va fi mentinută în sistem timp de 24 de ore, după care sistemul va fi spălat cu apă potabilă până ce conţinutul rezidual de clor este în limitele admisibile pentru furnizarea de apă potabilă, adică 200mg/m3.

2.5.25 Întreţinere Îtreţinerea, repararea şi modificarea sistemului de conducte se va face de către Client sau de către autoritatea competentă. Toate modificările, reparaţiile şi operaţiunile de întreţinere vor fi executate în conformitate cu prevederile proiectului şi ale prezentului caiet de sarcini.

2.5.26 Recepţia Recepţia reprezintă acţiunea prin care Investitorul acceptă şi preia lucrările executate, în scopul de a începe exploatarea lor, certificând faptul că Antreprenorul şi-a indeplinit obligaţiile în conformitate cu contractul şi cu documentaţia de execuţie. Recepţia se realizează în conformitate cu Legea 10/1995 privind calitatea în construcţii “Regulamentul de recepţie al lucrărilor de construcţii şi a instalaţiilor aferente” (HG 273/1994) şi cu alte norme aferente acestui domeniu. Stadiile recepţiei sunt: • Recepţia la terminarea lucrărilor contractate. Receptia finală – la sfirşitul perioadei de garanţie, stipulatâ în contract.

2.6 2.6.1

Drumuri si pavaje (inlusiv reparatii) Date generale

Acest capitol cuprinde necesitatile pentru drumurile noi de acces. Pentru umplutura generala a santurilor de conducte vezi Cap. 7. Acest capitol cuprinde cerintele suplimentare necesare pentru repararea suprafetelor de drum sau pavaj de deasupra santurilor de conducte.

Page 81 of 556

In zona exista 3 tipuri de suprafete de drum sau pavaj care acopera drumurile asfaltate, drumurile balastate si strazile neamenajate (pamant).

2.6.2

Materiale

Materialele care se folosesc la reparatiile de drumuri si pavaje vor include:

- Sub-fundatii - cuprind balast si straturi de pietris - Fundatii de drum - cuprind straturi de macadam

- Nivelarea suprafetelor - carosabile de beton, placi de pavaj si diferite straturi de asfalt - Materialele furnizate vor corespunde cu STAS 10473/1-87 si SR 179: 1995.

2.6.3

Sub-fundatii

Toate drumurile si pavajele vor fi prevazute cu o sub-fundatie care cuprinde urmatoarele: - strat initial de balast. Acest strat se va dispune in straturi uniforme care nu depasesc 150 mm grosime care se vor compacta conform STAS 294-84. - un strat intermediar de 63-90 mm piatra sparta. Acest strat se va aseza pe stratul de balast si va fi rulat conform STAS 6400-84. - un strat final de 16-25 mm piatra sparta. Acest strat se va aseza pe stratul intermediar si va fi netezit conform STAS 6400-84. - un strat de nisip. Un strat de nisip se va aseza si netezi peste stratul final de piatra sparta.

2.6.4

Fundatia de drum si nivelarea

2.6.5

Drumuri asfaltate

Se va asigura o fundatie de drum macadam conform SR 179-1995. Nivelarea drumurilor inclusiv straturile de asfalt si bitum va fi asigurata conform STAS 1338-84. Contractantul se va asigura ca stratul de macadam este curatit complet inaintea realizarii nivelarii finale. Contractantul va asigura protectia corespunzatoare a strazilor asfaltate in eventualitatea de vreme rea.

2.6.6

Strazi pietruite

Drumurile pietruite se vor construi conform SR 179-1995. Contractantul va asigura ca straturile de macadam, pietris, balast sunt foarte bine compactate.

2.6.7

Borduri

Bordurile vor fi executate din pietre dure sau beton prefabricat, conform STAS 1139-87. Bordurile se vor aseza pe o fundatie de beton si vor fi imbinate cu mortar de ciment.

2.6.8

Tolerante

Deviatii permise: - pentru lungime +/- 4 mm - pentru latime +/- 3 mm - pentru suprafetele suport, lungimea sau latimea pentru elementele placii si acoperisului: 10 mm pentru 1 = 6 m and 15 mm pentru 1 > 6 m.

Page 82 of 556

2.7 2.7.1

Hidroizolatii Date generale

Acest capitol se refera la lucrarile de hidroizolatii impotriva umiditatii pamântului si a apelor din precipitatii pe elemente de beton si metal amplasate sub pamant. Proiectarea si executarea lucrarilor de hidroizolatie se vor efectua conform prevederilor standardelor si normativelor romanesti. Elementele de beton cum ar fi conductele, gurile de vizitare, blocurile de ancoraj sau constructiile speciale vor fi izolate cu doua straturi de vopsea bituminoasa. Peretii subsolurilor folosibile in contact cu pamântul au fost hidroizolati fata de umiditatea naturala a terenului sau din precipitatii, cu hidroizolatii bituminoase in straturi multiple.

2.7.2

Standarde si normative de referinta - STAS 2355/1 - 85

Constructii civile, industriale si agrozootehnice. Lucrari de hidroizolatii in constructii. Clasificare si terminologie.

- STAS 2355/2 - 87

Constructii civile, industriale si agrozootehnice. Hidroizolatii din materiale bituminoase la elemente de constructii. Prescriptii generale de proiectare si executie.

- STAS 10265 - 75

Tolerante in constructii. Calitatea suprafetelor finisate. Termeni si notiuni de baza.

- C 112 - 86

Normativ pentru proiectarea si executarea hidroizolatiilor din materiale bituminoase la lucrarile de constructii.

2.7.3

Probe si teste

Inainte de a comanda si furniza materialele pentru santierul de constructie, Contractantul trebuie sa prezinte spre aprobarea Şefului de Proiect, probe de: - pasla armata cu sticla - asfalt - panza asfaltica tip PI50, PI40, PA55, PA45 - carton asfalt CA333, CA400 Materialele se vor folosi daca sunt aprobate probele.

2.7.4

Materiale si produse

2.7.5

Materiale asfaltice in folii: - carton asfalt tip CA 333, CA 400 ca in STAS 138-80 - pasla asfaltica cu fibra de sticla tip IA 1100, IB 200 si IBP 2200 ca in STAS 7916-80

Page 83 of 556

- pasla asfaltica cu fibra de sticla tip IA 1100 R, IBP 110 R conform NTR 8067-85 - panza asfaltica tip U50, PI40, PA55, PA 45 conform STAS 1046-78 - plasa asfaltica cu fibra de sticla tip TSA 200 ca in STAS 10126-80.

2.7.6

Materiale asfaltice pentru grunduire, lipire si sigilare: - bitum pentru lucrari de hidroizolatii tip H68/75 si H80/90 conform STAS 7064-78 - asfalt cu adaos de cauciuc, tip SAC95/105 conform STAS 1546-70 - suspensie asfaltica granulara (SUBIF) ca in STAS 558-85 - chit facut din suspensie asfaltica granulara (CELOCHIT) ca in STAS 661-71.

2.7.7

Materiale auxiliare: - material de umplutura din calcar ca in STAS 639-79 - spirt alb ca in STAS 44-84

2.7.8

Materiale ceramice:

Pentru protectia exterioara a hidroizolatiei peretilor se va executa o zidarie de caramida plina C 100 cu mortar M 50 Z. Materialele vor fi protejate pentru a se evita efectele climatice negative atat la depozitare cat si la incarcare. Materialele se vor folosi cat de repede posibil pentru a se evita depozitarea intermediara. Pentru alte materiale auxiliare se va consulta normativul C 112 - 86.

2.7.9

Executia

Se vor folosi numai subcontractantii specializati si echipele calificate. Lucrarile care se vor efectua in conditii de vreme rece se vor conforma strict prevederilor din C16-79. Temperatura masticului asfaltic din boiler nu va depasi 220° C si va fi intre 150-200° C, cand se foloseste la lipirea straturilor unele de altele.

2.7.10 Hidroizolatii contra apelor fara presiune Aceste hidroizolatii se prevad impotriva umiditatii pamântului si a apelor din precipitatii care se pot acumula si stagna in zona de umplutura, la peretii construcţiilor din beton şi metal amplasate sub pămînt. Hidroizolatia peretilor exteriori ai construcţiilor se va realiza cu structura prevazuta in detaliile de executie ale proiectului. Hidroizolatia bituminoasa a peretilor se va executa pe structura de rezistenta din beton, executia efectuânduse dinspre exteriorul constructiei in spatiul rezultat din sapatura. Se vor respecta indicatiile cuprinse in normativul C 112 - 86, capitolul 4 “Hidroizolatii la constructii subterane”.

2.7.11 Verificarea calitatii lucrarilor de hidroizolatii Se vor respecta indicatiile cuprinse in capitolul 5 din normativul C 112 - 86.

2.7.12 Hidroizolatii, invelitori 2.7.13 Generalităţi Prezentul capitol cuprinde specificaţiile pentru proiectarea şi executarea hidroizolaţiilor la învelitori din materiale bituminoase, împotriva umidităţii la terase.

2.7.14 Standarde de referinţă C 37-88 – Normativ pentru alcătuirea şi execuţia învelitorilor la construcţii; Page 84 of 556

C 112-86 – Normativ pentru proiectarea şi executarea hidroizolaţiilor din materiale bituminoase. STAS 138-80 – Carton bitumat. STAS 7916-80 – Împâslitură din fibre de sticlă bitumată. STAS 1046-78 – Pânză bitumată.

2.7.15 Produse şi materiale -

carton bitumat tip CA-333; CA 400 – STAS 138-8. împâslitură din fibre de sticlă bitumată tip IA 1100; IB 1200; STAS 7916-80. împletitură bitumată cu bitum aditivat tip IAA 1200; STI 17-86. pânză bitumată tip PI 50; PA 55; PA 45 conform – STAS 1046-78. bitum pentru lucrări de hidroizolaţie tip A 68/75 şi A 60/90 – STAS 7064-78.

2.7.16 Livrare, depozitare, manipulare Cartoane bitumate, împâsliturile bitumate şi pânză bitumată se livrează în suluri care se depozitează în spaţii acoperite ferite de razele directe ale soarelui şi ferite de murdărirea cu noroi sau substanţe grase. Bitumul se livrează în cilindri de carton presat. se depozitează pe rastele în poziţie verticală. Se va controla pentru toate materialele existenţa buletinelor de calitate.

2.7.17 Execuţia lucrărilor 2.7.18 Lucrări pregătitoare Se montează toate elementele străpung hidroizolaţia (ventilaţii, coşuri, conducte, ancore) ca şi elementele confecţionate din tablă zincată ca şorţuri, pazii; rectificarea suprafeţelor elem.prefabr. cu mortar M 100 T, cu panta racordurilor de minim 1:5; se vor rectifica pantele şi se va controla dacă suprafaţa este curată, fără asperităţi mai mari de ± 2 mm şi denivelări peste 5 mm, verificat cu un dreptar de 3 m lungime, iar scafele executate cu raze de min.5 cm şi muchiile de min.3 cm; se va verifica dacă suportul de mortar sau beton este uscat şi întărit, prin lipirea pe numai 20 cm a unei fâşii de carton bitumat de 30 x 20 cm, după o prealabilă amorsare şi care la încercarea de dezlipire după 1 oră trebuie să se rupă. Dezlipirea de pe suprafaţă a fâşiei, sau cu mortar arată că şapa este ori umedă ori necorespunzătoare pentru aplicarea hidroizolaţiei.

2.7.19 Execuţia lucrărilor Hidroizolaţia la elem. verticale ale învelitorilor se va aplica până la înălţimea de max. 30 cm; Hidroizolaţia pe suprafete înclinate react. (3-5%) cuprinde urmatoarele straturi : -

amorse cu soluţie sau emulsie de bitum (300 g/mp); mastic de bitum cu IB 80/90 (1,5 kg/mp); pânză bitumată PA 55 sau PA 45; mastic de bitum cu IB 80/90; pânză bitumată cu PA 55 sau PA 45 (stratul de amorsă cu soluţie de bitum se execută în perioada de timp cu temperaturi de +8°C); strat de difuzie din împâslitură bitumată perforată IBP 1200; barieră contra vaporilor din împâslitură bitumată IA 1100 lipită în puncte; caşerare a termoizolaţiei cu carton bitumat CA 400 sau ţesătură bitumată TSA 2000; carton bitumat CA 400, lipit pe toată suptafaţa cu – mastic de bitum; protecţie a hidroizolaţiei Page 85 of 556

-

cu vopsea reflectorizantă cu dale prefabricate, în pantă de 1-2% pentru terasele circulabile aaşezate în pat de nisip de 3 cm grosime.

Pentru executarea hidroizolaţiei în câmpul acoperişului, sulurile de foi bitumate se vor derula pe suprafaţa suport şi se vor curăţa prin periere energică după care se vor lăsa un timp suficient pentru relaxare şi îndreptare a foilor; Se va mătura suprafaţa suport, se vor poza şi croi foile bitumate la lungimea necesară pe locul de aplicare, după care se vor rula şi se vor lipi prin derulare succesivă şi presare a sulului peste stratul de mastic turnat cu canciocul în faţă şi pe toată lăţimea sulului; Suprapunerile dintre foile de hidroizolaţie vor fi de 7-10 cm; straturile 2 şi 3 se vor aplica asemănător, cu decalări între suprapunerile foilor. Fiecare strat se va aplica începând de la streaşină sau gurile de scurgere, astfel încât suprapunerile să fie făcute în sensul de curgere a apelor; Montarea gurilor de scurgere interioare la terase circulabile se va face conf.STAS 2742-86. ,,Receptoare pentru colectarea apelor de pe terase şi acoperişuri. Forme şi dimensiuni.” pentru scurgeri exterioare se va ţine seama de prevederile din STAS 2389-77. Jgheaburi şi burlane. Prescriptii. de proiectare şi alcătuire”.

2.7.20 Protejarea lucrărilor Se face cu stratul de protecţie a hidroizolaţiei descris la pct.2 – Execuţii lucrărilor. Se face protecţia hidroizolaţiei la socluri, atice, reborduri cu şape de mortare de ciment M 100 T armate cu reţea de oţel φ 4-6 sau cu TBAL.

2.7.21 Recepţionarea lucrărilor Hhidroizolaţiile finite vor fi recepţionate în conformitate cu instrucţiunile din C56-2000 cap. XIV. ,,Instrucţiuni tehnice pentru verificarea calităţii lucrărilor de construcţii-montaj la clădiri civile şi industriale”. La recepţie se vor verifica următoarele: - calitatea stratului suport - executarea corectă a pantelor - nivelul şi amplasamentul gurilor de scurgere - montarea corectă a diblurilor pentru tinichigerie Executarea corectă a racordurilor (scafe, reborduri, parapete etc.) care asigură continuitatea str. hidroizolant. Respectarea reţelelor şi procedeelor de preparare a materialelor pe şantiere (masticuri, soluţii) conf.normativ C 112-36. Realizarea comunicării cu atmosfera a stratului de difuzie pe sub şanţuri, copertine sau tuburi. Pentru lucrările ascunse se vor încheia procese verbale.

Page 86 of 556

2.8 2.8.1

Protectii anticorozive Generalitati

Prezentul capitol cuprinde specificatii pentru executia diverselor retete de protectii anticorozive, alegerea lor facindu-se in functie de tipul de agresivitate a produselor rezultate in urma proceselor tehnologice. Prezentul capitol prezinta urmatoarele retete:

a). Pardoseli de caramizi de gresie antiacida tip”A” sau “D”: -caramida de gresie antiacida pozata in chit tip ORAMIN M sau C si rostuite cu chit tip ORAMIN M sau C, sau chit ALOREX MS-81 pe orizontala, sau plinte pe verticala. -folie de Butarom DS( 3 mm. Grosime) lipita cu Prenadez 300, cu rosturile de imbinare etansate cu straifuri din folia Butarom DS, atit pe orizontala cat si pe verticala. -beton de panta din B200 in grosimi de 3~20 mm. Pe orizontala si mortar M100-T pe verticala, in grosime de 2 cm. pe o inaltime de 30cm.

b). Protectie cuva( batal din beton armat) la actiune sulfatica folosindu-se in compozitia betoanelor si mortarelor de protectie cimentul tip SRA 35 si ca strat hidroizolator folii de PVC plastifiat si folii de polietilena expandata.

Straturi pe orizontala - beton B300 de 7 cm. grosime,turnat in placi de 2,00x2,00 m.,rostuite cu chit ALOREX MS-81 ; - sapa de mortar M100-T de 2 cm. grosime pentru protectia hidroizolatiei orizontale ; - folie PVC plastifiat de 0.8 mm lipita cu mastic de bitum H80-90 conf.STAS 7064-78 ; - sapa mortar M100 de 2 cm. ca strat de egalizare al radierului.

Straturi pe peretele vertical al cuvei - beton B300 slab armat,cu rosturile chituite cu chit tip ALOREX MS-81 ; - strat de polietilena expandata de 4 mm. grosime lipita cu mastic de bitum tip H80-90 ; - strat folie PVC plastifiat de 0.8 mm.lipita cu mastic de bitum H80-90 ; - strat mortar M100-T pe verticala,de 2 cm.grosime ca egalizare a stratului suport.

2.8.2

Standarde de referinta - STAS 8080/76 - gresie ceramica antiacida - NII

6736/76 - Folie Butarom DS

- NII

6887/77 – chit ALOREX MS.81

- NII

6613/76 – chit ALOREX AL-111

- NII

2985/63 - chit ALOREX C

Page 87 of 556

- NII

4185/75 - chit ORAMIN R

- NII

5250//73 - Alorex VSA

- GP 013- 96 - Ghid privind proiectarea , executia si asigurarea calitatii pardoselilor la constructii in care se desfasoara activitati de productie - STAS 1667/76 - Agregate naturale - NE 012- 99 - Cod de practica pentru executia lucrarilor de beton , beton armat si beton precomprimat - GP 036- 98

- Ghid de proiectare ,constructie si exploatare a bazinelor de beton armat destinata neutralizarii si epurarii apelor industriale

- STAS 7064-78 - Mastic de bitum H80-90 - SII 49-86

2.8.3

- Folii stratificate din PVC plastifiat

Produse

Caramizile din gresie ceramica antiacida - se fabrica dintr-unamestec de argila refractara si caolinoasa, fondanti si degresanti, ars pana la vitrifiere si glazurare la cerere ; - se fabrica la dimensiuni A250x123x65 mm. D25x123x30 mm ; - caramizile trebuie sa aiba fata de lucru plana, si neteda,cu exceptia celor prevazute prin proiect.fetele glazurate trebuie sa aiba stratul de uzura uniform si continuu - caramizile normale trebuie sa fie bine arse,lovite cu un ciocan de otel trebuie sa dea un sunet clar, metalic ; - caramizile normale trebuie sa aiba pe toata suprafata de rupere o structura fin granulata, omogena si compacta.Granulele nu trebuie sa se desprinda usor sau sa se farimiteze la incercare cu mana.

Folia Butarom SPE, se prezinta sub forma de folie calandrata avind urmatoarele dimensiuni: 3mm.x 900 mm.Culoarea foliei fiind mata.

ALOREX MS81 , este un produs pe baza de rasini epoxidice avind 3 componente: - componenta epoxidica CE - componenta intaritor CI - componenta solida

CS

PRENADEZ 300 - adeziv monocomponent pe baza de cauciuc sintetic in solventi organici cu aderenta la temperatura mediului ambiant. Se prezinta ca o dispersie omogena de culoare galben-verzuie.

ALOREX AL 111 - chit anticoroziv pe baza de rasini de culoare gri-alba.

Page 88 of 556

ORAMIN GR - chit anticoroziv compus din monomer FA, o solutie alcoolica de acid benzen sulfuric si electrografit.

2.8.4

Materiale - Ciment portland -STAS 388-80 - Nisip cu granulatie 0-1 mm. - Sapa de mortar de ciment - Apa STAS 790-73

2.8.5

Livrare, depozitare, manipulare

Se va asigura protectia placilor de gresie ferindu-se de contaminarea cu materialele care pot pata la depozitare,cat si la manipulare . Folia de Butarom se livreaza in rulouri infasurate simultan cu o folie de polietilena . Transportul se face cu mijloace auto acoperite, iar depozitarea se face in pozitie orizontala. In timpul depozitarii ,foliile se vor feri de actiunea razelor de soare,iar temperatura nu va depasi +50o C . Componentele epoxidice de Alorex se livreaza in bidoane de tabla inchise etans. Componenta solida se livreaza in saci de polietilena introdusi in saci de hartie.Ele se depoziteaza in spatii inchise, uscate, ferite de actiunea directa a razelor de soare,la temperatura de +50o  +30o C. Durata de conservare este de 60 de zile de la data fabricatiei. Prenadezul 300 este ambalat in bidoane metalice, inchise etans depozitate in spatii lipsite de umiditate, surse de foc si prevazut cu iluminat antiex.Temperatura de depozitare a adezivului este cuprinsa intre +5o+25oC. Manipularea se face fara socuri ,numai in pozitie verticala. Cimentul se va depozita conform specificatiei “Betoane”. Foliile PVC plastifiat se livreaza in suluri.

2.8.6

Executia lucrarilor

2.8.7

Lucrari pregatitoare

Suprafata betonului de rezistenta peste care se va executa betonul de panta se va pregati prin sablare si desprafuire. Pentru structurile de pardoseli la care stratul de egalizare si de panta este din beton, inainte cu aplicarea acestuia, suprafata betonului de rezistenta se va uda bine cu apa si se va amorsa cu mortar fluid cu nisip 0-3 mm.,dozaj 1:1. Betonul de panta va avea marca B200 si gradul de impermeabilitate minim P 4 10. Suprafata betonului de panta se va realiza perfect plana,va fi driscuita si va avea pantele din proiectul de executie. Verificarea etanseitatii bazinelor se realizeaza prin proba de umplere cu apa conform STAS 4165/87. In cazul in care betonul prezinta unele defectiuni de executie se va remedia conform P73/78. Concomitent cu executarea betonului simplu sau betonului armat de rezistenta,se vor executa toate fundatiile de utilaje ,rebordurile ,golurile de scurgere, strapungerile si celelalte profile indicate prin

Page 89 of 556

proiect.Rugozitatea stratului de beton va fi de +/-5 mm.in cazul betonului driscuit. Pentru evitarea aparitiei fisurilor din contractie betonul de panta se va pastra umed timp de 7 zile.

2.8.8

Executia izolatiei

Consta dintr-o hidroizolatie anticoroziva ce se realizeaza din folie de Butarom. Foliile sint controlate sa nu aiba defecte(fisuri, strapungeri incluziuni de corpuri straine), apoi sint croite si degresate cu toluen pe suprafata de lipire. Dupa trei ore se aplica un prim strat de adeziv, atit pe beton, cat si pe folie si se lasa 24 de ore pentru evaporarea solventului.Dupa 24 de ore se aplica cel de-al doilea strat de adeziv, atit pe beton cat si pe folie.Dupa cca.1 ora se trece la lipirea foliilor pe suport. Lipirea se face muchie linga muchie ,si dupa 4 zile se aplica straifuri de 10 cm. pe rost. Peste folia Butarom, se aplica chit de pozare ORAMIN cu compozitia conform C219/85, si se va prepara astfel:se amesteca rasina cu intaritorul si se omogenizeaza timp de 5 minute, utilizandu-se malaxorul. Chiturile de pozare se vor prezenta in cantitati care pot fi consumate in interval optim. Prepararea chiturilor se va face la o temperatura intre +15o  +20oC. Materialele componente vor fi tinute la aceasta temperatura timp de 24 de ore, inainte de prepararea chiturilor. Executarea pardoselilor din placaje incepe prin montarea placilor sau caramizilor la coame,dolie,si bordurile din lungul peretilor.Se vor monta apoi scafele sau plintele la pereti,dupa care va incepe montarea placilor in campurile dintre coame si dolii, sau dintre perete si dolii. Pozarea caramizilor sau placilor se face cu chitul de pozare, si se acopera cu un strat egal de chit, precum si fetele laterale cu spaclul, prin intinderea pentru indepartarea aerului prins intre masa de chit si suprafata placii sau a caramizii. Caramida se aseaza pe suprafata de protejat si se preseaza cu mana prin impingeri in caramizile sau placile invecinate, pozate anterior, eventual prin batere cu un ciocan de lemn, pana ce excesul de chit iese din rost. In 24 de ore de la pozare, se va verifica prinderea fiecarei placi prin ciocanire, si se va proceda la inlocuirea placilor care nu prezinta aderenta corespunzatoare. Umplerea rosturilor dintre placi va incepe la minim 7 zile de la terminarea operatiei de pozare. Consistenta chiturilor de rostuire trebuie sa fie slab plastica, pentru a permite umplerea completa a rosturilor, si fuguirea acestora. Chiturile se introduc in rost prin indesare laterala cu spaclul pe marginile rosturilor si se compacteaza bine pe fundul rostului cu fugul. Dupa ce rostul a fost bine umplut si compactat, se finiseaza cu atentie fata rostului,acordandu-se o atentie deosebita perfectei etanseitati la marginea placii.

2.8.9

Protejarea lucrarilor

Suprafetele placate si rosturile vor fi protejate timp de 7-10 zile de la terminarea rostuirii, mentinandu-se o temperatura a mediului ambiant de minimum +20o C.

2.8.10 Terminarea lucrarilor Darea in exploatare a acestor suprafete se poate face dupa 14 zile de la terminarea operatiei de rostuire.

2.8.11 Abateri admise - devierea de la suprafetele orizontale la dreptarul de 2 m sa nu fie mai mari de 5-10 mm. - pentru supraf.verticale, verificarea sa se faca la firul cu plumb, tolerantele admise fiind de 5-10 mm.

2.8.12 Verificari, receptia lucrarilor Pentru o corecta executie, verificarea fiecarui strat este obligatorie. Nu se vor pun in opera materiale fara certificate de calitate.

Page 90 of 556

Verificarea calitatii fiecarui strat de protectie peliculara se face vizual, urmarindu-se obtinerea unor straturi uniforme, continue si aderente . Folia Butarom este corect lipita daca pe suprafata nu apar dupa aplicare nule sau umflaturi. Verificarea intaririi stratului de chit se face prin zgarierea cu un cui de otel. Controlul zidariei prin ciocanire, caramizile neaderente se indeparteaza si se procedeaza la o noua fixare. Se verifica dimensiunea rosturilor si umplerea corespunzatoare a acestora cu chit.

Page 91 of 556

2.9 2.9.1

Staţii de pompare Siguranţă

2.9.1.1 Generalităţi Acest capitol conţine informaţii de bază privind instalarea, funcţionarea şi întreţinerea şi trebuie urmărit cu atenţie. Este esenţial ca aceste instrucţiuni să fie citite cu multă atenţie înainte de instalare sau darea în exploatare, de către ambele echipe, atât cea responsabilă cu asigurarea funcţionării echipamentului, cât şi de către cea care răspunde de exploatare si întreţinerea acestuia. Instrucţiunile de funcţionare trebuie, de asemenea, să fie afişate cât mai vizibil, la locul în care este amplasat echipamentul pentru a putea fi citite în orice moment. 2.9.1.2 Calificarea personalului Întreaga lucrare va fi desfăşurată de un electrician şi un mecanic, ambii autorizaţi. 2.9.1.3 Reglementări privind siguranţa, pentru beneficiar / operator Toate reglementările guvernamentale, codurile de siguranţă şi privind sănătatea din zona în care este montat echipamentul trebuie respectate. Toate pericolele datorate electricităţii trebuie evitate (pentru detalii, consultaţi regulamentele companiei locale de electricitate, de la care vă alimentaţi cu energie electrică). 2.9.1.4 Modificări unilaterale şi producerea pieselor de schimb Modificările sau schimbările aduse echipamentului trebuie efectuate numai după ce v-aţi consultat cu firma producătoare. Piesele de schimb originale şi accesoriile autorizate de producător sunt esenţiale pentru gradul de conformitate. Folosirea altor tipuri de piese de schimb poate anula prevederile garanţiei sau compensării. 2.9.2

Descrierea staţiei de pompare

2.9.2.1 Introducere În acest capitol de instalare, exploatare şi întreţinere se găsesesc informaţiile necesare pentru instalărea şi întreţinerea staţiei de pompare, astfel încât să se asigure pentru acest produs o durată lungă de viaţă şi o funcţionare eficientă. Pompa este instalată cu ajutorul barelor de ghidare, cu conectare automată la cotul de refulare instalat permanent, în partea inferioară a colectorului de apă.

2.9.2.2 Aplicaţie Această statie este fabricată în următoarele scopuri : - pomparea pierderilor de apă; - pomparea apei neepurate sau a apei curate. Pentru mai multe informaţii despre aplicaţii, contactaţi cel mai apropiat reprezentant al furnizorului..

2.9.2.3 Materiale Staţia de pompare este fabricată din polimer armat cu fibre de sticlă (GRP) sau din polietilenă. Staţia de pompare va fi proiectată luându-se în calcul un nivel al pânzei freatice până la nivelul solului. Staţia de pompare va fi instalată în aşa fel încât încărcările datorate traficului să nu fie mai aproape de 1 metru faţă de marginea staţiei de pompare.

Page 92 of 556

Material conducte Staţia de pompare este disponibilă cu conducte din oţel inox. Barele de ghidare sunt din oţel galvanizat.

1. Tablou de control 2. Capac 3. Intrare cablu 4. Preaplin 5. Indicatori nivel 6. Refulare 7. Intrare ( aspiraţie ) 8. Pompă ( pompe )

2.9.3

Transport şi depozitare

Staţia de pompare este livrată în poziţie orizontală sau verticală, în funcţie de tip şi lungime. Asiguraţi-vă că aceasta nu se poate rostogoli sau cădea. Dacă staţia de pompare va fi depozitată pentru o perioadă mai lungă înaintea instalării, păstraţi-o în poziţie orizontală sau asiguraţi-o în mod adecvat, în poziţie verticală. Asiguraţi-vă că staţia este descărcată din camion cu o macara adecvată sau cu un echipament de ridicare. Întotdeauna descărcaţi staţia folosindu-vă de ochiurile de ridicare şi frânghii de ridicare adecvate. Descărcaţi-o şi aşezaţi-o cu grijă.

2.9.4

Instalarea

Instalarea se face in conformitate cu proiectul de instalare referitor la fiecare aplicatie Se vor respecta prevederile in vigoare privind transportul ridicarea manipularea sarcinilor.

Page 93 of 556

Precauţii de siguranţă În vederea minimizării riscului de accidente legate de transportul şi lucrările de instalare, trebuie respectate următoarele reguli: - întotdeaua acordaţi o atenţie deosebită aspectelor privind siguranţa când lucraţi cu echipamente de ridicat; - nu lucraţi niciodată singur; - folosiţi cască şi încălţăminte de protecţie; - asiguraţi-vă că echipamentul de ridicat este aprobat şi în bune condiţii; - asiguraţi-vă că ochirile de ridcare / mânerele, şi frânghiile sunt în bune condiţii; - întotdeauna ridicţi echipamentul de ochiurile / mânerele de ridicare; - nu staţionaţi sub obiectele aflate în suspensie; - citiţi manualul de instalare, îngrijire şi întreţinere al pompelor şi al celorlalte echipamente; - respectaţi toate celelalte regulamente privind siguranţa şi sănătatea, ordonanţe şi coduri locale;

2.9.4.1 Generalităţi Responsabilitatea pentru instalarea staţiei de pompare este întotdeauna purtată de contractor. Îndrumări generale conform EN 976-2 : 1997 Înlăturaţi ambalajul din jurul rezervorului, asiguraţi-vă că acesta nu se poate rostogoli. Fixaţi frânghii corespunzătoare pentru ridicare în ochiurile de ridicat.

La ridicare de la orizontală staţia de pompare, nu se va zdruncina şi nici balansa.

Page 94 of 556

Pentru a evita accidentele, se va păstra o distanţă de siguranţă, pe toata statiei.

durata de manevrare a

Amplasaţi staţia de pompare pe o suprafaţă orizontală rigidă şi asiguraţi-vă că aceasta nu va cădea.

2.9.4.2 Procedura de instalare Condiţiile dificile de sol cer întotdeauna investigarea de către un inginer geotehnic. Regulile generale de siguranţă pentru personal trebuie respectate.

Clasificarea condiţiilor de sol şi instalare conform ISO EN 976-2 CATEGORII DE INSTALARE

I

II

III

IV

V

Descriere sol

Foarte bun

Bun

Bunicel

Slab

Foarte slab

Coeziune minimă (kPa)

36

18

12

6

<6

Forţă portantă minimă, (kPa)

168

45

24

12

<6

SOLUL NATURAL

Page 95 of 556

Modul min. al solului,

2,8

1,7

1,4

0,7

< 0,7

Min. lovituri conform SPT 18

12

5

2

<2

Mpa

EXCAVARE REZERVOR CLASA 1 Pereţii excavării

Foarte stabili

Stabili

Instabili

instabili

Instabili

Distanţă minimă între două rezervoare (mm)

450

450

450

450

450

Distanţă minimă până la perete (mm)

450

450

0,5 D

0,5 D

450

Necesită geotextile

Nu

Nu

Nu

nu

Da

Necesită permanent foi (lemn/oţel) pentru

Nu

Nu

Nu

nu

Da

Pereţii excavării

Foarte stabili

Stabili

Instabili

instabili

Instabili

Distanţă minimă între două rezervoare (mm)

450

450

450

450

450

Distanţă minimă până la perete (mm)

450

0,5 D

0,5 D

0,5 D

450

Necesită geotextile

Nu

Nu

Nu

Da

Da

Necesită permanent foi (lemn/oţel) pentru

Nu

Nu

Nu

Nu

Da

Susţinerea pereţilor EXCAVARE REZERVOR CLASA 2

Susţinerea pereţilor

* Detalii privind descrierea solului: FOARTE BUN

: argilă foarte compactă, nisip dens, stâncă

BUN

: argilă compactă, nisip, soluri granulare cu densitate medie spre mare

BUNICEL

: argile moi spre mediu, soluri granulare fluide (lejere, curgătoare)

SLAB

: argile foarte uşoare până la uşoare şi nisipuri foarte fluide până la fluide

FOARTE SLAB: mai slabe decât IV, de obicei foarte fluide ** SPT : Test standard de penetrare.

Page 96 of 556

NB Peretii sapaturii se vor asigura contra sapaturii

2.9.4.3 Excavarea Modurile de excavare pentru rezervor (se vor lua în considerare stabilitatea nămolului, posibile scurgeri de apă etc.) vor fi adaptate condiţiilor de sol existente.

2.9.4.4 Prepararea plăcii rezervorului Asiguraţi-vă că placa este plană. Turnaţi nisip ca umplutură şi compactaţi-l. Asiguraţi-vă că suprafaţa este orizontală şi plană. Pentru staţii de pompare mai mari folosiţi o platformă de beton prefabricată pentru ancorarea staţiei de pompare sau turnaţi o placă de beton pe şantier (vezi figura de mai jos) .

2.9.4.5 Ancorarea Coborâţi staţia de pompare, temporar securizată, şi aliniaţi-o. Barele orizontale, fixate de fundul acesteia sunt folosite în vederea susţinerii staţiei în timpul transportului şi instalării. Staţiile tip sunt echipate cu o flanşă orizontală pe fundul acesteia. Greutatea materialului de umplutură de pe flanşă va preveni plutirea staţiei. Staţiile tip sunt ancorate cu ajutorul barelor de ancorare, fixate staţiei. Fie barele de ancorare sunt încastrate în platforma de beton de pe fundul găurii, fie se va turna beton ud între cilindru şi un amestec de beton, cu un diametru minim conform tabelului de mai jos. Pentru a se asigura o ancorare eficientă, betonul trebuie să fie turnat până la nivelul de minim al „h Min”, conform tabelului. Dacă înălţimea ( h ) betonului este cuprinsă între nivelele de Min şi Max, o contragreutate suficientă va fi obţinută prin umplerea staţiei de pompare cu apă, până la nivelul de minim 1500 mm, în timpul betonării. Calitatea minimă de beton cerută este de ENV 206, C30 / 37.

1. Umplutură compactată 2. Flanşă 3. Umplutură 4. Placă beton turnată pe şantier 5. Platformă de beton prefabricată

Page 97 of 556

2.9.4.6 Conexiunile conductelor Staţia de pompare este livrată complet cu conexiunile de intrare şi de refulare, ca de altfel şi cu conducta de preaplin ( dacă este comandată ). A se lua la cunoştinţă regulile locale cu privire la adâncimea de îngheţ.

2.9.4.7 Conexiunile electrice - Toate lucrările electrice vor fi efectuate sub supravegherea unui electrician autorizat. - Toate reglementările şi codurile locale se vor respecta. - Înaintea începerii lucrării, cablul de alimentare trebuie verificat să fie scos de sub tensiune. Amplasaţi tabloul de control al staţiei de pompare în aşa fel încât să fie uşor de operat în timpul operaţiunilor de verificare şi service. Verificaţi plăcuţa de date a pompei pentru a determina alimentarea cu voltaj corespunzător. Verificaţi dacă voltajul şi frecvenţa circuitului principal sunt în conformitate cu specificaţiile de pe plăcuţa de date a pompei. Citiţi cu atenţie manualul de instalare, îngrijire şi întreţinere, livrat împreună cu pompa, precum şi manualul pentru pornire şi pentru tabloul electric. Treceţi cablurile prin intrarea de cabluri, până la tabloul de control. Folosiţi suporţi de cabluri adecvate pentru interiorul staţiei de pompare. Conectaţi cablurile de la motor şi cablurile de la regulatorii de nivel, precum este arătat în diagrama de conexiuni a tabloului de control. -

Aveţi în vedere existenţa riscului de electrocutare şi a riscului de explozie, în cazul în care conexiunile electrice nu sunt correct efectuate! Respectaţi regulile şi recomandările din IEC 61140, „Protecţia împotriva electrocutării – aspecte generale pentru instalare şi echipament”.

2.9.4.8 Legătură de echilibrare Staţia de pompare este pregătită pentru o legătură de echilibrare a protecţiei, ceea ce înseamnă că, bara de ghidare superioară şi grătarul de protecţie, dacă sunt montate, sunt conectate cu un fir de împământare separat. Cablul de împământare va fi conectat la brida de ghidaj superioară. Doar personalului autorizat îi este permisă efectuarea conexiunilor la tabloul electric.

Page 98 of 556

Înaintea umplerii gropii Verificaţi că lucrările la conducte şi la conexiunile electrice sunt bine protejate şi sprijinite în timpul umplerii în jurul staţiei, în aşa fel încât nici o încărcare să nu fie aplicată acestora în timpul operaţiunii de compactare.

2.9.4.9 Umplerea Umplerea în jurul staţiei de pompare va fi executată cu sol mineral de nisip sau pietriş, având proprietăţile conform tabelului de mai jos :

Proprietăţile fizice ale materialului de umplere Proprietăţi fizice

CERINTA

Dimensiunea granulei, diametru

0,06 – 20 mm

Conţinut organic

< 2 % din greutate

Conţinutul de granule, dimensiunea < 0,06 mm

< 15 % din greutate

Coeficient de uniformitate, Cu = d 60 / d 10

5 – 10

Conţinutul de apă, w

3–8%

Materialul de umplere nu trebuie să conţină contaminări, ca de exemplu, zăpadă sau gheaţă în cantităţi semnificative. Încărcările contraactive vor fi obţinute prin greutatea proprie a platformei de beton şi a presiunii verticale a pământului asupra platformei de beton. Dacă staţia de pompare este instalată într-un material nămolos sau într-un sol organic, cleios, un strat separat de material geotextil va fi ataşat la pereţii excavarii înaintea umplerii şi compactării. Materialul geotextil va preveni transportarea materialului din solul natural în materialul de umplere, ceea ce ar putea deteriora calitatea materialului de umplere. Dacă staţia de pompare este instalată într-un material de umplere din roci sparte sau orice altfel de material stâncos, un strat separator de material geotextil va fi pozat pe pereţi excavarii înainte ca umplerea şi compactarea să se facă. Materialul geotextil va preveni transportarea materialului din solul natural în materialul de umplere, ceea ce ar putea deteriora calitatea materialului de umplere.

( Din ISO EN 976-2) Geotextile În cazul solului instabil definit conform paragrafului „Clasificarea condiţiilor de sol şi instalare”, sau acolo unde condiţiile pânzei freatice pot determina migrarea materialului de umplutură , trebuie instalat un

Page 99 of 556

material geotextil pe post de filtru. Materialul geotextil trebuie întins în conformitate cu recomandările producătorului. Compactarea materialului de umplere trebuie realizată complet, pentru a se asigura un sprijin ferm faţă de materialul aflat în structura staţiei de pompare. Deşi lucrările de compactare nu trebuie executate exagerat, pentru că, în funcţie de gradul de compactare al materialului de umplere, forţele orizontale care vor acţiona asupra peretelui staţiei de pompare vor fi mai mari. Umplerea şi compactarea trebuie executate strat cu strat, în jurul staţiei de pompare, de la peretele inferior al staţiei, ca de altfel, până la partea superioară a peretelui staţiei. Începeţi compactarea cu ajutorul unui utilaj vibrant, în jurul staţiei de pompare, acoperind toată suprafaţa. Doar când primul pas a fost completat se poate începe al doilea pas – când toţi paşii prescrişi pentru fiecare strat în parte au fost parcurşi se poate începe trecerea la următorul strat. Grosimea stratului şi numărul de paşi trebuie să fie conform tabelului de mai jos .

Compactarea materialului de umplere Echipament

Greutate ( kg )

Grosime strat ( mm )

Numărul de paşi pe strat

Ciocan pneumatic

70

300

4

Compactor cu placă vibratoare

50

200

3

Instalarea în zone de trafic rutier În zonele de trafic rutier, partea superioară, fabricată din GRP este schimbată cu o placă de beton. Design-ul plăcii de beton depinde de tipul de greutate la care va fi expusă. Exemple de încărcări ( pot varia, în funcţie de reglementările locale sau de standarde ) : - pietoni, biciclişti : 5 kN - autoturisme : 15 kN - trafic uşor : 80 kN - trafic greu : 400 kN Accesul la staţia de pompare este asigurat de un cadru de acces şi acoperit pentru desfăşurarea traficului.

Proiectarea plăcii de beton este responsabilitatea consultantului local sau a contractorului, ca de altfel şi achiziţionarea capacului cu ramă.

Page 100 of 556

Concrete slab = placă de beton Concrete ring stiffener = corniere beton Ground level = nivelul solului Flexible sealing = etansare flexibilă Back fill = material de umplutură Slab from above = placa de beton, vedere de sus

2.9.5

Punerea în funcţiune şi modul de funcţionare

2.9.5.1 Înainte de instalare Staţia de pompare este livrată complet pre-fabricată, cu cot de refulare, ţevi, valve, bare de ghidaj şi alte echipamente mecanice şi electrice. -

-

Când deschideţi staţia – verificaţi capacul din partea superioară şi grilajul de protecţie (dacă le-aţi comandat) dacă sunt bine fixate. Luaţi în considerare riscul producerii unor accidente sau pagube datorate strivirii. Verificaţi dacă întregul echipament din interiorul staţiei de pompare este foarte bine fixat şi se află în poziţie corectă, după ce a fost transportat şi instalat în pământ. Verificaţi toate conexiunile electrice. Înlăturaţi reziduurile de pe fundul colectorului de apă. Verificaţi dacă barele de ghidaj se află în poziţie verticală, folosind o nivela sau un fir cu plumb. Verificaţi toate cablurile şi asiguraţi-vă că acestea nu prezintă îndoiri majore sau că nu sunt tăiate sau perforate. Citiţi cu atenţie atât manualul de instalare, exploatare şi întreţinere al pompei, cât şi cel referitor la tabloul de control.

2.9.5.2 Instalarea pompei Coborâţi pompa de-a lungul barelor de ghidare. Când a ajuns în poziţia cea mai de jos, sprijinindu-se pe partea sa inferioară, pompa este automat conectată la cotul de refulare pre-asamblat.

Page 101 of 556

Pompa poate fi ridicată de-a lungul barelor de ghidare, pentru verificări, fără a fi nevoie de desfacerea oricărui tip de conectare. Fixaţi în cârligul cadrului de acces lanţul de ridicare şi cablul motorului la suportul acestuia. Folosiţi clemele – suport adecvate acestor operaţii.

2.9.5.3 Instalarea regulatorilor de nivel Folosiţi cleme-suport pentru cablurile regulatorului de nivel tip şi prindeţi-le în suportul cablului. Reglaţi înălţimea regulatorilor în concordanţă cu schema instalării. Dacă este utilizat alt tip al nivelului de măsurare vă rugăm să citiţi manualul de instalare.

2.9.5.4 Exploatare şi întreţinere Intervalele verificărilor şi a lucrărilor de întreţinere pot varia în funcţie de aplicaţie şi sunt adecvate fiecărei instalări în parte. Citiţi cu atenţie recomandările pentru programele de întreţinere preventivă şi / sau intervalele dintre lucrările de service pentru pompa existentă, senzorii de nivel şi tabloul de control. Aveţi grijă ca atat interiorul staţiei de pompare, cat si armaturile şi ţevile să fie păstrate curate (pe cât posibil). Grasimea din apa uzata depunerile si plutitorii, pot afecta funcţionarea senzorilor de nivel şi pot cauza, de asemenea, mirosuri neplăcute. Aceasta poate provoca atât neplăceri în ceea ce priveşte staţia de pompare, cât şi riscuri în activitatea echipei de lucrători. Depunerile pot determina o activitate destul de costisitoare cu evacuarea lor. Următoarele puncte sunt importante referindu-se la lucrările executate la staţia de pompare şi la echipamentul auxiliar: - Nu folosiţi grilajul ca platformă de lucru. Grilajul de protecţie are scopul de a evita producerea de accidente. - Atenţie la riscul de răniri cauzate prin strivire. - Dacă intraţi în staţia de pompare, fiţi atenţi la riscul emanaţiei de gaze periculoase şi folosiţi întotdeauna măşti de protecţie. - Verificaţi cu regularitate că echipamentul de ridicare se află în bune condiţii. - Asiguraţi grilajul de protecţie în poziţia deschisă, în conformitate cu figura de mai jos.

- Asiguraţi-vă că echipamentul electric este izolat faţă de alimentarea cu current şi că nu poate fi sub tensiune. - Asiguraţi-vă că echipamentul a fost complet curăţat. - Feriţi-vă de riscul de infecţie. - Respectaţi reglmentările locale privind siguranţa. - Întotdeauna purtaţi mănuşi şi încălţăminte de cauciuc. - Întotdeauna închideţi şi blocaţi capacul înaintea plecării de la staţia de pompare.

Page 102 of 556

Pentru orice lucrări de reparaţii – citiţi cu atenţie recomandările din manualul de instalare, îngrijire şi întreţinere, pentru pompele şi tabloul de control existente.

Page 103 of 556

2.10 Montaj conducte şi echipamente în staţii de epurare 2.10.1 Echipamente 2.10.1.1 Scopul lucrărilor Prezentul capitol, are scopul de a pune la dispoziţia beneficiarului şi a executantului informaţiile tehnice necesare efectuării lucrărilor de montaj echipamente şi conducte aparente, sub presiune, aferente Unitatilor de epurare compacte, containerizate tip, Bazinului de egalizare, omogenizare si pompare ape menajere, Gratarului manual si celelalte obiecte aferente statiei de epurare. Caietul de sarcini conţine: - condiţii tehnice necesare realizării lucrărilor de montaj - etape de execuţie a lucrărilor de montaj - condiţii de execuţie a lucrărilor de verificari şi probe - program pentru controlul calităţii lucrărilor executate Prezentul caiet de sarcini nu conţine prevederi pe parte de construcţii, instalaţii, electric şi automatizare, acestea făcând obiectul unor caiete de sarcini distincte.

2.10.1.2 Lucrari executate de furnizor •

Aprovizionarea, producerea si instalarea unitatilor electro-mecanice mentionate mai sus



Supravegherea tuturor fazelor de construire a statie de epurare



Pregatirea proiectelor pentru lucrarile civile, mecanice si electrice



Pregatirea manualului de utilizare pentru operatori si instructia echipei de operare



Transportul statiei de epurare si al echipamentului

2.10.1.3 Lucrari executate de beneficiar • Legaturile de conducte ce nu apartine statiei si conductele din cadrul statiei de epurare ce vin ingropate •

Toate lucrarile civile



Dimensiunile bazinelor sunt date conform calculului pentru volumul net necesar de apa.

• Constructorul trebuia sa ia in calcul nivelul real al apei astfel incat volumul net al bazinului sa includa volumul necesar de apa.

2.10.1.4 Materiale Materialele utilizate la execuţia lucrărilor de montaj vor fi noi şi vor respecta specificaţiile de materiale indicate în proiect. Toate materialele folosite vor fi însoţite de certificatele de calitate eliberate de furnizorul acestora. Certificatele vor fi completate cu rezultatele încercărilor, conform standardelor în vigoare. Avand in vedere caracteristicle fluidului de lucru si parametrii de lucru, materialul utilizat pentru conducte (tuburi, fitinguri) este PEHD (polietilena de inalta densitate) pentru conducte sub presiune si PVC pentru conducte cu curgere gravitationala.

2.10.1.5 Descrierea lucrărilor Realizarea lucrărilor de montaj ale echipamentelor şi conductelor implică parcurgerea următoarelor etape Page 104 of 556

de execuţie: - verificarea părţii de construcţii la montaj; - execuţia montajului echipamentelor; - execuţia montajului instalaţiilor de conducte; - efectuarea lucrărilor de verificări şi probe; - darea în exploatare a instalaţiei;

2.10.1.6 Verificarea părţii de construcţie la montaj Operaţiunea de verificare a lucrărilor de construcţie în vederea efectuării montajului se va face după o atentă analiză a proiectului de montaj, urmata de verificarea măsurătorilor executate de montor în amplasament. Montorul va face măsurători în amplasament, acestea se vor consemna într-un proces verbal semnat de către montor şi beneficiarul de investiţie. Se va acorda o atenţie deosebită următoarele aspecte: - verificarea poziţionării, a cotelor şi dimensiunilor penetraţiilor şi pieselor înglobate în beton; - verificarea cotelor de gabarit ale staţiei; - verificarea poziţionării şi dimensiunilor fundaţiilor echipamentelor; Datele obţinute prin măsurători, în teren, trebuie să corespundă celor prevăzute în proiectele de construcţii şi montaj. În cazul în care se constată abateri, este obligatorie consultarea proiectantului în vederea analizării situaţiei apărute şi stabilirii unei soluţii.

2.10.1.7 Montajul echipamentelor Se recomanda procurarea fitingurilor de racord la echipamente dupa achizitionarea echipamentelor si adaptarea racordurilor din proiect cu furnitura.

2.10.1.8 Montajul electropompelor Se monteaza trei electropompe in Bazinul de egalizare, omogenizare si pompare ape menajere. Montajul echipamentului se va executa cu respectarea prevederilor C 204-80, a prescripţiilor fabricantului (consemnate în cărţile tehnice) şi a cotelor din desenele de montaj. Racordurile dintre echipamente şi instalaţia de conducte se realizează prin flanşare. Datorită acestui aspect, trebuiesc respectate cotele de montaj faţă de partea de construcţie pentru a se putea monta cu uşurinţă garniturile şi şuruburile şi pentru evitarea apariţiei solicitărilor mecanice (tensiunilor) în corpul pompelor.

Montarea electropompelor implică parcurgerea următoarelor etape: a) - organizarea lucrărilor de montaj, care cuprinde: - amenajarea platformei de depozitare (destinată depozitării şi verificării părţilor componente ale echipamentelor, precum şi deconservarea lor înaintea începerii montajului); - accesul (care trebuie să asigure posibilitatea transportului echipamentelor de pe platforma de depozitare până la locul de montaj precum şi condiţiile necesare pentru ajungerea personalului la locul de montaj). - locul de montaj (care trebuie să asigure condiţiile necesare realizării montajului în mod

Page 105 of 556

corespunzător din punctul de vedere al calităţii lucrărilor executate, al normelor de protecţie a muncii şi al condiţiilor de lucru). b)- identificarea echipamentului (cot suport, unitate pompa-motor, ghidaj) în conformitate cu documentaţia de montaj si cărtea tehnic a echipamentului, verificarea stării de conservare (conform cărţii tehnice), verificarea şi preluarea certificatelor de calitate şi întocmirea formelor de preluare la montaj c) - pregătirea radierului/fundaţiei, curăţirea părţilor filetate a şuruburilor de fundaţie, a găurilor filetate şi nefiletate din plăca de bază; d) - trasarea axelor fundaţiei, a golurilor suruburilor de fundatie si a ghidajului şi verificarea cotelor de nivel si de montaj ale suportului pompei si ghidajului (corelarea intre suportul popei si ghidajul fixat la partea superioara de rama golului de montaj din planseul bazinelor) e) - înaintea instalării, se va spăla echipamentul pentru a înlătura inhibitorul de coroziune sau alte materiale străine ce s-ar fi putut acumula în timpul transportului, depozitării şi manipulării. Se va utiliza o soluţie slab alcalină la 800 C sau un solvent petrolier eficace f) - curăţirea suprafeţelor plăcii de bază ce vin în contact direct cu betonul. Nu se vor folosi solvenţi deoarece reziduul poate împiedica aderenţa. g) - premontarea plăcii de bază (cotului suport) si ghidajului, efectuându-se totodată controlul planeităţii placii de baza (cu ajutorul nivelei) si verticalitatii ghidajului cu ajutorul firului cu plumb. Orizontalitatea se va realiza prin strângerea piuliţelor şuruburilor de fundaţie. Se verifică în permanenţă orizontalitatea reajustând cât este necesar cu ajutorul unor by-lagare, până când piuliţele sunt complet strânse şi placa de bază este orizontală. h) - montarea unitatii pompa-motor pe cotul suport şi verificarea corectitudinii pozitiei de montaj a cotului suport si ghidajului prin manevre de scoatere si introducere a pompei. i) - intocmirea formelor de verificare a centrajului cot suport-ghidaj (cu beneficiarul şi asistenţa tehnică). j) - pregătirea pentru injectie/betonare, dupa cum placa suport a cotului pompei se fixeaza direct de radierul chesonului sau pe o fundatie din beton armat ancorata de armaturile di radierul chesonului, injectarea/betonarea, verificarea prizei betonului marca C 20/25 (după perioada prescrisă) conform NE012 – 2007. Alinierea precisă a cotului suport al pompei si ghidajului este indispensabilă pentru corecta funcţionare si exploatare a pompei. k) - conservarea echipamentelor, începând cu perioada de asamblare în instalaţie şi până la terminarea montajului

2.10.1.9 Montajul mixerelor Se monteaza un mixer in Bazinul de egalizare, omogenizare si pompare apa menajera. Conditiile si etapele de montaj ale mixerului sunt similare cu cele de la pompele submersibile mai putin cele legate de montajul cotului suport care lipseste in cazul mixerului.

2.10.1.10

Montajul containerelor aferente Unitatilor de epurare si anexelor acesteia

Containerele aferente Unitatilor biologice si anexelor acesteia se monteaza pe platforme de beton armat aferente. Montajul echipamentelor se va executa cu respectarea prevederilor C 204-80, a prescripţiilor fabricantului (consemnate în cărţile tehnice) şi a cotelor din desenele de montaj. Racordurile dintre echipamente şi instalaţiile de conducte se realizează prin flanşare sau filetare. Datorită acestui aspect, trebuiesc respectate cotele de montaj faţă de partea de construcţie pentru a se putea monta cu uşurinţă garniturile şi şuruburile şi pentru evitarea apariţiei solicitărilor mecanice (tensiuni) în zonele de racord.

Page 106 of 556

Montarea containerelor implică parcurgerea următoarelor etape: a) - organizarea lucrărilor de montaj, care cuprinde: - amenajarea platformei de depozitare (destinată depozitării şi verificării părţilor componente ale echipamentelor precum şi deconservarea lor înaintea începerii montajului); - accesul (care trebuie să asigure posibilitatea transportului echipamentelor de pe platforma de depozitare până la locul de montaj precum şi condiţiile necesare pentru ajungerea personalului la locul de montaj). - locul de montaj (care trebuie să asigure condiţiile necesare realizării montajului în mod corespunzător din punctul de vedere al calităţii lucrărilor executate, al normelor de protecţie a muncii şi al condiţiilor de lucru). b)- identificarea echipamentelor în conformitate cu documentaţia de montaj si cărtea tehnic a echipamentului, verificarea stării de conservare (conform cărţii tehnice), verificarea şi preluarea certificatelor de calitate şi întocmirea formelor de preluare la montaj c) - pregătirea fundaţiei d) - trasarea axelor fundaţiei si a golurilor suruburilor de fundatie e) - înaintea instalării, se va spăla echipamentul pentru a înlătura inhibitorul de coroziune sau alte materiale străine ce s-ar fi putut acumula în timpul transportului, depozitării şi manipulării. Se va utiliza o soluţie slab alcalină la 800 C sau un solvent petrolier eficace f) - curăţirea suprafeţelor plăcii de bază ce vin în contact direct cu betonul. Nu se vor folosi solvenţi deoarece reziduul poate împiedica aderenţa. g) - premontarea containerelor, efectuându-se totodată controlul planeităţii placii de baza (cu ajutorul nivelei). Orizontalitatea se va realiza prin strângerea piuliţelor şuruburilor de fundaţie. Se verifică în permanenţă orizontalitatea reajustând cât este necesar cu ajutorul unor by-lagare, până când piuliţele sunt complet strânse şi placa de bază este orizontală. h) - Intocmirea formelor de verificare a montajului containerelor pe fundatiile/platformele de beton armat (cu beneficiarul şi asistenţa tehnică). i) - injectia suruburilor de ancorare/conexpandurilor. j) - conservarea echipamentelor, începând cu perioada de asamblare în instalaţie şi până la terminarea montajului

2.10.1.11

Montajului instalaţiei de conducte

Conductele aparente, sub presiune, care fac obiectul prezentului Caiet de sarcini, se executa din tuburi si fitinguri din PEHD si PVC, care se asambleaza prin infiletare si flansare. În principiu, montarea instalaţiilor tehnologice cu conducte implică parcurgerea următoarelor etape: - studierea documentaţiei de montaj şi organizarea execuţiei montajului; - verificarea stării fizice a conductelor (tuburi, fitinguri) si armaturilor (robineti) şi identificarea acestora în conformitate cu desenele de montaj, implicit verificarea materialelor după certificatele de calitate emise de furnizori; - trasarea, debitarea, filetarea tronsoanelor de tuburi, alinierea şi centrarea traseelor de conducte, întocmirea fişelor de măsurători, - premontarea elementelor de conducta si armaturilor conform desenelor de montaj - verificarea fişelor de măsurători şi montarea definitivă urmată de montarea suporturilor

Page 107 of 556

provizorii, apoi verificarea realizării pantelor tehnologice; - blocarea suporturilor şi pregătirea circuitelor în vederea efectuării probei hidraulice; - efectuarea probei hudraulice de etanşeitate, în scopul depistării şi remedierii eventualelor defecte constatate; - conservarea materialelor de bază şi auxiliare începând cu perioada de asamblare în instalaţie şi până la terminarea montajului; Amintim că toate lucrările de montaj se vor executa cu materiale noi, omlogate, ce corespund standardelor în vigoare, însoţite de certificate de calitate, recepţionare şi depozitare conform prevederilor în vigoare. Asamblările demontabile cu organe de asamblare (suruburi, piulite, saibe, garnituri) si prin infiletare, vor fi executate cu personal calificat pentru asemenea operaţiuni.

2.10.1.12

Efectuarea lucrărilor de verificări şi probe

Această etapă cuprinde: - verificarea vizuală a realizării montajului echipamentelor si conductelor în conformitate cu proiectul de montaj - efectuarea probei de presiune cu apă - efectuarea remedierilor eventualelor defecţiuni evidenţiate în timpul lucrărilor de probe. Lucrările de probe se vor executa conform prevederilor cuprinse în prezentul caiet de sarcini.

2.10.1.13

Darea în exploatare a instalaţiilor

Această etapă cuprinde: - verificarea tuturor documentelor care atestă parcurgerea tuturor etapelor prezentate mai sus (procese verbale de preluare a construcţiei pentru efectuarea montajului, certificate privind calitatea materialelor folosite, procese verbale de efectuare a probelor - inclusiv defectele apărute şi remedierile executate) - verificarea execuţiei montajului în teren în conformitate cu prevederile proiectului; - efectuarea probei de funcţionare a instalaţiei timp de 72 ore (conform PE 003), pe parcursul acesteia urmărindu-se încadrarea funcţionării instalaţiei în parametrii (realizarea obiectivelor cheie).

2.10.1.14

Condiţii de execuţie a lucrărilor

La execuţia instalaţiei se vor respecta indicaţiile şi condiţiile tehnice cuprinse în desenele de montaj şi NORMATIVELE C204-80 şi C150-84; Tehnologia de execuţie va fi stabilită de către executanţ, cu respectarea obligatorie a condiţiilor prescrise în desenele de execuţie (cote, dimensiuni, materiale, abateri, etc.) si a cerintelor din prezentul Caiet de sarcini.

2.10.1.15 Verificări şi lucrări de probe 2.10.1.15.1.1 Verificări Înainte de efectuarea lucrărilor de probe, se vor face o serie de verificări la terminarea montajului, în conformitate cu prescripţiile în vigoare (PE003 şi C204-80). Se va verifica existenţa certificatelor de calitate pentru materialele noi. Page 108 of 556

Se va verifica vizual aspectul materialelor intrate în operă. Tuburile, fitingurile, armăturile care prezintă defecţiuni nu vor fi folosite. Se verifică dacă montajul s-a executat în conformitate cu desenele de montaj. Se verifică încadrarea lucrărilor de montaj în cotele prevăzute în desenele de montaj. Pentru echipamente, se verifică respectarea condiţiilor impuse prin instrucţiunile si normele tehnice de montaj întocmite de proiectantul de specialitate (Carti tehnice care insotesc echipamentul). Se verifică existenţa procesului verbal de admitere a instalaţiei la probe, după terminarea lucrărilor de montaj.

2.10.1.15.1.2 Proba de presiune hidraulică La terminarea montajului instalaţiilor de conducte acestea se vor proba din punct de vedere al rezistenţei şi etanşeităţii. Proba de presiune va certifica capacitatea sistemelor de a funcţiona în limitele parametrilor de exploatare şi fiabilitate proiectaţi. Proba de presiune hidraulică se va executa pe circuitul de presiune cuprins între echipamente si intre punctul de racord la reţeaua exterioară şi echipamente, verificând circuitul la valorile de presiune indicate, cu blindarea legăturilor cu echipamentele (nu se verifică echipamentele ci doar conductele) şi a punctului de racord cu reţeaua exterioară. Este interzisa izolarea circuitelor care se probeaza cu ajutorul robinetilor. La executarea lucrărilor de probe se va respecta Legea 10/1995 privind calitatea în construcţii şi precum şi prevederile Normativului I 12-78. Valoarea presiunii de probă:

- pentru instalaţia de conducte de refulare: P = 1,5 x P lucru =2x1,5=3 bar

Înainte şi pe parcursul lucrărilor de probe, se vor respecta următoarele condiţii: - tronsoanele de conducte supuse probei vor fi suflate la interior şi curăţate cu aer sub presiune; - se va asigura accesul pentru vizitare a întregului tronson probat. În acest scop, se vor îndepărta toate materialele ce ar putea împiedica controlul şi se va asigura posibilitatea de acces pentru personal; - proba de presiune se va efectua pe vreme uscată, astfel încât să poată fi observate eventualele scăpări de apă; - umplerea cu apă a tronsoanelor se va face astfel încât să se asigure completa evacuare a aerului din interior; - fluidul de lucru va fi apa curată, fără particule în suspensie, la o temperatură cuprinsă între +50C şi +300C; - manometrele utilizate vor fi astfel alese încât valoarea presiunii maxime de încercare să se poată citi pe ultima treime a scării gradate, iar diametrul exterior va fi de minim 160 mm pentru a putea fi citite de la o distanţă de 5 m; - ridicarea presiunii se va face cu pompa manuală de presiune, treptat, fără şocuri. La fiecare treaptă se va menţine presiunea atâta timp cât este necesar verificării întregului tronson probat, dar nu mai puţin de 10 minute. Încercarea de presiune se consideră reuşită dacă, după trecerea intervalului de 10 minute de la realizarea presiunii de probă, valoarea presiunii pe manometrul de probă nu a scăzut cu mai mult de 5% din valoarea

Page 109 of 556

presiunii de probă şi nu au apărut scăpări vizibile de apă. Dacă pe parcursul efectuării probelor se ivesc defecţiuni, se întrerup lucrările de probe şi se remediază defecţiunile. După efectuarea remedierilor, se reiau de la început lucrările de probe. Rezultatele lucrărilor de probe vor fi consemnate în procese verbale încheiate între executanţi şi beneficiari. Pe lângă alte date, acestea vor conţine obligatoriu şi următoarele: - data încercării; - parametrii fluidului de încercare; - valoarea presiunii de încercare şi timpul de menţinere la presiunea de probă; - rezultatele obţinute (inclusiv defecţiunile constatate şi remedierile efectuate); - concluzii (inclusiv diagrama de înregistrare a presiunii, dacă este posibil); - semnăturile comisiei de probe. Un exemplar din înregistrările probei hidraulice se va transmite de executant proiectantului, pentru a fi inclus în documentaţia "cartea documentaţiei". După efectuarea cu succes a probei hidraulice, se vor realiza racordurile finale la echipamente, fiind interzisă orice intervenţie (modificare) a respectivului circuit până la punerea în funcţiune. Organizaţia de montaj va lua măsuri de protecţia muncii pe toată durata probelor. Personalul care efectuează probele va fi calificat şi special instruit. Perimetrul de execuţie a lucrărilor de probe va fi îngrădit şi va fi prevăzut cu plăcuţe de avertizare. Se interzice accesul în perimetrul de lucru al persoanelor neautorizate. Personalul care efectuează probele va avea instructajul de NTSM făcut şi va fi instruit asupra modului de funcţionare a instalaţiei. La execuţia lucrărilor de probe se vor respecta prevederile cuprinse în Normativul de verificări, încercări şi probe privind montajul, punerea în funcţiune şi darea în exploatare a instalaţiilor energetice ind. 30-2-1970.

2.10.1.15.1.3 Condiţii de recepţie şi probe tehnologice la terminarea montajului Pentru recepţia lucrărilor de montaj, executantul va prezenta beneficiarului următoarele documente: - proces verbal de preluare a construcţiei pentru efectuarea montajului; - proces verbal de calitate a materialelor puse în operă; - procese verbale de efectuare a probelor; Beneficiarul va verifica execuţia lucrărilor pe teren în conformitate cu proiectul de montaj. Ultima etapă, înainte de darea în exploatare a instalaţiei, este efectuarea probei de funcţionare de 72 ore (conform PE 003), în care se poate urmări încadrarea instalaţiei în parametrii indicaţi în proiect.

2.10.1.16

Urmărirea comportării construcţiilor

Pentru echipamentele şi instalaţiile de conducte aparente aferente staţiei de epurare, nu sunt necesare instalaţii speciale de urmărire a comportării în exploatare a construcţiei.

2.10.1.17 Documentaţie de referinţă 2.10.1.17.1.1 Normative - C204-80 Normativ cadru privind verificarea calităţii lucrărilor de montaj a utilajelor şi instalaţiilor tehnologice pentru obiective de investiţii. - I12-78 - Normativ pentru efectuarea încercărilor de presiune la conducte tehnologice din oţel. Page 110 of 556

- OG 95/99 Privind calitatea lucrărilor de montaj

2.10.1.17.1.2 Standarde - STAS 10110-76 -

Alimentarea cu apă. Staţii de pompare. Prescripţii generale de proiectare.

- Colecţia de STAS-uri "Organe de maşini", vol. III-a şi III-b, Institutul Român de Standardizare, E.T. 1985. 2.10.1.17.1.3 Cataloage de produse - Catalog de produse şi specificatii oferte pentru echipamente si materiale

2.10.1.18

Măsuri de protecţia muncii şi PSI

Lucrările cuprinse în prezenta documentaţie corespund cerinţelor din normativele de mai jos, fiind obligatorie respectarea acestora de către executanţi şi beneficiar: -

-

Regulamentul privind protecţia muncii şi igiena muncii în construcţii, aprobat de MLPAT prin ordinul 9/1993; Legea nr. 90/1997 cu privire la protecţia muncii; Ordinul 35/208/1993 al Ministerului Muncii şi Ministerului Sănătăţii pentru aprobarea concentraţiilor maxime admisibile în scopul prevenirii îmbolnăvirilor profesionale şi a accidentelor de muncă provocate de gaze, vapori, pulberi. Norme republicane de protecţia muncii modificate şi completate prin ordinul comun al Ministerului Muncii şi Ministerul Sănătăţii nr. 110/77 şi 39/77; PE 009/93 Norme de prevenire, stingere şi dotare împotriva incendiilor pentru ramura energiei electrice şi termice, cu modificări în ordinul MEE nr. 1450/83; PE 022/87 Prescripţii generale de proiectare a centralelor termoelectrice şi a reţelelor de termoficare; I 9/82 Normativ pentru proiectarea şi executarea instalaţiilor sanitare, aprobate cu decizia ICCPDC nr. 107/82; P 118/99 Norme tehnice de proiectare şi realizare a construcţiilor privind protecţia la acţiunea focului; Norme generale de prevenire şi stingere a incendiilor, aprobate cu ordinul MI nr. 381/93 şi ord. MLPAT nr. 7/N/93; C 300/94 Normativ de prevenire şi stingere a incendiilor pe durata executării lucrărilor de construcţii şi instalaţii aferente; HG nr. 51/92 privind unele măsuri pentru îmbunătăţirea activităţii de prevenire şi stingere a incendiilor cu modificările şi completările din HG nr. 71/96, HG nr. 571/98 şi HG nr. 775/98; Norme generale de prevenire şi stingere a incendiilor aprobate cu ord. MI nr. 775/98; Ordonanţa Guvernului nr. 60/97 privind apărarea împotriva incendiilor, aprobată prin Legea nr. 212/97 şi prin decretul nr. 636/97.

2.10.2 Reţele în incintă 2.10.2.1 Scopul lucrării Prezentul capitol cuprinde condiţiile tehnice necesare efectuării lucrărilor de terasamente şi construcţii montaj aferente realizării reţelei de canalizare menajeră si retelei de conducte sub presiune. Caietul de sarcini cuprinde: -

descrierea lucrărilor caracteristicile materialelor ce intră în operă etape de execuţie a lucrărilor de canalizare si conducte sub presiune din incintă verificări şi probe recepţia şi punerea în funcţiune măsuri de securitate la incendiu norme de protecţia muncii standarde, normative, instrucţiuni

Page 111 of 556

2.10.2.2 Descrierea lucrărilor Proiectul cuprinde: -detaliile necesare pentru realizarea lucrărilor de canalizare menajeră de pe platforma Statiei de epurare intre colectorul general de canalizare apa menajera, obiectele Statiei de epurare si colectorul de evacuare apa epurata si dezinfectata -detaliile necesare pentru realizarea lucrărilor de conducte sub presiune intre Bazinul de egalizare, omogenizare si pompare si Unitatile de epurare, intre Unitatea de epurare si Cladirea tehnologica care contine Bazinul de colectare si pompare namol si Unitatea de deshidratare si conductele de apa potabila de pe platforma. Conductele de canalizare (gravitationale) se vor realiza din tuburi, fitinguri cu mufa din PVC, iar conductele sub presiune din tuburi, fitinguri din PEHD asamblate prin sudura.

2.10.2.3 Caracteristicile materialelor ce intră în operă Materialele utilizate la execuţia reţelelor de canalizare si sub presiune din tuburi, fitinguri PVC si PEHD vor fi noi, omologate şi vor respecta standardele şi specificaţiile de material indicate în prezentul caiet de sarcini. Toate materialele folosite vor fi noi şi însoţite de certificatele de calitate eliberate de furnizorul materialelor, completate cu rezultatele încercărilor, conform standardelor în vigoare.

2.10.2.4 Etape de execuţie a lucrărilor Tehnologia executării reţelelor de canalizare si sub presiune din tuburi PVC si PEHD îngropate în pământ comportă următoarele faze şi operaţiuni:

2.10.3 Faza premergătoare - Pregătirea traseului conductei (eliberare teren) - Marcarea traseului şi fixarea reperilor în vederea execuţiei lucrărilor la cotele din proiect. - Recepţia, sortarea şi transportul conductelor după diametre şi a materialelor pentru execuţie. - Stabilirea amplasamentelor căminelor de vizitare, - Verificarea cotelor în căminele de vizitare

2.10.4 Faza de execuţie - Săparea tranşeelor -

Lansarea şi îmbinarea conductelor Execuţia căminelor de vizitare cf. STAS 2448/82

2.10.5 Faza de probe şi punere în funcţiune - Proba de etanşeitate a conductelor - Înlăturarea defecţiunilor - Execuţia umpluturilor - Recepţia generală a reţelei. Din prezentul caiet de sarcini/sectiunea B, fac parte integrantă standardele normativele şi instrucţiunile privind execuţia terasamentelor, probele de presiune, protecţia muncii în vigoare la data executării lucrării.

Page 112 of 556

2.10.5.1 Trasarea şi nivelmentul Înainte de începerea lucrărilor, constructorul va materializa pe teren traseul reţelelor şi racordurilor şi a căminelor de vizitare conform proiect, marcând punctele caracteristice (amplasament cămine, separator, schimbări de direcţie, etc.) prin ţăruşi. În cazul în care elementele de trasare sunt insuficiente sau apar neconcordanţe între situaţia din teren şi proiect, se vor solicita clarificări din partea proiectantului. Determinarea exactă a adâncimii de săpătură se va face cu rigle de nivel şi cruci de vizare, pentru asigurarea cotelor din proiect şi panta continuă. Se va corela obligatoriu cota terenului amenajat cu adâncimea de pozare a conductei conform profilelor longitudinale. Săpătura şi sprijinirea tranşeei La efectuarea săpăturilor se vor respecta prevederile din normativ C 169/88 pentru execuţia lucrărilor de terasamente şi din I 22 - 99. Săpătura se va începe numai după completa organizare a şantierului şi aprovizionarea conductelor şi a celorlalte materiale necesare, astfel ca şanţurile să rămână deschise un timp cât mai scurt. Săpătura şanţurilor se va face conform unui grafic detaliat al execuţiei conductelor şi căminelor, întocmit de constructor pe baza posibilităţilor de lucru ale şantierului. Săpăturile se vor executa manual în tranşee cu taluz vertical cu lăţimea de 1,20 m, cu sprijiniri orizontale la tranşee şi sprijiniri cu dulapi metalice verticali la cămine. Pentru cămine, secţiunea săpăturii va fi cu 1 m mai mare pe fiecare latură, decât dimensiunile exterioare ale construcţiei. Amenajarea patului pentru conducte se va face prin aşternerea manuală a unui strat de nisip de 10 cm grosime sub tuburile de PEHD.

2.10.5.2 Lansarea conductelor PEHD La primirea ţevilor pe şantier se va examina certificatul de calitate şi se vor verifica dimensiunile şi caracteristicile tuburilor din PEHD, atât la primirea acestora pe şantier cât şi la depozitarea acestora pe marginea şanţului. Verificarea va avea ca obiect atât dimensiunile conductelor şi vor trebui să se încadreze condiţiilor tehnice din catalogul de produse (PEHD) al furnizorului. Înainte de coborârea tuburilor în tranşee , se recomandă să se asigure o adâncitură de îmbinare sau “clopot” pe fundul tranşeei (în dreptul îmbinării cu mufa sau prin sudura) pentru a permite asamblarea corectă.

2.10.5.3 Asamblarea conductelor PVC pentru canalizare Inelul de etanşare din cauciuc al racordului şi capătul drept pereche trebuie să fie curăţite şi unse cu pastă de îmbinare chiar înainte de realizarea îmbinării La executarea canalizărilor din PVC se vor respecta obligatoriu toate prevederile din “Ghid privind proiectarea, execuţia şi exploatarea sistemelor de alimentare cu apă şi canalizare utilizând conducte din PVC”.

2.10.5.4 Asamblarea conductelor PEHD sub presiune La primirea ţevilor pe şantier se va examina certificatul de calitate şi se vor verifica dimensiunile şi caracteristicile ţevilor.

Page 113 of 556

În procedeul de sudare cap la cap cu termoelement (disc sau oglinda), piesele de asamblat (tub/tub, tub/fiting sau fiting/fiting) sunt încălzite în zona de sudat la temperatura de sudură, apoi sudate împreună prin aplicarea presiunii fără aport suplimentar de material. Rezultă o îmbinare omogenă. Realizarea sudurilor cap la cap cu termoelement nu trebuie să se făcă decât prin utilizarea aparatelor de sudură care permit controlul valorii presiunii aplicate şi de regulă, al temperaturii. Indicele de fluiditate a racordurilor cu capete drepte pentru sudura în PE se situează în gama 0,7 si 1,3g/10min. Ele pot fi sudate cu tuburi din PE al căror indice de fluiditate MFI este cuprins între 0,4 si 1,3g/10min. În zona îmbinării, grosimea peretelui tubului de racordat trebuie să corespundă celei a racordului de sudat cap la cap. Sudurile cap la cap cu termoelement nu trebuie să fie executate decât de sudori calificaţi, atestati de producător sau o instituţie autorizată. Suplimentar faţă de uneltele folosite în mod curent pentru instalarea ţevilor din materiale plastice, cum ar fi tăietor de tuburi sau foarfecă, este necesar un aparat de sudat special pentru sudura cap la cap. Acest aparat trebuie să răspundă următoarelor cerinţe minimale: -Dispozitivele de strângere trebuie să permită strângerea corespunzătoare a pieselor fără să deterioreze suprafeţele şi nici să afecteze forma rotundă a lor. Dealtfel, piesele trebuie să poată fi strânse într-o aliniere perfectă. -Este necesar să fie posibilă o pregătire prin îndepărtarea aşchiilor cu feţe plan-paralele de pe suprafeţele de sudat strânse de aparatul de sudură. -Aparatul de sudură trebuie sa aiba o construcţie suficient de rigidă pentru ca în timpul procesului de sudură presiunile ce trebuie aplicate să nu provoace deformări ale acestuia.

Suprafeţele de încălzire ale termoelementului trebuie să fie plane si paralele. Repartiţia temperaturii pe suprafaţa utilă nu trebuie să prezinte depăşiri superioare la 10 0C. Pentru instalarea şi utilizarea aparatului de sudură, trebuie să se urmeze modul de întrebuinţare indicat de producător Locul de muncă trebuie să fie protejat împotriva efectelor defavorabile ale intemperiilor, cum sunt ploaia, zapadă sau vântul. In caz de temperaturi mai mici de +5gr.C şi mai mari de 40gr.C, este necesar să se ia măsuri corespunzătoare pentru protejarea locului de muncă ,în scopul obţinerii unei temperaturi care să permită asigurarea unei execuţii impecabile a sudurilor şi a unor condiţii normale de muncă. In caz de expunere la razele solare, protecţia locului unde se efectuează sudura se va realiza printr-o prelată care permite să se obţină o temperatura uniformă pe tot conturul tubului. In măsura în care este posibil, extremităţile opuse ale tuburilor de sudat trebuie să fie obturate pentru a reduce cât mai mult posibil răcirea suprafeţelor sudurii prin efectul vântului. Temperatura de sudură trebuie să fie cuprinsă între 200 si 220 0C. Trebuie să se controleze, de asemenea, din când în când, temperatura de sudare, în timpul execuţiei lucrărilor de sudură. In special efectul vântului poate provoca modificari uşoare ale temperaturii termoelementului. Suprafaţa termoelementului trebuie să fie protejată împotriva murdăriei.Înainte de a începe fiecare sudură, se curăţă cele doua părţi ale termoelementului cu ajutorul unei hârtii uscate şi nefibroase. În timpul întreruperilor sudurii, termoelementul se păstrează astfel încât să fie protejat împotriva efectelor vântului, murdăririi şi deteriorărilor. Piesele strânse în dispozitivul de sudură sunt pregătite simultan prin îndedărtarea aşchiilor cu ajutorul rabotezei destinate acestui scop. Grosimea aşchiilor trebuie să fie < 0,2mm. Această pregătire este suficientă atunci când cele două piese de sudat nu mai prezintă părţi nerăzuite. Acesta este, în mod normal, cazul atunci când nu se mai desprind aşchii de pe suprafeţele pregătite. In orice caz se evita atingerea cu mâinile a suprafeţelor de sudat. In caz contrar, se procedeaza la o curăţire cu hârtie absorbantă îmbibată

Page 114 of 556

cu solvent. După pregătire, cele două piese se apropie până când ajung în contact. Spaţiul dintre piese nu trebuie să depăşeasca în nici un punct 0,5mm. Se controlează în acelaşi timp alinierea celor două piese. Un eventual decalaj al suprafeţelor exterioare nu trebuie să depăşească 10% din grosimea peretelui. In caz contrar, trebuie găsită o poziţie mai bună de strângere, de exemplu prin rotirea tubului. Important: Pregătirea suprafeţelor de sudură trebuie să fie efectuată chiar înaintea sudurii. Nu se admite în nici un caz folosirea agenţilor de răcire in timpul răcirii. Piesele de sudat trebuie să fie menţinute în dispozitivul de sudare sub presiunea de îmbinare până la încheierea timpului de răcire indicat în tabel.

2.10.5.5 Execuţia căminelor de vizitare Căminele de vizitare se vor executa conform STAS 2448/82 şi sunt compuse din: -

fundaţia căminului, din beton camera de lucru realizată din tuburi de beton cu mufă, Dn 1000, înglobată la un capăt în fundaţia căminului placa între camera de lucru şi coşul de acces aducerea la cotă a coşului de acces ( la nivelul terenului) cu beton monolit

La partea superioară este prevăzută o placă prefabricată pe care se va rezema capacul. Acoperirea căminelor de vizitare se va face cu capace cu ramă din fontă STAS 2308/81 cu piesă suport tip IIIB carosabil.

2.10.5.6 Verificări şi probe 2.10.5.6.1.1 Pentru conductele de canalizare Reţelele de canalizare se vor proba preliminar la fiecare tronson, pe marginea şanţului. Proba finală se poate realiza pe mai multe tronsoane, dar numai în şanţ. Înaintea probei de etanşeitate, tranşeea se umple parţial până la 20-30 cm peste partea superioară a tubului lăsându-se îmbinările libere. Proba de etanşeitate se va efectua între cămine consecutive, umplerea canalului făcându-se de la capătul aval. Pentru realizarea probei de etanşeitate se închid etanş toate orificiile şi se blochează extremităţile canalelor şi a tuturor punctelor susceptibile de a se deplasa în timpul probei. P proba=0,5 bar Durata de încercare este de minim 15 minute. Pierderile de apă admise în canal sunt conform STAS 3051/91 Probele de etanşeitate nu se vor executa la temperaturi exterioare mai mici de + 50C . Se vor respecta cu stricteţe prevederile din ghidul indicativ GP 043/99 Pentru canalizarea din tuburi PEHD conducta trebuie să fie umplută cu apă timp de 1 oră. Proba nu trebuie să prezinte pierderi de apă cel puţin 15 minute la o presiune de 0.5 bari. Apa adăugată nu trebuie să depăşească 0.02 litri / mp de suprafaţă udată în interiorul tubului (cf. DIN 4033).

2.10.5.6.1.2 Pentru conductele de canalizare Proba de presiune se efectueaza o data cu tronsoanele de conducte aparente de la capete conform cap.7.2 din prezentul Caiet de sarcini/sectiuna A.

Page 115 of 556

2.10.5.7 Umplerea tranşeei cu pământ La execuţia umpluturilor se vor respecta prevederile Ghidul indicativ GP 043/99.Materialul de umplutură trebuie să fie curăţat de pietre şi blocuri ( granule de 20 mm cel mult) şi de materiale susceptibile să deterioreze conductele (cenuşi agresive), precum şi goluri care pot avea tasări ulterioare. Se interzice execuţia lucrărilor de umplutură pe timp friguros cu temperaturi având valori sub 0oC. Umplerea tranşeei se va executa după efectuarea probei de presiune . Umplerea tranşeei se va face în straturi succesive de pământ de 15 cm grosime, compactat cu maiul de mână la umiditatea optimă, funcţie de natura terenului de umplutură, simultan pe ambele părţi pentru evitarea deplasării laterale a tubului. In zona tubului, până la 0.30m deasupra generatoarei superioare, materialele de umplutură trebuie să fie puse în straturi succesive de grosime maximă de 0.15m. Aceste materiale vor fi compactate manual sau cu echipament uşor. Compactarea nu trebuie să fie excesivă pentru a nu periclita stabilitatea tubului, în special tuburile deformabile. Trebuie să se compacteze în jurul tubului atât cât este necesar pentru asigurarea stabilităţii tubului După efectuarea probei de etanşeitate pe tronsoane, tranşeea se va umple cu pământ, lăsându-se libere îmbinările între tronsoane, care se vor umple după proba generală. La umplerea completă a tranşeei se va avea grijă ca suprafaţa terenului să fie refăcută conform amenajării iniţiale (drumuri, trotuare, etc.).

2.10.5.8 Recepţia şi punerea în funcţiune După efectuarea probelor pe tronsoane, remedierea defecţiunilor şi realizarea racordurilor, se trece la proba generală şi recepţia lucrărilor conform prevederilor normativului I 22-99. Recepţia lucrărilor este precedată de controlul riguros al acestora, care cuprinde în mod obligatoriu următoarele elemente: -

verificarea aspectului general al instalaţiei respectarea dimensiunilor şi a celorlalte cote prevăzute în proiectele de execuţie, asigurarea capacităţii de transport, respectarea măsurilor de protecţie şi securitate a muncii,

Punerea în funcţiune a lucrărilor necesită luarea în prealabil a următoarelor măsuri obligatorii: - instruirea personalului de exploatare şi verificarea însuşirii de către aceştia a prevederilor regulamentului, - organizarea evidenţelor de exploatare, - asigurarea unui sistem corespunzător de informare şi de transmitere a datelor.

2.10.5.9 Masuri de securitate la incendiu La executarea şi exploatarea lucrărilor din documentaţie se va avea în vedere respectarea precizărilor firmei producătoare şi a următoarelor normative: -

PE 022/87 Prescripţii generale de proiectare a centralelor termoelectrice şi a reţelelor de termoficare; PE 009/93 Norme de prevenire, stingere şi dotare împotriva incendiilor pentru producerea, transportul şi distribuţia energiei electrice şi termice. I-9/94 Normativ pentru proiectarea şi executarea instalaţiilor sanitare aprobate cu Ord. MLPAT nr.17/NI/16.05.1995; I9/1-96 Normativ pentru exploatarea instalaţiilor sanitare P-118/99 Norme tehnice de proiectare şi realizare a construcţiilor privind protecţia la acţiunea focului cu modificările din ordinul MLPAT nr 29/N-96

Page 116 of 556

C-300/94 Normativ de prevenire şi stingere a incendiilor pe durata executării lucrărilor de construcţii şi instalaţii aferente. HG nr.51/92 privind unele măsuri pentru îmbunătăţirea activităţii de prevenire şi stingere a incendiilor cu modificările şi completările HG nr.71/96, HG 571/98 şi HG nr.676/98. Norme generale de prevenire şi stingere a incendiilor aprobate cu Ord. MI nr. 775/98 Ordonanţa guvernului nr. 60/97 privind apărarea împotriva incendiilor aprobată prin decretul nr. 636/97 şi cu modificările din Legea nr. 212/97 prevederile din GP 043/99

-

2.10.5.10

Măsuri de protecţia muncii

Pentru executarea lucrărilor prevăzute în cadrul prezentului proiect este absolut necesar respectarea de către executant şi beneficiar a prevederilor din "Regulamentul privind protecţia şi igiena muncii în construcţii" aprobat cu ord. 9/15.03.1993 al MLPAT publicat în BC 5-6-7-8. Atât executantul cât şi beneficiarul vor respecta din ordinul de mai sus cu precădere următoarele articole: -

reguli generale 1583-1680 pentru executarea săpăturilor 537-566, 574-590, 568, 1611-1661 pentru prepararea şi transportul betoanelor şi mortarelor 691-761 pentru turnarea şi compactarea betoanelor 762-770 pentru fasonare şi montare armături, articolele 794-806 pentru lucrările executate pe timp friguros 283-292

Se vor respecta de asemeni: - Norme generale de protecţia muncii 2002 - Norme specifice de protecţia muncii pentru lucrări de zidărie, montaj prefabricate şi finisaje în construcţii ind. IM 006/96 aprobat cu ord. nr. 73/N/15.01.1996 - Norme specifice de securitate pentru lucrări de instalaţii tehnico-sanitare şi de încălzire aprobate cu ord. 117/96 de MM şi PS. - Legea protecţiei muncii 90/96 şi normele metodologice de aplicare - PE 006/81 Instrucţiuni generale de protecţia muncii pentru unităţile MEE - Norme specifice de securitate a muncii pentru preparare, transport, turnarea betoanelor şi executarea lucrărilor de beton armat, precomprimat aprobat cu ord. 136/95 de MM şi PS. - Norme specifice de protecţia muncii pentru lucrări de cofraje- schele, cintre eşafodaje, Ind. Im 00696, cap. 24, 29 - DCS nr. 400/81 pentru instituirea unor reguli privind exploatarea şi întreţinerea instalaţiilor utilajelor şi maşinilor, întărirea ordinii şi disciplinei în muncă în unităţile cu foc continuu. Intrarea în cămine se va face numai în mod organizat, în prezenţa şefului de echipă. Echipa care efectuează lucrările de reparaţii la cămine va fi formată din cel puţin trei lucrători. Aerisirea căminelor se va face prin ventilare artificială cu ajutorul unui ventilator electric. Este interzis fumatul, aprinsul chibritelor sau iluminatul cu flacără în cămine (canale). Iluminatul se va face numai cu lămpi etanşe de tip minier, (tip Davis) sau cu lămpi electrice având tensiunea de alimentare maximă 12 V. Muncitorii trebuie să poarte echipament de protecţie: mască de gaze, combinezon, cască, cizme şi mănuşi de cauciuc. La coborârea şi scoaterea utilajelor din cămine muncitorii trebuie să stea în afara căminului evitând astfel să fie vătămaţi de căderea vreunei scule sau a unui utilaj. Căminele vor fi prevăzute în mod obligatoriu cu capace, coborârea în cămin urmând a se face numai în condiţiile prevăzute în normativele de protecţie a muncii. Extras de măsuri de protecţia muncii

Page 117 of 556

Nr. Crt

Denumire lucrare

1

Fondul necesar pentru protecţia muncii Cuprins implicit în valoarea lucrării

Separat

Trepte de acces

Da

-

2

Capace la cămine

-

Da

3

Podeţe şi parapete la săpături

4

Sprijiniri verticale şi orizontale din dulapi metalici

Da

-

Da

5

Dispozitive de ventilaţie (proprii)

Prin organizare de şantier, din dotaţii

-

6

Echipamente de protecţie

Prin organizare de şantier, din dotaţii

-

6

Propaganda de protecţie (plăci avertizoare)

Prin organizare de şantier, din dotaţii

-

7

Bariere de trecere la limita zonelor cu pericol de accidente

Prin organizare de şantier, din dotaţii

-

2.10.5.11 Standarde, instrucţiuni şi normative 2.10.5.11.1.1 Standarde - 9824/5-75 Trasarea reţelelor pe teren - SR ISO - 5996/2000 Armături industriale din fontă - 8804/3,5,6,8/92 Fitinguri sudate din oţel - DIN 8074-SDR11 Ţevi din polietilenă PE 80 Pn 10 - 438/1-89 Produse din oţel pentru armarea betonului. Oţel beton - SR ISO 7005-1-99 Flanşe din oţel. Flanşe rotunde plate. - DIN 16963 Flanşe –ansamblu adaptor, Pn 10 (cf catalog de produse furnizor) - 2308/81 Capace şi rame din fontă pentru cămine. - 695/80 Hidranţi subterani de incendiu - 3779/80 Hidranţi supraterani de incendiu - 701/74 Racorduri fixe pentru incendiu tip A,B - 705/74 Racorduri înfundate pentru incendiu tip A, B - SR 6819/97 Alimentări cu apă. Aducţiuni. Studii, prescripţii de proiectare şi de execuţie. - 9312/90 Subtraversări de drumuri

Page 118 of 556

2.10.5.11.1.2 Instrucţiuni şi normative - P 66/2000 Instrucţiuni privind alimentarea cu apă şi canalizare elaborat de ISLGC - Regulamentul nr. 10830/1970 de efectuare a recepţiei obiectivelor de investiţii - I 22/99 Normativ pentru executarea conductelor de aducţiune şi a reţelelor de apă şi canalizare a localităţilor aprobat de MLPAT cu ord. 23/N/07.04.99 - I9/94 şi I9/96 Normativ pentru proiectarea, executarea şi exploatarea instalaţiilor sanitare - C 169/1988 Normativ pentru executarea lucrărilor de terasamente - C 56/86 Normativ pentru verificarea calităţii şi recepţia lucrărilor de construcţii şi instalaţii aferente - C 11/74 Instrucţini tehnice privind alcătuirea şi folosirea în construcţii a panourilor din placaj pentru cofraje. - NE 012/99 Cod de practică pentru execuţia lucrărilor de beton armat şi beton precomprimat, aprobat de MLPAT cu ord. 59/N/24,08/99 - P 130/97 Normativ pentru urmărirea comportării construcţiilor - GP 043/99 Ghid pentru proiectarea, execuţia şi exploatarea sistemelor de alimentare cu apă şi canalizare utilizând conducte din PVC, polietilenă şi polipropilenă. - Ghid pentru programarea controlului calităţii executării lucrărilor pe şantier

Page 119 of 556

3 3.1

CAIET DE SARCINI INSTALATII ELECTRICE SPAU Date generale

Prezenta documentaţie conţine datele necesare realizării lucrărilor în şantier şi predării acestora către beneficiar, referitoare la instalaţiile electrice şi de automatizare aferente obiectivului statii de pompare ape uzate (SPAU).

3.2

Amplasarea echipamentelor

Echipamentele, obiectele de construcţie şi traseele de cabluri sunt prezentate în planşele anexate şi în manualul tehnic al staţiei de pompare prefabricate.

3.3

Componenta instalaţiilor electrice 4.1.1. 4.1.2. 4.1.3.

4.1.4.

Tablou electric general, simbolizat TGD, care conţine blocul de măsură şi protecţie trifazic (BMPT), circuit de alimentare tablou electric de automatizare TA, circuite electrice de iluminat şi prize. Tabloul electric de automatizare a statiei de pompare, denumit în proiect TA, care este prefabricat de către producător. Aparataj de măsură şi control pentru: Măsurarea nivelului minim al apei în corpul staţiei de pompare prefabricate; Măsurarea nivelului intermediar al apei în corpul staţiei de pompare prefabricate; Măsurarea nivelului maxim al apei în corpul staţiei de pompare prefabricate; Cablajele pentru realizarea legăturilor funcţionale între consumatorii electrici şi tablorile electrice.

3.4 Standarde şi normative de referinţă - STAS 12604-87-"Protectia impotriva electrocutarii. Prescriptii generale". - STAS 12604/4-89-"Protectia impotriva e1ectrocutarii. Instalatii electrice fixe. Prescriptii". - ST AS 12604/5-90.- "Protectia impotriva. electrocutarii. Instalatii electrice fixe. Prescriptii de proiectare, executie si verificare. - STAS R 9321-79.-"Prefabricate electrice de joasa tensiune. - Recomandare". - NP-I7-08 -"Normativ pentru proiectarea si executarea instalatiilor electrice cu tensiuni pana la 1000 V c.a. si 1500 V c.c.” - C 56-2002 -"Normativ pentru verificarea calitatii lucrarilor de constructii si insta1atii aferente" - C 16-84 -"Nomativ pentru realizarea pe timp friguros a lucrarilor de constructii si instalatii aferente" - C167-77-"Norme privind cuprinsul si modul de intocmire, completare si pastrare a cartii tehnice a constructiei” . , - PE 107/81 editia 1988 -"Normativ pentru proiectarea si executia retelelor de cabluri electrice " - GP 052-2000- Ghid pentru Instalatii electrice cu tensiuni pana la 1000 V c.a. si 1500 Vc.c. 3.5 Mostre şi testări Toate materialele si aparatele care se vor monta trebuie sa corespunda caracteristicilor tehnice impuse prin proiectul tehnic. La cererea consultantului (dirigintelui de santier), antreprenorul va prezenta mostre sau file de catalog pentru materialele sau aparatele solicitate de acesta. Mostrele vor fi insotite de certificate de calitate emise de producator, care vor contine informatii despre normele de fabricatie, specificand standardele (normele interne) de fabricatie, testarile efectuate si rezultatele acestora. In cazul utiliziirii de materiale si/sau aparataje din import, acestea trebuie sa fie insotite de agrementul tehnic pentru Romania. Toate materialele si aparatele vor fi admise la santier pe baza certificatului de calitate emis de producator. Acesta trebuie sa contina rezultatele testarilor efectuate pe lotul respectiv si garantiile acordate de producator.Testarile si rezultatele acestora trebuie sa corespunda cerintelor cuprinse in standardele romanesti de fabricatie ale materialelor si/sau aparatelor respective.

Page 120 of 556

Materiale şi produse

3.6

3.6.1 Materiale Materialele produse de antreprenor trebuie sa corespunda cerintelor din specificatiile tehnice din proiectul tehnic. Materialele ce fac obiectul prezntei documentatii sunt cele continute in : jurnalul de cabluri electrice, jurnalul de cabluri AMC, specificatia de aparataje montate in tabloul electric AMC: a) Conductori si.cabluri electrice ; b) Tuburi de protectie; c) Materiale marunte. 3.6.2 Conductori electrici Conductorii recomandati sunt de tipul FY - executati conform STAS 6865-80, cu materialul conducator din cupru, cu izolatie din policlorura de vinil (PVC) pentru o tensiune de 500 V. In instalatie se vor folosi conductori electrici doar le echiparea tabloului TG, circuitele intre tabloul electric si consumatori realizandu-se numai in cablu de energie (tipul CYAbY) . Culoarea izolatei conductoarelor va fi conforma normelor in vigoare, respectiv: - verde/ galben pentru nulul de protectie; - albastru deschis pentru nulul de lucru; - alb sau cenusiu deschis pentru mediane sau neutre; - alte culori decat cele de mai sus (de exemplu: rosu, albastru, negru) pentru conducte de faza sau pol. Curentii maximi admisibili pentru diferite situatii de montare ale conductoarelor electrice sunt cei din normativuI NP I7-02,anexa 8. 3.6.3 Cabluri electrice Conform STAS 11388/7-80 - fara intarziere la propagarea flacarii Curentii maximi admisibili pentru caburi electrice functie de modul si locuI de montare sunt prezentati in normativuI PE 107. 3.6.4

Tuburi de protecţie

Ca elemente de protectie mecanica pentru conductele si cablurile electrice se folosese tuburi si/sau tevi de PVC. Tuburile folosite in distributia electrica interioara sunt tuburi din material plastic. Cele mai uzuale tuburi de protectie care se folosesc sunt : -

tuburi izolante pentru Instalatii electrice cu tensiunea pana la 1000 V din policlorura de viniI neplastificata executate conformSTAS 6990-84 si anume: -

tuburile de tipul IPEY, etanse (cu pereti grosi), care se folosese inglobate in elementele de constructie adiacente incaperilor umede,dar se pot folosi si in montaje aprente acolo unde pericolul de deteriorari mecanice este redus.

-

tuburi de tipul IPFY - care sunt tuburi flexibile si care se folosesc pe trasee scurte, la legaturile catre receptori cu vibratii, sau la trasee dificile.

-

tevi din PVC - tip 1 (U), care se folosesc la protectia cablurilor la montaje subterane sau la treceri prin elemente de fundatie. Acestea sunt executate in conformitate cu STAS 6675/2-80.

3.6.5 Materiale mărunte Aceasta categorie cuprinde :

Page 121 of 556

-

cleme de legatura ; dibluri ; carlige ; suruburi ; etc.

Dozele vor fi din PVC. Pe traseele cu circuite putine (maxim 2 tuburi in paralel) se pot folosi doze etanse de tipul NED, confectionate din material plastic. Coturile si mansoanele sunt prefabricate sau confectionate pe santier. Diblurile pot fi din lemn, material plastic sau metalice. Se folosesc conform indicatiilor fiecarui proiect in parte. 3.6.6 Produse Produsele ce se folosesc in instalatiile electrice ce fac obiectul acestei lucrari sunt „aparate" si "prefabricate de atelier", respectiv Tabloul electric si de automatizare - TA. Aparate Prin aparate (CONTINUTE IN PROIECT) se inteleg urmatoarele: - dispozitive de conectare - deconectare si/sau comutare; - aparatele AMC. Clasa de izolatie a aparate1or de joasa tensiune (conform STAS 8275) utilizate trebuie sa corespunda prevederllor cuprinse in STAS 11 054 - 78. 3.6.7 Livrare, depozitare, manipulare Livrarea materialelor, aparatelor si echipamentelor la santier se va desfasura in mod ritmic, organizat, tinand cont de etapa de executie efectiva. Depozitarea si manipularea materialelor, aparate1or si a echipamentelor se va face astfel incat sa se evite deteriorarea sau distrugerea acestora. Antreprenorul isi va amenaja in cadrul santierului sau in imediata apropiere a acestuia spatii adecvate pentru depozitarea materialelor si aparaturii. O atentie deosebitia trebuie acordata depozitarii si manipularii materialelor pe timp friguros. In Romania perioada 15 noiembrie-15 martie este considerata "perioada conventionala de timp friguros" Regimul tehnic critic pe toata durata de depozitare si manipulare a principalelor materiale prezinta urmatoarele temperaturi minime: - Tuburi izolante tip IPY si IPEY, din PVC - 5° C; - Conducte din Cu si AI cu izolatie din PVC -5° C;

3.7

Execuţia lucrărilor

3.7.1 Operaţiuni pregătitoare La aducerea materialelor pe santier acestea vor fi supuse unui control visual pentru a depista eventualele deteriorari aparute in timpul transportului, depozitarii sau manipularii. De asemenea, se verifica si corespondenta cu proiectul si/sau prospectele sau fise1e telmnice, in mod special din punct de vedere al respectarii aracteristicilor tehnice ale materialelor si aparatelor. La inceperea lucrarilor de executie propriu-zise se vor pune la dispozitia consultantului fisele tehnologice de executie pentru categoriile de lucrari ce fac obiectul proiectului. Acestea trebuie sa respecte legislatia tehnica in vigoare, precum si celelalte norme adiacente cum sunt normele de protectie a muncii si nome1e de protectie a mediului. In timpul executiei vor fi urmarite urmatoarele aspecte: - pozitionarea golurilor de trecere prin plansee si pereti; - inglobarea tuburilor de protectie a conductelor electrice in placi turnate pe santier si/sau in suprabetonare (la lucrari de tnrnare pe santier); - montarea corecta (confonn planurilor) a elementelor de structnra prefabricate care contin tuburi de protectie sau alte parti ale instalatiei electrice (la lucrarile cu elemente prefabricate)

Page 122 of 556

Zona de lucru se va prelua pe baza de proces-verbal in care se va specifica in mod expres fidelitatea executiei lucrarilor de constructii in raport cu prevederile documentatiei. de executie. In cazul depistarii unor deficiente, antreprenorul va efectua, pe cheltuiala sa, corecturile necesare astfel incat montajul instalatiilor sa se desfasoare fara incidente. Inainte de inceperea lucrauilor de montaj a instalatiilor electrice, zona de lucru se va asigura din punct de vedere al accesului numai a personalului autorizat si instruit in mod corespunzator. 3.7.2 Tipuri de lucrări - marcarea traseelor si a pozitiilor de instalare a circuitelor si aparatelor; - montarea tuburilor de protectie a conductelor si cablurilor - montarea elementelor de sustinere si fixare a tubrilor de protectie si a cablurilor electrice; - montarea conductelor si cabluilor electrice, - montarea aparatelor; - montarea prefabricatelor (tablourilor electrice) - executarea legaturilor acestora la conductorii electrici, - verificari in vederea punerii sub tensiune, - verificari in vederea receptiei finale; - predarea instalatiilor catre beneficiar. 3.7.3 Execuţia Marcarea traseelor si a pozitiilor de instalare a aparatelor se face pe baza documentatiei , spectanduse prescriptiile de montaj speciale referitoare la corelarea traseelor electrice cu traseele celoralte instalatii precum si a distantelor minime fata de acestea (conform cu normativele 17 si PE 107). Distantele minime ce trebuie respectate, sunt indicate in normativul I7-2008, tabelul 4.1. Conditiile pentru:montarea tuburilor si tevilor de protectie sunt indicate in nomiativul I7-2008: - Nu se vor monta tuburi si tevi in care sunt introduse conducte electrice cu izolatie obisnuita pe suprafata cosurilor, in spatele sobelor sau al corpurilor de incaIzire; - Tuburile din PVC se pot instala aparent numai la inaltimi de peste 2 m de la pardoseala; - Tuburile si tevile se instaleaza numai pe trasee verticale sau orizontale. Se admit trasee oblice in cazul tuburilor peste plansee sau ingropate in beton ,precum si ale golurilor formate in panouri din beton, - In incaperi de locuit si similare, traseelor orizontale se distanteaza la cca 0,3 m de la plafon; - In incaperi in care in tuburi si tevi poate patrunde sau se poate colecta apa de condensare, acestea se vor monta pe trasee orizontale eu panta de 0,5 -0. 1 % intre doze; - Tuburile din PVC montate peste plansee sub pardoseala se protejeaza prin acoperire cu un strat de mortar de ciment cu grosimea minima de 1. cm. - Se va evita montarea tuburilor si a tevilor de protectie pe sau in structura de rezistenta a constructiilor, in caz contrar aceasta montare este permisa in conditiile prevazute in normativul P1OO; - Tuburile si tevile montate ingropat intr-un slit in elemental de constructie sau sub tencuiala se acopera cu un strat de tencuiala de minim 1.cm grosime - Tuburile si tevile se fixeaza pe elementele de constructie cu accesorii de montare prin care sa se realizeze o prindere sigura in timp. Distantele intre punctele de fixare pe portiuni drepte sunt indicate in tabelul 4.5. din normativul I7-2008. Se prevad elemente de fixare si la 10 cm de la capetele tuburilor si curbelor. - Tuburile si tevile din PVC se manevreaza in limitele de temperatura a mediului ambiant prevazute in standardele de produs. In cazul unor temperaturi sub regimul termic critic admis, se va face preincalzirea la o temperatura de +5° C timp de 24 ore (conform normativ C 16-84). Conditiile pentru montarea accesoriilor pentru tuburi trebuie sa respecte urmatoarele: - Se vor evita imbinarile la tuburile montate inlgropat; - Se interzice imbinarea tuburilor montate inglobat in elementele de beton la turnarea acestora; - Se interzice imbinarea tuburilor la trecerile prin elementele de constructie; - Curbarea tuburilor se executa cu raza interiora egala cu min. de 5...6 ori diametrul exterior al tubului la montaj aparent si egala cu min. de 10 ori diametrul tubului la montaj ingropat; Page 123 of 556

-

Dozele si cutiile de derivatie se monteaza cu prioritate pe suprafetele verticale ale elementelor de constructie; - Dozele de tragere a conductelor electrice prin tuburi se prevad pe trasee drepte, la distanta de maxim 25 m si pe trasee cu cel mult 3 curbe, la distanta de maxim 15 m. Conditille pentru montarea aparatelor electrice sunt specificate in normativul NP. I 7-2008,capitolul 5. Dintre acestea se exemplifica urmatoarele: - Intrerupatoarele, comutatoarele si butoanele se monteaza numai pe conductoarele de faza; - Intrerupatoarele, comutatoarele si butoanele se monteaza la inaltimea de 0,6...1,5 m, masurata de la axuI aparatuIui pana la nivelul pardoselii finite; - Prizele se monteaza pe pereti la urmatoarele inaltimi masurate de la axul aparatului pana la nivelul pardoselii finite: peste 1,5 m; - Elementele conductoare de curent ale aparatelor de comutatie pentru montaj ingropat in elementele de constructie se instaleaza in doze ce trebuie sa asigure protectia impotriva electrocutarilor. Conditiile specifice pentru montarea tablourilor electrice sunt descrise mnormativul NP I 7-2008: - Tablourile de distributie se monteaza vertical si se fixeaza sigur pentru a se evita vibratiile; - Tablourile de distributie se instaleaza astfel incat inaltimea laturii de sus a tablourilor fata de pardoseala finita sa nu depaseasca 2 m. Fac exceptie tablourile cu contoare din locuinte pentru care se admite o lnaltime de cel mult 2,6 m.; - Aparatele de masura sau cu citire directa ale tablourilor se amplaseaza la inaltimea de 1 m pana la 2 m, masurata intre axul aparatelor si pardoseala finita. 3.7.4 Probe şi verificări Verificarea instalatiilor electrice cu tensiuni pana la 1000 V c.a. ale constructiilor, in timpul executiei si inainte de punerea in functiune, se executa conform prevederilor din normativul C 56 - 2002 . Punerea sub tensiune a unei Instalatii electrice la consumator se face numai dupa verificarea ei de catre furnizorul de energie electrica conform prevederilor din regulamentul PE 932, Verificari pe parcursul executarii lucrarilor. - Pentru instalatiile care se ingroapa sau se ascund, verificarea calitatii se efectueaza pe faze de lucrari; - Verificarile care constau din probe electrice sau mecanice vor fi efectuate de catre persoane autorizate; - Toate aparatele, echipamentele si utilajele vor fi controlate separat pentru a corespunde caracteristicilor prevazute in proiect si calitatii functionale garantate de furnizor. Verificarile de calitate se efectueaza de catre conducatorul tehnic al lucrarii si de controlorii tehnici din societatea de executie. Verificarile de efectuat pe faze de lucrari sunt: - La incheierea unei faze de lucrari, respectiv la terminarea unor portiuni din instalatie, care pot functiona sau se pot proba independent, verificarile si probele se fac cu participarea delegatului beneficianuui (consultantului), iar rezultatele se inscriu in registrul de procese verbale. - Calitatea circuitelor electrice se va verifica dupa ce conductele electrice au fost trase in tuburi sau montate pe pereti, inainte de acoperirea lor (cu mortar, rabit etc.); La circuitele cu cabluri, verificarea calitiitii se va face inainte de inchiderea canalelor, santurilor ,etc. - Instalatiile electrice etanse executate in tuburi vor fi verificate cu aer la o presiune de 2,5 atm. Incercarea se va face pe tronsoane de instalatie, astfel incat sa fie usoara localizarea rapida a eventualelor scapari. Daca se constata scapari, se vor face remedierile si se va repeta proba. - La circuitele electrice se va masura rezistenta de izolatie intre conducte si intre conducte si pamant. Se recomanda ca rezistenta de izolatie sa se masoare pe portiuni de instalatie cu lungimi limitate de cca. 100 m. Pentru masurare se va folosi un inductor si o tensiune de cel putin 500 V c.c. In timpul probei, circuitul va fi deconectat de la sursa de alimentare. Rezistenta de izolatie se considera admisibila daca are o valoare de cel putin 500.000 Ω. La verificarea instalarii tablourilor electrice se vor controla vizual si prin masuratori, dupa caz, : - modul si calitatea fixarii lor pe suporti - inaltimile de montaj admise, Page 124 of 556

-

distantele admise pana la elementele de pe traseu si elementele constructiei, conform specificatiilor telmice si a prescriptiilor tehnice in vigoare; - existenta tuturor aparatelor de pornire, reglaj, protectie etc., previazute in proiect; - modul si calitatea executarii legaturilor; - existenja etichetelor si inscriptiilor de identificare, marcare etc., prevazute in proiect. In cazul in care se constata ca nu sunt indeplinite conditjiile impuse, se vor lua masuri pentru remediere, apoi, dupa efectuarea remedierilor, se vor face din nou verificarile. Aceste verificari se vor efectua (in prezenta) comisiei de receptie care va fi desemnata de beneficiar si antreprenor. Antreprenorul (executantul) solicita fumizorului de energie electrica, pe baza dosarului de acord, efectuarea controlului tehnic al instalatiilor electrice ale consumatorului. Personalul fumizorului de energie verifica documentele cuprinse in dosar_i poate face verificari in teren, prin sondaj. Dupa obtinerea aprobarii de racord, inainte de punerea sub tensiune, instalatiei electrice i se va face inca o verificare minutioasa, acordandu-se in special atentie acelor elemente sau parti de instalatie la care nu au fost respectate toate conditiile tehnice si organizatorice prevazute in proiect. Se vor lua toate masurile prin care sa fie exclusa posibilitatea accidentarii personalului la punerea in funtiune a masinilor, utilajelor etc. Comisia de receptie va verifica pe teren urmatoarele: - Existenta dispozitivelor de protectie contra supracurentilor si echiparea-respectiv reglarea corecta a acestora. - Functionarea corecta armaturilor electrice. Se verifica existenta echipamentului de protectie si de pornire, precum si legatura la pamant a carcasei metalice . - Functionarea corecta a instalatiei de iluminat. Prin sondaj, la 2...3% din corpurile de iluminat fluorescente se va verifica existenta condensatoarelor pentru imbunatatirea factorului de putere. - Functionarea eficienta ainstalatiilor de protectie prin legare la pamant Antreprenorul va preda beneficiarului toate actele de atestare si verificare a calitatii lucrarilor de instalatii (de exemplu: procese verbale pentru lucrari ascunse, certificate de calitate,buletine de incercari, etc.). Acesteacte vor fi folosite la intocmirea "Cartii tehnice a constructiei" . TERMENI UTILIZATI

Investitorul, beneficiarul sau Autoritatea Contractanta - persoana juridica care finanteaza si realizeaza investitia in sensul legii. Antreprenorul executantul sau constructorul (dupa caz) - persoana juridica ce a incheiat contractul de executie de lucrari, in urma achizitiei publice.

Proiectantul – persoana juridica care intocmeste documentatia tehnica pe baza careia se finanteaza si executa lucrarile de constructii. Procedura - mod specific de a efectua o activitate. Verificare - confirmare prin examinare si prezentarea de probe obiective a faptului ca cerintele specifice au fost satisfacute.

Page 125 of 556

4

CAIET DE SARCINI TABLOU ELECTRIC DE JOASA TENSIUNE SPAU

4.1

Documente tehnice normative -

4.2 -

4.3

SR EN 60439.1-2002: Ansambluri de joasă tensiune. Partea 1: Ansamblu prefabricat de aparataj de joasă tensiune şi ansamblu derivate dintr-un ansamblu prefabricat de aparataj de joasă tensiune; I7-2002: Normativ pentru proiectarea şi executarea instalaţiilor electrice cu tensiune până la 1000 V ca şi 1500 V cc .

Parametri electrici Tablourile de joasa tensiune vor fi montate cu neutrul in regim TN-C-S Tablourile de joasa tensiune vor putea suporta un curent maxim de scurtcircuit de scurta durata de 15 kA efectiv f timp de 1s sau cel impus de producătorul tabloului electric; Tablourile de joasa tensiune vor putea avea un curent nominal impus de către producătorul tabloului electric. Tablourile de joasa tensiune vor fi concepute pentru a realiza distributia de 0,4kV, frecventa de 50 Hz. Grad de protecţie: IP55 Tensiunea de serviciu: U s = ±10 % U n

Execuţia tablourilor electrice de JT

Anvelopele si plastroanele de protectie ale tablourilor de joasa tensiune vor fi constituite din table de otel electrozincate. Ele vor avea o imbracaminte anticoroziva de pudra epoxi-poliester polimerizata la cald. Tablourile joasa tensiune vor permite realizarea unui montaj simplu si sigur al sistemului de bare, al aparatajului si al racordurilor lor, gratie suporturilor si ecranelor de protectie specifice fiecarei functiuni Anvelopele tablourilor vor fi demontabile pentru a usura eventualele interventii. Sistemul de constructie va propune un ansamblu functional complet alcatuit din elemente prefabricate modulare, pentru montajul aparatelor de protectie, masura si de control. Tablourile vor fi structurate in zone dedicate pentru :

- racordarea aparatelor de sosire - distributia de putere - aparataj si repartitie - racordarea aparatelor de plecare.

Pentru a asigura protectia personalului de exploatare si intretinere la deschiderea usilor, dulapurile vor fi totdeauna prevazute cu plastroane de protectie decupate care lasa libere numai manerele de manevra ale aparatelor.

Elemente interioare de protectie vor interzice contactele directe, accidentale, cu partile aflate sub tensiune pana la bornele amonte ale aparatelor de plecare.

Un set de bare (protejat contra atingerilor) va putea fi instalat pentru a usura racordul aparatelor si a permite eventuale modificari.

Page 126 of 556

Pentru alimentarea unui rand de aparate modulare , omogene sau nu, vor fi folositi repartitori de curent, izolati, asigurandu-se echilibru pe faze.

Va fi prevazut un spatiu de rezerva (5%) echipat cu toate elementele necesare pentru amplasarea si racordarea de noi aparate modulare.

Dulapurile electrice de joasa tensiune se executa conform detaliilor din documentatia tehnico-economica (eventual corectata de catre atelierul de executie in acord cu tehnologia acestuia, dar cu acordul proiectantului si beneficiarului).

Confectia metalica si amenajarile interioare si exterioare aferente tablourilor electrice vor corespunde tipului, gradului de protectie si dimensiunilor indicate in documentatia tehnico-economica.

Tabloul electric va fi de tip metalic, prevazut cu dispozitive auxiliare: - de inchidere a usilor (zavoare cu cheie triunghiulara). - de manipulare si transport (inele de ridicare - dimensionate corespunzator greutatii dulapurilor electrice de joasa tensiune).

Aparatele, reperele si subansamblele aprovizionate de la terti trebuie sa corespunda prevederilor documentatiei tehnico-economice, atestarea calitatii acestora facandu-se pe baza certificatelor de calitate emise de firmele fabricante.

Montajul aparatelor, reperelor si subansamblurilor electrice, dispunerea sirurilor de conectori si realizarea cablajului trebuie sa respecte documentatia tehnico-economica asigurand un nivel optim de utilizare a dulapurilor electrice de joasa tensiune (d.p.d.v. al montajului la locul de exploatare, conectarii exterioare, intretinerii).

4.4

Condiţii de încercare a tablourilor electrice

Toate tablourile electrice executate conform prezentului caiet de sarcini sunt, in mod obligatoriu, testate prin incercari individuale .

Incercarile individuale , conform SR EN 60439.1 cuprind : -

verificarea tabloului, inclusiv al cablajului, eventual incercarea functionarii electrice incercarea dielectrica verificarea masurilor de protectie si a continuitatii circuitului de protectie.

Efectuarea incercarilor individuale are ca scop depistarea eventualelor defecte de materiale si individuale de fabricatie. Aceste incercari se executa pe fiecare tablou electric de joasa tensiune inainte de livrare. Constructorul va controla tablourile electrice de joasa tensiune si dupa operatiunile de transport si instalare, in vederea inlaturarii eventualelor deteriorari.

Page 127 of 556

Page 128 of 556

5 5.1

CAIET DE SARCINI INSTALATII DE AUTOMATIZARE SPAU Generalităţi

Prezentul caiet de sarcini se refera la modul de executie si de asigurare a calitatii pentru instalatia de automatizare.

5.2

Condiţii tehnice generale pentru execuţie

Pregatirea executarii instalatiei AMC se va face de catre Constructor si Beneficiar, conform reglementarilor in vigoare. Inaintea lansarii in executie a instalatiei AMC, Constructorul va verifica proiectul din punct de vedere al : - caracteristicilor si codurilor aparatelor; - tipurilor, sectiunilor si cantitatilor de cabluri; - gabaritelor confectiilor metalice; - cotelor de amplasare si al traseelor in interior si exterior; - conditiilor de mediu ambiant in locurile de montaj. Confectiile metalice – se protejeaza anticoroziv prin vopsire cu email epoxidic. Orice modificare de schema, de material sau aparate se va efectua doar cu avizul proiectantului.

5.3

Condiţii pentru îmbunătăţirea calităţii lucrărilor de montaj

La montaj, Constructorul nu va admite : - tablouri cu abateri de la proiect, fara avizul proiectantului; - modificari fata de proiect, fara acordul proiectantului; - greseli flagrante de proiectare sau de executie, care pun in pericol parti mari din instalatia tehnologica sau viata oamenilor; concilierea acestora se va face cu acordul proiectantului.

5.4

Condiţii particulare pentru execuţie

La aparatele de masura, valorile limite admise de lunga durata vor fi marcate pe scala. Capetele conductoarelor de conexiune se marcheaza cu numele destinatiei. In acelasi panou, conexiunile de diferite tensiuni vor avea obligatoriu culori diferite. De preferinta, se vor folosi urmatoarele culori pentru conductoarele de conexiune: - bleu – pentru circuitul de comanda c.c. - verde – galben- pentru legarea la pamant sau neutru de protectie - alb – pentru neutru de lucru - rosu – pentru circuit de comanda c.a. - negru – pentru alimentare c.c. - galben – pentru alimentare c.a. - maron – pentru circuit de masura

Page 129 of 556

- verde – pentru circuit de semnalizare Pentru executia pupitrului de comanda PC vor fi indeplinite sarcinile impuse prin cap. “Prefabricate electrice de joasa tensiune (P.E.J.T.)”.

5.5

Protecţia muncii

Punerea in functiune a instalatiei de automatizare se va face numai de catre personal instruit special in acest scop, pe baza dispozitiei tehnologului instalatiei, dupa ce, in prealabil, au fost executate toate verificarile si probele de functionare. La punerea in functiune si in timpul exploatarii vor fi asigurate conditiile normale de lucru specificate in instructiunile de exploatare si de punere in functiune. Orice interventie la partea electrica a instalatiei se va realiza numai cu avizul sefului de instalatie de catre personal calificat si numai dupa intreruperea circuitului respectiv de la retea. Se vor conecta in mod obligatoriu la instalatia de legare la pamant partile metalice ale instalatiei si ale echipamentului electric care in mod normal nu sunt sub tensiune. Nu este permisa conectarea in serie la priza de pamant sau la conductoarele principale de legare la pamant a mai multor elemente care necesita legarea la pamant. Toate echipamentele si aparatele electrice si de automatizare vor fi verificate inainte de darea in funtiune conform regulamentelor in vigoare. Instalatia se va executa cu respectarea urmatoarelor norme : - STAS 6119 si 6616 referitoare la instalatiile de legare la pamant si respectiv nul de protectie - STAS 2612/1987 ;12604/4,5/1990 ; 12.277/1988 - STAS 297/2 – referitor la indicatoare de securitate; Norme de protectie a muncii pentru lucrul in instalatii electrice.

5.6

Punerea în funcţiune şi asistenţă tehnică de specialitate

Inaintea punerii in functiune se verifica : - procesele verbale de incheiere a lucrarilor; - corespondenta dintre specificatia tehnica si tipul aparaturii AMC montate; - integritatea si corectitudinea circuitelor electrice; - buna legare la potentialul de protectie. Inaintea punerii in functiune, se vor simula situatiile functionale care pot aparea in camp.

5.7

Prefabricate electrice de joasă tensiune

Generalitati In cele ce urmeaza se stabilesc condiile tehnice generale ale P.E.J.T. uzinate si incercarile ce trebuie efectuate pentru atestarea acestorea. Domeniul de aplicare – se aplica tuturor P.E.J.T. cu functii de distributie, actionare, automatizare, reglare, protectie, semnalizare, masura,etc. Conditii de mediu, functionare si transport Altitudinea maxima : 2.000m

Page 130 of 556

Zona climatica si categoria de exploatare sunt cele prevazute in documentatia tehnico-economica, daca aceste date lipsesc, in contractul economic se inscrie o clauza care sa prevada zona climatica N, conform STAS 6535/1983 si categoria de exploatare 3 conform STAS 6692/1983. Vibratii cu acceleratia 1g si frecventa 10...55Hz Socuri (apar de obieci numai in timpul transportului si manipularilor cu acceleratia 3g si frecventa 80 scurtaturi/minut). Atmosfera lipsita de substante poluante sub forma de pulberi sau aerosoli, fara radiatii si fara substante explozive sau active chimic.

Parametri electrici - Tensiuni nominale Un 1000V , c.a. si c.c. - Tensiunea de serviciu : Un 90% ...110% Un - Frecventa nominala Fn 50 (60) Hz

Grade de protectie Gradele normale de protectie ale P.E.J.T. trebuie alese in conformitate cu STAS 5325/1979 si CEI/IEC 529/1989. Gradul de protectie al P.E.J.T. este determinat de gradul de protectie al carcasei, combinat cu gradele de protectie ale aparatelor si dispozitivelor monate separat. Daca documentatia tehnico-economica nu indica gradul de protectie, se considera ca aceasta este IPxx conform CEI/IMJ 529/1989,punctul 4.1(nu se cere specificarea acestor cifre caracteristice).

Documentatii de referinta - CEI439/1-1992 - ”Ansambles d’appareillage a base tension” - STAS 8138/1983 – “Echipament electric pentru masini industriale.Conditii tehnice generale”. - STAS B9321/1972 rev.4/1979 – “Prefabricate electrice de joasa tensiune” - STAS 12604/5/1990 – “Protectia impotriva electrocutarilor” – Instalatii electrice fixe.

Prescriptii de proiectare, executie si verificare 17-1991, Ed 1994 “Normativ pentru proiectare si executare a instalatiiloe electrice cu tensiuni pana la 1000V c.a. si 1500V c.c.” CEI/IEC 529/1289 – “Degres de protection procures par les enveloppes” (Code IP)” STAS 6692/1983 – “Protectia climatica .Tipuri de protectie climatica”. STAS 5325/1979 , rev 9/1982 – “Grade normale de protectie asigurate prin carcase.Clasificare si metode de verificare”. STAS 6535/1983 – “Protectia climatica . Impartirea climatica a pamantului in scopuri tehnice”

Page 131 of 556

STAS 9638/1974 – “Marcarea conductelor izolate pentru identificarea circuitelor instalatiilor electrice”. STAS 3661/1988 – “Lacuri si vopsele. Determinarea aderentei peliculei la suport.” STAS 6854/1990 – “Acoperiri metalice. Determinarea grosimii stratului prin metoda cu picaturi”. NT 10-2 Automatica – “Masuri de protectie impotriva stingerii indirecte care folosesc conductori de protectie.”

Conditii tehnice Executia P.E.J.T. - Formele si gabaritele, amenajarile interioare, acoperirile de protectie(prin vopsire si electrochimice), diversele dispozitive auxiliare (de inchidere, manipulare, transport, etc) precum si gradele de protectie (IP) aferente P.E.J.T trebuie sa corespunda documentatiei tehnico-economice. - Aparatele, piesele si subansamblele aprovizionate de la terti trebuie sa corespunda prevederilor documentatiilor tehnice, atestarea calitatii acestora facandu-se pe baza etichetelor “ACCEPTAT” de CTC de receptie sau a duplicatelor acestora emise de magazii. - Montajul aparatelor, pieselor si subansamblelor electrice, dispunerea sirurilor de cleme si realizarea cablajului trebuie sa respecte documentatia tehnica asigurand un nivel optim de utilizare al P.E.J.T.(din punct de vedere montaj) la locul de exploatare, conectare exterioara, PIF, mentenanta,etc). - Distantele de izolatie in aer si distantele de conturnare fata de masa trebuie sa nu fie inferioare valorilor minime prevazute in STAS R9321/1973, pentru Un 500V si conditii de mediu de exploatare N3, distantele de izolare in aer trebie sa fie minim 6mm , iar distantele de conturnare minim de 10m. - Modul de realizare al masurilor de protectie impotriva electrocutarilor (atingeri accidentale directe sau indirecte) trebuie sa corespunda documentatiei tehnice si prevederilor normativelor specifice. - Caile de curent - Barele conducatoare de curent, neizolate sunt din aluminiu sau cupru electrotehnic, neacoperite prin vopsire sau electrochimic, marcate la locuri vizibile astfel : - faza L1 sau (+) c.c. : rosu ; - faza L2

: galben;

- faza L3 sau (-) c.c. : albastru; - nul de lucru – N

: alb;

- nul de protectie – PE sau PEN : verde-galben cu benzi alternative transversale avand latimea de 20mm.

Conexiuni electrice Se realizeaza cu conductoare din cupru izolat in PVC , cu sectiunile si culorile in concordanta cu consumatorii indicati (natura, putere, regim de lucru , cerinte de fiabilitate,etc) avand urmatoarele culori recomandate :

Page 132 of 556

- circuite principale c.a. sau c.c. – negru; - circuitele secundare c.a.

– rosu

- circuite secundare c.c.

– albastru

- nul de lucru N - nul de protectie PE sau PEN

– alb (sau bleu) – verde-galben

NOTA: Se recomanda ca circuitele secundare ( in special cele de c.c.) din cadrul aceleiasi P.E.J.T. sa aiba culori diferentiate pe tensiuni si / sau functiuni altele decat cele folosite pentru celelalte circuite, ca de exemplu: maro, gri, mov, etc. Pentru conectare, capetele conductoarelor se vor prelucra in functie de tipul bornei si/sau indicatiile fabricantilor de aparate, capetele deziozlate conectandu-se direct , sau prevazute cu elemente auxiliare de conectare(papuci si mansoane) montate prin sertizare. Este interzisa cositorirea capetelor conductelor ce urmeaza a fi conectate la borne care realizeaza fixarea prin strangere mecanica. Conductoarele se vor inscriptiona la capete cu simbolul aparatului si bornei la care se conecteaza capatul respectiv conform pct. 2.4.1.1 din STAS 9638/1974. Se admit conductoare neiscriptionate numai in interiorul subansamblelor cu functii relativ independente (sertare, module, dispozitive prefabricate,etc).

Etichetari si inscriptionari

Cele mai multe P.E.J.T din proiectele elaborate sunt prevazute cu etichete care definesc unitatea ( tablou,dulap,pupitru,cutie,etc) si functiunile unor aparate ( de regula cele montate aparent si avand functiuni de masura, reglare, protectie, comanda, etc) .Aceste etichete pot fi confectionate din materiale plastice (PVC, plexiglas, etc) sau metalice (aluminiu,alama,etc), inscriptionarile realizanduse prin diverse procedee ca de exemplu : pantografiere, metalografiere, eloxare,etc. Daca in documentatia de executie lipsesc –partial sau total- detalii privind executia si montarea acestor etichete , intreprinderea (prin tehnologul de produs) este abilitata sa decida in consecinta :daca si ce etichete sunt necesare , cum si unde se monteaza. Pe elementele de monatj ( placi,traverse,usi,etc) in interorul P.E.J.T. langa fiecare aparat se inscriptioneaza vizibil si durabil simbolul respectiv in conformitate cu schemele electrice. Pe carcasele aparatelor ce se demonteaza in vederea transportului se inscriptioneaza simbolul aparatului , respectiv simbolul P.E.J.T. care il inglobeaza. P.E.J.T asamblate din mai multe unitati (dulapuri, panouri, pupitre, etc) se tronsoneaza in vederea transportului asa cum prevede documentatia tehnica : daca aceste prevederi lipsesc, intreprinderea (prin tehnologul de produs care eventual consulta si atelierul executant) decide modul de tronsonare, asfel incat desfacerea si refacerea ansamblului(in special caile de curent), ambalarea si transportul sa poata fi realizate in conditii optime.

Rezistenta de izolatie masurata intre caile de curent (principale si secundare) si masa, precum si intre caile de curent principale(circuite de forta) trebuie sa nu fie mai mica de 1MOhm. Calitatea dielectrica a unui P.E.J.T. este considerata acceptabila daca rezista la o incercare de rigiditate aplicata intre partile active si masa la o tensiune conform tabel 2.

Page 133 of 556

P.E.J.T trebuie sa asigure corecta functionare a instalatiei electrice care il inglobeaza in conformitate cu schemele electrice continute in documentatia de executie.

Conditii de incercare Incercarile destinate sa verifice caracteristicile unui P.E.J.T sunt : - incercari de tip; - incercari individuale; Incercarile de tip au scop sa verifice ca toate P.E.J.T. de un anumit tip sau model prezinta caracteristici constructive si functionale care respecta normativcvul tehnic specific. Urmand linia scopului propus, prezentul P.T. nu va trata incercarile de tip: in toate cazurile in care se impune efectuarea acestor incercari, existenta normativului tehnic specific este obligatorie.

Incercari individuale

Efectuarea incercarilor individuale are ca scop depistarea eventualelor defecte de materiale si de fabricatie. Aceste incercari se executa pe fiecare exemplar de P.E.J.T. dupa asamblare si echipare inainte de livrare. Executarea incercarilor individuale nu absolva societatea care executa instalarea de a controla P.E.J.T. dupa transport in vederea inlaturarii eventualelor deteriorari aparute in timpul acestuia si apoi efectuarea tuturor verificarilor si reglajelor indicate de fabricant.

Metode de incercare

Verificarea conditiilor tehnice se face vizual din punct de vedere aspectual (calitatea executiei, aspectul acoperirilor, executia ambalajelor, prelucrarea barelor,etc) cat si al confruntarii P.E.J.T executat cu documentele tehnico-conomice : contract, proiect de executie, documentatie de semifabricatie, cataloage,etc. Masurile impuse de aceste verificari (gabarite, rezistentele circuitelor de protectie, continuitatea cablajului, cote diverse legate de montajul aparatelor, distantele de izolatie si de conturnare, etc) se realizeaza cu aparate de masura uzuale cum ar fi: subler,lampa de control, punte pentru rezistente, etc. Nu sunt necesare aparate si dispozitive speciale. Verificarea condititei tehnice speciale se face cu MOhmetrul , masurandu-se rezistentele de izolatie intre caile de curent si masa, iar la circuitele principale (de forta) si intre fazele acestora. Rezultatele se considera satisfacatoare daca toate valorile masurate sunt mai mari de 1MOhm. Pentru anumiti parametri verificarea conditiei tehnice se face prin aplicarea intre caile de curent si masa a unei tensiuni alternative a carei valoare specifica este data in tabelul nr.2. Tensiunea trebuie sa aiba in mod practic o forma sinusoidala cu frecventa cuprinsa intre 45÷65Hz si se aplica prin cresterea progresiva timp de cateva secunde pana la valoarea prescrisa, mentinandu-se timp de 1 minut. Pentru incercare, toate aparatele electrice ale P.E.J.T vor fi racordate cu exceptia acelora care sunt prevazute a fi supuse unei tensiuni inferioare de incercare si a altor aparate care s-ar putea gasi parcurse de curent la aplicarea tensiunii (de exemplu diferite infasurari, aparate de masura, termocuple,aceste aparate vor fi deconectate). Incercarea se considera satisfacatoare daca nu se produc conturnari sau strapungeri iar caracteristicile materialelor izolante nu au suferit modificari sensibile.

Page 134 of 556

Tensiunea nominala

0÷60

61÷125

126÷350

1000

1500

2000

251÷500

501÷750

2500

3000

751÷1000

de izolatie [c.a.] , V Tensiune de incercare in c.a.

3500

[val.eficace],V NOTA : Pentru c.c. aceste valori se majoreaza cu 20%. O alta modalitate de verificare pentru anumiti parametri este aceea prin efectuarea unei simulari de functionare pe baza schemelor electrice alimentand P.E.J.T. cu tensiunea nominala ; in prealabil se executa o serie de conexiuni provizorii care sa suplineasca legaturile exterioare, aparatura locala, consumatorii etc. Daca se constata existenta unor circuite ce functioneaza anormal, se trece (partial sau total) la reverificarea conexiunuilor cu lampa de control si refacerea circuitelor necorespunzatoare. Rezultatul se considera satisfacator daca toate circuitele P.E.J.T functioneza corect conform schemelor electrice.

Marcare,ambalare,transport,depozitare

Marcarea

- Fiecare P.E.J.T contine o eticheta pe care sunt marcate rezistent cel putin urmatoarele date emblema intreprinderii executante; - seria si anul fabricatiei;

- tensiunea nominala (x); - curent nominal (x); - denumire sau simbol (daca exista in proiect). NOTA : Tensiunea si curentul nominal (notate cu x) sunt obligatorii numai pentru P.E.J.T de distributie.

Ambalarea

In vederea transportului fiecare P.E.J.T. se ambaleaza in husa PVC. Aparatele sensibile (in majoritate cele de panou) se demonteaza din P.E.J.T. , se ambaleaza in ambalajul original si se transporta separat.

Transport

Transportul se realizeaza cu mijloace auto sau CFR de catre Beneficiar sau fabricant. Inainte de transport se verifica ambalajul si se iau toate masurile ca unitatile P.E.J.T. sa fie asezate in pozitii convenabile si asigurate impotriva socurilor si vibratiilor.

Depozitare

Depozitarea se realizeaza intotdeauna prin grija Beneficiarului in incaperi inchise, ferite de intemperii si radiatii directe, cu atmosfera neutra, lipsita de umezeala excesiva, gaze si aerosoli corozivi, cu temperaturi cuprinse intre +10°C÷+30°C.

Page 135 of 556

Garantii Termenul de garantie este cel prevazut in contractul economic. In lipsa unor intelegeri contractuale (piese de rezeva pentru montaj) ,PIF, perioada de garantie si/sau postgarantie “NU SE LIVREAZA”.

Documente insotitoare la livrare La livrare P.E.J.T sunt insotite de : - certificat de calitate; - inventar de livrare (inclusiv pentru aparatele demontate); - buletin de incercari; - proces verbal de receptie sau autoreceptie dupa caz.

Page 136 of 556

Mentenanta Statia de pomare si pompe subersibile Tot echipamentul mecanic şi electric va avea o fiabilitate dovedită înregistrată în aplicaţii similare. O fiabilitate dovedită înregistrată în aplicaţii similare înseamnă:



pentru materialul şi echipamentul mecanic şi electric: materialul şi echipamentul comparabil se află în operare de cel puţin 5 ani în 5 aplicaţii similare diferite.



pentru instrumentele electronice şi alt echipament care sunt supuse unor cicluri de dezvoltare scurte: materialul şi echipamentul comparabil se află în operare de cel puţin 2 ani în 3 aplicaţii similare diferite.

Echipamentele selectate nu trebuie să fie în totalitate identice cu echipamentele de referinţă, dar vor trebui să fie comparabile ca dimensiune, tip, calitate şi aplicaţie. Pentru echipamentele mecanice principale, referinţele menţionate mai

sus

vor

trebui

furnizate

împreună cu oferta:



pompe suberersibile



grup pompare

Antreprenorul trebuie sa se asigure ca proiectul indeplineste cerintele minime privind durata de viata proiectata pentru obiectivele de investitie precizate in tabelul de mai jos: Element

Durata proiectata de viata

Motoare de pompe

20

Motoare de pompe pentru ape uzate

10

Adaptoare cu flansa

25

Cablaje

25

Motoare electrice de joasa tensiune

25

Tablouri electrice si de comanda

25

Convertizoare de frecventa

15

Page 137 of 556

SENZITIVITATEA PROCESULUI LEGAT DE RESPECTIVUL ECHIPAMENT In ceea ce priveste senzitivitatea legata de echipamente, S-a optat pentru: •

Pentru echipamente robuste si cu parametrii performanti;



Descrierea echipamentele si utilajele alese sunt prezentate in fisele tehnice respectiv in specificatiile tehnice ale echipamentelor

REFERITOR LA ECHIPAMENTE Pompele submersibile Senzitivitate optima avand urmatoarele caracteristici: •

protectie la scurtcircuit;



protectie la supracurent (suprasarcina, porniri grele, blocare motor);



protectia la minima si maxima tensiune;



protectia la lipsa faza (antibifazic)



protectiel a lipsa curent (infasurare intrerupta, contactor defect, etc)



protectie la succesiunea incorecta a fazelor;



protectie la supraincalzirea bobinajului;



protectie la subtensiune;



protectie la supratensiune



modul de rotire pentru uzura uniforma



functionare pe convertizor de frecventa



Functionarea pompelor se face in functie de senzorii de nivel minim, maxim si avarie



La nivelul minim de apa din bazin ,nivel dat de producatorul pompelor, nicio pompa nu poate fi in functiune. Se mentione in mod automat un debit constant de apa uzata la iesirea din statia de pompare prin pornirea-oprirea pompelor, precum si prin reglarea turatiei pompelor prin convertizoarele de frecventa.



Cablurile de alimentare a pompelor sunt

protejate .

Page 138 of 556



Traseele de cabluri vor fi alese sa nu impiedice desfasurarea activitatilor de mentenanta specifice.

Inainte de pornirea echipamentelor se va tine cont de urmatoarele: •

Instalatiile nu se vor porni inainte de a fi asigurati ca toate dispozitivele de siguranta sunt montate si operabile, si ca uzina in care aparatul va fi incorporat este compatibila cu regulile.



Orice manevra de intretinere trebuie efectuata doar de personal calificat.



Orice operatiune de verificare sau instalare trebuie facuta doar de personal calificat si autorizat.



Nu se va reporni instalatia imediat daca motivul deconectarii este necunoscut. Cineva ar fi putut deconecta instalatia cu scopul de a efectua o operatiune manuala si exista posibilitatea sa nu se fi asigurat in vederea conectarii. O pornire neasteptata poate avea urmari grave pentru personal.



Este obligatorie utilizarea de componete de rezerva originale , piese de schimb originale si accesorii originale pentru ca acestea au fost proiectate special pentru instalatie. Componenetele achizitionate din alte parti nu garanteaza faptul ca au fost proiectate si fabricate pentru a asigura o functionare corecta si specifica a instalatiei.

Page 139 of 556

REGISTRU DE MENTENANTA

3

8

Pompe submersibile cu tocator

Grup pompare

Inspectie vizuala zilnica Se verifica starea de uzura a pompelor Programul de intretinere si revizii al fiecarei pompe in parte se va face in conformitate cu cartea tehnica a echipamentului Inspectie vizuala zilnica Se verifica starea de uzura a pompelor Programul de intretinere si revizii al fiecarei pompe in parte se va face in conformitate cu cartea tehnica a echipamentului

Page 140 of 556

x x x x x x

Annual

Semestrial

Operatii care se executa

Lunar

Denumire echipament

Saptamanal

Nr crt.

zilnic

POMPE

Observatii

AUTORITATEA CONTRACTANTA: EXECUTANTUL: OBIECTIVUL:

COMUNA FORASTI SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL Extindere retea de canalizare în satele Manolea si Boura

Grafic Gantt Pozitie

Denumire

Durata

Ore manopera

Nr. muncitori

Ore Utilaj

Nr. Utilaje

Data inceput

May. 24-Oct. 5, 2018

Data sfarsit

0004.1.1

RETEA DE CANALIZARE DIN…

164

35

10

01.06.2018

17.01.2019

0004.1.2

SUBTRAVERSARE DRIJM IN…

52

15

3

06.11.2018

17.01.2019

0004.1.3

BAZIN SP1AU

15

14

17

01.06.2018

22.06.2018

0004.1.4

CAMIN GRATAR SP1AU

2

10

9

22.06.2018

26.06.2018

0004.1.5

INSTALATII HIDRAULICE ST…

1

4

2

26.06.2018

27.06.2018

0004.1.6

INSTALATII ELECTRICE SP1…

1

16

2

27.06.2018

28.06.2018

0004.1.7

Bransament electric SP1AU

1

3

1

28.06.2018

29.06.2018

0004.1.8

Coloana electrica SP1AU

2

5

1

29.06.2018

03.07.2018

0004.1.9

DRUM ACCES+SISTEMATIZ…

4

4

3

03.07.2018

07.07.2018

0004.1.10 ÎMPREJMUIRE STATIE SPIA…

16

3

1

09.07.2018

31.07.2018

0004.1.11 INSTALATII HIDROMECANIC…

2

9

5

31.07.2018

02.08.2018

0004.1.12 CONDUCTA REFULARE-PO…

8

9

7

02.08.2018

14.08.2018

0004.1.13 BY PASS VARSARE SPIAU

2

6

4

14.08.2018

16.08.2018

16

4

6

16.08.2018

07.09.2018

3

5

5

07.09.2018

12.09.2018

0004.1.14 By PASS SP1AU L=40 M 0004.1.15 GOLIRE SI AERISIRE TRAVE… 0004.1.16 BAZIN SP2AU

15

14

17

12.09.2018

03.10.2018

0004.1.17 CAMIN GRATAR SP2AU

2

10

9

03.10.2018

05.10.2018

0004.1.18 INSTALATII HIDRAULICE ST…

1

4

2

05.10.2018

06.10.2018

0004.1.19 CONDUCTA REFULARE-PO…

18

10

7

08.10.2018

01.11.2018

0004.1.20 INSTALATII ELECTRICE SP2…

1

16

2

01.11.2018

02.11.2018

0004.1.21 Bransament electric SP2AU

1

3

1

02.11.2018

03.11.2018

0004.1.22 Coloana electrica SP2AU

2

4

1

05.11.2018

07.11.2018

0004.1.23 DRUM ACCES+SISTEMATIZ…

3

4

3

07.11.2018

10.11.2018

0004.1.24 ÎMPREJMUIRE STATIE SP2A…

15

3

1

12.11.2018

01.12.2018

0004.1.25 INSTALATII HIDROMECANIC…

2

9

5

03.12.2018

05.12.2018

0004.1.26 BY PASS VARSARE SP2AU

2

6

4

05.12.2018

07.12.2018

0004.1.27 BY PASS SP2AU L=9 M

4

5

6

07.12.2018

13.12.2018

14

15

18

13.12.2018

02.01.2019

0004.1.29 CAMIN GRATAR SP3AU

2

10

9

02.01.2019

04.01.2019

0004.1.30 INSTALATII HIDRAULICE ST…

1

4

2

04.01.2019

05.01.2019

0004.1.31 CONDUCTA REFULARE-PO…

9

9

7

07.01.2019

18.01.2019

0004.1.32 INSTALATII ELECTRICE SP3…

1

16

2

18.01.2019

19.01.2019

0004.1.33 Bransament electric SP3AU

0

0

0

21.01.2019

21.01.2019

0004.1.34 Coloana electrica SP3AU

5

5

1

21.01.2019

26.01.2019

0004.1.35 DRUM ACCES+SISTEMATIZ…

3

3

3

28.01.2019

31.01.2019

0004.1.36 ÎMPREJMUIRE STATIE SP3A…

16

3

1

31.01.2019

22.02.2019

0004.1.37 INSTALATII HIDROMECANIC…

2

9

5

22.02.2019

26.02.2019

0004.1.28 BAZIN SP3AU

Jun

Raport generat cu ISDP; Web-site: www.devize.ro; E-mail: [email protected]; Telefon: 0236.477007

Page 141 of 556

Jul

2018 Q3 Aug

Sep

Oct. 5, 2018 - Jun. 5, 2019 Oct

2018 Q4 Nov

Dec

2019 Q1 Feb

Jan

Raport generat cu ISDP; Web-site: www.devize.ro; E-mail: [email protected]; Telefon: 0236.477007

Page 142 of 556

Mar

Apr

2019 Q2 May

Pozitie

Denumire

Durata

Ore manopera

Nr. muncitori

Ore Utilaj

Nr. Utilaje

Data inceput

Data sfarsit

0004.1.38 BY PASS VARSARE SP3AU

2

6

4

26.02.2019

28.02.2019

0004.1.39 BY PASS SP3AU L-13 M

6

5

6

28.02.2019

08.03.2019

0004.1.40 GOLIRE SI AERISIRE TRAVE…

3

5

5

08.03.2019

13.03.2019

14

15

18

13.03.2019

02.04.2019

2

10

9

02.04.2019

04.04.2019

0004.1.43 INSTALATII HIDRAULICE ST…

1

4

2

04.04.2019

05.04.2019

0004.1.44 CONDUCTA REFULARE-PO…

15

3

7

05.04.2019

26.04.2019

0004.1.45 INSTALATII ELECTRICE SP4…

1

16

2

26.04.2019

27.04.2019

0004.1.46 Bransament electric SP4AU

1

3

1

29.04.2019

30.04.2019

0004.1.47 Coloana electrica SP4AU

3

6

1

30.04.2019

03.05.2019

0004.1.48 DRUM ACCES+SISTEHATIZ…

2

3

3

03.05.2019

07.05.2019

0004.1.49 ÎMPREJMUIRE STATIE SP4A…

5

6

1

07.05.2019

14.05.2019

0004.1.50 INSTALAT!I HIDROMECANIC…

2

9

5

14.05.2019

16.05.2019

0004.1.51 BY PASS VARSARE SP4AU

2

6

4

16.05.2019

18.05.2019

0004.1.52 BY PASS SP4AU L=4 M

2

7

6

20.05.2019

22.05.2019

0004.1.53 GOLIRE SI AERISIRE TRAVE…

3

5

5

22.05.2019

25.05.2019

0004.1

Lista echipamente

0

27.06.2018

27.06.2018

0004.2.1

RETEA DE CANALIZARE DIN…

93

33

10

17.01.2019

28.05.2019

0004.2.2

SUBTRAVERSARE DRUM IN…

24

8

3

24.04.2019

28.05.2019

0004.1.41 BAZIN SP4AU 0004.1.42 CAMIN GRATAR SP4AU

0,00

0,00

Raport generat cu ISDP; Web-site: www.devize.ro; E-mail: [email protected]; Telefon: 0236.477007

Page 143 of 556

Raport generat cu ISDP; Web-site: www.devize.ro; E-mail: [email protected]; Telefon: 0236.477007

Page 144 of 556

OBIECTIV:

Extindere retea de canalizare în satele Manolea si Boura

Beneficiar:

COMUNA FORASTI

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

Durata proiect:

344 zile / 361 zile calendaristice

Grafic Gantt Nr. crt.

Denumire capitole de lucrari/ activitati

Durata in zile

Nr. muncitori

Ore manopera

Nr. utilaje

Ore utilaj

luna 1

Data inceput Data sfarsit

iunie 1 4

Extindere retea de canalizare în satele Manolea si Boura

344

95,780.19

4.1

Extindere retea de canalizare în sat Manolea

191

0004.1.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3

164

35

45,784.33

10

0004.1.2

SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MAN

52

15

6,167.77

0004.1.3

BAZIN SP1AU

15

14

0004.1.4

CAMIN GRATAR SP1AU

2

0004.1.5

INSTALATII HIDRAULICE STATIE POMPARE SP1AU

0004.1.6

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

6,277.49

6/1/2018

5/27/2019

5,718.28

6/1/2018

5/24/2019

1,585.29

6/1/2018

1/16/2019

3

78.92

11/6/2018

1/16/2019

1,652.50

17

948.79

6/1/2018

6/21/2018

d=15 zile, NrMunc=14, oreManopera= [1,652.5 ora]

10

159.05

9

19.41

6/22/2018

6/25/2018

d=2 zile, NrMunc=10, oreMa

1

4

30.88

2

0.02

6/26/2018

6/26/2018

d=1 zi, NrMunc=4, oreM

INSTALATII ELECTRICE SP1AU

1

16

125.98

2

3.22

6/27/2018

6/27/2018

d=1 zi, NrMunc=1

0004.1.7

Bransament electric SP1AU

1

3

21.78

1

0.75

6/28/2018

6/28/2018

d=1 zi, NrM

0004.1.8

Coloana electrica SP1AU

2

5

79.04

1

0.74

6/29/2018

7/2/2018

0004.1.9

DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4

4

104.33

3

5.94

7/3/2018

7/6/2018

0004.1.10

ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

16

3

267.39

1

7.45

7/9/2018

7/30/2018

69,771.22

0004.1.11

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

2

9

139.49

5

9.64

7/31/2018

8/1/2018

0004.1.12

CONDUCTA REFULARE-POMPARE SPlAU PEIDPN6 DN 110 KM L = 75 M

8

9

568.65

7

4.91

8/2/2018

8/13/2018

0004.1.13

BY PASS VARSARE SPIAU

2

6

89.00

4

6.73

8/14/2018

8/15/2018

0004.1.14

By PASS SP1AU L=40 M

16

4

453.45

6

5.59

8/16/2018

9/6/2018

0004.1.15

GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VEN

3

5

111.15

5

4.19

9/7/2018

9/11/2018

0004.1.16

BAZIN SP2AU

15

14

1,652.50

17

948.79

9/12/2018

10/2/2018

0004.1.17

CAMIN GRATAR SP2AU

2

10

159.05

9

19.41

10/3/2018

10/4/2018

0004.1.18

INSTALATII HIDRAULICE STATIE POMPARE SP2AU

1

4

30.88

2

0.02

10/5/2018

10/5/2018

0004.1.19

CONDUCTA REFULARE-POMPARE SP2AU PEIDPN6 DN 110 MM L = 195

18

10

1,420.83

7

7.72

10/8/2018

10/31/2018

0004.1.20

INSTALATII ELECTRICE SP2AU

1

16

125.98

2

3.22

11/1/2018

11/1/2018

0004.1.21

Bransament electric SP2AU

1

3

22.62

1

0.75

11/2/2018

11/2/2018

0004.1.22

Coloana electrica SP2AU

2

4

63.15

1

0.74

11/5/2018

11/6/2018

0004.1.23

DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

3

4

77.19

3

3.61

11/7/2018

11/9/2018

0004.1.24

ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

15

3

242.40

1

6.75

11/12/2018

11/30/2018

0004.1.25

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

2

9

139.49

5

9.64

12/3/2018

12/4/2018

0004.1.26

BY PASS VARSARE SP2AU

2

6

89.00

4

6.73

12/5/2018

12/6/2018

0004.1.27

BY PASS SP2AU L=9 M

4

5

136.01

6

5.53

12/7/2018

12/12/2018

0004.1.28

BAZIN SP3AU

14

15

1,652.50

18

948.79

12/13/2018

1/1/2019

0004.1.29

CAMIN GRATAR SP3AU

2

10

159.05

9

19.41

1/2/2019

1/3/2019

0004.1.30

INSTALATII HIDRAULICE STATIE POMPARE SP3AU

1

4

30.88

2

0.02

1/4/2019

1/4/2019

0004.1.31

CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

9

9

640.55

7

4.92

1/7/2019

1/17/2019

0004.1.32

INSTALATII ELECTRICE SP3AU

1

16

125.98

2

3.22

0004.1.33

Bransament electric SP3AU

1/18/2019

1/18/2019

1/21/2019

2/20/2019

0004.1.34

Coloana electrica SP3AU

5

5

178.15

1

0.74

1/21/2019

1/25/2019

0004.1.35

DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MPLASP3AU

3

3

49.95

3

2.04

1/28/2019

1/30/2019

0004.1.36

ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

16

3

258.34

1

6.96

1/31/2019

2/21/2019

0004.1.37

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

2

9

139.49

5

9.64

2/22/2019

2/25/2019

0004.1.38

BY PASS VARSARE SP3AU

2

6

89.00

4

6.73

2/26/2019

2/27/2019

0004.1.39

BY PASS SP3AU L-13 M

6

5

193.19

6

5.54

2/28/2019

3/7/2019

0004.1.40

GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE2 BUCJ VEN

3

5

111.15

5

4.19

3/8/2019

3/12/2019

0004.1.41

BAZIN SP4AU

14

15

1,652.50

18

948.79

3/13/2019

4/1/2019

0004.1.42

CAMIN GRATAR SP4AU

2

10

159.05

9

19.41

4/2/2019

4/3/2019

0004.1.43

INSTALATII HIDRAULICE STATIE POMPARE SP4AU

1

4

30.88

2

0.02

4/4/2019

4/4/2019

0004.1.44

CONDUCTA REFULARE-POMPARE SP4AU PEIDPN6 DN 110 MM L - 40 M

15

3

328.56

7

4.87

4/5/2019

4/25/2019

0004.1.45

INSTALATII ELECTRICE SP4AU

1

16

125.98

2

3.22

4/26/2019

4/26/2019

0004.1.46

Bransament electric SP4AU

1

3

22.38

1

0.75

4/29/2019

4/29/2019

0004.1.47

Coloana electrica SP4AU

3

6

121.96

1

0.74

4/30/2019

5/2/2019

0004.1.48

DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MPLASP4AU

2

3

44.82

3

2.04

5/3/2019

5/6/2019

0004.1.49

ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

5

6

200.82

1

5.60

5/7/2019

5/13/2019

0004.1.50

INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

2

9

139.49

5

9.64

5/14/2019

5/15/2019

0004.1.51

BY PASS VARSARE SP4AU

2

6

89.00

4

6.73

5/16/2019

5/17/2019

0004.1.52

BY PASS SP4AU L=4 M

2

7

106.50

6

5.52

5/20/2019

5/21/2019

0004.1.53

GOLIRE SI AERISIRE TRAVERSARE SP4AU;CAMIN GOLIRE 2 BUCr VEN

3

5

111.15

5

4.19

4.1

Lista echipamente 26,008.97

5/22/2019

5/24/2019

6/27/2018

5/31/2018

4.2

Extindere retea de canalizare în sat Boura

344

559.21

1/17/2019

5/27/2019

0004.2.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S

93

33

24,540.45

10

538.80

1/17/2019

5/27/2019

0004.2.2

SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

24

8

1,468.52

3

20.42

4/24/2019

5/27/2019 luna 1

Raport incarcare cu forta de munca - numar ore/luna

iunie 7,892.35

Necesar

Page 145 of 556

OBIECTIV:

Extindere retea de canalizare în satele Manolea si Boura

Beneficiar:

COMUNA FORASTI

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

Durata proiect:

344 zile / 361 zile calendaristice

Grafic Gantt Nr. crt.

Denumire capitole de lucrari/ activitati

Durata in zile

Nr. muncitori

Ore manopera

Nr. utilaje

Ore utilaj

luna 2

Data inceput Data sfarsit

iulie 1 4

Extindere retea de canalizare în satele Manolea si Boura

344

95,780.19

4.1

Extindere retea de canalizare în sat Manolea

191

0004.1.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3

164

35

45,784.33

10

0004.1.2

SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MAN

52

15

6,167.77

0004.1.3

BAZIN SP1AU

15

14

0004.1.4

CAMIN GRATAR SP1AU

2

0004.1.5

INSTALATII HIDRAULICE STATIE POMPARE SP1AU

0004.1.6

INSTALATII ELECTRICE SP1AU

0004.1.7

Bransament electric SP1AU

1

3

21.78

1

0004.1.8

Coloana electrica SP1AU

2

5

79.04

1

0004.1.9

DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4

4

104.33

3

0004.1.10

ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

16

3

267.39

0004.1.11

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

2

9

2

3

4

5

6

7

6,277.49

6/1/2018

5/27/2019

5,718.28

6/1/2018

5/24/2019

1,585.29

6/1/2018

1/16/2019

3

78.92

11/6/2018

1/16/2019

1,652.50

17

948.79

6/1/2018

6/21/2018 ],

10

159.05

9

19.41

6/22/2018

6/25/2018 nopera= [159.05 ora],

1

4

30.88

2

0.02

6/26/2018

6/26/2018 Manopera= [30.88 ora],

1

16

125.98

2

3.22

6/27/2018

6/27/2018 16, oreManopera= [125.98 ora],

0.75

6/28/2018

6/28/2018 Munc=3, oreManopera= [21.78 ora],

0.74

6/29/2018

7/2/2018

5.94

7/3/2018

7/6/2018

1

7.45

7/9/2018

7/30/2018

139.49

5

9.64

7/31/2018

8/1/2018

69,771.22

0004.1.12

CONDUCTA REFULARE-POMPARE SPlAU PEIDPN6 DN 110 KM L = 75 M

8

9

568.65

7

4.91

8/2/2018

8/13/2018

0004.1.13

BY PASS VARSARE SPIAU

2

6

89.00

4

6.73

8/14/2018

8/15/2018

0004.1.14

By PASS SP1AU L=40 M

16

4

453.45

6

5.59

8/16/2018

9/6/2018

0004.1.15

GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VEN

3

5

111.15

5

4.19

9/7/2018

9/11/2018

0004.1.16

BAZIN SP2AU

15

14

1,652.50

17

948.79

9/12/2018

10/2/2018

0004.1.17

CAMIN GRATAR SP2AU

2

10

159.05

9

19.41

10/3/2018

10/4/2018

0004.1.18

INSTALATII HIDRAULICE STATIE POMPARE SP2AU

1

4

30.88

2

0.02

10/5/2018

10/5/2018

0004.1.19

CONDUCTA REFULARE-POMPARE SP2AU PEIDPN6 DN 110 MM L = 195

18

10

1,420.83

7

7.72

10/8/2018

10/31/2018

0004.1.20

INSTALATII ELECTRICE SP2AU

1

16

125.98

2

3.22

11/1/2018

11/1/2018

0004.1.21

Bransament electric SP2AU

1

3

22.62

1

0.75

11/2/2018

11/2/2018

0004.1.22

Coloana electrica SP2AU

2

4

63.15

1

0.74

11/5/2018

11/6/2018

0004.1.23

DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

3

4

77.19

3

3.61

11/7/2018

11/9/2018

0004.1.24

ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

15

3

242.40

1

6.75

11/12/2018

11/30/2018

0004.1.25

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

2

9

139.49

5

9.64

12/3/2018

12/4/2018

0004.1.26

BY PASS VARSARE SP2AU

2

6

89.00

4

6.73

12/5/2018

12/6/2018

0004.1.27

BY PASS SP2AU L=9 M

4

5

136.01

6

5.53

12/7/2018

12/12/2018

0004.1.28

BAZIN SP3AU

14

15

1,652.50

18

948.79

12/13/2018

1/1/2019

0004.1.29

CAMIN GRATAR SP3AU

2

10

159.05

9

19.41

1/2/2019

1/3/2019

0004.1.30

INSTALATII HIDRAULICE STATIE POMPARE SP3AU

1

4

30.88

2

0.02

1/4/2019

1/4/2019

0004.1.31

CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

9

9

640.55

7

4.92

1/7/2019

1/17/2019

0004.1.32

INSTALATII ELECTRICE SP3AU

1

16

125.98

2

3.22

0004.1.33

Bransament electric SP3AU

1/18/2019

1/18/2019

1/21/2019

2/20/2019

0004.1.34

Coloana electrica SP3AU

5

5

178.15

1

0.74

1/21/2019

1/25/2019

0004.1.35

DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MPLASP3AU

3

3

49.95

3

2.04

1/28/2019

1/30/2019

0004.1.36

ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

16

3

258.34

1

6.96

1/31/2019

2/21/2019

0004.1.37

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

2

9

139.49

5

9.64

2/22/2019

2/25/2019

0004.1.38

BY PASS VARSARE SP3AU

2

6

89.00

4

6.73

2/26/2019

2/27/2019

0004.1.39

BY PASS SP3AU L-13 M

6

5

193.19

6

5.54

2/28/2019

3/7/2019

0004.1.40

GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE2 BUCJ VEN

3

5

111.15

5

4.19

3/8/2019

3/12/2019

0004.1.41

BAZIN SP4AU

14

15

1,652.50

18

948.79

3/13/2019

4/1/2019

0004.1.42

CAMIN GRATAR SP4AU

2

10

159.05

9

19.41

4/2/2019

4/3/2019

0004.1.43

INSTALATII HIDRAULICE STATIE POMPARE SP4AU

1

4

30.88

2

0.02

4/4/2019

4/4/2019

0004.1.44

CONDUCTA REFULARE-POMPARE SP4AU PEIDPN6 DN 110 MM L - 40 M

15

3

328.56

7

4.87

4/5/2019

4/25/2019

0004.1.45

INSTALATII ELECTRICE SP4AU

1

16

125.98

2

3.22

4/26/2019

4/26/2019

0004.1.46

Bransament electric SP4AU

1

3

22.38

1

0.75

4/29/2019

4/29/2019

0004.1.47

Coloana electrica SP4AU

3

6

121.96

1

0.74

4/30/2019

5/2/2019

0004.1.48

DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MPLASP4AU

2

3

44.82

3

2.04

5/3/2019

5/6/2019

0004.1.49

ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

5

6

200.82

1

5.60

5/7/2019

5/13/2019

0004.1.50

INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

2

9

139.49

5

9.64

5/14/2019

5/15/2019

0004.1.51

BY PASS VARSARE SP4AU

2

6

89.00

4

6.73

5/16/2019

5/17/2019

0004.1.52

BY PASS SP4AU L=4 M

2

7

106.50

6

5.52

5/20/2019

5/21/2019

0004.1.53

GOLIRE SI AERISIRE TRAVERSARE SP4AU;CAMIN GOLIRE 2 BUCr VEN

3

5

111.15

5

4.19

4.1

Lista echipamente 26,008.97

5/22/2019

5/24/2019

6/27/2018

5/31/2018

4.2

Extindere retea de canalizare în sat Boura

344

559.21

1/17/2019

5/27/2019

0004.2.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S

93

33

24,540.45

10

538.80

1/17/2019

5/27/2019

0004.2.2

SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

24

8

1,468.52

3

20.42

4/24/2019

5/27/2019

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

d=2 zile, NrMunc=5, oreManopera= [79.04 ora], d=4 zile, NrMunc=4, oreManopera= [104.33 ora], d=16

luna 2 Raport incarcare cu forta de munca - numar ore/luna

iulie 6,622.79

Necesar

Page 146 of 556

OBIECTIV:

Extindere retea de canalizare în satele Manolea si Boura

Beneficiar:

COMUNA FORASTI

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

Durata proiect:

344 zile / 361 zile calendaristice

Grafic Gantt Nr. crt.

Denumire capitole de lucrari/ activitati

Durata in zile

Nr. muncitori

Ore manopera

Nr. utilaje

Ore utilaj

luna 3

Data inceput Data sfarsit

august 1 95,780.19

6,277.49

6/1/2018

5/27/2019

5,718.28

6/1/2018

5/24/2019

1,585.29

6/1/2018

1/16/2019

3

78.92

11/6/2018

1/16/2019

1,652.50

17

948.79

6/1/2018

6/21/2018

10

159.05

9

19.41

6/22/2018

6/25/2018

1

4

30.88

2

0.02

6/26/2018

6/26/2018

1

16

125.98

2

3.22

6/27/2018

6/27/2018

0.75

6/28/2018

6/28/2018

0.74

6/29/2018

7/2/2018

2

3

4

5

6

7

8

4

Extindere retea de canalizare în satele Manolea si Boura

344

4.1

Extindere retea de canalizare în sat Manolea

191

0004.1.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3

164

35

45,784.33

10

0004.1.2

SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MAN

52

15

6,167.77

0004.1.3

BAZIN SP1AU

15

14

0004.1.4

CAMIN GRATAR SP1AU

2

0004.1.5

INSTALATII HIDRAULICE STATIE POMPARE SP1AU

0004.1.6

INSTALATII ELECTRICE SP1AU

0004.1.7

Bransament electric SP1AU

1

3

21.78

1

0004.1.8

Coloana electrica SP1AU

2

5

79.04

1

0004.1.9

DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4

4

104.33

3

5.94

7/3/2018

7/6/2018

0004.1.10

ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

16

3

267.39

1

7.45

7/9/2018

7/30/2018 zile, NrMunc=3, oreManopera= [267.39 ora],

69,771.22

0004.1.11

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

2

9

139.49

5

9.64

7/31/2018

8/1/2018

0004.1.12

CONDUCTA REFULARE-POMPARE SPlAU PEIDPN6 DN 110 KM L = 75 M

8

9

568.65

7

4.91

8/2/2018

8/13/2018

0004.1.13

BY PASS VARSARE SPIAU

2

6

89.00

4

6.73

8/14/2018

8/15/2018

0004.1.14

By PASS SP1AU L=40 M

16

4

453.45

6

5.59

8/16/2018

9/6/2018

0004.1.15

GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VEN

3

5

111.15

5

4.19

9/7/2018

9/11/2018

0004.1.16

BAZIN SP2AU

15

14

1,652.50

17

948.79

9/12/2018

10/2/2018

0004.1.17

CAMIN GRATAR SP2AU

2

10

159.05

9

19.41

10/3/2018

10/4/2018

0004.1.18

INSTALATII HIDRAULICE STATIE POMPARE SP2AU

1

4

30.88

2

0.02

10/5/2018

10/5/2018

0004.1.19

CONDUCTA REFULARE-POMPARE SP2AU PEIDPN6 DN 110 MM L = 195

18

10

1,420.83

7

7.72

10/8/2018

10/31/2018

0004.1.20

INSTALATII ELECTRICE SP2AU

1

16

125.98

2

3.22

11/1/2018

11/1/2018

0004.1.21

Bransament electric SP2AU

1

3

22.62

1

0.75

11/2/2018

11/2/2018

0004.1.22

Coloana electrica SP2AU

2

4

63.15

1

0.74

11/5/2018

11/6/2018

0004.1.23

DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

3

4

77.19

3

3.61

11/7/2018

11/9/2018

0004.1.24

ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

15

3

242.40

1

6.75

11/12/2018

11/30/2018

0004.1.25

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

2

9

139.49

5

9.64

12/3/2018

12/4/2018

0004.1.26

BY PASS VARSARE SP2AU

2

6

89.00

4

6.73

12/5/2018

12/6/2018

0004.1.27

BY PASS SP2AU L=9 M

4

5

136.01

6

5.53

12/7/2018

12/12/2018

0004.1.28

BAZIN SP3AU

14

15

1,652.50

18

948.79

12/13/2018

1/1/2019

0004.1.29

CAMIN GRATAR SP3AU

2

10

159.05

9

19.41

1/2/2019

1/3/2019

0004.1.30

INSTALATII HIDRAULICE STATIE POMPARE SP3AU

1

4

30.88

2

0.02

1/4/2019

1/4/2019

0004.1.31

CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

9

9

640.55

7

4.92

1/7/2019

1/17/2019

0004.1.32

INSTALATII ELECTRICE SP3AU

1

16

125.98

2

3.22

0004.1.33

Bransament electric SP3AU

1/18/2019

1/18/2019

1/21/2019

2/20/2019

0004.1.34

Coloana electrica SP3AU

5

5

178.15

1

0.74

1/21/2019

1/25/2019

0004.1.35

DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MPLASP3AU

3

3

49.95

3

2.04

1/28/2019

1/30/2019

0004.1.36

ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

16

3

258.34

1

6.96

1/31/2019

2/21/2019

0004.1.37

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

2

9

139.49

5

9.64

2/22/2019

2/25/2019

0004.1.38

BY PASS VARSARE SP3AU

2

6

89.00

4

6.73

2/26/2019

2/27/2019

0004.1.39

BY PASS SP3AU L-13 M

6

5

193.19

6

5.54

2/28/2019

3/7/2019

0004.1.40

GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE2 BUCJ VEN

3

5

111.15

5

4.19

3/8/2019

3/12/2019

0004.1.41

BAZIN SP4AU

14

15

1,652.50

18

948.79

3/13/2019

4/1/2019

0004.1.42

CAMIN GRATAR SP4AU

2

10

159.05

9

19.41

4/2/2019

4/3/2019

0004.1.43

INSTALATII HIDRAULICE STATIE POMPARE SP4AU

1

4

30.88

2

0.02

4/4/2019

4/4/2019

0004.1.44

CONDUCTA REFULARE-POMPARE SP4AU PEIDPN6 DN 110 MM L - 40 M

15

3

328.56

7

4.87

4/5/2019

4/25/2019

0004.1.45

INSTALATII ELECTRICE SP4AU

1

16

125.98

2

3.22

4/26/2019

4/26/2019

0004.1.46

Bransament electric SP4AU

1

3

22.38

1

0.75

4/29/2019

4/29/2019

0004.1.47

Coloana electrica SP4AU

3

6

121.96

1

0.74

4/30/2019

5/2/2019

0004.1.48

DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MPLASP4AU

2

3

44.82

3

2.04

5/3/2019

5/6/2019

0004.1.49

ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

5

6

200.82

1

5.60

5/7/2019

5/13/2019

0004.1.50

INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

2

9

139.49

5

9.64

5/14/2019

5/15/2019

0004.1.51

BY PASS VARSARE SP4AU

2

6

89.00

4

6.73

5/16/2019

5/17/2019

0004.1.52

BY PASS SP4AU L=4 M

2

7

106.50

6

5.52

5/20/2019

5/21/2019

0004.1.53

GOLIRE SI AERISIRE TRAVERSARE SP4AU;CAMIN GOLIRE 2 BUCr VEN

3

5

111.15

5

4.19

4.1

Lista echipamente 26,008.97

5/22/2019

5/24/2019

6/27/2018

5/31/2018

4.2

Extindere retea de canalizare în sat Boura

344

559.21

1/17/2019

5/27/2019

0004.2.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S

93

33

24,540.45

10

538.80

1/17/2019

5/27/2019

0004.2.2

SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

24

8

1,468.52

3

20.42

4/24/2019

5/27/2019

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

d=2 zile, NrMunc=9, oreManopera= [139.49 ora], d=8 zile, NrMunc=9, oreManopera= [568.65 ora], d=2 zile, NrMunc=6, oreManopera= [89 ora],

luna 3 Raport incarcare cu forta de munca - numar ore/luna

august 7,488.46

Necesar

Page 147 of 556

24

25

26

27

28

29

30

31

OBIECTIV:

Extindere retea de canalizare în satele Manolea si Boura

Beneficiar:

COMUNA FORASTI

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

Durata proiect:

344 zile / 361 zile calendaristice

Grafic Gantt Nr. crt.

Denumire capitole de lucrari/ activitati

Durata in zile

Nr. muncitori

Ore manopera

Nr. utilaje

Ore utilaj

luna 4

Data inceput Data sfarsit

septembrie 1 4

Extindere retea de canalizare în satele Manolea si Boura

344

95,780.19

6,277.49

6/1/2018

5/27/2019

4.1

Extindere retea de canalizare în sat Manolea

191

0004.1.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3

164

35

45,784.33

10

5,718.28

6/1/2018

5/24/2019

1,585.29

6/1/2018

0004.1.2

SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MAN

52

15

6,167.77

1/16/2019

3

78.92

11/6/2018

0004.1.3

BAZIN SP1AU

15

14

1/16/2019

1,652.50

17

948.79

6/1/2018

0004.1.4

CAMIN GRATAR SP1AU

2

6/21/2018

10

159.05

9

19.41

6/22/2018

0004.1.5

INSTALATII HIDRAULICE STATIE POMPARE SP1AU

6/25/2018

1

4

30.88

2

0.02

6/26/2018

0004.1.6

INSTALATII ELECTRICE SP1AU

6/26/2018

1

16

125.98

2

3.22

6/27/2018

6/27/2018

0004.1.7

Bransament electric SP1AU

1

3

21.78

1

0004.1.8

Coloana electrica SP1AU

2

5

79.04

1

0.75

6/28/2018

6/28/2018

0.74

6/29/2018

0004.1.9

DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4

4

104.33

3

5.94

7/3/2018

7/2/2018 7/6/2018

0004.1.10

ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

16

3

267.39

1

7.45

7/9/2018

7/30/2018

69,771.22

0004.1.11

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

2

9

139.49

5

9.64

7/31/2018

8/1/2018

0004.1.12

CONDUCTA REFULARE-POMPARE SPlAU PEIDPN6 DN 110 KM L = 75 M

8

9

568.65

7

4.91

8/2/2018

8/13/2018

0004.1.13

BY PASS VARSARE SPIAU

2

6

89.00

4

6.73

8/14/2018

8/15/2018

0004.1.14

By PASS SP1AU L=40 M

16

4

453.45

6

5.59

8/16/2018

9/6/2018

0004.1.15

GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VEN

3

5

111.15

5

4.19

9/7/2018

9/11/2018

0004.1.16

BAZIN SP2AU

15

14

1,652.50

17

948.79

9/12/2018

10/2/2018

0004.1.17

CAMIN GRATAR SP2AU

2

10

159.05

9

19.41

10/3/2018

10/4/2018

0004.1.18

INSTALATII HIDRAULICE STATIE POMPARE SP2AU

1

4

30.88

2

0.02

10/5/2018

10/5/2018

0004.1.19

CONDUCTA REFULARE-POMPARE SP2AU PEIDPN6 DN 110 MM L = 195

18

10

1,420.83

7

7.72

10/8/2018

10/31/2018

0004.1.20

INSTALATII ELECTRICE SP2AU

1

16

125.98

2

3.22

11/1/2018

11/1/2018

0004.1.21

Bransament electric SP2AU

1

3

22.62

1

0.75

11/2/2018

11/2/2018

0004.1.22

Coloana electrica SP2AU

2

4

63.15

1

0.74

11/5/2018

11/6/2018

0004.1.23

DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

3

4

77.19

3

3.61

11/7/2018

11/9/2018

0004.1.24

ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

15

3

242.40

1

6.75

11/12/2018

11/30/2018

0004.1.25

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

2

9

139.49

5

9.64

12/3/2018

12/4/2018

0004.1.26

BY PASS VARSARE SP2AU

2

6

89.00

4

6.73

12/5/2018

12/6/2018

0004.1.27

BY PASS SP2AU L=9 M

4

5

136.01

6

5.53

12/7/2018

12/12/2018

0004.1.28

BAZIN SP3AU

14

15

1,652.50

18

948.79

12/13/2018

1/1/2019

0004.1.29

CAMIN GRATAR SP3AU

2

10

159.05

9

19.41

1/2/2019

1/3/2019

0004.1.30

INSTALATII HIDRAULICE STATIE POMPARE SP3AU

1

4

30.88

2

0.02

1/4/2019

1/4/2019

0004.1.31

CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

9

9

640.55

7

4.92

1/7/2019

1/17/2019

0004.1.32

INSTALATII ELECTRICE SP3AU

1

16

125.98

2

3.22

0004.1.33

Bransament electric SP3AU

1/18/2019

1/18/2019

1/21/2019

2/20/2019

0004.1.34

Coloana electrica SP3AU

5

5

178.15

1

0.74

1/21/2019

1/25/2019

0004.1.35

DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MPLASP3AU

3

3

49.95

3

2.04

1/28/2019

1/30/2019

0004.1.36

ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

16

3

258.34

1

6.96

1/31/2019

2/21/2019

0004.1.37

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

2

9

139.49

5

9.64

2/22/2019

2/25/2019

0004.1.38

BY PASS VARSARE SP3AU

2

6

89.00

4

6.73

2/26/2019

2/27/2019

0004.1.39

BY PASS SP3AU L-13 M

6

5

193.19

6

5.54

2/28/2019

3/7/2019

0004.1.40

GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE2 BUCJ VEN

3

5

111.15

5

4.19

3/8/2019

3/12/2019

0004.1.41

BAZIN SP4AU

14

15

1,652.50

18

948.79

3/13/2019

4/1/2019

0004.1.42

CAMIN GRATAR SP4AU

2

10

159.05

9

19.41

4/2/2019

4/3/2019

0004.1.43

INSTALATII HIDRAULICE STATIE POMPARE SP4AU

1

4

30.88

2

0.02

4/4/2019

4/4/2019

0004.1.44

CONDUCTA REFULARE-POMPARE SP4AU PEIDPN6 DN 110 MM L - 40 M

15

3

328.56

7

4.87

4/5/2019

4/25/2019

0004.1.45

INSTALATII ELECTRICE SP4AU

1

16

125.98

2

3.22

4/26/2019

4/26/2019

0004.1.46

Bransament electric SP4AU

1

3

22.38

1

0.75

4/29/2019

4/29/2019

0004.1.47

Coloana electrica SP4AU

3

6

121.96

1

0.74

4/30/2019

5/2/2019

0004.1.48

DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MPLASP4AU

2

3

44.82

3

2.04

5/3/2019

5/6/2019

0004.1.49

ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

5

6

200.82

1

5.60

5/7/2019

5/13/2019

0004.1.50

INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

2

9

139.49

5

9.64

5/14/2019

5/15/2019

0004.1.51

BY PASS VARSARE SP4AU

2

6

89.00

4

6.73

5/16/2019

5/17/2019

0004.1.52

BY PASS SP4AU L=4 M

2

7

106.50

6

5.52

5/20/2019

5/21/2019

0004.1.53

GOLIRE SI AERISIRE TRAVERSARE SP4AU;CAMIN GOLIRE 2 BUCr VEN

3

5

111.15

5

4.19

4.1

Lista echipamente 26,008.97

5/22/2019

5/24/2019

6/27/2018

5/31/2018

4.2

Extindere retea de canalizare în sat Boura

344

559.21

1/17/2019

5/27/2019

0004.2.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S

93

33

24,540.45

10

538.80

1/17/2019

5/27/2019

0004.2.2

SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

24

8

1,468.52

3

20.42

4/24/2019

5/27/2019

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

d=16 zile, NrMunc=4, oreManopera= [453.45 ora], d=3 zile, NrMunc=5, oreManopera= [111.15 ora],

luna 4 Raport incarcare cu forta de munca - numar ore/luna

septembrie 7,240.14

Necesar

Page 148 of 556

21

22

23

24

25

26

27

28

29

30

OBIECTIV:

Extindere retea de canalizare în satele Manolea si Boura

Beneficiar:

COMUNA FORASTI

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

Durata proiect:

344 zile / 361 zile calendaristice

Grafic Gantt Nr. crt.

Denumire capitole de lucrari/ activitati

Durata in zile

Nr. muncitori

Ore manopera

Nr. utilaje

Ore utilaj

luna 5

Data inceput Data sfarsit

octombrie 1 4

Extindere retea de canalizare în satele Manolea si Boura

344

95,780.19

6,277.49

6/1/2018

5/27/2019

4.1

Extindere retea de canalizare în sat Manolea

191

0004.1.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3

164

35

45,784.33

10

5,718.28

6/1/2018

5/24/2019

1,585.29

6/1/2018

0004.1.2

SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MAN

52

15

6,167.77

1/16/2019

3

78.92

11/6/2018

0004.1.3

BAZIN SP1AU

15

14

1/16/2019

1,652.50

17

948.79

6/1/2018

0004.1.4

CAMIN GRATAR SP1AU

2

6/21/2018

10

159.05

9

19.41

6/22/2018

0004.1.5

INSTALATII HIDRAULICE STATIE POMPARE SP1AU

6/25/2018

1

4

30.88

2

0.02

6/26/2018

0004.1.6

INSTALATII ELECTRICE SP1AU

6/26/2018

1

16

125.98

2

3.22

6/27/2018

6/27/2018

0004.1.7

Bransament electric SP1AU

1

3

21.78

1

0004.1.8

Coloana electrica SP1AU

2

5

79.04

1

0.75

6/28/2018

6/28/2018

0.74

6/29/2018

0004.1.9

DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4

4

104.33

3

5.94

7/3/2018

7/2/2018 7/6/2018

0004.1.10

ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

16

3

267.39

1

7.45

7/9/2018

7/30/2018

69,771.22

0004.1.11

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

2

9

139.49

5

9.64

7/31/2018

8/1/2018

0004.1.12

CONDUCTA REFULARE-POMPARE SPlAU PEIDPN6 DN 110 KM L = 75 M

8

9

568.65

7

4.91

8/2/2018

8/13/2018

0004.1.13

BY PASS VARSARE SPIAU

2

6

89.00

4

6.73

8/14/2018

8/15/2018

0004.1.14

By PASS SP1AU L=40 M

16

4

453.45

6

5.59

8/16/2018

9/6/2018

0004.1.15

GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VEN

3

5

111.15

5

4.19

9/7/2018

9/11/2018

0004.1.16

BAZIN SP2AU

15

14

1,652.50

17

948.79

9/12/2018

10/2/2018

0004.1.17

CAMIN GRATAR SP2AU

2

10

159.05

9

19.41

10/3/2018

10/4/2018

0004.1.18

INSTALATII HIDRAULICE STATIE POMPARE SP2AU

1

4

30.88

2

0.02

10/5/2018

10/5/2018

0004.1.19

CONDUCTA REFULARE-POMPARE SP2AU PEIDPN6 DN 110 MM L = 195

18

10

1,420.83

7

7.72

10/8/2018

10/31/2018

0004.1.20

INSTALATII ELECTRICE SP2AU

1

16

125.98

2

3.22

11/1/2018

11/1/2018

0004.1.21

Bransament electric SP2AU

1

3

22.62

1

0.75

11/2/2018

11/2/2018

0004.1.22

Coloana electrica SP2AU

2

4

63.15

1

0.74

11/5/2018

11/6/2018

0004.1.23

DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

3

4

77.19

3

3.61

11/7/2018

11/9/2018

0004.1.24

ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

15

3

242.40

1

6.75

11/12/2018

11/30/2018

0004.1.25

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

2

9

139.49

5

9.64

12/3/2018

12/4/2018

0004.1.26

BY PASS VARSARE SP2AU

2

6

89.00

4

6.73

12/5/2018

12/6/2018

0004.1.27

BY PASS SP2AU L=9 M

4

5

136.01

6

5.53

12/7/2018

12/12/2018

0004.1.28

BAZIN SP3AU

14

15

1,652.50

18

948.79

12/13/2018

1/1/2019

0004.1.29

CAMIN GRATAR SP3AU

2

10

159.05

9

19.41

1/2/2019

1/3/2019

0004.1.30

INSTALATII HIDRAULICE STATIE POMPARE SP3AU

1

4

30.88

2

0.02

1/4/2019

1/4/2019

0004.1.31

CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

9

9

640.55

7

4.92

1/7/2019

1/17/2019

0004.1.32

INSTALATII ELECTRICE SP3AU

1

16

125.98

2

3.22

0004.1.33

Bransament electric SP3AU

1/18/2019

1/18/2019

1/21/2019

2/20/2019

0004.1.34

Coloana electrica SP3AU

5

5

178.15

1

0.74

1/21/2019

1/25/2019

0004.1.35

DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MPLASP3AU

3

3

49.95

3

2.04

1/28/2019

1/30/2019

0004.1.36

ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

16

3

258.34

1

6.96

1/31/2019

2/21/2019

0004.1.37

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

2

9

139.49

5

9.64

2/22/2019

2/25/2019

0004.1.38

BY PASS VARSARE SP3AU

2

6

89.00

4

6.73

2/26/2019

2/27/2019

0004.1.39

BY PASS SP3AU L-13 M

6

5

193.19

6

5.54

2/28/2019

3/7/2019

0004.1.40

GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE2 BUCJ VEN

3

5

111.15

5

4.19

3/8/2019

3/12/2019

0004.1.41

BAZIN SP4AU

14

15

1,652.50

18

948.79

3/13/2019

4/1/2019

0004.1.42

CAMIN GRATAR SP4AU

2

10

159.05

9

19.41

4/2/2019

4/3/2019

0004.1.43

INSTALATII HIDRAULICE STATIE POMPARE SP4AU

1

4

30.88

2

0.02

4/4/2019

4/4/2019

0004.1.44

CONDUCTA REFULARE-POMPARE SP4AU PEIDPN6 DN 110 MM L - 40 M

15

3

328.56

7

4.87

4/5/2019

4/25/2019

0004.1.45

INSTALATII ELECTRICE SP4AU

1

16

125.98

2

3.22

4/26/2019

4/26/2019

0004.1.46

Bransament electric SP4AU

1

3

22.38

1

0.75

4/29/2019

4/29/2019

0004.1.47

Coloana electrica SP4AU

3

6

121.96

1

0.74

4/30/2019

5/2/2019

0004.1.48

DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MPLASP4AU

2

3

44.82

3

2.04

5/3/2019

5/6/2019

0004.1.49

ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

5

6

200.82

1

5.60

5/7/2019

5/13/2019

0004.1.50

INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

2

9

139.49

5

9.64

5/14/2019

5/15/2019

0004.1.51

BY PASS VARSARE SP4AU

2

6

89.00

4

6.73

5/16/2019

5/17/2019

0004.1.52

BY PASS SP4AU L=4 M

2

7

106.50

6

5.52

5/20/2019

5/21/2019

0004.1.53

GOLIRE SI AERISIRE TRAVERSARE SP4AU;CAMIN GOLIRE 2 BUCr VEN

3

5

111.15

5

4.19

4.1

Lista echipamente 26,008.97

5/22/2019

5/24/2019

6/27/2018

5/31/2018

4.2

Extindere retea de canalizare în sat Boura

344

559.21

1/17/2019

5/27/2019

0004.2.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S

93

33

24,540.45

10

538.80

1/17/2019

5/27/2019

0004.2.2

SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

24

8

1,468.52

3

20.42

4/24/2019

5/27/2019

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

d=15 zile, NrMunc=14, oreManopera= [1,652.5 ora], d=2 zile, NrMunc=10, oreManopera= [159.05 ora], d=1 zi, NrMunc=4, oreManopera= [30.88 ora],

luna 5 Raport incarcare cu forta de munca - numar ore/luna

octombrie 8,252.07

Necesar

Page 149 of 556

18

19

20

21

22

23

24

25

26

27

28

29

30

31

OBIECTIV:

Extindere retea de canalizare în satele Manolea si Boura

Beneficiar:

COMUNA FORASTI

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

Durata proiect:

344 zile / 361 zile calendaristice

Grafic Gantt Nr. crt.

Denumire capitole de lucrari/ activitati

Durata in zile

Nr. muncitori

Ore manopera

Nr. utilaje

Ore utilaj

luna 6

Data inceput Data sfarsit

noiembrie 1 4

Extindere retea de canalizare în satele Manolea si Boura

344

95,780.19

6,277.49

6/1/2018

5/27/2019

4.1

Extindere retea de canalizare în sat Manolea

191

0004.1.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3

164

35

45,784.33

10

5,718.28

6/1/2018

5/24/2019

1,585.29

6/1/2018

0004.1.2

SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MAN

52

15

6,167.77

1/16/2019

3

78.92

11/6/2018

0004.1.3

BAZIN SP1AU

15

14

1/16/2019

1,652.50

17

948.79

6/1/2018

0004.1.4

CAMIN GRATAR SP1AU

2

6/21/2018

10

159.05

9

19.41

6/22/2018

0004.1.5

INSTALATII HIDRAULICE STATIE POMPARE SP1AU

6/25/2018

1

4

30.88

2

0.02

6/26/2018

0004.1.6

INSTALATII ELECTRICE SP1AU

6/26/2018

1

16

125.98

2

3.22

6/27/2018

6/27/2018

0004.1.7

Bransament electric SP1AU

1

3

21.78

1

0004.1.8

Coloana electrica SP1AU

2

5

79.04

1

0.75

6/28/2018

6/28/2018

0.74

6/29/2018

0004.1.9

DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4

4

104.33

3

5.94

7/3/2018

7/2/2018 7/6/2018

0004.1.10

ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

16

3

267.39

1

7.45

7/9/2018

7/30/2018

69,771.22

2

3

4

5

6

7

8

9

10

0004.1.11

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

2

9

139.49

5

9.64

7/31/2018

8/1/2018

0004.1.12

CONDUCTA REFULARE-POMPARE SPlAU PEIDPN6 DN 110 KM L = 75 M

8

9

568.65

7

4.91

8/2/2018

8/13/2018

0004.1.13

BY PASS VARSARE SPIAU

2

6

89.00

4

6.73

8/14/2018

8/15/2018

0004.1.14

By PASS SP1AU L=40 M

16

4

453.45

6

5.59

8/16/2018

9/6/2018

0004.1.15

GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VEN

3

5

111.15

5

4.19

9/7/2018

9/11/2018

0004.1.16

BAZIN SP2AU

15

14

1,652.50

17

948.79

9/12/2018

10/2/2018

0004.1.17

CAMIN GRATAR SP2AU

2

10

159.05

9

19.41

10/3/2018

10/4/2018

0004.1.18

INSTALATII HIDRAULICE STATIE POMPARE SP2AU

1

4

30.88

2

0.02

10/5/2018

10/5/2018

0004.1.19

CONDUCTA REFULARE-POMPARE SP2AU PEIDPN6 DN 110 MM L = 195

18

10

1,420.83

7

7.72

10/8/2018

10/31/2018 d=18 zile, NrMunc=10, oreManopera= [1,420.83 ora],

0004.1.20

INSTALATII ELECTRICE SP2AU

1

16

125.98

2

3.22

11/1/2018

11/1/2018

0004.1.21

Bransament electric SP2AU

1

3

22.62

1

0.75

11/2/2018

11/2/2018

0004.1.22

Coloana electrica SP2AU

2

4

63.15

1

0.74

11/5/2018

11/6/2018

0004.1.23

DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

3

4

77.19

3

3.61

11/7/2018

11/9/2018

0004.1.24

ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

15

3

242.40

1

6.75

11/12/2018

11/30/2018

0004.1.25

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

2

9

139.49

5

9.64

12/3/2018

12/4/2018

0004.1.26

BY PASS VARSARE SP2AU

2

6

89.00

4

6.73

12/5/2018

12/6/2018

0004.1.27

BY PASS SP2AU L=9 M

4

5

136.01

6

5.53

12/7/2018

12/12/2018

0004.1.28

BAZIN SP3AU

14

15

1,652.50

18

948.79

12/13/2018

1/1/2019

0004.1.29

CAMIN GRATAR SP3AU

2

10

159.05

9

19.41

1/2/2019

1/3/2019

0004.1.30

INSTALATII HIDRAULICE STATIE POMPARE SP3AU

1

4

30.88

2

0.02

1/4/2019

1/4/2019

0004.1.31

CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

9

9

640.55

7

4.92

1/7/2019

1/17/2019

0004.1.32

INSTALATII ELECTRICE SP3AU

1

16

125.98

2

3.22

0004.1.33

Bransament electric SP3AU

1/18/2019

1/18/2019

1/21/2019

2/20/2019

0004.1.34

Coloana electrica SP3AU

5

5

178.15

1

0.74

1/21/2019

1/25/2019

0004.1.35

DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MPLASP3AU

3

3

49.95

3

2.04

1/28/2019

1/30/2019

0004.1.36

ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

16

3

258.34

1

6.96

1/31/2019

2/21/2019

0004.1.37

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

2

9

139.49

5

9.64

2/22/2019

2/25/2019

0004.1.38

BY PASS VARSARE SP3AU

2

6

89.00

4

6.73

2/26/2019

2/27/2019

0004.1.39

BY PASS SP3AU L-13 M

6

5

193.19

6

5.54

2/28/2019

3/7/2019

0004.1.40

GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE2 BUCJ VEN

3

5

111.15

5

4.19

3/8/2019

3/12/2019

0004.1.41

BAZIN SP4AU

14

15

1,652.50

18

948.79

3/13/2019

4/1/2019

0004.1.42

CAMIN GRATAR SP4AU

2

10

159.05

9

19.41

4/2/2019

4/3/2019

0004.1.43

INSTALATII HIDRAULICE STATIE POMPARE SP4AU

1

4

30.88

2

0.02

4/4/2019

4/4/2019

0004.1.44

CONDUCTA REFULARE-POMPARE SP4AU PEIDPN6 DN 110 MM L - 40 M

15

3

328.56

7

4.87

4/5/2019

4/25/2019

0004.1.45

INSTALATII ELECTRICE SP4AU

1

16

125.98

2

3.22

4/26/2019

4/26/2019

0004.1.46

Bransament electric SP4AU

1

3

22.38

1

0.75

4/29/2019

4/29/2019

0004.1.47

Coloana electrica SP4AU

3

6

121.96

1

0.74

4/30/2019

5/2/2019

0004.1.48

DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MPLASP4AU

2

3

44.82

3

2.04

5/3/2019

5/6/2019

0004.1.49

ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

5

6

200.82

1

5.60

5/7/2019

5/13/2019

0004.1.50

INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

2

9

139.49

5

9.64

5/14/2019

5/15/2019

0004.1.51

BY PASS VARSARE SP4AU

2

6

89.00

4

6.73

5/16/2019

5/17/2019

0004.1.52

BY PASS SP4AU L=4 M

2

7

106.50

6

5.52

5/20/2019

5/21/2019

0004.1.53

GOLIRE SI AERISIRE TRAVERSARE SP4AU;CAMIN GOLIRE 2 BUCr VEN

3

5

111.15

5

4.19

4.1

Lista echipamente 26,008.97

5/22/2019

5/24/2019

6/27/2018

5/31/2018

4.2

Extindere retea de canalizare în sat Boura

344

559.21

1/17/2019

5/27/2019

0004.2.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S

93

33

24,540.45

10

538.80

1/17/2019

5/27/2019

0004.2.2

SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

24

8

1,468.52

3

20.42

4/24/2019

5/27/2019

11

12

13

14

15

16

17

18

d=1 zi, NrMunc=16, oreManopera= [125.98 ora], d=1 zi, NrMunc=3, oreManopera= [22.62 ora], d=2 zile, NrMunc=4, oreManopera= [63.15 ora], d=3 zile, NrMunc=4, oreManopera= [77.19 ora],

luna 6 Raport incarcare cu forta de munca - numar ore/luna

noiembrie 8,926.74

Necesar

Page 150 of 556

19

20

21

22

23

24

25

26

27

28

29

30

OBIECTIV:

Extindere retea de canalizare în satele Manolea si Boura

Beneficiar:

COMUNA FORASTI

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

Durata proiect:

344 zile / 361 zile calendaristice

Grafic Gantt Nr. crt.

Denumire capitole de lucrari/ activitati

Durata in zile

Nr. muncitori

Ore manopera

Nr. utilaje

Ore utilaj

luna 7

Data inceput Data sfarsit

decembrie 1 4

Extindere retea de canalizare în satele Manolea si Boura

344

95,780.19

6,277.49

6/1/2018

5/27/2019

4.1

Extindere retea de canalizare în sat Manolea

191

0004.1.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3

164

35

45,784.33

10

5,718.28

6/1/2018

5/24/2019

1,585.29

6/1/2018

0004.1.2

SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MAN

52

15

6,167.77

1/16/2019

3

78.92

11/6/2018

0004.1.3

BAZIN SP1AU

15

14

1/16/2019

1,652.50

17

948.79

6/1/2018

0004.1.4

CAMIN GRATAR SP1AU

2

6/21/2018

10

159.05

9

19.41

6/22/2018

0004.1.5

INSTALATII HIDRAULICE STATIE POMPARE SP1AU

6/25/2018

1

4

30.88

2

0.02

6/26/2018

0004.1.6

INSTALATII ELECTRICE SP1AU

6/26/2018

1

16

125.98

2

3.22

6/27/2018

6/27/2018

0004.1.7

Bransament electric SP1AU

1

3

21.78

1

0004.1.8

Coloana electrica SP1AU

2

5

79.04

1

0.75

6/28/2018

6/28/2018

0.74

6/29/2018

0004.1.9

DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4

4

104.33

3

5.94

7/3/2018

7/2/2018 7/6/2018

0004.1.10

ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

16

3

267.39

1

7.45

7/9/2018

7/30/2018

69,771.22

2

3

4

5

6

7

8

9

0004.1.11

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

2

9

139.49

5

9.64

7/31/2018

8/1/2018

0004.1.12

CONDUCTA REFULARE-POMPARE SPlAU PEIDPN6 DN 110 KM L = 75 M

8

9

568.65

7

4.91

8/2/2018

8/13/2018

0004.1.13

BY PASS VARSARE SPIAU

2

6

89.00

4

6.73

8/14/2018

8/15/2018

0004.1.14

By PASS SP1AU L=40 M

16

4

453.45

6

5.59

8/16/2018

9/6/2018

0004.1.15

GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VEN

3

5

111.15

5

4.19

9/7/2018

9/11/2018

0004.1.16

BAZIN SP2AU

15

14

1,652.50

17

948.79

9/12/2018

10/2/2018

0004.1.17

CAMIN GRATAR SP2AU

2

10

159.05

9

19.41

10/3/2018

10/4/2018

0004.1.18

INSTALATII HIDRAULICE STATIE POMPARE SP2AU

1

4

30.88

2

0.02

10/5/2018

10/5/2018

0004.1.19

CONDUCTA REFULARE-POMPARE SP2AU PEIDPN6 DN 110 MM L = 195

18

10

1,420.83

7

7.72

10/8/2018

10/31/2018

0004.1.20

INSTALATII ELECTRICE SP2AU

1

16

125.98

2

3.22

11/1/2018

11/1/2018

0004.1.21

Bransament electric SP2AU

1

3

22.62

1

0.75

11/2/2018

11/2/2018

0004.1.22

Coloana electrica SP2AU

2

4

63.15

1

0.74

11/5/2018

11/6/2018

0004.1.23

DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

3

4

77.19

3

3.61

11/7/2018

11/9/2018

0004.1.24

ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

15

3

242.40

1

6.75

11/12/2018

11/30/2018 d=15 zile, NrMunc=3, oreManopera= [242.4 ora],

0004.1.25

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

2

9

139.49

5

9.64

12/3/2018

12/4/2018

0004.1.26

BY PASS VARSARE SP2AU

2

6

89.00

4

6.73

12/5/2018

12/6/2018

0004.1.27

BY PASS SP2AU L=9 M

4

5

136.01

6

5.53

12/7/2018

12/12/2018

0004.1.28

BAZIN SP3AU

14

15

1,652.50

18

948.79

12/13/2018

1/1/2019

0004.1.29

CAMIN GRATAR SP3AU

2

10

159.05

9

19.41

1/2/2019

1/3/2019

0004.1.30

INSTALATII HIDRAULICE STATIE POMPARE SP3AU

1

4

30.88

2

0.02

1/4/2019

1/4/2019

0004.1.31

CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

9

9

640.55

7

4.92

1/7/2019

1/17/2019

0004.1.32

INSTALATII ELECTRICE SP3AU

1

16

125.98

2

3.22

0004.1.33

Bransament electric SP3AU

1/18/2019

1/18/2019

1/21/2019

2/20/2019

0004.1.34

Coloana electrica SP3AU

5

5

178.15

1

0.74

1/21/2019

1/25/2019

0004.1.35

DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MPLASP3AU

3

3

49.95

3

2.04

1/28/2019

1/30/2019

0004.1.36

ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

16

3

258.34

1

6.96

1/31/2019

2/21/2019

0004.1.37

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

2

9

139.49

5

9.64

2/22/2019

2/25/2019

0004.1.38

BY PASS VARSARE SP3AU

2

6

89.00

4

6.73

2/26/2019

2/27/2019

0004.1.39

BY PASS SP3AU L-13 M

6

5

193.19

6

5.54

2/28/2019

3/7/2019

0004.1.40

GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE2 BUCJ VEN

3

5

111.15

5

4.19

3/8/2019

3/12/2019

0004.1.41

BAZIN SP4AU

14

15

1,652.50

18

948.79

3/13/2019

4/1/2019

0004.1.42

CAMIN GRATAR SP4AU

2

10

159.05

9

19.41

4/2/2019

4/3/2019

0004.1.43

INSTALATII HIDRAULICE STATIE POMPARE SP4AU

1

4

30.88

2

0.02

4/4/2019

4/4/2019

0004.1.44

CONDUCTA REFULARE-POMPARE SP4AU PEIDPN6 DN 110 MM L - 40 M

15

3

328.56

7

4.87

4/5/2019

4/25/2019

0004.1.45

INSTALATII ELECTRICE SP4AU

1

16

125.98

2

3.22

4/26/2019

4/26/2019

0004.1.46

Bransament electric SP4AU

1

3

22.38

1

0.75

4/29/2019

4/29/2019

0004.1.47

Coloana electrica SP4AU

3

6

121.96

1

0.74

4/30/2019

5/2/2019

0004.1.48

DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MPLASP4AU

2

3

44.82

3

2.04

5/3/2019

5/6/2019

0004.1.49

ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

5

6

200.82

1

5.60

5/7/2019

5/13/2019

0004.1.50

INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

2

9

139.49

5

9.64

5/14/2019

5/15/2019

0004.1.51

BY PASS VARSARE SP4AU

2

6

89.00

4

6.73

5/16/2019

5/17/2019

0004.1.52

BY PASS SP4AU L=4 M

2

7

106.50

6

5.52

5/20/2019

5/21/2019

0004.1.53

GOLIRE SI AERISIRE TRAVERSARE SP4AU;CAMIN GOLIRE 2 BUCr VEN

3

5

111.15

5

4.19

4.1

Lista echipamente 26,008.97

5/22/2019

5/24/2019

6/27/2018

5/31/2018

4.2

Extindere retea de canalizare în sat Boura

344

559.21

1/17/2019

5/27/2019

0004.2.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S

93

33

24,540.45

10

538.80

1/17/2019

5/27/2019

0004.2.2

SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

24

8

1,468.52

3

20.42

4/24/2019

5/27/2019

10

11

12

13

14

15

16

17

18

19

20

21

d=2 zile, NrMunc=9, oreManopera= [139.49 ora], d=2 zile, NrMunc=6, oreManopera= [89 ora], d=4 zile, NrMunc=5, oreManopera= [136.01 ora],

luna 7 Raport incarcare cu forta de munca - numar ore/luna

decembrie 10,252.43

Necesar

Page 151 of 556

22

23

24

25

26

27

28

29

30

31

OBIECTIV:

Extindere retea de canalizare în satele Manolea si Boura

Beneficiar:

COMUNA FORASTI

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

Durata proiect:

344 zile / 361 zile calendaristice

Grafic Gantt Nr. crt.

Denumire capitole de lucrari/ activitati

Durata in zile

Nr. muncitori

Ore manopera

Nr. utilaje

Ore utilaj

luna 8

Data inceput Data sfarsit

ianuarie 1 4

Extindere retea de canalizare în satele Manolea si Boura

344

95,780.19

4.1

Extindere retea de canalizare în sat Manolea

191

0004.1.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3

164

35

45,784.33

10

0004.1.2

SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MAN

52

15

6,167.77

0004.1.3

BAZIN SP1AU

15

14

0004.1.4

CAMIN GRATAR SP1AU

2

0004.1.5

INSTALATII HIDRAULICE STATIE POMPARE SP1AU

1

0004.1.6

INSTALATII ELECTRICE SP1AU

1

0004.1.7

Bransament electric SP1AU

1

3

21.78

1

0004.1.8

Coloana electrica SP1AU

2

5

79.04

1

0004.1.9

DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4

4

104.33

3

5.94

7/3/2018

7/6/2018

0004.1.10

ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

16

3

267.39

1

7.45

7/9/2018

7/30/2018

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

6,277.49

6/1/2018

5/27/2019

5,718.28

6/1/2018

5/24/2019

1,585.29

6/1/2018

1/16/2019

d=164 zile, NrMunc=35, oreManopera= [45,784.33 ora],

3

78.92

11/6/2018

1/16/2019

d=52 zile, NrMunc=15, oreManopera= [6,167.77 ora],

1,652.50

17

948.79

6/1/2018

6/21/2018

10

159.05

9

19.41

6/22/2018

6/25/2018

4

30.88

2

0.02

6/26/2018

6/26/2018

16

125.98

2

3.22

6/27/2018

6/27/2018

0.75

6/28/2018

6/28/2018

0.74

6/29/2018

7/2/2018

69,771.22

27

28

29

30

31

0004.1.11

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

2

9

139.49

5

9.64

7/31/2018

8/1/2018

0004.1.12

CONDUCTA REFULARE-POMPARE SPlAU PEIDPN6 DN 110 KM L = 75 M

8

9

568.65

7

4.91

8/2/2018

8/13/2018

0004.1.13

BY PASS VARSARE SPIAU

2

6

89.00

4

6.73

8/14/2018

8/15/2018

0004.1.14

By PASS SP1AU L=40 M

16

4

453.45

6

5.59

8/16/2018

9/6/2018

0004.1.15

GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VEN

3

5

111.15

5

4.19

9/7/2018

9/11/2018

0004.1.16

BAZIN SP2AU

15

14

1,652.50

17

948.79

9/12/2018

10/2/2018

0004.1.17

CAMIN GRATAR SP2AU

2

10

159.05

9

19.41

10/3/2018

10/4/2018

0004.1.18

INSTALATII HIDRAULICE STATIE POMPARE SP2AU

1

4

30.88

2

0.02

10/5/2018

10/5/2018

0004.1.19

CONDUCTA REFULARE-POMPARE SP2AU PEIDPN6 DN 110 MM L = 195

18

10

1,420.83

7

7.72

10/8/2018

10/31/2018

0004.1.20

INSTALATII ELECTRICE SP2AU

1

16

125.98

2

3.22

11/1/2018

11/1/2018

0004.1.21

Bransament electric SP2AU

1

3

22.62

1

0.75

11/2/2018

11/2/2018

0004.1.22

Coloana electrica SP2AU

2

4

63.15

1

0.74

11/5/2018

11/6/2018

0004.1.23

DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

3

4

77.19

3

3.61

11/7/2018

11/9/2018

0004.1.24

ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

15

3

242.40

1

6.75

11/12/2018

11/30/2018

0004.1.25

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

2

9

139.49

5

9.64

12/3/2018

12/4/2018

0004.1.26

BY PASS VARSARE SP2AU

2

6

89.00

4

6.73

12/5/2018

12/6/2018

0004.1.27

BY PASS SP2AU L=9 M

4

5

136.01

6

5.53

12/7/2018

12/12/2018

0004.1.28

BAZIN SP3AU

14

15

1,652.50

18

948.79

12/13/2018

1/1/2019

0004.1.29

CAMIN GRATAR SP3AU

2

10

159.05

9

19.41

1/2/2019

1/3/2019

0004.1.30

INSTALATII HIDRAULICE STATIE POMPARE SP3AU

1

4

30.88

2

0.02

1/4/2019

1/4/2019

0004.1.31

CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

9

9

640.55

7

4.92

1/7/2019

1/17/2019

0004.1.32

INSTALATII ELECTRICE SP3AU

1

16

125.98

2

3.22

1/18/2019

1/18/2019

0004.1.33

Bransament electric SP3AU

1/21/2019

2/20/2019

0004.1.34

Coloana electrica SP3AU

5

5

178.15

1

0.74

1/21/2019

1/25/2019

d=5 zile, NrMunc=5, oreManopera

0004.1.35

DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MPLASP3AU

3

3

49.95

3

2.04

1/28/2019

1/30/2019

d=3 z

0004.1.36

ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

16

3

258.34

1

6.96

1/31/2019

2/21/2019

0004.1.37

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

2

9

139.49

5

9.64

2/22/2019

2/25/2019

0004.1.38

BY PASS VARSARE SP3AU

2

6

89.00

4

6.73

2/26/2019

2/27/2019

0004.1.39

BY PASS SP3AU L-13 M

6

5

193.19

6

5.54

2/28/2019

3/7/2019

0004.1.40

GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE2 BUCJ VEN

3

5

111.15

5

4.19

3/8/2019

3/12/2019

0004.1.41

BAZIN SP4AU

14

15

1,652.50

18

948.79

3/13/2019

4/1/2019

0004.1.42

CAMIN GRATAR SP4AU

2

10

159.05

9

19.41

4/2/2019

4/3/2019

0004.1.43

INSTALATII HIDRAULICE STATIE POMPARE SP4AU

1

4

30.88

2

0.02

4/4/2019

4/4/2019

0004.1.44

CONDUCTA REFULARE-POMPARE SP4AU PEIDPN6 DN 110 MM L - 40 M

15

3

328.56

7

4.87

4/5/2019

4/25/2019

0004.1.45

INSTALATII ELECTRICE SP4AU

1

16

125.98

2

3.22

4/26/2019

4/26/2019

0004.1.46

Bransament electric SP4AU

1

3

22.38

1

0.75

4/29/2019

4/29/2019

0004.1.47

Coloana electrica SP4AU

3

6

121.96

1

0.74

4/30/2019

5/2/2019

0004.1.48

DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MPLASP4AU

2

3

44.82

3

2.04

5/3/2019

5/6/2019

0004.1.49

ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

5

6

200.82

1

5.60

5/7/2019

5/13/2019

0004.1.50

INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

2

9

139.49

5

9.64

5/14/2019

5/15/2019

0004.1.51

BY PASS VARSARE SP4AU

2

6

89.00

4

6.73

5/16/2019

5/17/2019

0004.1.52

BY PASS SP4AU L=4 M

2

7

106.50

6

5.52

5/20/2019

5/21/2019

0004.1.53

GOLIRE SI AERISIRE TRAVERSARE SP4AU;CAMIN GOLIRE 2 BUCr VEN

3

5

111.15

5

4.19

4.1

Lista echipamente 26,008.97

5/22/2019

5/24/2019

6/27/2018

5/31/2018

4.2

Extindere retea de canalizare în sat Boura

344

559.21

1/17/2019

5/27/2019

0004.2.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S

93

33

24,540.45

10

538.80

1/17/2019

5/27/2019

0004.2.2

SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

24

8

1,468.52

3

20.42

4/24/2019

5/27/2019

d=14 zile, NrMunc=15, oreManopera= [1,652.5 ora], d=2 zile, NrMunc=10, oreManopera= [159.05 ora], d=1 zi, NrMunc=4, oreManopera= [30.88 ora], d=9 zile, NrMunc=9, oreManopera= [640.55 ora], d=1 zi, NrMunc=16, oreManopera= [125.98 ora], ◊

luna 8 Raport incarcare cu forta de munca - numar ore/luna

ianuarie 8,994.78

Necesar

Page 152 of 556

OBIECTIV:

Extindere retea de canalizare în satele Manolea si Boura

Beneficiar:

COMUNA FORASTI

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

Durata proiect:

344 zile / 361 zile calendaristice

Grafic Gantt Nr. crt.

Denumire capitole de lucrari/ activitati

Durata in zile

Nr. muncitori

Ore manopera

Nr. utilaje

Ore utilaj

luna 9

Data inceput Data sfarsit

februarie 1 4

Extindere retea de canalizare în satele Manolea si Boura

344

95,780.19

6,277.49

6/1/2018

5/27/2019

4.1

Extindere retea de canalizare în sat Manolea

191

0004.1.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3

164

35

45,784.33

10

5,718.28

6/1/2018

5/24/2019

1,585.29

6/1/2018

0004.1.2

SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MAN

52

15

6,167.77

1/16/2019

3

78.92

11/6/2018

0004.1.3

BAZIN SP1AU

15

14

1/16/2019

1,652.50

17

948.79

6/1/2018

0004.1.4

CAMIN GRATAR SP1AU

2

6/21/2018

10

159.05

9

19.41

6/22/2018

0004.1.5

INSTALATII HIDRAULICE STATIE POMPARE SP1AU

6/25/2018

1

4

30.88

2

0.02

6/26/2018

0004.1.6

INSTALATII ELECTRICE SP1AU

6/26/2018

1

16

125.98

2

3.22

6/27/2018

6/27/2018

0004.1.7

Bransament electric SP1AU

1

3

21.78

1

0004.1.8

Coloana electrica SP1AU

2

5

79.04

1

0.75

6/28/2018

6/28/2018

0.74

6/29/2018

0004.1.9

DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4

4

104.33

3

5.94

7/3/2018

7/2/2018 7/6/2018

0004.1.10

ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

16

3

267.39

1

7.45

7/9/2018

7/30/2018

69,771.22

0004.1.11

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

2

9

139.49

5

9.64

7/31/2018

8/1/2018

0004.1.12

CONDUCTA REFULARE-POMPARE SPlAU PEIDPN6 DN 110 KM L = 75 M

8

9

568.65

7

4.91

8/2/2018

8/13/2018

0004.1.13

BY PASS VARSARE SPIAU

2

6

89.00

4

6.73

8/14/2018

8/15/2018

0004.1.14

By PASS SP1AU L=40 M

16

4

453.45

6

5.59

8/16/2018

9/6/2018

0004.1.15

GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VEN

3

5

111.15

5

4.19

9/7/2018

9/11/2018

0004.1.16

BAZIN SP2AU

15

14

1,652.50

17

948.79

9/12/2018

10/2/2018

0004.1.17

CAMIN GRATAR SP2AU

2

10

159.05

9

19.41

10/3/2018

10/4/2018

0004.1.18

INSTALATII HIDRAULICE STATIE POMPARE SP2AU

1

4

30.88

2

0.02

10/5/2018

10/5/2018

0004.1.19

CONDUCTA REFULARE-POMPARE SP2AU PEIDPN6 DN 110 MM L = 195

18

10

1,420.83

7

7.72

10/8/2018

10/31/2018

0004.1.20

INSTALATII ELECTRICE SP2AU

1

16

125.98

2

3.22

11/1/2018

11/1/2018

0004.1.21

Bransament electric SP2AU

1

3

22.62

1

0.75

11/2/2018

11/2/2018

0004.1.22

Coloana electrica SP2AU

2

4

63.15

1

0.74

11/5/2018

11/6/2018

0004.1.23

DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

3

4

77.19

3

3.61

11/7/2018

11/9/2018

0004.1.24

ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

15

3

242.40

1

6.75

11/12/2018

11/30/2018

0004.1.25

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

2

9

139.49

5

9.64

12/3/2018

12/4/2018

0004.1.26

BY PASS VARSARE SP2AU

2

6

89.00

4

6.73

12/5/2018

12/6/2018

0004.1.27

BY PASS SP2AU L=9 M

4

5

136.01

6

5.53

12/7/2018

12/12/2018

0004.1.28

BAZIN SP3AU

14

15

1,652.50

18

948.79

12/13/2018

1/1/2019

0004.1.29

CAMIN GRATAR SP3AU

2

10

159.05

9

19.41

1/2/2019

1/3/2019

0004.1.30

INSTALATII HIDRAULICE STATIE POMPARE SP3AU

1

4

30.88

2

0.02

1/4/2019

1/4/2019

0004.1.31

CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

9

9

640.55

7

4.92

1/7/2019

1/17/2019

0004.1.32

INSTALATII ELECTRICE SP3AU

1

16

125.98

2

3.22

0004.1.33

Bransament electric SP3AU

1/18/2019

1/18/2019

1/21/2019

2/20/2019

2

3

4

5

6

7

8

0004.1.34

Coloana electrica SP3AU

5

5

178.15

1

0.74

1/21/2019

1/25/2019 = [178.15 ora],

0004.1.35

DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MPLASP3AU

3

3

49.95

3

2.04

1/28/2019

1/30/2019 zile, NrMunc=3, oreManopera= [49.95 ora],

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

0004.1.36

ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

16

3

258.34

1

6.96

1/31/2019

2/21/2019

d=16 zile, NrMunc=3, oreManopera= [2

0004.1.37

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

2

9

139.49

5

9.64

2/22/2019

2/25/2019

d=2 zile, NrMunc

0004.1.38

BY PASS VARSARE SP3AU

2

6

89.00

4

6.73

2/26/2019

2/27/2019

d=2 z

0004.1.39

BY PASS SP3AU L-13 M

6

5

193.19

6

5.54

2/28/2019

3/7/2019

0004.1.40

GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE2 BUCJ VEN

3

5

111.15

5

4.19

3/8/2019

3/12/2019

0004.1.41

BAZIN SP4AU

14

15

1,652.50

18

948.79

3/13/2019

4/1/2019

0004.1.42

CAMIN GRATAR SP4AU

2

10

159.05

9

19.41

4/2/2019

4/3/2019

0004.1.43

INSTALATII HIDRAULICE STATIE POMPARE SP4AU

1

4

30.88

2

0.02

4/4/2019

4/4/2019

0004.1.44

CONDUCTA REFULARE-POMPARE SP4AU PEIDPN6 DN 110 MM L - 40 M

15

3

328.56

7

4.87

4/5/2019

4/25/2019

0004.1.45

INSTALATII ELECTRICE SP4AU

1

16

125.98

2

3.22

4/26/2019

4/26/2019

0004.1.46

Bransament electric SP4AU

1

3

22.38

1

0.75

4/29/2019

4/29/2019

0004.1.47

Coloana electrica SP4AU

3

6

121.96

1

0.74

4/30/2019

5/2/2019

0004.1.48

DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MPLASP4AU

2

3

44.82

3

2.04

5/3/2019

5/6/2019

0004.1.49

ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

5

6

200.82

1

5.60

5/7/2019

5/13/2019

0004.1.50

INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

2

9

139.49

5

9.64

5/14/2019

5/15/2019

0004.1.51

BY PASS VARSARE SP4AU

2

6

89.00

4

6.73

5/16/2019

5/17/2019

0004.1.52

BY PASS SP4AU L=4 M

2

7

106.50

6

5.52

5/20/2019

5/21/2019

0004.1.53

GOLIRE SI AERISIRE TRAVERSARE SP4AU;CAMIN GOLIRE 2 BUCr VEN

3

5

111.15

5

4.19

4.1

Lista echipamente 26,008.97

5/22/2019

5/24/2019

6/27/2018

5/31/2018

4.2

Extindere retea de canalizare în sat Boura

344

559.21

1/17/2019

5/27/2019

0004.2.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S

93

33

24,540.45

10

538.80

1/17/2019

5/27/2019

0004.2.2

SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

24

8

1,468.52

3

20.42

4/24/2019

5/27/2019 luna 9

Raport incarcare cu forta de munca - numar ore/luna

februarie 5,780.40

Necesar

Page 153 of 556

OBIECTIV:

Extindere retea de canalizare în satele Manolea si Boura

Beneficiar:

COMUNA FORASTI

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

Durata proiect:

344 zile / 361 zile calendaristice

Grafic Gantt Nr. crt.

Denumire capitole de lucrari/ activitati

Durata in zile

Nr. muncitori

Ore manopera

Nr. utilaje

Ore utilaj

luna 10

Data inceput Data sfarsit

martie 1 4

Extindere retea de canalizare în satele Manolea si Boura

344

95,780.19

6,277.49

6/1/2018

5/27/2019

4.1

Extindere retea de canalizare în sat Manolea

191

0004.1.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3

164

35

45,784.33

10

5,718.28

6/1/2018

5/24/2019

1,585.29

6/1/2018

0004.1.2

SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MAN

52

15

6,167.77

1/16/2019

3

78.92

11/6/2018

0004.1.3

BAZIN SP1AU

15

14

1/16/2019

1,652.50

17

948.79

6/1/2018

0004.1.4

CAMIN GRATAR SP1AU

2

6/21/2018

10

159.05

9

19.41

6/22/2018

0004.1.5

INSTALATII HIDRAULICE STATIE POMPARE SP1AU

6/25/2018

1

4

30.88

2

0.02

6/26/2018

0004.1.6

INSTALATII ELECTRICE SP1AU

6/26/2018

1

16

125.98

2

3.22

6/27/2018

6/27/2018

0004.1.7

Bransament electric SP1AU

1

3

21.78

1

0004.1.8

Coloana electrica SP1AU

2

5

79.04

1

0.75

6/28/2018

6/28/2018

0.74

6/29/2018

0004.1.9

DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4

4

104.33

3

5.94

7/3/2018

7/2/2018 7/6/2018

0004.1.10

ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

16

3

267.39

1

7.45

7/9/2018

7/30/2018

69,771.22

0004.1.11

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

2

9

139.49

5

9.64

7/31/2018

8/1/2018

0004.1.12

CONDUCTA REFULARE-POMPARE SPlAU PEIDPN6 DN 110 KM L = 75 M

8

9

568.65

7

4.91

8/2/2018

8/13/2018

0004.1.13

BY PASS VARSARE SPIAU

2

6

89.00

4

6.73

8/14/2018

8/15/2018

0004.1.14

By PASS SP1AU L=40 M

16

4

453.45

6

5.59

8/16/2018

9/6/2018

0004.1.15

GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VEN

3

5

111.15

5

4.19

9/7/2018

9/11/2018

0004.1.16

BAZIN SP2AU

15

14

1,652.50

17

948.79

9/12/2018

10/2/2018

0004.1.17

CAMIN GRATAR SP2AU

2

10

159.05

9

19.41

10/3/2018

10/4/2018

0004.1.18

INSTALATII HIDRAULICE STATIE POMPARE SP2AU

1

4

30.88

2

0.02

10/5/2018

10/5/2018

0004.1.19

CONDUCTA REFULARE-POMPARE SP2AU PEIDPN6 DN 110 MM L = 195

18

10

1,420.83

7

7.72

10/8/2018

10/31/2018

0004.1.20

INSTALATII ELECTRICE SP2AU

1

16

125.98

2

3.22

11/1/2018

11/1/2018

0004.1.21

Bransament electric SP2AU

1

3

22.62

1

0.75

11/2/2018

11/2/2018

0004.1.22

Coloana electrica SP2AU

2

4

63.15

1

0.74

11/5/2018

11/6/2018

0004.1.23

DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

3

4

77.19

3

3.61

11/7/2018

11/9/2018

0004.1.24

ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

15

3

242.40

1

6.75

11/12/2018

11/30/2018

0004.1.25

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

2

9

139.49

5

9.64

12/3/2018

12/4/2018

0004.1.26

BY PASS VARSARE SP2AU

2

6

89.00

4

6.73

12/5/2018

12/6/2018

0004.1.27

BY PASS SP2AU L=9 M

4

5

136.01

6

5.53

12/7/2018

12/12/2018

0004.1.28

BAZIN SP3AU

14

15

1,652.50

18

948.79

12/13/2018

1/1/2019

0004.1.29

CAMIN GRATAR SP3AU

2

10

159.05

9

19.41

1/2/2019

1/3/2019

0004.1.30

INSTALATII HIDRAULICE STATIE POMPARE SP3AU

1

4

30.88

2

0.02

1/4/2019

1/4/2019

0004.1.31

CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

9

9

640.55

7

4.92

1/7/2019

1/17/2019

0004.1.32

INSTALATII ELECTRICE SP3AU

1

16

125.98

2

3.22

0004.1.33

Bransament electric SP3AU

1/18/2019

1/18/2019

1/21/2019

2/20/2019

0004.1.34

Coloana electrica SP3AU

5

5

178.15

1

0.74

1/21/2019

1/25/2019

0004.1.35

DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MPLASP3AU

3

3

49.95

3

2.04

1/28/2019

1/30/2019

2

3

4

5

6

7

0004.1.36

ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

16

3

258.34

1

6.96

1/31/2019

2/21/2019 58.34 ora],

0004.1.37

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

2

9

139.49

5

9.64

2/22/2019

2/25/2019 =9, oreManopera= [139.49 ora],

0004.1.38

BY PASS VARSARE SP3AU

2

6

89.00

4

6.73

2/26/2019

2/27/2019 zile, NrMunc=6, oreManopera= [89 ora],

0004.1.39

BY PASS SP3AU L-13 M

6

5

193.19

6

5.54

2/28/2019

3/7/2019

0004.1.40

GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE2 BUCJ VEN

3

5

111.15

5

4.19

3/8/2019

3/12/2019

0004.1.41

BAZIN SP4AU

14

15

1,652.50

18

948.79

3/13/2019

4/1/2019

0004.1.42

CAMIN GRATAR SP4AU

2

10

159.05

9

19.41

4/2/2019

4/3/2019

0004.1.43

INSTALATII HIDRAULICE STATIE POMPARE SP4AU

1

4

30.88

2

0.02

4/4/2019

4/4/2019

0004.1.44

CONDUCTA REFULARE-POMPARE SP4AU PEIDPN6 DN 110 MM L - 40 M

15

3

328.56

7

4.87

4/5/2019

4/25/2019

0004.1.45

INSTALATII ELECTRICE SP4AU

1

16

125.98

2

3.22

4/26/2019

4/26/2019

0004.1.46

Bransament electric SP4AU

1

3

22.38

1

0.75

4/29/2019

4/29/2019

0004.1.47

Coloana electrica SP4AU

3

6

121.96

1

0.74

4/30/2019

5/2/2019

0004.1.48

DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MPLASP4AU

2

3

44.82

3

2.04

5/3/2019

5/6/2019

0004.1.49

ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

5

6

200.82

1

5.60

5/7/2019

5/13/2019

0004.1.50

INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

2

9

139.49

5

9.64

5/14/2019

5/15/2019

0004.1.51

BY PASS VARSARE SP4AU

2

6

89.00

4

6.73

5/16/2019

5/17/2019

0004.1.52

BY PASS SP4AU L=4 M

2

7

106.50

6

5.52

5/20/2019

5/21/2019

0004.1.53

GOLIRE SI AERISIRE TRAVERSARE SP4AU;CAMIN GOLIRE 2 BUCr VEN

3

5

111.15

5

4.19

4.1

Lista echipamente 26,008.97

5/22/2019

5/24/2019

6/27/2018

5/31/2018

4.2

Extindere retea de canalizare în sat Boura

344

559.21

1/17/2019

5/27/2019

0004.2.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S

93

33

24,540.45

10

538.80

1/17/2019

5/27/2019

0004.2.2

SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

24

8

1,468.52

3

20.42

4/24/2019

5/27/2019

8

9

10

11

12

13

14

15

16

17

18

19

20

21

d=6 zile, NrMunc=5, oreManopera= [193.19 ora], d=3 zile, NrMunc=5, oreManopera= [111.15 ora],

luna 10 Raport incarcare cu forta de munca - numar ore/luna

martie 7,348.00

Necesar

Page 154 of 556

22

23

24

25

26

27

28

29

30

31

OBIECTIV:

Extindere retea de canalizare în satele Manolea si Boura

Beneficiar:

COMUNA FORASTI

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

Durata proiect:

344 zile / 361 zile calendaristice

Grafic Gantt Nr. crt.

Denumire capitole de lucrari/ activitati

Durata in zile

Nr. muncitori

Ore manopera

Nr. utilaje

Ore utilaj

luna 11

Data inceput Data sfarsit

aprilie 1 4

Extindere retea de canalizare în satele Manolea si Boura

344

95,780.19

6,277.49

6/1/2018

5/27/2019

4.1

Extindere retea de canalizare în sat Manolea

191

0004.1.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3

164

35

45,784.33

10

5,718.28

6/1/2018

5/24/2019

1,585.29

6/1/2018

0004.1.2

SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MAN

52

15

6,167.77

1/16/2019

3

78.92

11/6/2018

0004.1.3

BAZIN SP1AU

15

14

1/16/2019

1,652.50

17

948.79

6/1/2018

0004.1.4

CAMIN GRATAR SP1AU

2

6/21/2018

10

159.05

9

19.41

6/22/2018

0004.1.5

INSTALATII HIDRAULICE STATIE POMPARE SP1AU

6/25/2018

1

4

30.88

2

0.02

6/26/2018

0004.1.6

INSTALATII ELECTRICE SP1AU

6/26/2018

1

16

125.98

2

3.22

6/27/2018

6/27/2018

0004.1.7

Bransament electric SP1AU

1

3

21.78

1

0004.1.8

Coloana electrica SP1AU

2

5

79.04

1

0.75

6/28/2018

6/28/2018

0.74

6/29/2018

0004.1.9

DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4

4

104.33

3

5.94

7/3/2018

7/2/2018 7/6/2018

0004.1.10

ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

16

3

267.39

1

7.45

7/9/2018

7/30/2018

69,771.22

0004.1.11

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

2

9

139.49

5

9.64

7/31/2018

8/1/2018

0004.1.12

CONDUCTA REFULARE-POMPARE SPlAU PEIDPN6 DN 110 KM L = 75 M

8

9

568.65

7

4.91

8/2/2018

8/13/2018

0004.1.13

BY PASS VARSARE SPIAU

2

6

89.00

4

6.73

8/14/2018

8/15/2018

0004.1.14

By PASS SP1AU L=40 M

16

4

453.45

6

5.59

8/16/2018

9/6/2018

0004.1.15

GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VEN

3

5

111.15

5

4.19

9/7/2018

9/11/2018

0004.1.16

BAZIN SP2AU

15

14

1,652.50

17

948.79

9/12/2018

10/2/2018

0004.1.17

CAMIN GRATAR SP2AU

2

10

159.05

9

19.41

10/3/2018

10/4/2018

0004.1.18

INSTALATII HIDRAULICE STATIE POMPARE SP2AU

1

4

30.88

2

0.02

10/5/2018

10/5/2018

0004.1.19

CONDUCTA REFULARE-POMPARE SP2AU PEIDPN6 DN 110 MM L = 195

18

10

1,420.83

7

7.72

10/8/2018

10/31/2018

0004.1.20

INSTALATII ELECTRICE SP2AU

1

16

125.98

2

3.22

11/1/2018

11/1/2018

0004.1.21

Bransament electric SP2AU

1

3

22.62

1

0.75

11/2/2018

11/2/2018

0004.1.22

Coloana electrica SP2AU

2

4

63.15

1

0.74

11/5/2018

11/6/2018

0004.1.23

DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

3

4

77.19

3

3.61

11/7/2018

11/9/2018

0004.1.24

ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

15

3

242.40

1

6.75

11/12/2018

11/30/2018

0004.1.25

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

2

9

139.49

5

9.64

12/3/2018

12/4/2018

0004.1.26

BY PASS VARSARE SP2AU

2

6

89.00

4

6.73

12/5/2018

12/6/2018

0004.1.27

BY PASS SP2AU L=9 M

4

5

136.01

6

5.53

12/7/2018

12/12/2018

0004.1.28

BAZIN SP3AU

14

15

1,652.50

18

948.79

12/13/2018

1/1/2019

0004.1.29

CAMIN GRATAR SP3AU

2

10

159.05

9

19.41

1/2/2019

1/3/2019

0004.1.30

INSTALATII HIDRAULICE STATIE POMPARE SP3AU

1

4

30.88

2

0.02

1/4/2019

1/4/2019

0004.1.31

CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

9

9

640.55

7

4.92

1/7/2019

1/17/2019

0004.1.32

INSTALATII ELECTRICE SP3AU

1

16

125.98

2

3.22

0004.1.33

Bransament electric SP3AU

1/18/2019

1/18/2019

1/21/2019

2/20/2019

0004.1.34

Coloana electrica SP3AU

5

5

178.15

1

0.74

1/21/2019

1/25/2019

0004.1.35

DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MPLASP3AU

3

3

49.95

3

2.04

1/28/2019

1/30/2019

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

0004.1.36

ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

16

3

258.34

1

6.96

1/31/2019

2/21/2019

0004.1.37

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

2

9

139.49

5

9.64

2/22/2019

2/25/2019

0004.1.38

BY PASS VARSARE SP3AU

2

6

89.00

4

6.73

2/26/2019

2/27/2019

0004.1.39

BY PASS SP3AU L-13 M

6

5

193.19

6

5.54

2/28/2019

3/7/2019

0004.1.40

GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE2 BUCJ VEN

3

5

111.15

5

4.19

3/8/2019

3/12/2019

0004.1.41

BAZIN SP4AU

14

15

1,652.50

18

948.79

3/13/2019

4/1/2019

0004.1.42

CAMIN GRATAR SP4AU

2

10

159.05

9

19.41

4/2/2019

4/3/2019

0004.1.43

INSTALATII HIDRAULICE STATIE POMPARE SP4AU

1

4

30.88

2

0.02

4/4/2019

4/4/2019

0004.1.44

CONDUCTA REFULARE-POMPARE SP4AU PEIDPN6 DN 110 MM L - 40 M

15

3

328.56

7

4.87

4/5/2019

4/25/2019

0004.1.45

INSTALATII ELECTRICE SP4AU

1

16

125.98

2

3.22

4/26/2019

4/26/2019

d=1 zi, NrMunc=16, ore

0004.1.46

Bransament electric SP4AU

1

3

22.38

1

0.75

4/29/2019

4/29/2019

d=1 z

0004.1.47

Coloana electrica SP4AU

3

6

121.96

1

0.74

4/30/2019

5/2/2019

0004.1.48

DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MPLASP4AU

2

3

44.82

3

2.04

5/3/2019

5/6/2019

0004.1.49

ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

5

6

200.82

1

5.60

5/7/2019

5/13/2019

0004.1.50

INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

2

9

139.49

5

9.64

5/14/2019

5/15/2019

0004.1.51

BY PASS VARSARE SP4AU

2

6

89.00

4

6.73

5/16/2019

5/17/2019

0004.1.52

BY PASS SP4AU L=4 M

2

7

106.50

6

5.52

5/20/2019

5/21/2019

0004.1.53

GOLIRE SI AERISIRE TRAVERSARE SP4AU;CAMIN GOLIRE 2 BUCr VEN

3

5

111.15

5

4.19

4.1

Lista echipamente 26,008.97

5/22/2019

5/24/2019

6/27/2018

5/31/2018

4.2

Extindere retea de canalizare în sat Boura

344

559.21

1/17/2019

5/27/2019

0004.2.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S

93

33

24,540.45

10

538.80

1/17/2019

5/27/2019

0004.2.2

SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

24

8

1,468.52

3

20.42

4/24/2019

5/27/2019

d=14 zile, NrMunc=15, oreManopera= [4,748.46 ora], d=2 zile, NrMunc=10, oreManopera= [159.05 ora], d=1 zi, NrMunc=4, oreManopera= [30.88 ora], d=15 zile, NrMunc=3, oreMa

luna 11 Raport incarcare cu forta de munca - numar ore/luna

aprilie 6,936.75

Necesar

Page 155 of 556

OBIECTIV:

Extindere retea de canalizare în satele Manolea si Boura

Beneficiar:

COMUNA FORASTI

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

Durata proiect:

344 zile / 361 zile calendaristice

Grafic Gantt Nr. crt.

Denumire capitole de lucrari/ activitati

Durata in zile

Nr. muncitori

Ore manopera

Nr. utilaje

Ore utilaj

luna 12

Data inceput Data sfarsit

mai 1 4

Extindere retea de canalizare în satele Manolea si Boura

344

95,780.19

6,277.49

6/1/2018

5/27/2019

4.1

Extindere retea de canalizare în sat Manolea

191

0004.1.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3

164

35

45,784.33

10

5,718.28

6/1/2018

5/24/2019

1,585.29

6/1/2018

0004.1.2

SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MAN

52

15

6,167.77

1/16/2019

3

78.92

11/6/2018

0004.1.3

BAZIN SP1AU

15

14

1/16/2019

1,652.50

17

948.79

6/1/2018

0004.1.4

CAMIN GRATAR SP1AU

2

6/21/2018

10

159.05

9

19.41

6/22/2018

0004.1.5

INSTALATII HIDRAULICE STATIE POMPARE SP1AU

6/25/2018

1

4

30.88

2

0.02

6/26/2018

0004.1.6

INSTALATII ELECTRICE SP1AU

6/26/2018

1

16

125.98

2

3.22

6/27/2018

6/27/2018

0004.1.7

Bransament electric SP1AU

1

3

21.78

1

0004.1.8

Coloana electrica SP1AU

2

5

79.04

1

0.75

6/28/2018

6/28/2018

0.74

6/29/2018

0004.1.9

DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4

4

104.33

3

5.94

7/3/2018

7/2/2018 7/6/2018

0004.1.10

ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

16

3

267.39

1

7.45

7/9/2018

7/30/2018

69,771.22

0004.1.11

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

2

9

139.49

5

9.64

7/31/2018

8/1/2018

0004.1.12

CONDUCTA REFULARE-POMPARE SPlAU PEIDPN6 DN 110 KM L = 75 M

8

9

568.65

7

4.91

8/2/2018

8/13/2018

0004.1.13

BY PASS VARSARE SPIAU

2

6

89.00

4

6.73

8/14/2018

8/15/2018

0004.1.14

By PASS SP1AU L=40 M

16

4

453.45

6

5.59

8/16/2018

9/6/2018

0004.1.15

GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VEN

3

5

111.15

5

4.19

9/7/2018

9/11/2018

0004.1.16

BAZIN SP2AU

15

14

1,652.50

17

948.79

9/12/2018

10/2/2018

0004.1.17

CAMIN GRATAR SP2AU

2

10

159.05

9

19.41

10/3/2018

10/4/2018

0004.1.18

INSTALATII HIDRAULICE STATIE POMPARE SP2AU

1

4

30.88

2

0.02

10/5/2018

10/5/2018

0004.1.19

CONDUCTA REFULARE-POMPARE SP2AU PEIDPN6 DN 110 MM L = 195

18

10

1,420.83

7

7.72

10/8/2018

10/31/2018

0004.1.20

INSTALATII ELECTRICE SP2AU

1

16

125.98

2

3.22

11/1/2018

11/1/2018

0004.1.21

Bransament electric SP2AU

1

3

22.62

1

0.75

11/2/2018

11/2/2018

0004.1.22

Coloana electrica SP2AU

2

4

63.15

1

0.74

11/5/2018

11/6/2018

0004.1.23

DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

3

4

77.19

3

3.61

11/7/2018

11/9/2018

0004.1.24

ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

15

3

242.40

1

6.75

11/12/2018

11/30/2018

0004.1.25

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

2

9

139.49

5

9.64

12/3/2018

12/4/2018

0004.1.26

BY PASS VARSARE SP2AU

2

6

89.00

4

6.73

12/5/2018

12/6/2018

0004.1.27

BY PASS SP2AU L=9 M

4

5

136.01

6

5.53

12/7/2018

12/12/2018

0004.1.28

BAZIN SP3AU

14

15

1,652.50

18

948.79

12/13/2018

1/1/2019

0004.1.29

CAMIN GRATAR SP3AU

2

10

159.05

9

19.41

1/2/2019

1/3/2019

0004.1.30

INSTALATII HIDRAULICE STATIE POMPARE SP3AU

1

4

30.88

2

0.02

1/4/2019

1/4/2019

0004.1.31

CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

9

9

640.55

7

4.92

1/7/2019

1/17/2019

0004.1.32

INSTALATII ELECTRICE SP3AU

1

16

125.98

2

3.22

0004.1.33

Bransament electric SP3AU

1/18/2019

1/18/2019

1/21/2019

2/20/2019

0004.1.34

Coloana electrica SP3AU

5

5

178.15

1

0.74

1/21/2019

1/25/2019

0004.1.35

DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MPLASP3AU

3

3

49.95

3

2.04

1/28/2019

1/30/2019

2

3

4

5

6

7

0004.1.36

ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

16

3

258.34

1

6.96

1/31/2019

2/21/2019

0004.1.37

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

2

9

139.49

5

9.64

2/22/2019

2/25/2019

0004.1.38

BY PASS VARSARE SP3AU

2

6

89.00

4

6.73

2/26/2019

2/27/2019

0004.1.39

BY PASS SP3AU L-13 M

6

5

193.19

6

5.54

2/28/2019

3/7/2019

0004.1.40

GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE2 BUCJ VEN

3

5

111.15

5

4.19

3/8/2019

3/12/2019

0004.1.41

BAZIN SP4AU

14

15

1,652.50

18

948.79

3/13/2019

4/1/2019

0004.1.42

CAMIN GRATAR SP4AU

2

10

159.05

9

19.41

4/2/2019

4/3/2019

0004.1.43

INSTALATII HIDRAULICE STATIE POMPARE SP4AU

1

4

30.88

2

0.02

4/4/2019

4/4/2019

0004.1.44

CONDUCTA REFULARE-POMPARE SP4AU PEIDPN6 DN 110 MM L - 40 M

15

3

328.56

7

4.87

4/5/2019

4/25/2019 nopera= [328.56 ora],

0004.1.45

INSTALATII ELECTRICE SP4AU

1

16

125.98

2

3.22

4/26/2019

4/26/2019 eManopera= [125.98 ora],

0004.1.46

Bransament electric SP4AU

1

3

22.38

1

0.75

4/29/2019

4/29/2019 zi, NrMunc=3, oreManopera= [22.38 ora],

0004.1.47

Coloana electrica SP4AU

3

6

121.96

1

0.74

4/30/2019

5/2/2019

0004.1.48

DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MPLASP4AU

2

3

44.82

3

2.04

5/3/2019

5/6/2019

0004.1.49

ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

5

6

200.82

1

5.60

5/7/2019

5/13/2019

0004.1.50

INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

2

9

139.49

5

9.64

5/14/2019

5/15/2019

0004.1.51

BY PASS VARSARE SP4AU

2

6

89.00

4

6.73

5/16/2019

5/17/2019

0004.1.52

BY PASS SP4AU L=4 M

2

7

106.50

6

5.52

5/20/2019

5/21/2019

0004.1.53

GOLIRE SI AERISIRE TRAVERSARE SP4AU;CAMIN GOLIRE 2 BUCr VEN

3

5

111.15

5

4.19

5/22/2019

5/24/2019

4.1

Lista echipamente

6/27/2018

5/31/2018

4.2

Extindere retea de canalizare în sat Boura

344

559.21

1/17/2019

5/27/2019

0004.2.1

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S

93

33

26,008.97 24,540.45

10

538.80

1/17/2019

5/27/2019

0004.2.2

SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

24

8

1,468.52

3

20.42

4/24/2019

5/27/2019

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

d=3 zile, NrMunc=6, oreManopera= [121.96 ora], d=2 zile, NrMunc=3, oreManopera= [44.82 ora], d=5 zile, NrMunc=6, oreManopera= [200.82 ora], d=2 zile, NrMunc=9, oreManopera= [139.49 ora], d=2 zile, NrMunc=6, oreManopera= [89 ora], d=2 zile, NrMunc=7, oreManopera= [106.5 ora], d=3 zile, NrMunc=5, oreManopera= [111.15 ora],

d=93 zile, NrMunc=33, oreManopera= [24,540.45 ora], d=24 zile, NrMunc=8, oreManopera= [1,468.52 ora], luna 12

Raport incarcare cu forta de munca - numar ore/luna

mai 6,949.31

Necesar

Page 156 of 556

Organigrama

„Extindere retea de canalizare în satele Manolea si Boura"

Administrator Reprezentantul managementului

Director tehnic Director productie

Aprovizionare

Sef santier

2xEchipa nr.1 Cf. formular resurse

2xEchipa nr. 3 Cf. formular resurse

2x Echipa nr. 2 Cf. formular resurse

Contabil

Productie

Mecanizare

2xEchipa nr. 4 Cf. formular resurse

Page 157 of 556

Responsabil gestiunea deseurilor

Responsabil SMI

Responsabil resurse umane

Caliatate

Mediu

RTE

SSO

ANEXA ORGANIGRAMA Titlul contractului: „Extindere retea de canalizare în satele Manolea si Boura"

Descrierea rolurilor si reponsabilitatilor personalului

Nr. crt.

Activitate

1

Semnare contract

2 3

Asigurare baza tehnico-materiala, resurse umane Executie lucrari de constructii

4 5

Intocmire PCCVI pe etape de executie Monitorizare lucrari de constructii

6

Monitorizare materiale puse in opera

7

Aprovizionare materiale / depozitare, receptie materiale

8

Asigurare echipamente si utilaje, mentenanta Instruire personal (profesionala, de SSM, protectia mediului, PSI)

9

Page 158 of 556

Responsabil Conducere, compartiment juridic Conducere, RU, financiarcontabilitate Constructor (sef santier, echipe muncitori, topometrist, RTE, CQ) RSMI + CQ Sef santier, CQ, RTE, diriginte santier, Inspectoratul de Stat in Consructii, Laborator Sef santier, RTE, CQ, laborator Compartiment aprovicionare / baza productie, comisie receptie Sef santier, sef mecanizare, sef statie Sef santier, responsabil PSI, Responsabil mediu

10

Protectia mediului, gestionarea deseurilor

11 12 13

Securitatea si sanatatea in munca Protectia impotriva incendiilor Monitorizarea proceselor sisitemului de management integrat Managementul de trafic

14 15 16 17

Executie masuratori, intocmire situatii de lucrari Intocmire documente pentru cartea tehnica a obiectivului Facturare

Page 159 of 556

Resaponsabil mediu, santier Lucrator desemnat SSM Responsabil PSI RSMI

sef

Responsabil management trafic, sef santier Tehnic RSMI, sef santier, RTE, diriginte santier Financiar - contabilitate

DESCRIEREA ROLURILOR SI RESPONSABILITATILOR PERSONALULUI

Poziţie/Nume Director general -

Descrierea activitatii intreprinse

- Reprezinta societatea in relatiile cu persoane juridice sau fizice si cu organele publice, la intilniri de afaceri, reuniuni profesionale sau stiintifice, interne si intemationale. Coordoneaza, indruma si asigura toate activitatile desfasurate de societate direct sau prin directorii din subordine, delegand acestora competentele necesare. Este reprezentant al managementului investit cu autoritatea de a asigura ca sistemul calitatii este implementat si mentinut in conformitate cu prevederile standardului de referint Declara in scris politica si obiectivele in domeniul calitatii. Coordoneaza, indruma si asigura desfasurarea, in bune conditiuni, a tuturor proceselor

Responsabil Proiect - Monitorizeaza in timp progresul atins fata de obiectivele propuse si redacteaza rapoarte lunare catre finantatori, parteneri si beneficiari cu respectarea datelor prevazute in contracte. - Asigura circulatia informatiei in cadrul proiectului si pentru alte departamente ale organizatiei, organizand periodic intalniri cu echipa de proiect si prezentand proiectul celorlalte departamente. - Asigura rezolvarea problemelor aparute in realizarea proiectului si informeaza la timp echipa de management despre problemele aparute si pe care nu le poate rezolva la nivelul sau. - Arhiveaza corespunzator toata documentatia legata de proiect. - Pregateste noi proiecte care valorifica expertiza existenta la nivelul organizatiei si rezultatele proiectelor anterioare si face propuneri de buget pentru fiecare proiect in parte pe care le inainteaza spre aprobare Directorului Financiar. - Face propuneri de imbunatatire a stilului de lucru pentru a maximiza eficienta atingerii obiectivelor propuse. - Evalueaza impactul proiectului si il comunica conducerii, finantatorilor si partenerilor de proiect. - Coordoneaza serviciile – tehnic , mecanizare , aprovizionare si santierele societatii ; - Informeaza Directorul general asupra problemelor din cadrul compartimentelor si serviciilor din subordine cat si asupra celor legate de calitate din cadrul societatii si actiunilor intreprinse pentru mentinerea nivelului calitatii ; - Asigura pregatirea si adoptarea de planuri ale calitatii pentru lucrari importante sau cu tehnologii noi in constructii , conform cererii clientilor cu care urmeaza a fi contractate lucrarile respective

Page 160 of 556

- Asigura concordanta dintre solutiile tehnice constructive din proiecte cu tehnologiile de executie practicate de catre societate si solicita proiectantului , cand este cazul modificarile si/sau adaptarile necesare ; - Organizeaza activitatile pentru derularea in bune conditii a proceselor tehnologice ; - Conciliaza cu beneficiarii , titulari de investitii si cu organele abilitate privind deschiderea finantarii , asigurarea amplasamentelor si alte conditii specifice ; - Analizeaza si isi da avizul asupra documentatiei tehnice de ofertare si stabileste cu compartimentul ofertare solutii tehnice ce vor sta la baza fundamentarii devizului de oferta ; - Urmareste graficele de executie si termenele intermediare , specifice pentru proiectant , beneficiar , monteur si constructor in corelatie cu devizul oferta; - Indruma activitatea de documentare tehnico – economica a personalului din serviciile pe care le coordoneaza ; - Raspunde de repartizarea sarcinilor pentru personalul din subordine , motivarea si incarcarea la capacitate cu activitatii

Page 161 of 556

Sef santier

Sef punct lucru

1.– Raspunde de implementarea sistemului de management al calitatii m cadrul activitatilor desfasurate de santierul pe care il conduce, fiind investit de catre Directorul general, cu autoritatea necesara pentru acest scop . 2. – Controleaza si actioneaza pentru ca produsele livrate la locul de punere in opera sa fie insotite de copiile documentelor de calitate primite de la fumizori . 3. – Anunta responsabilul CQ din cadrul societatii, indata ce depisteaza produse, servicii sau lucrari care sunt neconforme, in vederea constatarii si deschiderii rapoartelor de neconfonnitate (RNC) . 4. – Verifica, la primirea produselor, existenta si corelatia datelor de identificare cu cele din documentele insotitoare. Asigura manipularea corespunzatoare si depozitarea produselor primite, conform prescriptiilor tehnice, indicatiilor comisiei de receptie si prevederilor procedurilor tehnice aferente . 5. – Tine evidenta si asigura conservarea datelor de identificare a materialelor puse in opera, precum si transmiterea acestora in inregistrarile de calitate aferente lucrarilor executate de santier . 6. – Urmareste si asigura ca procesele de executie din cadrul santierului sa se desfasoare numai pe baza de proceduri si instructiuni care sa defmeasca precis si complet modul de lucru . 7. – in colaborare cu functiile implicate din cadrul societadi, urmareste asigurarea tuturor documentelor si conditiilor necesare executiei, in realizarea cerintelor de calitate: documentatii tehnice si tehnologice de executie, proceduri tehnice de executie (PTE) si planurile de control calitate (PCC) aferente pe lucrari/ produs; gestioneaza toate documentele mentionate aferente executiei lucrarilor contractate . 8. – Controleaza inainte de inceperea executiei, indeplinirea tuturor cerintelor stabilite in documentatii si in PTE, urmarind organizarea zonei in conformitate cu prevederile acestora, in vederea asigurarii conditiilor prealabile necesare pentru desfasurarea corespunzatoare a proceselor de productie, protectia muncii, prevenirea si stingerea incendiilor (PSI), protejarea mediului ambiant, realizarea racordurilor la utilitati (energie, apa, canalizare, etc. ) . 9. – Asigura executarea lucrarilor de constructii contractate cu clientii, in conformitate cu PTE, PCC si cu graficele de esalonare . 10.- Urmareste si asigura consemnarea in inregistrari ale calitatii ce reprezanta indicatori de stadiu (FCC, PV predare-primire fronturi de lucru, PV de receptie calitativa, PV receptie lucrari care devin ascunse, PV de control, PV de probe, buletine de incercari, etc.) toate datele privind verificarile, incercarile si inspectiile efectuate la executia lucrarilor/ produselor pe faze intermediare determinante si in final in vederea acceptarii acestora. Asigura gestionarea inregistrarilor calitatii conform, prevederilor din procedurile aplicabile . 11. – Asigura conditiile necesare accesului la lucrare si la inregistrarile ernise de santier, pentru desfasurarea activitatilor de control si inspectii/ incercari pe flux si finale, conform PCC de catre responsabilii AQ, CTC, din cadrul organizatiei sau proiectanti, clienti si alte organe exteme de control abilitate . 12. – Raspunde de indeplinirea prevederilor de control din PCC aprobat pentru fiecare lucrare si confirma in Fisa de control calitate (FCC) aferenta, efectuarea operatiilor tehnologice si a verificarilor faza cu faza a lucrarii/ produsului executat. coordoneaza activitatea personalului din subordine astfel incat sa se poata respecta graficul de executie si implicit al termenului de predare al obiectivului; urmareste aprovizionarea fluenta cu meteriale necesare desfasurarii lucrarii; instiinteaza seful de santier si dirigintele de santier de o eventuala dotare cu alte utilaje sau aprovizionarea cu alte materiale, functie de necesitatile aparute pe parcursul derularii executiei lucrarii; asista la furnizeaza detalii comisiilor de specialitate, in cazul diferitelor faze de control de pe parcursul executiei lucrarii; urmareste toate fazele de executie a obiectivului in lucru;

Page 162 of 556

Responsabil Tehnic analizeaza si aproba documentatia tehnica de baza, procedurile tehnice de cu Execuţia* (RTE) executie si planul de control al calitatii de verificari si incercari; analizeaza si dispune masuri de inlaturare a neconformitatilor privind productia si calitatea produselor; urmareste si controleaza in mod sistematic modul in care se desfasoara activitatea de control tehnic de calitate, inspectiile si incercarile reglementate si documentarea rezultatelor prin inregistrari corecte si complete; - asigura implementarea prevederilor SMQ in cadrul activitatilor proprii de control; Responsabil CQ - asigura realizarea colaborarii cu laboratoare de specialitate autorizate; - asigura realizarea programului de actiuni corective si preventive adoptat pentru activitatea de CQ ; - detine permanent situatia generala a neconformitatilor si a stadiului lor de rezolvare / solutionare ; - efectueaza controale in depozite si la lucrari, in diferite stadii de executie, conform prevederilor PCC; - gestioneaza documentele si inregistrarile aferente controlului de conformitate ; - asigura respectarea si efectuarea activitatilor de control, verificari/incercari conform documentatiei activitatii de productie (proceduri/instructiuni, PCCVI-uri, reglementari in domeniu, etc.); - urmareste respectarea si aplicarea prevederilor procedurilor privind inregistrarile calitatii; - asigura transmiterea la santiere a documentatiei/ inregistrarilor calitatii care sunt aferente activitatilor derulate de catre acestea. - Urmareste modul de implementare a actiunilor corrective si/sau preventive stabilite in urma derularii auditurilor interne; - Efectueaza la nivel de santier /punct de lucru in cadrul societatii activitatile de inregistrare a calitatii in vederea asigurarii trasabilitatii din punct de vedere a calitatii lucrarilor efectuate; - identificarea pericolelor si evaluarea riscurilor pentru fiecare componenta a Responsabil sistemului de munca, respectiv executant, sarcina de munca, mijloace de SSM munca/echipamente de munca si mediul de munca pe locuri de munca/posturi de lucru; - elaborarea, indeplinirea, monitorizarea si actualizarea planului de prevenire si protectie; - verificarea insusirii si aplicarii de catre toti lucratorii a masurilor prevazute in planul de prevenire si protectie, a instructiunilor proprii, precum si a atributiilor si responsabilitatilor ce le revin in domeniul securitatii si sanatatii in munca stabilite prin fisa postului; - intocmirea unui necesar de documentatii cu caracter tehnic de informare si instruire a lucratorilor in domeniul securitatii si sanatatii in munca; - elaborarea tematicii pentru toate fazele de instruire, stabilirea, in scris, a periodicitatii instruirii adecvate pentru fiecare loc de munca in instructiunile proprii, asigurarea informariisi instruirii lucratorilor in domeniul securitatii si sanatatii in munca si verificarea insusirii si aplicarii de catre lucratori a informatiilor primite; - elaborarea programului de instruire-testare - evidenta zonelor cu risc ridicat si specific prevazute la art. 101-107 HG1425/2006; - stabilirea zonelor care necesita semnalizare de securitate si sanatate in munca, stabilirea tipului de semnalizare necesar si amplasarea conform prevederilor Hotararii Guvernului nr. 971/2006 privind cerintele minime pentru semnalizarea de securitate si/sau sanatate la locul de munca

Page 163 of 556

Topograf

Muncitori executie

Conducator auto

Instalator

- Efectuarea de trasari si verificari in constructii Descrierea sarcinilor/atributiilor/activitatilor postului: - Efectuarea profilurilor transversale si longitudinale. - Masurarea terenurilor pentru realizarea planurilor cotate - Efectuarea de trasari si verificari in constructii - Executarea masuratorilor topografice pentru reabilitare drumuri - Masuratori topografice si cadastrale, masuratori GPS, integrarea datele provenite din masuratori si alte metode de achizitie de date - Dezvoltare de programe existente si adaptare la piata romaneasca. - Extragerea datelor din plansele proiectului (plan situatie, profil longitudinal, profile transversale), inclusiv prin interpolare acolo unde este cazul, precum si verificarea acestor planse d.p.d.v. topografic - Materializarea (trasarea) in teren a datelor sus-mentionate - Ridicari topografice in vederea determinarii cantitatilor de lucrari executate si calculul acestor cantitati pe baza profilelor transversale rezultate Executia lucrarilor conform Instructiunii de lucru de la sefii de santier, sef punct lucru, responsabil CTC , responsabil SSM si conform detaliilor de executie. Respecta programul de lucru si regulamentele de ordine interioara, respecta termenele alocate fiecarei activitati Asigura integritatea marfii in timpul transportului Respecta imaginea si politica companiei in relatia cu tertii Participa la toate sedintele organizate in cadrul departamentului si la orice alta sedinta la cererea sefilor ierarhici Participa la activitatile de instruire, calificare si perfectionare atat in domeniul profesional cat si in domeniul managementului calitatii Informeaza seful de departament despre stadiul activitatilor/proceselor desfasurate Raporteaza, ori de cate ori i se cere, activitatea desfasurata si problemele aparute Raporteaza fara intarziere orice eveniment aparut in trafic in care este implicat atunci cand canduce masina companiei Raspunde civil, disciplinar, administrativ sau, dupa caz, penal, de necesitatea, oportunitatea, legalitatea si realitatea documentelor pe care le-a intocmit sau la care a participat si care privesc utilizarea mijloacelor materiale sau banesti ale firmei Respecta dispozitiile sefului de echipa si comunica acestuia modul de rezolvare al situatiilor ivite; Informeaza asupra aspectelor de mediu aparute in timpul programului Raspunde de indeplinirea in bune conditii si la termen a sarcinilor si lucrarilor repartizate; Asigura indeplinirea politicii si obiectivelor SMCM Respecta si concura la indeplinirea obiectivelor de mediu ale organizatiei Raspunde de indeplinirea in bune conditii si la termen a sarcinilor si lucrarilor repartizate; Participa la activitatile de instruire, calificare si perfectionare atat in domeniul profesional cat si in domeniul managementului calitatii Furnizeaza informatii, la cerere sau ori de cate ori este nevoie, celorlalte departamente pentru analize specifice de activitate Raspunde civil, disciplinar, administrativ sau, dupa caz, penal, de necesitatea, oportunitatea, legalitatea si realitatea documentelor pe care le-a intocmit sau la care a participat si care privesc utilizarea mijloacelor materiale si banesti ale firmei Respecta programul de lucru si regulamentele de ordine interioara, respecta termenele alocate fiecarei activitati Respecta imaginea si politica companiei in relatia cu tertii Participa la toate sedintele de interes organizate in cadrul organizatiei Respecta prevederile normative cu privire la securitatea si sanatatea in munca, cele de P.S.I. precum si cele de protectia mediului; Page 164 of 556

Fierar betonist

Electrician

Montează armături la pereţi curbi ( castele de apă , turnuri de răcire ), cupole, cadre curbe , arce, pâlnii de siloz , grinzi cu zăbrele, ferme , sheduri, plăci autoportante , scări în spirală, planşee pentru turbină şi generatori din beton armat Consultă schiţele întocmite după planurile de execuţie . Respectă tehnologia de confecţionare a barelor de oţel - beton . Respectă regulile de montare în ordine raţională a barelor componente ale armăturii elementelor de rezistenţă complexe din beton armat monolit . Montează carcase de armătură pentru ferme, grinzi cu zăbrele, arce, sheduri şi alte elemente similare din beton armat prefabricat . Consultă schiţele întocmite după planurile de execuţie . Respectă tehnologia de asamblare a carcaselor de armătură pentru elemente prefabricate . Respectă regulile de montare a carcaselor de armătură în tipare, asigurând grosimea stratului de acoperire cu beton a armăturii . Răspunde de organizarea şi desfăşurarea activităţii la locul de muncă repartizat în cadrul punctului de lucru. Construieste, monteaza si instaleaza diferite structuri din lemn pe santierul de constructii; Ajusteaza, asambleaza imbina, finiseaza, incadreaza usi, ferestre, pereti despartitori din lemn in interiorul constructiei; Executa cofraje pentru turnarea betonului; Confectioneaza panourile folosite la cofrag; Executa constructii din din lemn cu caracter provizoriu sau definitive; Confectioneaza podine din lemnpentru schele; Executa lucrari de zidarie , construind sau reparand, folosind caramizi, pietre sau materiale similare dupa anumite reguli, folosind lianti pentru fixarea acestora; Respecta intocmai sarcinile si indicatiile primite de la seful direct cu privire la procesul tehnologic si materialele folosite ( proportii, cantitati, calitate);Respecta intocmai precizarile si indicatiile inscrise in proiectele de executie; raspunde pentru neindeplinirea sau indeplinirea necorespunzatoare a atributiilor ce-i revin,cat si de calitatea lucrarilor executate ; raspunde pentru prejudiciile create ca efect al activitatii sale ; raspunde de mentinerea in stare buna a echipamentelor si a sculelor din dotare ; raspunde de existenta si pastrarea in bune conditii a a documentatiei tehnice,instructiunilor de lucru,a fiselor de inspectie si incercare conform procedurilor in vigoare ; sa cunoasca si sa respecte prevederile privind PM-PSI-Protectia Mediului ; NSSM pentru lucru la inaltime ; NSSM pentru lucrari de montaj tehnologic ;

Page 165 of 556

Muncitori necalificati

Munca unui muncitor necalificat in construcţii este de a presta muncii necalificate in domeniul constructilor civile si al constructilor in general. Obilgatiile includ: -sa incarce -sa descarce sau sa stocheze materiale de construcţie si produse, sa le mute in corucioare -sa pregatesca materialul solicitate in utilizarea procesului tehnologic -sa le amestece in recipienti -sa le intinda, sa le taie -sa sorteze materialul rezultat din demolări -sa ajute in cadrul echipei deservirea diferitelor maşini si echipamente Lucrează in general pe şantiere unde sunt conditi de vreme schimbatoere , se lucrează la inaltime , in mediu cu praf si in contact cu materiale de construcţie care pot conţine substanţe chimice ,etc

OFERTANT, CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI GIANCARLO COLOMBO

Page 166 of 556

PLANUL DE ASIGURARE A CALITATII PENTRU EXECUTAREA LUCRARILOR Ofertantul va prezenta o declaratie detaliata pentru intreg presonalul, utilajele si echipamentele care vor fi folosite pentru indeplinirea contractului. Declaratia va contine : •

numarul si categoriile de personal tehnic, de supervizare, respectiv personal muncitor calificat si necalificat care va fi disponibilizat; PERSONAL CHEIE:

Nr.crt. Pozitie propusa

1 2 3 4 5

Manager de proiect SEF DE SANTIER RESPONSABIL SSM RESPONSABIL CQ RTE



Numarul de personal alocat

12 15 10 7 15

1 1 1 1 1

numarul si categoriile de utilaje si echipamente care vor fi utilizate pentru indeplinirea contractului;

Nr.crt. Denumire utilaj/echipament

1 2 …

Pregatire profesionala/ Calificarea/ ani experienta

Caracteristica tehnica utilaj/echipam ent

Numarul de uitlaj/echipament alocat

A se vedea anexa atasata

Ofertant, CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI GIANCARLO COLOMBO *Nota: personalul, utilajele si echipamentele declarate vor fi in numar suficient pentru indeplinirea totala a lucrarilor aferente prezentei achizitii.

Page 167 of 556

Page 168 of 556

Page 169 of 556

Page 170 of 556

Page 171 of 556

Page 172 of 556

Page 173 of 556

Page 174 of 556

Page 175 of 556

Page 176 of 556

Page 177 of 556

Page 178 of 556

Page 179 of 556

Page 180 of 556

Page 181 of 556

Page 182 of 556

Page 183 of 556

Page 184 of 556

Page 185 of 556

Page 186 of 556

Page 187 of 556

Page 188 of 556

Page 189 of 556

Page 190 of 556

Page 191 of 556

Page 192 of 556

Page 193 of 556

Page 194 of 556

Page 195 of 556

Page 196 of 556

Page 197 of 556

Page 198 of 556

Page 199 of 556

Page 200 of 556

Page 201 of 556

Page 202 of 556

Page 203 of 556

Page 204 of 556

Page 205 of 556

Page 206 of 556

Page 207 of 556

Page 208 of 556

Page 209 of 556

Page 210 of 556

Page 211 of 556

Page 212 of 556

Page 213 of 556

Page 214 of 556

Page 215 of 556

Page 216 of 556

Page 217 of 556

Page 218 of 556

Page 219 of 556

Page 220 of 556

Page 221 of 556

Page 222 of 556

Page 223 of 556

Page 224 of 556

Page 225 of 556

Page 226 of 556

Page 227 of 556

Page 228 of 556

Page 229 of 556

Page 230 of 556

Page 231 of 556

Page 232 of 556

Page 233 of 556

Page 234 of 556

Page 235 of 556

Page 236 of 556

Page 237 of 556

Page 238 of 556

Page 239 of 556

Page 240 of 556

Page 241 of 556

Page 242 of 556

Page 243 of 556

Page 244 of 556

Page 245 of 556

Page 246 of 556

Page 247 of 556

Page 248 of 556

Page 249 of 556

Page 250 of 556

Page 251 of 556

Page 252 of 556

Page 253 of 556

Page 254 of 556

Page 255 of 556

Page 256 of 556

Page 257 of 556

Page 258 of 556

Page 259 of 556

Page 260 of 556

Page 261 of 556

Page 262 of 556

Page 263 of 556

Page 264 of 556

Page 265 of 556

Page 266 of 556

Page 267 of 556

Page 268 of 556

Page 269 of 556

Page 270 of 556

Page 271 of 556

Page 272 of 556

Page 273 of 556

Page 274 of 556

Page 275 of 556

Page 276 of 556

Page 277 of 556

Page 278 of 556

Page 279 of 556

Page 280 of 556

Page 281 of 556

Page 282 of 556

Page 283 of 556

Page 284 of 556

Page 285 of 556

Page 286 of 556

Page 287 of 556

Page 288 of 556

Page 289 of 556

Page 290 of 556

Page 291 of 556

Page 292 of 556

Page 293 of 556

Page 294 of 556

Page 295 of 556

Page 296 of 556

Page 297 of 556

Page 298 of 556

Page 299 of 556

Page 300 of 556

Page 301 of 556

Page 302 of 556

Page 303 of 556

Page 304 of 556

Page 305 of 556

Page 306 of 556

Page 307 of 556

Page 308 of 556

Page 309 of 556

Page 310 of 556

Page 311 of 556

Page 312 of 556

Page 313 of 556

Page 314 of 556

Page 315 of 556

Page 316 of 556

Page 317 of 556

Page 318 of 556

Page 319 of 556

Page 320 of 556

Page 321 of 556

Page 322 of 556

Page 323 of 556

Page 324 of 556

Page 325 of 556

Page 326 of 556

Page 327 of 556

Page 328 of 556

Page 329 of 556

Page 330 of 556

Page 331 of 556

Page 332 of 556

Page 333 of 556

Page 334 of 556

Page 335 of 556

Page 336 of 556

Page 337 of 556

Operator economic CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI Bucuresti, Sector 1, Bd. Nicolaie Balcescu, Nr 18, Intrarea A, Cam.1, Biroul 1

DECLARATIE PE PROPRIE RASPUNDERE Subsemnatul GIANCARLO COLOMBO, reprezentant imputernicit al CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI - Societate de drept roman cu sediul în Bucuresti, Sector 1, Bd. Nicolaie Balcescu, Nr 18, Intrarea A, Cam.1, Biroul 1, Bl Dalles, Et.4, Ap. 25, inscrisa la Registrul Comertului sub nr. J40/3122/2018, cod unic de inregistrare CUI 3896361, in calitate de OFERTANT la procedura de atribuire „Extindere retea de canalizare în satele Manolea si Boura" declar pe proprie răspundere, ca in cazul in care vom fi declarati castigatori la aceasta procedura, vom semna un contract de colaborare cu unul din Laboratoarele de analize si incercari in constructii GRAD II, disponibile in zona Suceava, respectiv: Drumuri si Poduri S.A. KAROM PLUS SRL, AXICON SRL, COMINCO BUCOVINA SA., etc Intrucat un astfel de contract genereaza costuri, vom prezenta un astfel de contract in momentul in care vom fi declarati castigatori.

Data completarii: 14.05.2018

Operator economic, CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI prin reprezentant imputernicit, GIANCARLO COLOMBO

Page 338 of 556

RESURSE Prezentul document cuprinde urmatoarele capitole: 1. Resurse umane, mijloace de transport si utilaje de constructii 2. Materiale 3. Resurse financiare 4. Leadership si responsabilitati 5. Organigrama proiectului 1. Resurse umane, mijloace de transport si utilaje de constructii In tabelul de mai jos se detaliaza dotarile necesare derularii activitatii in conditii optime (mijloace de transport si utilaje de constructii). Obiectul de investitie/zona

Echipa

Personal (calificare si numar)

Utilaje si echipamente (tip si numar)

Retea distributie/aductiune

Conducta canalizare gravitationala si refulare, inclusiv carnine si racorduri

Amenajare teren

Sub/supratraversari

Conducta refulare, inclusiv carnine si racorduri

Formatia 1: -necalificat = 6 -sofer = 2 -mecanic utilaj = 3 -dulgheri = 2 -betonist = 1 -instalatori alimentare apa = 4 Formatia 2: 2 X Echipa - asfaltator = 4 1 -necalificat = 4 -sofer = 3 -mecanic utilaj = 3 Formatia 3: -sudor PE = 1 -necalificat = 2 -sofer = 1 -mecanic utilaj = 3 Formatia 1: -necalificat = 6 2 X Echipa -sofer = 2 1 -mecanic utilaj = 3 -dulgheri = 2 -betonist = 1

Page 339 of 556

-buldoexcavator = 1 -autobasculante = 1 -cilindru compactor = 1 -mai compactor = 1 -motopompa = 1 -automalaxor = 1 -automacara = 1 autocamioan = 1 -cilindru compactor = 1 -mai compactor = 1 --buldoexcavator = 1 -autobasculante = 1 -autocamioan = 1 -buldoexcavator = 1 -mai compactor = 1 -instalatie foraj orizontal = 1 -autobasculanta = 1 -trusa oxiacetilenica = 1 -aparat sudura MIG = 1 - autocamioan = 1 -buldoexcavator = 1 -autobasculante = 1 -cilindru compactor = 1 -mai compactor = 1 -motopompa = 1 -automalaxor = 1

-instalatori alimentare apa = 4

autocamioan = 1 -automacara = 1

2. Statii pompare

Constructie

2X Echipa 2 Instalatii

Electrice-automatizari

Formatia 1: -necalificat = 4 -sofer = 3 -mecanic utilaj = 1 -electricieni = 2 -lacatusi = 4 -dulgheri = 2 -fierari-betonisti = 2 -betonisti = 2 Formatia 2: -instalatori = 2 -necalificat = 2 Formatia 3: -necalificat = 4 -sofer = 1 -electricieni = 2 -mecanic utilaj = 1 -automatisti = 2 -programator IT = 1

-buldoexcavator = 1 -mai compactor = 1 -camion = 1 -autobasculanta = 1 -automalaxor = 1 -mai compactor = 1 -vibrator de beton = 1 autocamioan = 1 -aparat sudura MIG = 1 -trusa oxiacetilenica = 1 -generator electric = 1

-autoutilitara 7 locuri - bena 3.5 to capacitate

3. Montaj utilaje Montare utilaje, (pompe )

Montare panouri de santier, indicatoare rutiere, semaforizare si iluminat nocturne,dezafectare organizare de santier

Formatia 1: -electrician = 1 -necalificat = 4 -lacatus-sudor = 1 -sofer = 1 2 X Echipa Formatia 2: 4 -electrician = 1 -necalificat = 2 -lacatus-sudor = 1 -asfaltator = 1 -mecanic utilaj = 1 -sofer = 2

Page 340 of 556

-autoutilitara 7 locuri si bena 3.5 to capacitate

-automacara = 1 -buldoexcavator = 1 -autobasculanta = 1 -autosa = 1 - autocamioan = 1

Retele si organizare de santier

Formatia 3: -necalificati = 4

-perie mecanica = 2 -compresor spalare = 2

Tot santierul

Formatia 4: -topometrist = 1 -necalificati = 2 -laborant = 1

-autoturism = 1

3. Materiale Materialele si utilajele/echipamentele tehnologice care urmeaza sa fie puse in opera sunt prezentate in Fisele tehnice. Selectia furnizorilor s-a realizat in baza procedurilor proprii, in 2 etape: 1. in urma fazei de preselectie au ramas numai furnizorii care ofereau produse care sa corespunda cerintelor tehnice ale documentatie de atribuire; 2. in faza finala a selectiei, s-a ales cate un furnizor pentru fiecare produs in functie de distanta de transport, modalitati si termene de plata si nu in ultimul rand, pentru ca acesta este si unul din criteriile de atribuire din Fisa de date achizitiei. 4. Resurse financiare S-a analizat necesarul de resurse financiare si s-a elaborat o esalonare (grafic) valorica a lucrarilor corelata cu graficul de executie si, in cazul in care vom executa lucrarea, se vor crea disponibilati financiare pentru un flux de numerar (cash-flow) care sa asigure derularea fluenta a lucrarilor, asa cum au fost ele programate.

5. Leadership si responsabilitati Personalul de conducere, coordonare, supraveghere si control intern desemnat sa gestioneze resursele prezentate la cap. 2-4 este nominalizat in Organigrama proiectului, unde sunt prezentate schematic si relatiile de munca intre persoanele implicate in proiect. Nivelul de competenta, responsabilitate si reprezentativitate al fiecarui membru din echipa de leadership este prezentat, pe diferite aspecte, in Planul calitatii, care sunt cuprinse in Propunerea tehnica.

Ofertant, CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI

Page 341 of 556

Page 342 of 556

Page 343 of 556

Page 344 of 556

Page 345 of 556

CUPRINS OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

CAPITOLUL

Pagina

DG - DEVIZ GENERAL al obiectivului de investitii

2

F1 - Centralizatorul cheltuielilor pe obiectiv

6

F2cp - CENTRALIZATORUL cheltuielilor pe obiect si categorii de lucrari - cumulat proiect - „Extindere retea de canalizare în satele Manolea si Boura"

7

F2 - CENTRALIZATORUL cheltuielilor pe obiect si categorii de lucrari - Extindere retea de canalizare în sat Manolea

10

F2 - CENTRALIZATORUL cheltuielilor pe obiect si categorii de lucrari - Extindere retea de canalizare în sat Boura

12

F2 - CENTRALIZATORUL cheltuielilor pe obiect si categorii de lucrari - Lucrari racordare la energie electrica

13

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3378 M SAT MANOLEA

14

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MANOLEA

18

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - BAZIN SP1AU

21

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - CAMIN GRATAR SP1AU

25

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - INSTALATII HIDRAULICE STATIE POMPARE SP1AU

28

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - INSTALATII ELECTRICE SP1AU

31

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

35

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

37

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

39

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - BY PASS VARSARE SPIAU

41

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - By PASS SP1AU L=40 M

43

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VENTIL AERISIRE 1

46

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - BAZIN SP2AU

49

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - CAMIN GRATAR SP2AU

53

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - INSTALATII HIDRAULICE STATIE POMPARE SP2AU

56

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - INSTALATII ELECTRICE SP2AU

59

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

63

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

65

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

67

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - BY PASS VARSARE SP2AU

69

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - BY PASS SP2AU L=9 M

71

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - BAZIN SP3AU

74

Page 346 of 556

CAPITOLUL

Pagina

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - CAMIN GRATAR SP3AU

78

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - INSTALATII HIDRAULICE STATIE POMPARE SP3AU

81

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - INSTALATII ELECTRICE SP3AU

84

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MP LA SP3AU

88

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

90

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

92

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - BY PASS VARSARE SP3AU

94

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - BY PASS SP3AU L-13 M

96

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE 2 BUCJ VENTIL AERISIRE I

99

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - BAZIN SP4AU

102

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - CAMIN GRATAR SP4AU

106

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - INSTALATII HIDRAULICE STATIE POMPARE SP4AU

109

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - INSTALATII ELECTRICE SP4AU

112

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MP LA SP4AU

116

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

118

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

120

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - BY PASS VARSARE SP4AU

122

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - BY PASS SP4AU L=4 M

124

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - GOLIRE SI AERISIRE TRAVERSARE SP4AU; CAMIN GOLIRE 2 BUCr VENTIL AERISIRE

127

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - CONDUCTA REFULARE-POMPARE SPlAU PEID PN6 DN 110 KM L = 75 M

130

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - CONDUCTA REFULARE-POMPARE SP2AU PEID PN6 DN 110 MM L = 195 M

133

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

136

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - CONDUCTA REFULARE-POMPARE SP4AU PEID PN6 DN 110 MM L - 40 M

139

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S74 M SAT BOURA

142

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

146

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - Bransament electric SP1AU

149

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - Coloana electrica SP1AU

152

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - Bransament electric SP2AU

155

Page 347 of 556

CAPITOLUL

Pagina

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - Coloana electrica SP2AU

158

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - Bransament electric SP3AU

161

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - Coloana electrica SP3AU

162

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - Bransament electric SP4AU

165

F3 - LISTA cu cantitati de lucrari pe categorii de lucrari - [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - Coloana electrica SP4AU

168

F4 - LISTA cu cantitatile de utilaje si echipamente tehnologice , inclusiv dotari si active necorporale [ 0017 ] - „Extindere retea de canalizare în satele Manolea si Boura" - Lista echipamente

171

C6cp - LISTA cuprinzand consumurile de resurse materiale - cumulat proiect - „Extindere retea de canalizare în satele Manolea si Boura"

173

C7cp - LISTA cuprinzand consumurile cu mana de lucru - cumulat proiect - „Extindere retea de canalizare în satele Manolea si Boura"

186

C8cp - LISTA cuprinzand consumurile de ore de functionare a utilajelor de constructii - cumulat proiect „Extindere retea de canalizare în satele Manolea si Boura"

188

C9cp - LISTA cuprinzand consumurile privind transporturile - cumulat proiect - „Extindere retea de canalizare în satele Manolea si Boura"

190

Page 348 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

Anexa Nr. 7

DEVIZUL GENERAL al obiectivului de investitii

„Extindere retea de canalizare în satele Manolea si Boura" Conform H.G. nr. 907 din 2016 Nr. crt.

Denumirea capitolelor si subcapitolelor de cheltuieli

1

2

Valoare (fara TVA)

TVA

Valoare cu TVA

lei

lei

lei

3

4

5

CAPITOL 1 Cheltuieli pentru obtinerea si amenajarea terenului 1.1

Obtinerea terenului

1.2

Amenajarea terenului

1.3 1.4

Amenajari pentru protectia mediului si aducerea terenului la starea initiala Cheltuieli pentru relocarea/protectia utilitatilor

TOTAL CAPITOL 1 CAPITOL 2 Cheltuieli pentru asigurarea utilitatilor necesare obiectivului de investitii TOTAL CAPITOL 2 CAPITOL 3 Cheltuieli pentru proiectare si asistenta tehnica 3.1 3.1.1

Studii Studii de teren

3.1.2

Raport privind impactul asupra mediului

3.1.3

Alte studii specifice

3.2 3.3 3.4 3.5

Documentatii-suport si cheltuieli pentru obtinerea de avize, acorduri si autorizatii Expertizare tehnica Certificarea performantei energetice si auditul energetic al cladirilor Proiectare

3.5.1

Tema de proiectare

3.5.2

Studiu de prefezabilitate

3.5.3

Studiu de fezabilitate/documentatie de avizare a lucrarilor de interventii si deviz general

3.5.4

Documentatiile tehnice necesare in vederea obtinerii avizelor/acordurilor/autorizatiilor

3.5.5

Verificarea tehnica de calitate a proiectului tehnic si a detaliilor de executie Proiect tehnic si detalii de executie

3.5.6 3.6

Organizarea procedurilor de achizitie

3.7

Consultanta

3.7.1 3.7.2 3.8 3.8.1 3.8.1.1 3.8.1.2

3.8.2

Managementul de proiect pentru obiectivul de investitii Auditul financiar Asistenta tehnica Asistenta tehnica din partea proiectantului pe perioada de executie a lucrarilor pentru participarea proiectantului la fazele incluse în programul de control al lucrarilor de executie, avizat de catre Inspectoratul de Stat în Constructii Dirigentie de santier Pag 2 Page 349 of 556

DEVIZUL GENERAL: „Extindere retea de canalizare în satele Manolea si Boura" 1

2

3

4

5

TOTAL CAPITOL 3 CAPITOL 4 Cheltuieli pentru investitia de baza 4.1 4.1.1.1

Constructii si instalatii [0017.2.1] RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3378 M SAT MANOLEA

4.1.1.2

[0017.2.2] SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MANOLEA 4.1.1.3 [0017.2.3] BAZIN SP1AU 4.1.1.4

[0017.2.4] CAMIN GRATAR SP1AU

4.1.1.5

[0017.2.5] INSTALATII HIDRAULICE STATIE POMPARE SP1AU

4.1.1.6 4.1.1.7

[0017.2.6] INSTALATII ELECTRICE SP1AU [0017.2.7] DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4.1.1.8

[0017.2.8] ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

4.1.1.9

[0017.2.10] BY PASS VARSARE SPIAU

4.1.1.10

[0017.2.11] By PASS SP1AU L=40 M

4.1.1.11

[0017.2.12] GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VENTIL AERISIRE 1 4.1.1.12 [0017.2.13] BAZIN SP2AU 4.1.1.13

[0017.2.14] CAMIN GRATAR SP2AU

4.1.1.14

[0017.2.15] INSTALATII HIDRAULICE STATIE POMPARE SP2AU

4.1.1.15 4.1.1.16

[0017.2.16] INSTALATII ELECTRICE SP2AU [0017.2.17] DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

4.1.1.17

[0017.2.18] ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

4.1.1.18

[0017.2.20] BY PASS VARSARE SP2AU

4.1.1.19

[0017.2.21] BY PASS SP2AU L=9 M

4.1.1.20

[0017.2.22] BAZIN SP3AU

4.1.1.21

[0017.2.23] CAMIN GRATAR SP3AU

4.1.1.22

[0017.2.24] INSTALATII HIDRAULICE STATIE POMPARE SP3AU

4.1.1.23 4.1.1.24

[0017.2.25] INSTALATII ELECTRICE SP3AU [0017.2.26] DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MP LA SP3AU

4.1.1.25

[0017.2.27] ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

4.1.1.26

[0017.2.29] BY PASS VARSARE SP3AU

4.1.1.27

[0017.2.30] BY PASS SP3AU L-13 M

4.1.1.28

[0017.2.31] GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE 2 BUCJ VENTIL AERISIRE I 4.1.1.29 [0017.2.32] BAZIN SP4AU 4.1.1.30

[0017.2.33] CAMIN GRATAR SP4AU

4.1.1.31

[0017.2.34] INSTALATII HIDRAULICE STATIE POMPARE SP4AU

4.1.1.32 4.1.1.33

[0017.2.35] INSTALATII ELECTRICE SP4AU [0017.2.36] DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MP LA SP4AU

4.1.1.34

[0017.2.37] ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

4.1.1.35

[0017.2.39] BY PASS VARSARE SP4AU

4.1.1.36

[0017.2.40] BY PASS SP4AU L=4 M

4.1.1.37

[0017.2.41] GOLIRE SI AERISIRE TRAVERSARE SP4AU; CAMIN GOLIRE 2 BUCr VENTIL AERISIRE Pag 3 Page 350 of 556

DEVIZUL GENERAL: „Extindere retea de canalizare în satele Manolea si Boura" 1

2

4.1.1.38

PEID PEID

[0017.2.43] CONDUCTA REFULARE-POMPARE SP2AU PN6 DN 110 MM L = 195 M

4.1.1.39 4.1.1.40

4

5

[0017.2.44] CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

4.1.1.41

PEID 4.1.2.1

3

[0017.2.42] CONDUCTA REFULARE-POMPARE SPlAU PN6 DN 110 KM L = 75 M

[0017.2.45] CONDUCTA REFULARE-POMPARE SP4AU PN6 DN 110 MM L - 40 M

[0017.3.1] RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S74 M SAT BOURA

4.1.2.2

[0017.3.2] SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA 4.1.3.1 [0017.4.1] Bransament electric SP1AU 4.1.3.2

[0017.4.2] Coloana electrica SP1AU

4.1.3.3

[0017.4.3] Bransament electric SP2AU

4.1.3.4

[0017.4.4] Coloana electrica SP2AU

4.1.3.5

[0017.4.5] Bransament electric SP3AU

4.1.3.6

[0017.4.6] Coloana electrica SP3AU

4.1.3.7

[0017.4.7] Bransament electric SP4AU

4.1.3.8

[0017.4.8] Coloana electrica SP4AU

4.2

Montaj utilaje, echipamente tehnologice si functionale

4.2.1.1

[0017.2.9] INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

4.2.1.2

[0017.2.19] INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

4.2.1.3

[0017.2.28] INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

4.2.1.4

[0017.2.38] INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

4.3

Utilaje, echipamente tehnologice si functionale care necesita montaj 4.3.1.1 [0017.2] Lista echipamente 4.4 4.5 4.6

Utilaje, echipamente tehnologice si functionale care nu necesita montaj si echipamente de transport Dotari Active necorporale

TOTAL CAPITOL 4 CAPITOL 5 Alte cheltuieli 5.1 5.1.1 5.1.2 5.2

Organizare de santier Lucrari de constructii si instalatii aferente organizarii de santier Cheltuieli conexe organizarii santierului Comisioane, cote, taxe, costul creditului

5.2.1

Comisioanele si dobanzile aferente creditului bancii finantatoare

5.2.2

Cota aferenta ISC pentru controlul calitatii lucrarilor de constructii

5.2.3

Cota aferenta ISC pentru controlul statului in amenajarea teritoriului, urbanism si pentru autorizarea lucrarilor de constructii Cota aferenta Casei Sociale a Constructorilor - CSC

5.2.4 5.2.5 5.3 5.4

Taxe pentru acorduri, avize conforme si autorizatia de construire/desfiintare Cheltuieli diverse si neprevazute Cheltuieli pentru informare si publicitate

TOTAL CAPITOL 5

Pag 4 Page 351 of 556

DEVIZUL GENERAL: „Extindere retea de canalizare în satele Manolea si Boura" 1

2

3

4

5

CAPITOL 6 Cheltuieli pentru probe tehnologice si teste 6.1

Pregatirea personalului de exploatare

6.2

Probe tehnologice si teste

TOTAL CAPITOL 6 TOTAL GENERAL din care: C+M (1.2+1.3+1.4+2+4.1+4.2+5.1.1)

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 5 Page 352 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F1 - CENTRALIZATORUL cheltuielilor pe obiectiv „Extindere retea de canalizare în satele Manolea si Boura" Nr. cap./ subcap. deviz general

Denumirea capitolelor de cheltuieli

1

2

3

1.2

Amenajarea terenului

1.3

Amenajari pentru protectia mediului si aducerea terenului la starea initiala

1.4

Cheltuieli pentru relocarea/protectia utilitatilor

2 3.5

lei

4

Proiectare Tema de proiectare

3.5.2

Studiu de prefezabilitate

3.5.3

Studiu de fezabilitate/documentatie de avizare a lucrarilor de interventii si deviz general

3.5.4

Documentatiile tehnice necesare in vederea obtinerii avizelor/acordurilor/autorizatiilor

3.5.5

Verificarea tehnica de calitate a proiectului tehnic si a detaliilor de executie

3.5.6

Proiect tehnic si detalii de executie Investitia de baza

4.1

Constructii si instalatii

4.2

Montaj utilaje, echipamente tehnologice si functionale

4.3

Utilaje, echipamente tehnologice si functionale care necesita montaj

4.4

Utilaje, echipamente tehnologice si functionale care nu necesita montaj si echipamente de transport

4.5

Dotari

4.6

Active necorporale

5.1

Organizare de santier

5.1.1

Lucrari de constructii si instalatii aferente organizarii de santier

5.1.2

Cheltuieli conexe organizarii santierului

6.2

Din care: C+M

Realizarea utilitatilor necesare obiectivului

3.5.1

4

Valoarea cheltuielilor pe obiect (exclusiv TVA) lei

Probe tehnologice si teste

TOTAL VALOARE (exclusiv TVA) TVA

19 %

TOTAL VALOARE (inclusiv TVA)

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 6 Page 353 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F2cp - CENTRALIZATORUL cheltuielilor pe categorii de lucrari

Nr. cap./subcap. deviz general

Valoare (exclusiv TVA)

Cheltuieli pe categoria de lucrari

lei

1

2

3

I. Lucrari de constructii si instalatii 4.1 4.1.1

Constructii si instalatii [0017.2] Extindere retea de canalizare în sat Manolea

4.1.1.1

[0017.2.1] RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3378 M SAT MANOLEA

4.1.1.2

[0017.2.2] SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MANOLEA [0017.2.3] BAZIN SP1AU

4.1.1.3 4.1.1.4

[0017.2.4] CAMIN GRATAR SP1AU

4.1.1.5

[0017.2.5] INSTALATII HIDRAULICE STATIE POMPARE SP1AU

4.1.1.6

[0017.2.6] INSTALATII ELECTRICE SP1AU

4.1.1.7

[0017.2.7] DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

4.1.1.8

[0017.2.8] ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

4.1.1.9

[0017.2.10] BY PASS VARSARE SPIAU

4.1.1.10

[0017.2.11] By PASS SP1AU L=40 M

4.1.1.11 4.1.1.12

[0017.2.12] GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VENTIL AERISIRE 1 [0017.2.13] BAZIN SP2AU

4.1.1.13

[0017.2.14] CAMIN GRATAR SP2AU

4.1.1.14

[0017.2.15] INSTALATII HIDRAULICE STATIE POMPARE SP2AU

4.1.1.15

[0017.2.16] INSTALATII ELECTRICE SP2AU

4.1.1.16

[0017.2.17] DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

4.1.1.17

[0017.2.18] ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

4.1.1.18

[0017.2.20] BY PASS VARSARE SP2AU

4.1.1.19

[0017.2.21] BY PASS SP2AU L=9 M

4.1.1.20

[0017.2.22] BAZIN SP3AU

4.1.1.21

[0017.2.23] CAMIN GRATAR SP3AU

4.1.1.22

[0017.2.24] INSTALATII HIDRAULICE STATIE POMPARE SP3AU

4.1.1.23

[0017.2.25] INSTALATII ELECTRICE SP3AU

4.1.1.24 4.1.1.25

[0017.2.26] DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MP LA SP3AU [0017.2.27] ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

4.1.1.26

[0017.2.29] BY PASS VARSARE SP3AU

4.1.1.27

[0017.2.30] BY PASS SP3AU L-13 M

4.1.1.28 4.1.1.29

[0017.2.31] GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE BUCJ VENTIL AERISIRE I [0017.2.32] BAZIN SP4AU

4.1.1.30

[0017.2.33] CAMIN GRATAR SP4AU

4.1.1.31

[0017.2.34] INSTALATII HIDRAULICE STATIE POMPARE SP4AU

2

Pag 7 Page 354 of 556

1 4.1.1.32 4.1.1.33 4.1.1.34

2

3

[0017.2.35] INSTALATII ELECTRICE SP4AU [0017.2.36] DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MP SP4AU [0017.2.37] ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

4.1.1.35

[0017.2.39] BY PASS VARSARE SP4AU

4.1.1.36

[0017.2.40] BY PASS SP4AU L=4 M

4.1.1.37

[0017.2.41] GOLIRE SI AERISIRE TRAVERSARE SP4AU; 2 BUCr VENTIL AERISIRE

4.1.1.38

[0017.2.42] CONDUCTA REFULARE-POMPARE SPlAU PEID 110 KM L = 75 M

PN6 DN

4.1.1.39

[0017.2.43] CONDUCTA REFULARE-POMPARE SP2AU PEID 110 MM L = 195 M

PN6 DN

4.1.1.40

[0017.2.44] CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

4.1.1.41

[0017.2.45] CONDUCTA REFULARE-POMPARE SP4AU PEID 110 MM L - 40 M [0017.3] Extindere retea de canalizare în sat Boura

4.1.2

CAMIN GOLIRE

PN6 DN

4.1.2.1

[0017.3.1] RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S74 M SAT BOURA

4.1.2.2

[0017.3.2] SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA [0017.4] Lucrari racordare la energie electrica

4.1.3 4.1.3.1

[0017.4.1] Bransament electric SP1AU

4.1.3.2

[0017.4.2] Coloana electrica SP1AU

4.1.3.3

[0017.4.3] Bransament electric SP2AU

4.1.3.4

[0017.4.4] Coloana electrica SP2AU

4.1.3.5

[0017.4.5] Bransament electric SP3AU

4.1.3.6

[0017.4.6] Coloana electrica SP3AU

4.1.3.7

[0017.4.7] Bransament electric SP4AU

4.1.3.8

[0017.4.8] Coloana electrica SP4AU

LA

TOTAL I II. Montaj utilaje si echipamente tehnologice 4.2 4.2.1

Montaj utilaje, echipamente tehnologice si functionale [0017.2] Extindere retea de canalizare în sat Manolea

4.2.1.1

[0017.2.9] INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

4.2.1.2

[0017.2.19] INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

4.2.1.3

[0017.2.28] INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

4.2.1.4

[0017.2.38] INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

TOTAL II III. Procurare 4.3 4.3.1 4.3.1.1 4.4 4.5 4.6

Utilaje, echipamente tehnologice si functionale care necesita montaj [0017.2] Extindere retea de canalizare în sat Manolea [0017.2] Lista echipamente Utilaje, echipamente tehnologice si functionale care nu necesita montaj si echipamente de transport Dotari Active necorporale

TOTAL III IV. Probe tehnologice si teste 6.2

Probe tehnologice si teste

TOTAL IV TOTAL VALOARE (exclusiv TVA): TVA 19%: Pag 8 Page 355 of 556

1

2

3

TOTAL VALOARE:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 9 Page 356 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F2 - CENTRALIZATORUL cheltuielilor pe categorii de lucrari Obiectul Extindere retea de canalizare în sat Manolea Nr. cap./subcap. deviz general

Valoare (exclusiv TVA)

Cheltuieli pe categoria de lucrari

lei

1

2

3

I. Lucrari de constructii si instalatii 4.1

Constructii si instalatii

4.1.1

[0017.2.1] RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3378 M SAT MANOLEA

4.1.2

[0017.2.2] SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MANOLEA [0017.2.3] BAZIN SP1AU

4.1.3 4.1.4

[0017.2.4] CAMIN GRATAR SP1AU

4.1.5

[0017.2.5] INSTALATII HIDRAULICE STATIE POMPARE SP1AU

4.1.6

[0017.2.6] INSTALATII ELECTRICE SP1AU

4.1.7 4.1.8

[0017.2.7] DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU [0017.2.8] ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

4.1.9

[0017.2.10] BY PASS VARSARE SPIAU

4.1.10

[0017.2.11] By PASS SP1AU L=40 M

4.1.11 4.1.12

[0017.2.12] GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VENTIL AERISIRE 1 [0017.2.13] BAZIN SP2AU

4.1.13

[0017.2.14] CAMIN GRATAR SP2AU

4.1.14

[0017.2.15] INSTALATII HIDRAULICE STATIE POMPARE SP2AU

4.1.15

[0017.2.16] INSTALATII ELECTRICE SP2AU

4.1.16 4.1.17

[0017.2.17] DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU [0017.2.18] ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

4.1.18

[0017.2.20] BY PASS VARSARE SP2AU

4.1.19

[0017.2.21] BY PASS SP2AU L=9 M

4.1.20

[0017.2.22] BAZIN SP3AU

4.1.21

[0017.2.23] CAMIN GRATAR SP3AU

4.1.22

[0017.2.24] INSTALATII HIDRAULICE STATIE POMPARE SP3AU

4.1.23

[0017.2.25] INSTALATII ELECTRICE SP3AU

4.1.24 4.1.25

[0017.2.26] DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MP SP3AU [0017.2.27] ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

4.1.26

[0017.2.29] BY PASS VARSARE SP3AU

4.1.27

[0017.2.30] BY PASS SP3AU L-13 M

4.1.28 4.1.29

[0017.2.31] GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE BUCJ VENTIL AERISIRE I [0017.2.32] BAZIN SP4AU

4.1.30

[0017.2.33] CAMIN GRATAR SP4AU

4.1.31

[0017.2.34] INSTALATII HIDRAULICE STATIE POMPARE SP4AU

LA

2

Pag 10 Page 357 of 556

1

2

3

4.1.32

[0017.2.35] INSTALATII ELECTRICE SP4AU

4.1.33 4.1.34

[0017.2.36] DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MP SP4AU [0017.2.37] ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

4.1.35

[0017.2.39] BY PASS VARSARE SP4AU

4.1.36

[0017.2.40] BY PASS SP4AU L=4 M

LA

4.1.37

[0017.2.41] GOLIRE SI AERISIRE TRAVERSARE SP4AU; BUCr VENTIL AERISIRE

4.1.38

[0017.2.42] CONDUCTA REFULARE-POMPARE SPlAU PEID L = 75 M

PN6 DN 110 KM

4.1.39

[0017.2.43] CONDUCTA REFULARE-POMPARE SP2AU PEID L = 195 M

PN6 DN 110 MM

4.1.40

[0017.2.44] CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

4.1.41

[0017.2.45] CONDUCTA REFULARE-POMPARE SP4AU PEID L - 40 M

CAMIN GOLIRE 2

PN6 DN 110 MM

TOTAL I II. Montaj utilaje si echipamente tehnologice 4.2

Montaj utilaje, echipamente tehnologice si functionale

4.2.1

[0017.2.9] INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

4.2.2

[0017.2.19] INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

4.2.3

[0017.2.28] INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

4.2.4

[0017.2.38] INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

TOTAL II III. Procurare 4.3 4.3.1 4.4 4.5 4.6

Utilaje, echipamente tehnologice si functionale care necesita montaj [0017.2] Lista echipamente Utilaje, echipamente tehnologice si functionale care nu necesita montaj si echipamente de transport Dotari Active necorporale

TOTAL III IV. Probe tehnologice si teste 6.2

Probe tehnologice si teste

TOTAL IV TOTAL VALOARE (exclusiv TVA): TVA 19%: TOTAL VALOARE:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 11 Page 358 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Boura

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F2 - CENTRALIZATORUL cheltuielilor pe categorii de lucrari Obiectul Extindere retea de canalizare în sat Boura Nr. cap./subcap. deviz general

Cheltuieli pe categoria de lucrari

Valoare (exclusiv TVA) lei

1

2

3

I. Lucrari de constructii si instalatii 4.1

Constructii si instalatii

4.1.1

[0017.3.1] RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S74 M SAT BOURA

4.1.2

[0017.3.2] SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

TOTAL I II. Montaj utilaje si echipamente tehnologice 4.2

Montaj utilaje, echipamente tehnologice si functionale

TOTAL II III. Procurare 4.3 4.4 4.5 4.6

Utilaje, echipamente tehnologice si functionale care necesita montaj Utilaje, echipamente tehnologice si functionale care nu necesita montaj si echipamente de transport Dotari Active necorporale

TOTAL III IV. Probe tehnologice si teste 6.2

Probe tehnologice si teste

TOTAL IV TOTAL VALOARE (exclusiv TVA): TVA 19%: TOTAL VALOARE:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 12 Page 359 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Lucrari racordare la energie electrica

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F2 - CENTRALIZATORUL cheltuielilor pe categorii de lucrari Obiectul Lucrari racordare la energie electrica Nr. cap./subcap. deviz general

Cheltuieli pe categoria de lucrari

Valoare (exclusiv TVA) lei

1

2

3

I. Lucrari de constructii si instalatii 4.1

Constructii si instalatii

4.1.1

[0017.4.1] Bransament electric SP1AU

4.1.2

[0017.4.2] Coloana electrica SP1AU

4.1.3

[0017.4.3] Bransament electric SP2AU

4.1.4

[0017.4.4] Coloana electrica SP2AU

4.1.5

[0017.4.5] Bransament electric SP3AU

4.1.6

[0017.4.6] Coloana electrica SP3AU

4.1.7

[0017.4.7] Bransament electric SP4AU

4.1.8

[0017.4.8] Coloana electrica SP4AU

TOTAL I II. Montaj utilaje si echipamente tehnologice 4.2

Montaj utilaje, echipamente tehnologice si functionale

TOTAL II III. Procurare 4.3 4.4 4.5 4.6

Utilaje, echipamente tehnologice si functionale care necesita montaj Utilaje, echipamente tehnologice si functionale care nu necesita montaj si echipamente de transport Dotari Active necorporale

TOTAL III IV. Probe tehnologice si teste 6.2

Probe tehnologice si teste

TOTAL IV TOTAL VALOARE (exclusiv TVA): TVA 19%: TOTAL VALOARE:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 13 Page 360 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC: Beneficiar:

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3378 SAT MANOLEA COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

M

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

ACA15G1

2

TUB DE CANALIZARE GOFRAT ÎMBINAT CU MUFA MONTAT IN PAM.DH 250 MM SN8

3

m

4

5=3x4

3,378.00

material: manopera: utilaj:

2

6270043

TUB CANALIZARE GOFRAT CU MUFA SH8 D.250 MM

M

transport: 3,547.00 material: manopera: utilaj:

3

6607628

Garnitura de etansare ans plan pn6/2,5 D = 250 M 100-500 g2x4 s1733

buc

transport: 563.00 material: manopera: utilaj:

4

ACD04B1

Camin vizitare STAS 2448-73 cu camera lucru hc=2m din tub beton cu cep si buza la canale cu dn 250

buc

transport: 118.00 material: manopera: utilaj:

5

ACD01L1

Capac si rama STAS 2308-81 pentru camine cu piesa suport carosabil IV

buc

transport: 118.00 material: manopera: utilaj: transport:

6

ACD07B1

Elemente la camine STAS cu h>2 m cuprinzind:cos acces din tuburi beton dn 800 l= 2 m cu mufa

m

5.50

material: manopera: utilaj: transport:

7

CZ0209A1

Mortar de var - ciment pentru zidarie marca M 100-T preparat cu ciment M 30, în instalatii centralizate, fara adaos de var;

mc

4.72

material: manopera: utilaj: transport:

8

CZ0204A1

Mortar de var - ciment pentru zidarie marca M 100-Z preparat cu ciment M 30, în instalatii centralizate fara adaos de var;

mc

0.10

material: manopera: utilaj: transport:

Pag 14 Page 361 of 556

STADIUL FIZIC: RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3378

0 9

1 CA01B1

2

Turnarea betonului simplu în fundatii continue, izolate, socluri cu volum peste 3 mc, precum si în ziduri de sprijin

3

mc

M SAT MANOLEA

4

5=3x4

133.40

material: manopera: utilaj:

10

11

12

13

14

15

16

CZ0105B1

TSA07C1

TSA07F1

TSC02B2

TSA24A1

TSF05A1

ACE08A1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 în instalatii necentralizate ; Sapatura manuala de pamant,in spatii limitate,avand peste 1 m latime si maximum 6 m adancime,executata cu sprijiniri,cu evacuare manuala,in fundatii,subsoluri,canale,drenuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-2 m teren tare Sapatura manuala de pamant,in spatii limitate,avand peste 1 m latime si maximum 6 m adancime,executata cu sprijiniri,cu evacuare manuala,in fundatii,subsoluri,canale,drenuri etc...in pamant cu umiditate naturala adancimea sapaturii 2.01-4 m teren tare Sapatura mecanica cu excavator pe pneuri de 0.21-0.39 mc,cu comanda hidraulica,in :...pamant imbibat cu apa descarcare in depozit teren catg 2

mc

Epuizarea mecanica a apelor din sapaturi,in teren cu infiltratii puternice de apa,executate cu:...motopompa de apa 6.6-12 Kw (9-16 CP)

ora

Sprijiniri de maluri,cu dulapi metalici asezati orizontal,la sapaturi executate in spatii limitate,avand latimea de pana la 1.50 m intre maluri ...adancimea sapaturii pana la 4 m interspatii intre dulapi de 0.00-0.20 m Umplutura in sant. la cond. de alim. cu apa si canalizare cu: nisip

mp

transport: 129.00 material: manopera: utilaj: transport:

mc

3,256.00

material: manopera: utilaj: transport: mc

2,149.00

material: manopera: utilaj: transport: 100 mc

16.30

material: manopera: utilaj: transport: 1,014.00 material: manopera: utilaj: transport: 13,566.00 material: manopera: utilaj: transport:

mc

2,195.00

material: manopera: utilaj:

17

3270029

BANDA AVERTIZOARE CONDUCTE CANALIZARE

M

transport: 3,547.00 material: manopera: utilaj:

18

TRA01A30

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

transport: 4,061.00 material: manopera: utilaj: transport:

Pag 15 Page 362 of 556

STADIUL FIZIC: RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3378

0 19

1 TRA06A30

2

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

3

tona

M SAT MANOLEA

4

5=3x4

333.50

material: manopera: utilaj:

20

TSD01C1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

mc

transport: 4,168.00 material: manopera: utilaj:

21

22

TSD04A1

TRI1AA06F1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant necoeziv Incarcarea materialelor, grupa a-usoare in prafuri...prin transport pina la 10m rampa,teren-auto categ

mc

transport: 3,908.00 material: manopera: utilaj: transport:

tona

5,471.00

material: manopera: utilaj:

23

TRI1AA08C1

Descarcarea materialelor,grupa a-grele si marunte prin...aruncare auto-rampa,teren categ.1

tona

transport: 5,471.00 material: manopera: utilaj:

24

TRA01A05P

Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

tona

transport: 10,942.00 material: manopera: utilaj:

25

26

27

28

TSD03A1

TSC02D1

TSD05A1

TRA01A05P

Imprastierea pamantului afanat provenit din teren categoria 1 sau 2 si categoria 3 sau 4,executata cu buldozer pe tractor cu senile de 81-180 CP,in straturi cu grosimea de :...15-20 cm,teren catg. 1 sau 2 Sapatura mecanica cu excavator pe pneuri de 0.21-0.39 mc,cu comanda hidraulica,in :...pamant cu umiditate naturala descarcare auto in teren catg 2

100 mc

Compactarea cu maiul mecanic de 150-200 Kg a umpluturilor in straturi succesive de 20-30 cm grosime,exclusiv udarea fiecarui strat in parte,umpluturile executandu-se din :...pamant necoeziv

100 mc

Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

tona

transport: 16.30 material: manopera: utilaj: transport:

100 mc

22.00

material: manopera: utilaj: transport: 16.30 material: manopera: utilaj: transport: 4,136.00 material: manopera: utilaj:

29

TSD02B1

Imprastierea pamantului afanat provenit din teren categoria 1 sau 2,executata cu buldozer pe tractor cu senile de 65-80 CP,in straturi cu grosimea de:...21-30 cm

100 mc

transport: 29.60 material: manopera: utilaj: transport:

Pag 16 Page 363 of 556

STADIUL FIZIC: RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DM 250 MM SHB L-3378

0 30

1 ACE06A1

2

Sustineri din lemn pentru cabluri si conducte intilnite in sapatura : grele

3

m

M SAT MANOLEA

4

5=3x4

200.00

material: manopera: utilaj:

31

ACE06B1

Sustineri din lemn pentru cabluri si conducte intilnite in sapatura : usoare

m

transport: 400.00 material: manopera: utilaj:

32

ACE16A1

Montarea parapetelor si podetelor metalice de inventar la santuri pentru conducte

m

transport: 7,760.00 material: manopera: utilaj:

33

34

DF27A1

Piloti pentru dirijarea circulatiei rutiere in scopul asigurarii fluentei traficului pe sectoarele de drum cu restrictii de circulatie, impuse de calamitati sau executarea unor lucrari de constructii, reparatii sau intretinerea de drumuri Semnalizarea rutiera pentru asigurarea continuitatii circulatiei in timpul executarii lucrarilor, cu indicatoare metalice

DF24A1

ora

transport: 240.00 material: manopera: utilaj: transport:

ps

100.00

material: manopera: utilaj:

35

TRA04A30

Transport rutier materiale semifabricate cu autoremorchere cu remorci treiler sub 20t pe...dis.30 km.

tona

transport: 36.10 material: manopera: utilaj:

36

ACE17A1

Placa indicatoare montata la camine rezerv. sau alte constructii pentru alimentari cu apa si canaliz.

buc

transport: 118.00 material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL: 1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 17 Page 364 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MANOLEA

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

3

4

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA04D1

TSA04G1

TSF05A1

ACE06B1

2

Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-1,5 m teren foarte tare Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 1,5-3 teren foarte tare Sprijiniri de maluri,cu dulapi metalici asezati orizontal,la sapaturi executate in spatii limitate,avand latimea de pana la 1.50 m intre maluri ...adancimea sapaturii pana la 4 m interspatii intre dulapi de 0.00-0.20 m Sustineri din lemn pentru cabluri si conducte intilnite in sapatura : usoare

3

mc

4

5=3x4

299.40

material: manopera: utilaj: transport: mc

125.20

material: manopera: utilaj: transport: mp

965.00

material: manopera: utilaj: transport: m

40.00

material: manopera: utilaj:

5

ACA15G1

Montare tuburi de presiune din poliestiren armate cu fibra sticla prin infas. in pamant exterioare clad. mf+cep p,d250

m

transport: 238.50 material: manopera: utilaj:

6

6270043

TUB CANALIZARE GOFRAT CU MUFA SH8 D.250 MM

M

transport: 251.00 material: manopera: utilaj:

7

ACB08H1

Montare teava otel pentru conducte imbinare prin sudura el. Dn 300

m

transport: 11.00 material: manopera: utilaj:

8

3113080

Teava pentru constructii fara sudura LC 324 x10 / OLT 35 s 404/2

m

transport: 11.00 material: manopera: utilaj: transport:

Pag 18 Page 365 of 556

STADIUL FIZIC: SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MANOLEA

0 9

1 ACB08K1

2

Montare teava otel pentru conducte imbinare prin sudura el. Dn 500

3

m

4

5=3x4

240.00

material: manopera: utilaj:

10

3314984

CONDUCTA PROTECTIE PENTRU SUBTRAVERSARE 500XSMM

M

transport: 240.00 material: manopera: utilaj:

11

IZL01A

Izolatie usoara (citomare) executata manual ...pe traseu la tevi de otel

mp

transport: 392.00 material: manopera: utilaj:

12

IZL08A

Izolare manuala a conductelor montate in pamant cu...doua straturi de bitum si un rand de hartie tip sulfit tip I

mp

transport: 392.00 material: manopera: utilaj:

13

14

IZI05F1

TRB01C15

Protectia termoizolatiei la conducte, executata cu ...folie din aluminiu de 0,05 mm grosime pe suport de folie de aluminiu de 0,04 mm grosime ondulata, legata cu sârma din otel moale zincata 0 0,8 mm grosime Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 50m

mp

transport: 12.50 material: manopera: utilaj: transport:

tona

1,190.00

material: manopera: utilaj:

15

TRA01A05P

Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

tona

transport: 187.00 material: manopera: utilaj:

16

TRA01A30

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

transport: 111.00 material: manopera: utilaj:

17

TRA04A30

Transport rutier materiale semifabricate cu autoremorchere cu remorci treiler sub 20t pe...dis.30 km.

tona

transport: 30.00 material: manopera: utilaj:

18

ACE16A1

Montarea parapetelor si podetelor metalice de inventar la santuri pentru conducte

m

transport: 500.00 material: manopera: utilaj:

19

DF27A1

Piloti pentru dirijarea circulatiei rutiere in scopul asigurarii fluentei traficului pe sectoarele de drum cu restrictii de circulatie, impuse de calamitati sau executarea unor lucrari de constructii, reparatii sau intretinerea de drumuri

ora

transport: 200.00 material: manopera: utilaj: transport:

Pag 19 Page 366 of 556

STADIUL FIZIC: SUBTRAVERSARE DRIJM IN SAPATURA DESCHISA L-249,5 M SAT MANOLEA

0 20

1 DF24A1

2

Semnalizarea rutiera pentru asigurarea continuitatii circulatiei in timpul executarii lucrarilor, cu indicatoare metalice

3

ps

4

5=3x4

50.00

material: manopera: utilaj:

21

TSD01D1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren foarte tare

mc

transport: 425.00 material: manopera: utilaj:

22

TSD04B1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

mc

transport: 425.00 material: manopera: utilaj: transport:

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 20 Page 367 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

BAZIN SP1AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

3

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA21B1

TSA21E1

TRI1AA01C1

2

Sapatura manuala de pamant,executata in cheson deschis,de pana la 18 m adancime,cu evacuarea pamantului cu macara Pionier...in pamant cu umiditate naturala adancimea sapaturii 2-6 m,teren tare Sapatura manuala de pamant,executata in cheson deschis,de pana la 18 m adancime,cu evacuarea pamantului cu macara Pionier...in pamant cu umiditate naturala adancimea sapaturii 6.01-10 m,teren tare Incarcarea materialelor, grupa a-grele si...marunte,prin aruncare rampa sau teren-auto categ.1

3

mc

4

5=3x4

75.40

material: manopera: utilaj: transport: mc

20.10

material: manopera: utilaj: transport: tona

172.00

material: manopera: utilaj: transport:

4

5

TSD04B1

TRA01A05P

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

mc

2.50

material: manopera: utilaj: transport: tona

172.00

material: manopera: utilaj: transport:

6

ACE08E1

Umplutura in sant la cond. de alim. cu apa si canalizare cu balast

mc

2.50

material: manopera: utilaj: transport:

7

TSD01B1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren mijlociu

mc

2.50

material: manopera: utilaj: transport:

8

TRA01A30

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

4.00

material: manopera: utilaj: transport:

Pag 21 Page 368 of 556

STADIUL FIZIC: BAZIN SP1AU

0 9

1 TSA25B1

2

Epuizarea mecanica a apei din sapaturi,in terenuri nisipoase cu:...instalatie de filtre aciculare cu motor Diesel de 37 CP

3

ora

4

5=3x4

240.00

material: manopera: utilaj: transport:

10

11

TSD04D1

CA01B1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...20 cm grosime pamant coeziv Turnarea betonului simplu în fundatii continue, izolate, socluri cu volum peste 3 mc, precum si în ziduri de sprijin

mc

2.50

material: manopera: utilaj: transport: mc

2.50

material: manopera: utilaj: transport:

12

13

14

15

16

17

18

CZ0105A1

CB03A1

CC02B1

CZ0301B1

CA02E1

CZ0107A1

CB41B1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Cofraje pentru beton armat în pereti drepti si diafragme, din panouri refolosibile, cu astereala din scânduri de rasinoase scurte si subscurte inclusiv sprijinirile la constructii având înaltimea pâna la 20 m inclusiv, cu planseu din beton monolit Montarea armaturilor din otel-beton în elemente de constructii, exclusiv cele din constructiile executate în cofraje glisante la constructii executate la o înaltime pâna la 35 m inclusiv, din bare fasonate având diametrul de 10 si 12 mm, în pereti si diafragme cu distantier din plastic Confectionarea armaturilor din otel beton pentru beton armat în fundatii fasonarea barelor pentru fundatii izolate (inclusiv fundatii pahar) continui si radiere, în ateliere centralizate OB 37, D= 10-16 mm ;

mc

Turnarea betonului armat in elementele constructiilor, exclusiv cele executate in cofraje glisante în rezervoare sau bazine subterane

mc

Beton marca B 250, cu agregate grele, sortate cu granulatia pâna la 16 mm, pentru executarea prin glisare a unor constructii înalte cu sectiune variabila (cosuri de fabrica, turnuri de racire, castele de apa etc), preparat cu ciment Pa 35 în instalatii necentralizate, la constructii cu înaltimea pâna la 50 m inclusiv; Sustineri din elemente de schela metalica, tubulara pentru cofrajele planseelor pentru cofraje amplasate la parter, cu înaltimea sustinerilor intre 3 si 6 m inclusiv

mc

2.50

material: manopera: utilaj: transport: mp

204.00

material: manopera: utilaj: transport: kg

4,079.00

material: manopera: utilaj: transport: kg

4,202.00

material: manopera: utilaj: transport: 57.30 material: manopera: utilaj: transport: 58.69 material: manopera: utilaj: transport:

mp

60.00

material: manopera: utilaj: transport:

Pag 22 Page 369 of 556

STADIUL FIZIC: BAZIN SP1AU

0 19

20

20.L 21

1 CB47C1

CL21A1

6309886 CL20B1

2

3

4

Schela metalica tubulara lucrari de finisaje la tavane si lucrari de monolitizari a prefabricatelor de beton armat, amplasate la înaltimi pâna la 7 m inclusiv;

mp

Confectii metalice diverse înglobate total sau partial in beton din profile laminate, tabla, tabla striata, otel beton, tevi pentru sustineri sau acoperiri

kg

Confectie metalice inglobate in beton Confectii metalice diverse, montate aparent balustrazi grile, chepeng, opritori, gratare

kg

transport: 263.00

kg

100.00

5=3x4

60.00

material: manopera: utilaj: transport: 263.00 material: manopera: utilaj:

material: manopera: utilaj:

21.L 22

6306274 CF12A1

Grilaj pentru scari,balcoane ornam.simpl. otel profil. Tencuieli speciale de protectie impermeabile, la cuve, bazine, rezervoare, castele de apa etc, la care presiunea apei nu depaseste 2 daN/cm2

kg

Curatarea de rugina cu peria de sârma a confectiilor si constructiilor metalice executate din profile cu grosimi între 8 mm si 12 mm inclusiv

tona

Vopsirea confectiilor si constructiilor metalice cu un strat de vopsea de din profile, cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

Vopsire confectiilor si constructiilor metalice cu vopsea de ulei in doua straturi, executate din profile cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

Transport utilaj...10km-65123003-automacara 0,045-0,059mn,h. max. 6,5m,des. max. 5,5m,moment max. 15tfm

buc

Ora pr. automacara cu brat zabrele 4,5-5,8 tf 2 schimburi

ora

transport: 100.00

mp

58.80

material: manopera: utilaj: transport:

23

IZD02A

1.00

material: manopera: utilaj: transport:

24

IZD03A

1.00

material: manopera: utilaj: transport:

25

IZD04A

1.00

material: manopera: utilaj: transport:

26

27

MDTC4641010

AUT1233

2.00

material: manopera: utilaj: transport: 150.00 material: manopera: utilaj:

28

29

TSA24C1

MDTC5506010

Epuizarea mecanica a apelor din sapaturi,in teren cu infiltratii puternice de apa,executate cu:...motopompa de apa de joasa presiune montata pe tractor U650,debit 200-500 Mc/h

ora

Transport utilaj...10 km 90100011 schela metalica tubulara de exterior cu s=640mp g=11-13,5t

buc

transport: 100.00 material: manopera: utilaj: transport: 1.00

material: manopera: utilaj: transport: Pag 23

Page 370 of 556

STADIUL FIZIC: BAZIN SP1AU

0 30

1 TRA06A30

2

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

3

tona

4

5=3x4

153.00

material: manopera: utilaj: transport:

31

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

4.20

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 24 Page 371 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

CAMIN GRATAR SP1AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA06A1

TSE01B1

2

Sapatura manuala de pamant,de la 2 m la 6 m adancime,in spatii limitate,peste 1 m latime,executata cu taluz inclinat,fara sprijiniri,pamantul fiind evacuat cu macara Pioner,la fundatii,subsoluri,canale etc....in pamant cu umiditate naturala teren mijlociu Nivelarea manuala a terenurilor si platformelor,cu denivelari de 10-20 cm,in:...teren mijlociu

3

mc

4

5=3x4

15.70

material: manopera: utilaj: transport: 100 mp

0.18

material: manopera: utilaj: transport:

3

4

TSD04B1

TRB01C13

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 30m

mc

0.35

material: manopera: utilaj: transport: tona

8.16

material: manopera: utilaj: transport:

5

CA01B1

Turnarea betonului simplu în fundatii continue, izolate, socluri cu volum peste 3 mc, precum si în ziduri de sprijin

mc

0.35

material: manopera: utilaj: transport:

6

7

8

CZ0105A1

CB03A1

CC02B1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Cofraje pentru beton armat în pereti drepti si diafragme, din panouri refolosibile, cu astereala din scânduri de rasinoase scurte si subscurte inclusiv sprijinirile la constructii având înaltimea pâna la 20 m inclusiv, cu planseu din beton monolit Montarea armaturilor din otel-beton în elemente de constructii, exclusiv cele din constructiile executate în cofraje glisante la constructii executate la o înaltime pâna la 35 m inclusiv, din bare fasonate având diametrul de 10 si 12 mm, în pereti si diafragme cu distantier din plastic

mc

0.35

material: manopera: utilaj: transport: mp

19.40

material: manopera: utilaj: transport: kg

445.00

material: manopera: utilaj: transport:

Pag 25 Page 372 of 556

STADIUL FIZIC: CAMIN GRATAR SP1AU

0 9

10

1 CZ0301B1

CA02E1

2

Confectionarea armaturilor din otel beton pentru beton armat în fundatii fasonarea barelor pentru fundatii izolate (inclusiv fundatii pahar) continui si radiere, în ateliere centralizate OB 37, D= 10-16 mm ;

kg

Turnarea betonului armat in elementele constructiilor, exclusiv cele executate in cofraje glisante în rezervoare sau bazine subterane

mc

Beton marca B 250, cu agregate grele, sortate cu granulatia pâna la 16 mm, pentru executarea prin glisare a unor constructii înalte cu sectiune variabila (cosuri de fabrica, turnuri de racire, castele de apa etc), preparat cu ciment Pa 35 în instalatii necentralizate, la constructii cu înaltimea pâna la 50 m inclusiv; Sustineri din elemente de schela metalica, tubulara pentru cofrajele planseelor pentru cofraje amplasate la parter, cu înaltimea sustinerilor intre 3 si 6 m inclusiv

mc

Confectii metalice diverse înglobate total sau partial in beton din profile laminate, tabla, tabla striata, otel beton, tevi pentru sustineri sau acoperiri

kg

Confectie metalice inglobate in beton Confectii metalice diverse, montate aparent balustrazi grile, chepeng, opritori, gratare

kg

3

4

5=3x4

458.00

material: manopera: utilaj: transport: 2.60

material: manopera: utilaj: transport:

11

12

13

13.L 14

CZ0107A1

CB41B1

CL21A1

6309886 CL20B1

2.62

material: manopera: utilaj: transport:

mp

3.00

material: manopera: utilaj: transport: 16.00 material: manopera: utilaj: transport: 16.00

kg

125.00

material: manopera: utilaj:

14.L 15

6306274 CF12A1

Grilaj pentru scari,balcoane ornam.simpl. otel profil. Tencuieli speciale de protectie impermeabile, la cuve, bazine, rezervoare, castele de apa etc, la care presiunea apei nu depaseste 2 daN/cm2

kg

Curatarea de rugina cu peria de sârma a confectiilor si constructiilor metalice executate din profile cu grosimi între 8 mm si 12 mm inclusiv

tona

Vopsirea confectiilor si constructiilor metalice cu un strat de vopsea de din profile, cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

Vopsire confectiilor si constructiilor metalice cu vopsea de ulei in doua straturi, executate din profile cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

transport: 125.00

mp

10.00

material: manopera: utilaj: transport:

16

IZD02A

0.15

material: manopera: utilaj: transport:

17

IZD03A

0.15

material: manopera: utilaj: transport:

18

IZD04A

0.15

material: manopera: utilaj: transport:

Pag 26 Page 373 of 556

STADIUL FIZIC: CAMIN GRATAR SP1AU

0 19

1 TRA06A30

2

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

3

tona

4

5=3x4

7.50

material: manopera: utilaj: transport:

20

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

0.60

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 27 Page 374 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

INSTALATII HIDRAULICE STATIE POMPARE SP1AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

SA26C1

2

RACORD COMPRESIE TIP FE 90x2'

3

buc

4

5=3x4

1.00

material: manopera: utilaj: transport: 1.L 2

20020519 ACA15D1

Racord <waterkit> compres.d. 90x2 fe MONTARE CONDUCTA PEHD PE8O, PN6

1.00

buc m

5.75

material: manopera: utilaj: transport: 3

6702001

CONDUCTA PEHD PE80 PN6 DN 63 MM

M

0.50

material: manopera: utilaj: transport: 4

6701128

Teava HDPE 80 312uni7611.7615 pn6 DN 90x5.1 cod 64000091

m

5.25

material: manopera: utilaj: transport:

5

SA35D1

TEU COMPRESIUNE EGAL DE 90 MM

buc

1.00

material: manopera: utilaj: transport: 6

4105548

TEU COMPRESIUNE EGAL DE 90 MM

BUC

1.00

material: manopera: utilaj: transport: 7

SA26D1

MUFA REDUSA DE COMPRESIUNE De 110/90

buc

1.00

material: manopera: utilaj: transport:

8

4105158

MUFA REDUSA DE COMPRESIUNE De 110/90

BUC

1.00

material: manopera: utilaj: transport:

Pag 28 Page 375 of 556

STADIUL FIZIC: INSTALATII HIDRAULICE STATIE POMPARE SP1AU

0 9

1 SA26C1

2

MUFA REDUSA COMPRESIUNE De 90/63

3

buc

4

5=3x4

1.00

material: manopera: utilaj: transport: 10

4105159

MUFA REDUSA COMPRESIUNE De 90/63

BUC

1.00

material: manopera: utilaj: transport: 11

SD30C1

COT COMPRESIUNE LA 90 GR TIP FI 63 X 1 1/2 TOLI DN 1 1/2 TOL

buc

1.00

material: manopera: utilaj: transport:

12

4105160

COT COMPRESIUNE LA 90 GR TIP FI 63 X 1 1/2 TOLI DN 1 1/2 TOL

BUC

1.00

material: manopera: utilaj: transport:

13

SF07A1

Capac sau gratar cu rama din fonta pentru camine de vizitare,gura scurgere...capac tip 1 necaros. 45kg

buc

1.00

material: manopera: utilaj: transport:

14

ACD01L1

Capac si rama STAS 2308-81 pentru camine cu piesa suport carosabil IV

buc

2.00

material: manopera: utilaj: transport:

15

SD14D1

Robinet trecere cu ventil si mufe (cu descarcare) pentru tevi din otel cu...d=1 1/2

buc

1.00

material: manopera: utilaj: transport:

15.L 16

4202503 ACA10A1

Robinet trec. fonta 1 1/2 A vent+mufa pn10 s6480 RACORD FURTUN

1.00

buc m

1.00

material: manopera: utilaj: 17

SA43K1

COLIER DE FIXARE CU DIBLU SI FURTUN DIAMETRU BRATARA 4 TOLI

buc

transport: 10.00 material: manopera: utilaj: transport:

18

IZB04A2

Protectia anticoroziva a strapungerilor (la conducte, sifoane etc.) cu folie tip , într-un strat, lipita cu adeziv Prenadez, montare ;

buc

2.00

material: manopera: utilaj:

19

ACD02A1

Trepte din otel beton d=20 mm pentru camine din tuburi beton la retele de conducte

buc

transport: 48.00 material: manopera: utilaj: transport: Pag 29

Page 376 of 556

STADIUL FIZIC: INSTALATII HIDRAULICE STATIE POMPARE SP1AU

0 20

1 5842738

2

Piulita hexagonala semiprecise M 12 gr. 5 s 4071

3

buc

4

5=3x4

16.00

material: manopera: utilaj:

21

5881265

Saiba gros.plata pentru metale M 12, OL 34, s 1388

buc

transport: 16.00 material: manopera: utilaj: transport:

22

5881270

BUC

DIBLU CONEXPOND M12-150

8.00

material: manopera: utilaj: transport: 24

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

5.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 30 Page 377 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

INSTALATII ELECTRICE SP1AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

ATD29D

2

Suporti, stelaje, constructii metalice confectionate pe santier pentru aparate,elem. automat,sust. cablu,cond.

3

kg

4

5=3x4

30.00

material: manopera: utilaj:

1.L 2

3500130 CK26C1

Cornier aripi eg.lam cald s 424 25x 25x 3 OL 37-1n Dibluri din lemn si bolturi împuscate bolturi metalice impuscate in plansee sau pereti din beton armat

kg

transport: 30.00

buc

10.00

material: manopera: utilaj:

3

CK26C1

buc

BOLTURI METALICE

transport: 10.00 material: manopera: utilaj:

4

4.L 5

6

EA12A1

7356549 EA06A1

EA16A1

Tub metalic, flexibil, de protectie, neetans cu spirale cu 2 renuri, de forma unui patrulater, tip SPD, având diametrul de 13,5-23mm

m

Tub metalic flex.prot.neetans tip spd-roman D = 23 mm Teava din otel, neagra, pentru instalatii, sudata longitudinal, montata îngropat sau aparent, în mediul normal, având diametrul interior de 1/2 toli montata îngropat în pardoseala

m

Doza de derivatie, pentru cabluri sau tevi de instalatii, montata în mediu exploziv, avînd diametrul de 1/2" - 1 1/4"

buc

transport: 10.00 material: manopera: utilaj: transport: 10.25

m

10.00

material: manopera: utilaj: transport: 5.00

material: manopera: utilaj: transport:

7

8

EA17B1

EB08B1

Doza de ramificatie si tragere, de tip rotund sau patrat, pentru instalatiile de antena colectiva R + TV si ramificatia circuitelor instalatiilor electrice, inglobate in beton tip patrat, RIPS, marimea 29

buc

Conducta de otel, pentru legarea la pamînt sau la nul, a receptoarelor sau aparatelor electrice, montata pe zid de caramida sau beton, conducta fiind banda de otel, laminate la cald, de 25x4 mm

m

4.00

material: manopera: utilaj: transport: 8.00

material: manopera: utilaj: transport: Pag 31

Page 378 of 556

STADIUL FIZIC: INSTALATII ELECTRICE SP1AU

0 9

10

10.L 11

11.L 12

12.L 13

13.L 14

1 EB15A1

EC03A1

4802573 EC03A1

4802597 EC03A1

4803072 EC03A1

4803022 EC10A1

2

3

4

Numere si etichete, pentru bransamente, coloane electrice, circuite telefonice sau cabluri electrice numere pentru bransamente sau coloane electrice

buc

Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

Cablu energie cyabzy 0,6/ 1 KV 3x 1,5 U s 8778 Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

20.60

m

15.00

5=3x4

10.00

material: manopera: utilaj: transport: 20.00 material: manopera: utilaj: transport:

material: manopera: utilaj: transport:

Cablu energie cyabzy 0,6/ 1 KV 3x 2,5 U s 8778 Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

15.45

m

20.00

Cablu energie cyaby 0,6/ 1 KV 4x 16 M s 8778 Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

20.60

m

24.00

Cablu energie cyabzy 0,6/ 1 KV 4x 6 U s 8778 Scoaterea învelisului de iuta de pe cabluri cu sectiunea conductorului de pana la 35 mmp

m

material: manopera: utilaj: transport:

material: manopera: utilaj: transport: 24.72

m

4.00

material: manopera: utilaj: transport:

15

EC19A1

Presetupa pentru fixarea cablurilorla electromotoare, tablouri sau aparate, având diametrul pana la 16 mm,

buc

6.00

material: manopera: utilaj: transport:

15.L 16

5217464 ED03I1

Presetupa pentru fixare cabluri latablouri,aparate D = 11 Comutator unipolar pentru scara (cruce de capat) constructie etansa în carcasa metalica, montat aparent pe dibluri de lemn

buc

Comutator cumpana st.simbol 0176 10 A ;250 v Corp de iluminat, pentru lampi fluorescente tubulare etans, montat pe dibluri de lemn

buc

6.00

buc

1.00

material: manopera: utilaj: transport:

16.L 17

5520366 EE12F1

1.00

buc

1.00

material: manopera: utilaj: transport: Pag 32

Page 379 of 556

STADIUL FIZIC: INSTALATII ELECTRICE SP1AU

0 17.L 18

1 5103687 ED07A1

2

3

4

Corp il.fl.fipra-01 240 220 V 2x 40w reflect+balast Contactor automat de 10 sau 25 A, racordat la conducte de aluminiu sau de cupru, exclusiv racordarea, montat pe dibluri de lemn

buc

1.00

buc

1.00

Contactor electromagn.cu releecaps.simb.3207 10a;500 V Tablou electric, format panou, dulap, celula sau pupitru, având greutatea pîna la 150 kg

buc

5=3x4

material: manopera: utilaj: transport:

18.L 19

5529570 EF03A1

1.00

buc

1.00

material: manopera: utilaj:

20

21

EF09A1

EF08B1

Racordarea conductelor din cupru, la borne (aparate, motoare, tablouri electrice), conducta având sectiunea de pîna la 10 mmp (exclusiv)

buc

Racordarea conductelor din aluminiu, la borne (aparate, motoare, tablouri electrice), conducta având sectiunea de 10 sau 16 mmp

buc

Cutie cu eclisa de legatura, pentru centura de împamîntare

buc

transport: 10.00 material: manopera: utilaj: transport: 30.00 material: manopera: utilaj: transport:

22

EG10A1

2.00

material: manopera: utilaj:

23

EH01A1

Încercarea cablurilor de energie electrica, de maximum 1 kV

buc

transport: 10.00 material: manopera: utilaj: transport:

24

25

EH05A1

W1P08A

Încercarea tablourilor de distributie, de comanda de protectie, de semnalizare, a pupitrelor de comanda si a cutiilor metalice cu cleme tablouri de marmura cu peste 6 circuite

buc

Verificarea prizelor de pamant pentru lucrari de instalatii electrice la...constructii

buc

1.00

material: manopera: utilaj: transport: 1.00

material: manopera: utilaj:

26

W1R06A1

Electrod din teava de otel de doi toli si jumatatepentru legarea la pamant in teren...normal

m

transport: 18.00 material: manopera: utilaj: transport:

27

EG09B1

Protectie pentru conducta de coborîre, pe lungime de 1,80 m, executata din otel cornier cu aripi egale, având dimensiunile 30 X 30 X 4 mm

buc

2.00

material: manopera: utilaj: transport:

Pag 33 Page 380 of 556

STADIUL FIZIC: INSTALATII ELECTRICE SP1AU

0 28

1 ATA01A

2

Montarea aparatelor in panouri,dulapuri,cutii,aparent sau ingropat cu greutatea:pina la 1 kg

3

buc

4

5=3x4

10.00

material: manopera: utilaj: transport:

29

W2E12A01

FIRIDA DE BRANSAMENT SI MASURA MONOFAZICA BPM

buc

1.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 34 Page 381 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSG02A1

2

Curatarea terenului...de iarba si buruieni

100 mp

3

4

5=3x4

0.64

material: manopera: utilaj:

2

3

TSA01C1

TRB01A12

Sapatura manuala de pamant in spatii inchise la deblee,in canale deschise,in gropi de imprumut la indepartarea stratului vegetal de 10-30 cm grosime etc....in spatii intinse in pamant cu umiditate natuala aruncarea in depozit sau vehicul la H<0.6 m teren tare Transportul materialelor cu roaba pe pneuri inc asezare desc asezare grupa...1-3 distanta 20m

mc

transport: 19.20 material: manopera: utilaj: transport:

tona

28.70

material: manopera: utilaj:

4

TRA01A05P

Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

tona

transport: 28.70 material: manopera: utilaj:

5

TSH32D1

Amenajari de alei de parc si terenuri de joc pentru copii ...cu imbracaminte din piatra de 8-16 mm in strat de 5 cm

mp

transport: 51.06 material: manopera: utilaj:

6

TSH32A1

Amenajari de alei de parc si terenuri de joc pentru copii ...cu imbracaminte de balast de 10 cm grosime

mp

transport: 18.00 material: manopera: utilaj: transport:

7

CA01A1

Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

mc

3.30

material: manopera: utilaj: transport:

8

2100945

Beton de ciment

B 150 stas 3622

mc

3.30

material: manopera: utilaj: transport:

Pag 35 Page 382 of 556

STADIUL FIZIC: DRUM ACCES+SISTEMATIZARE VERTICALA L =9 M S=64 MP LA SP1AU

0 9

1 TRA06A30

2

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

3

4

tona

5=3x4

8.23

material: manopera: utilaj:

10

TSH26A1

Plantari pentru gard viu...arbusti foiosi,pe un rind

m

transport: 32.00 material: manopera: utilaj:

10.L 11

7202920 TSD01C1

Puiet arbust.foios.amorpha lfruticosa cal.1 H = 100cm Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

buc

transport: 114.05

mc

21.00

material: manopera: utilaj: transport:

12

13

TSD05A1

TRA01A30

Compactarea cu maiul mecanic de 150-200 Kg a umpluturilor in straturi succesive de 20-30 cm grosime,exclusiv udarea fiecarui strat in parte,umpluturile executandu-se din :...pamant necoeziv

100 mc

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

0.30

material: manopera: utilaj: transport: 3.40

material: manopera: utilaj: transport:

14

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

0.35

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 36 Page 383 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA02F1

TRB01C12

2

Sapatura manuala de pamant in spatii limitate,avand sub 1.00 m sau peste 1.00 m latime,executata fara sprijini,cu taluz vertical,la fundatii,canale,subsoluri,drenuri,trepte de infratire etc....in pamant coeziv mijlociu sau foarte coeziv adancime <1.5 m teren tare Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 20m

3

mc

4

5=3x4

12.80

material: manopera: utilaj: transport: tona

21.80

material: manopera: utilaj:

3

TSD01C1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

mc

transport: 12.80 material: manopera: utilaj:

4

5

TSD04D1

CA01A1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...20 cm grosime pamant coeziv Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

mc

transport: 12.80 material: manopera: utilaj: transport:

mc

14.90

material: manopera: utilaj:

6

2100945

Beton de ciment

B 150 stas 3622

mc

transport: 14.96 material: manopera: utilaj:

7

8

CO07B1

TRA06A30

Împrejmuiri din sârma, fixata pe stâlpi metalici cu panouri de gard din rama de otel rotund 0 16, mm si împletitura din sârma de otel zincata D= 2 mm cu ochiuri patrate de 16x16 mm, cu înaltimea la coama de 2,05 m Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

m

transport: 32.00 material: manopera: utilaj: transport:

tona

37.40

material: manopera: utilaj: transport:

Pag 37 Page 384 of 556

STADIUL FIZIC: ÎMPREJMUIRE STATIE SPIAU L= 32 M S=64 MP

0 9

1 TRA02A30

2

3

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

4

5=3x4

5.00

material: manopera: utilaj:

10

CP22C1

Sudarea pe contur a placilor de otel suprapuse 11-15mm inclusiv

m

transport: 64.00 material: manopera: utilaj: transport:

11

6101052

RAMA POARTA MICA 1220 X 2320 MM

BUC

1.00

material: manopera: utilaj: transport: 12

IZD04B

Vopsire confectiilor si constructiilor metalice cu vopsea de ulei in doua straturi, executate din profile cu grosimi peste 12 mm, cu pensula de mana

tona

0.20

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 38 Page 385 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

M1B13A1

2

Montarea...electropompei submersibile

3

m

4

5=3x4

20.00

material: manopera: utilaj: transport: 2

M7D07A1

Blindaje la galerii orizontale cu grosimea tolei...pina la 12 mm

tona

0.20

material: manopera: utilaj: transport:

3

M7C03A1

Revizia agregatelor rotative...polietajate cu greut 0,50-8 t

tona

0.50

material: manopera: utilaj: transport:

4

M7C04A1

Forte de munca pentru proba de punere in funct a agregrotative cu el mot cu putere...p la 100 kw

buc

1.00

material: manopera: utilaj:

5

M7C06A1

Energie electrica pentru...proba de punere in funct. a agreg. rotative cu motoare pina la 100 kw

kw

transport: 15.00 material: manopera: utilaj: transport:

6

M7G01A1

Forte de munca pentru probe la term....montaj. Instalatie anexe de ulei,pacura sau apa de racire

buc

1.00

material: manopera: utilaj:

7

M7G02A1

Energie electrica pentru probe la term. montaj. Instalatie anexe de...ulei,pacura sau apa de racire

kw

transport: 15.00 material: manopera: utilaj: transport:

8

IZD05B

Grunduirea manuala cu un strat de vopsea de miniu plumb a utilajelor tehnologice si a constructiilor metalice aferente acestora (suporti, sustineri, tiranti, console, platforme) la constructii metalice aferente utilajelor tehnologice

tona

1.00

material: manopera: utilaj: transport:

Pag 39 Page 386 of 556

STADIUL FIZIC: INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP1AU

0 9

1 IZK08D

2

Vopsirea cu vopsea pe baza de ulei în doua straturi a...conductelor cu Dn pâna la 400 mm

3

tona

4

5=3x4

1.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 40 Page 387 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

BY PASS VARSARE SPIAU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA02E1

CA01A1

2

Sapatura manuala de pamant in spatii limitate,avand sub 1.00 m sau peste 1.00 m latime,executata fara sprijini,cu taluz vertical,la fundatii,canale,subsoluri,drenuri,trepte de infratire etc....in pamant coeziv mijlociu sau foarte coeziv adancime <1.5 m teren mijlociu Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

3

mc

4

5=3x4

13.53

material: manopera: utilaj: transport:

mc

11.70

material: manopera: utilaj:

3

4

5

CZ0105A1

IFB10A1

IFB07B1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Filtru invers din straturi succesive din nisip si pietris sau piatra sparta , in grosime dupa compactare de :...30 cm cu nisip si pietris

mc

Pereu zidit din piatra bruta, in grosime de: 20 cm;

mp

transport: 11.70 material: manopera: utilaj: transport:

mp

15.00

material: manopera: utilaj: transport: 15.00 material: manopera: utilaj:

5.L 6

7

2201335 CZ0204B1

TSD01B1

Piatra bruta sortata r.magmatice pentru drum,anroc,pereuri Mortar de var - ciment pentru zidarie marca M 100-Z preparat cu ciment M 30, în instalatii centralizate cu adaos de var pasta ;

kg

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren mijlociu

mc

transport: 4,725.00

mc

1.05

material: manopera: utilaj: transport: 13.53 material: manopera: utilaj: transport:

Pag 41 Page 388 of 556

STADIUL FIZIC: BY PASS VARSARE SPIAU

0 8

1 TRA01A30

2

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

3

tona

4

5=3x4

7.65

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 42 Page 389 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

By PASS SP1AU L=40 M

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

3

4

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA04C1

TSA04F1

TSA14C1

TRB01C15

2

Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-1,5 m teren tare Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 1,5-3 m teren tare. Sapatura manuala de pamant,de pana la 6 m adancime,in gropi cu sectiunea poligonala sau circulara,avand latimea sau diametrul cercului de 1.50-6 m,executata cu sprijiniri,cu evacuare manuala,la fundatii,puturi,rezervoare etc...in pamant cu umiditate naturala adancimea sapaturii 0-2 m teren tare Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 50m

3

mc

4

5=3x4

48.00

material: manopera: utilaj: transport: mc

16.00

material: manopera: utilaj: transport: mc

2.00

material: manopera: utilaj: transport:

tona

24.70

material: manopera: utilaj:

5

TSD01C1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

mc

transport: 66.00 material: manopera: utilaj:

6

7

TSD04B1

TSF05B1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv Sprijiniri de maluri,cu dulapi metalici asezati orizontal,la sapaturi executate in spatii limitate,avand latimea de pana la 1.50 m intre maluri ...adancimea sapaturii pana la 4 m interspatii intre dulapi de 0.21-0.60 m

mc

transport: 66.00 material: manopera: utilaj: transport:

mp

165.00

material: manopera: utilaj: transport:

Pag 43 Page 390 of 556

STADIUL FIZIC: By PASS SP1AU L=40 M

0 8

1 ACE16A1

2

Montarea parapetelor si podetelor metalice de inventar la santuri pentru conducte

3

m

4

5=3x4

80.00

material: manopera: utilaj:

9

ACE08A1

Umplutura in sant. la cond. de alim. cu apa si canalizare cu: nisip

mc

transport: 14.80 material: manopera: utilaj:

10

TRA01A30

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

transport: 27.40 material: manopera: utilaj: transport:

11

ACD01L1

Capac si rama STAS 2308-81 pentru camine cu piesa suport carosabil IV

buc

1.00

material: manopera: utilaj: transport:

12

ACD08H1

Camin vane beton mon. sect. circ. pr. tip 1785-2 Di=1,25 m. h 2,0 fara apa subterana carosabil

buc

1.00

material: manopera: utilaj: transport:

13

ACB08G1

Montare teava otel pentru conducte imbinare prin sudura el. Dn 250

m

1.50

material: manopera: utilaj: transport:

13.L 14

3112646 ACA15G1

Teava pentru constructii fara sudura LC 250 x10 / OLT 35 s 404/2 Montare tuburi de presiune din poliestiren armate cu fibra sticla prin infas. in pamant exterioare clad. mf+cep p,d250

1.51

m m

40.00

material: manopera: utilaj:

15

6270043

TUB CANALIZARE GOFRAT CU MUFA SH8 D.250 MM

M

transport: 42.00 material: manopera: utilaj: transport:

16

6607628

Garnitura de etansare ans plan pn6/2,5 D = 250 M 100-500 g2x4 s1733

buc

7.00

material: manopera: utilaj:

17

3270029

BANDA AVERTIZOARE CONDUCTE CANALIZARE

M

transport: 42.00 material: manopera: utilaj: transport:

18

IZL01A

Izolatie usoara (citomare) executata manual ...pe traseu la tevi de otel

mp

2.40

material: manopera: utilaj: transport: Pag 44

Page 391 of 556

STADIUL FIZIC: By PASS SP1AU L=40 M

0 19

1 IZL08A

2

Izolare manuala a conductelor montate in pamant cu...doua straturi de bitum si un rand de hartie tip sulfit tip I

3

mp

4

5=3x4

2.40

material: manopera: utilaj: transport:

20

ACE09H1

Montarea armaturilor cu actionare manuala sau mecanica (robinet vane ventile clap. compens. etc. )dn: 250

buc

1.00

material: manopera: utilaj: transport:

20.L 21

4502496 ACB10G1

Robinet sp t.ol i.al ets.in.bz des.3104.0 pn4 DN 250 Flansa din otel rotunda montata prin sudura electr. avand dn = 250

buc

1.00

buc

2.00

material: manopera: utilaj: transport:

21.L 22

4401537 ACB12G1

Flansa plata pn 6 250- 273 OL 37-2 et pu s 8012 Imbinare prin sudura electr. piese legatura executata la pozitie avand dn 250

2.00

buc buc

2.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 45 Page 392 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VENTIL AERISIRE 1

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA04C1

ACD08H1

2

Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-1,5 m teren tare Camin vane beton mon. sect. circ. pr. tip 1785-2 Di=1,25 m. h 2,0 fara apa subterana carosabil

3

4

mc

5=3x4

5.00

material: manopera: utilaj: transport: buc

2.00

material: manopera: utilaj: transport:

3

ACB08A1

Montare teava otel pentru conducte imbinare prin sudura el. Dn 50

m

1.00

material: manopera: utilaj: transport:

3.L 4

3108229 ACB08C1

Teava pentru constructii fara sudura LC 57 x 3 / OLT 35 s 404/2 Montare teava otel pentru conducte imbinare prin sudura el. Dn 100

1.01

m m

2.00

material: manopera: utilaj: transport:

4.L 5

3110117 ACB05A1

Teava pentru constructii fara sudura LC 108 x 6 / OLT 35 s 404/2 Imbinare cu flanse piese leg. flanse armaturi si contoare cu dn 50 mm si pn 2,5-25 at.

2.01

m buc

2.00

material: manopera: utilaj: transport:

5.L

6607551

Garnitura de etansare ans plan pn6/2,5 D = 50 M 100-500 g2x4 s1733

buc

2.02

5.L

5801071

Surub cap hexagonal precis gr. 5.8 s4272

M 12 x 40

buc

8.00

5.L

5842738

Piulita hexagonala semiprecise M 12 gr. 5 s 4071 Imbinare cu flanse piese leg. flanse armaturi si contoare cu dn 100 mm si pn 2,5- 6 at.

buc

8.00

buc

4.00

6

ACB05C1

material: manopera: utilaj: transport:

6.L

6607587

6.L

5801320

Garnitura de etansare ans plan pn6/2,5 D = 100 M 100-500 g2x4 s1733

buc

4.04

Surub cap hexagonal precis gr. 5.8 s4272

buc

16.00

M 12 x100

Pag 46 Page 393 of 556

STADIUL FIZIC: GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VENTIL AERISIRE 1

0 7

1 ACE09A1

2

Montarea armaturilor cu actionare manuala sau mecanica (robinet vane ventile clap. compens. etc. )dn: 50

3

buc

4

5=3x4

1.00

material: manopera: utilaj: transport:

8

7319000

BUC

VENTIL AERISIRE 1 1/2 TOLI

1.00

material: manopera: utilaj: transport: 9

ACE09D1

Montarea armaturilor cu actionare manuala sau mecanica (robinet vane ventile clap. compens. etc. )dn: 100

buc

2.00

material: manopera: utilaj: transport:

10

7500112

BUC

VANA GOLIRE DN 100 MM

2.00

material: manopera: utilaj: transport: 11

ACB10A1

buc

Flansa din otel rotunda montata prin sudura electr. avand dn = 50

2.00

material: manopera: utilaj: transport:

11.L 12

4400791 ACB10C1

Flansa plata pn 6 50- 60 OL 37-2 pu s 8012 Flansa din otel rotunda montata prin sudura electr. avand dn = 100

et

2.00

buc buc

4.00

material: manopera: utilaj: transport:

12.L 13

4401147 IZL01A

Flansa plata pn 6 100- 114 OL 37-2k pu s 8012 Izolatie usoara (citomare) executata manual ...pe traseu la tevi de otel

et

4.00

buc mp

2.00

material: manopera: utilaj: transport:

14

IZL08A

Izolare manuala a conductelor montate in pamant cu...doua straturi de bitum si un rand de hartie tip sulfit tip I

mp

2.00

material: manopera: utilaj: transport:

15

ACD01L1

Capac si rama STAS 2308-81 pentru camine cu piesa suport carosabil IV

buc

2.00

material: manopera: utilaj: transport:

procent

material

manopera

utilaj

transport

total

Total Cheltuieli directe:

Pag 47 Page 394 of 556

STADIUL FIZIC: GOLIRE SI AERISIRE TRAVERSARE SPlAUf CAMIN GOLIRE 2 BUC; VENTIL AERISIRE 1

0 Recapitulatia: Contributie asiguratorie pentru munca (CAM)

1 Recap 1 ianuarie 2018

2

3

4

5=3x4

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 48 Page 395 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

BAZIN SP2AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

3

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA21B1

TSA21E1

TRI1AA01C1

2

Sapatura manuala de pamant,executata in cheson deschis,de pana la 18 m adancime,cu evacuarea pamantului cu macara Pionier...in pamant cu umiditate naturala adancimea sapaturii 2-6 m,teren tare Sapatura manuala de pamant,executata in cheson deschis,de pana la 18 m adancime,cu evacuarea pamantului cu macara Pionier...in pamant cu umiditate naturala adancimea sapaturii 6.01-10 m,teren tare Incarcarea materialelor, grupa a-grele si...marunte,prin aruncare rampa sau teren-auto categ.1

3

mc

4

5=3x4

75.40

material: manopera: utilaj: transport: mc

20.10

material: manopera: utilaj: transport: tona

172.00

material: manopera: utilaj: transport:

4

5

TSD04B1

TRA01A05P

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

mc

2.50

material: manopera: utilaj: transport: tona

172.00

material: manopera: utilaj: transport:

6

ACE08E1

Umplutura in sant la cond. de alim. cu apa si canalizare cu balast

mc

2.50

material: manopera: utilaj: transport:

7

TSD01B1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren mijlociu

mc

2.50

material: manopera: utilaj: transport:

8

TRA01A30

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

4.00

material: manopera: utilaj: transport:

Pag 49 Page 396 of 556

STADIUL FIZIC: BAZIN SP2AU

0 9

1 TSA25B1

2

Epuizarea mecanica a apei din sapaturi,in terenuri nisipoase cu:...instalatie de filtre aciculare cu motor Diesel de 37 CP

3

ora

4

5=3x4

240.00

material: manopera: utilaj: transport:

10

11

TSD04D1

CA01B1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...20 cm grosime pamant coeziv Turnarea betonului simplu în fundatii continue, izolate, socluri cu volum peste 3 mc, precum si în ziduri de sprijin

mc

2.50

material: manopera: utilaj: transport: mc

2.50

material: manopera: utilaj: transport:

12

13

14

15

16

17

18

CZ0105A1

CB03A1

CC02B1

CZ0301B1

CA02E1

CZ0107A1

CB41B1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Cofraje pentru beton armat în pereti drepti si diafragme, din panouri refolosibile, cu astereala din scânduri de rasinoase scurte si subscurte inclusiv sprijinirile la constructii având înaltimea pâna la 20 m inclusiv, cu planseu din beton monolit Montarea armaturilor din otel-beton în elemente de constructii, exclusiv cele din constructiile executate în cofraje glisante la constructii executate la o înaltime pâna la 35 m inclusiv, din bare fasonate având diametrul de 10 si 12 mm, în pereti si diafragme cu distantier din plastic Confectionarea armaturilor din otel beton pentru beton armat în fundatii fasonarea barelor pentru fundatii izolate (inclusiv fundatii pahar) continui si radiere, în ateliere centralizate OB 37, D= 10-16 mm ;

mc

Turnarea betonului armat in elementele constructiilor, exclusiv cele executate in cofraje glisante în rezervoare sau bazine subterane

mc

Beton marca B 250, cu agregate grele, sortate cu granulatia pâna la 16 mm, pentru executarea prin glisare a unor constructii înalte cu sectiune variabila (cosuri de fabrica, turnuri de racire, castele de apa etc), preparat cu ciment Pa 35 în instalatii necentralizate, la constructii cu înaltimea pâna la 50 m inclusiv; Sustineri din elemente de schela metalica, tubulara pentru cofrajele planseelor pentru cofraje amplasate la parter, cu înaltimea sustinerilor intre 3 si 6 m inclusiv

mc

2.50

material: manopera: utilaj: transport: mp

204.00

material: manopera: utilaj: transport: kg

4,079.00

material: manopera: utilaj: transport: kg

4,202.00

material: manopera: utilaj: transport: 57.30 material: manopera: utilaj: transport: 58.69 material: manopera: utilaj: transport:

mp

60.00

material: manopera: utilaj: transport:

Pag 50 Page 397 of 556

STADIUL FIZIC: BAZIN SP2AU

0 19

20

20.L 21

1 CB47C1

CL21A1

6309886 CL20B1

2

3

4

Schela metalica tubulara lucrari de finisaje la tavane si lucrari de monolitizari a prefabricatelor de beton armat, amplasate la înaltimi pâna la 7 m inclusiv;

mp

Confectii metalice diverse înglobate total sau partial in beton din profile laminate, tabla, tabla striata, otel beton, tevi pentru sustineri sau acoperiri

kg

Confectie metalice inglobate in beton Confectii metalice diverse, montate aparent balustrazi grile, chepeng, opritori, gratare

kg

transport: 263.00

kg

100.00

5=3x4

60.00

material: manopera: utilaj: transport: 263.00 material: manopera: utilaj:

material: manopera: utilaj:

21.L 22

6306274 CF12A1

Grilaj pentru scari,balcoane ornam.simpl. otel profil. Tencuieli speciale de protectie impermeabile, la cuve, bazine, rezervoare, castele de apa etc, la care presiunea apei nu depaseste 2 daN/cm2

kg

Curatarea de rugina cu peria de sârma a confectiilor si constructiilor metalice executate din profile cu grosimi între 8 mm si 12 mm inclusiv

tona

Vopsirea confectiilor si constructiilor metalice cu un strat de vopsea de din profile, cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

Vopsire confectiilor si constructiilor metalice cu vopsea de ulei in doua straturi, executate din profile cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

Transport utilaj...10km-65123003-automacara 0,045-0,059mn,h. max. 6,5m,des. max. 5,5m,moment max. 15tfm

buc

Ora pr. automacara cu brat zabrele 4,5-5,8 tf 2 schimburi

ora

transport: 100.00

mp

58.80

material: manopera: utilaj: transport:

23

IZD02A

1.00

material: manopera: utilaj: transport:

24

IZD03A

1.00

material: manopera: utilaj: transport:

25

IZD04A

1.00

material: manopera: utilaj: transport:

26

27

MDTC4641010

AUT1233

2.00

material: manopera: utilaj: transport: 150.00 material: manopera: utilaj:

28

29

TSA24C1

MDTC5506010

Epuizarea mecanica a apelor din sapaturi,in teren cu infiltratii puternice de apa,executate cu:...motopompa de apa de joasa presiune montata pe tractor U650,debit 200-500 Mc/h

ora

Transport utilaj...10 km 90100011 schela metalica tubulara de exterior cu s=640mp g=11-13,5t

buc

transport: 100.00 material: manopera: utilaj: transport: 1.00

material: manopera: utilaj: transport: Pag 51

Page 398 of 556

STADIUL FIZIC: BAZIN SP2AU

0 30

1 TRA06A30

2

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

3

tona

4

5=3x4

153.00

material: manopera: utilaj: transport:

31

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

4.20

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 52 Page 399 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

CAMIN GRATAR SP2AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA06A1

TSE01B1

2

Sapatura manuala de pamant,de la 2 m la 6 m adancime,in spatii limitate,peste 1 m latime,executata cu taluz inclinat,fara sprijiniri,pamantul fiind evacuat cu macara Pioner,la fundatii,subsoluri,canale etc....in pamant cu umiditate naturala teren mijlociu Nivelarea manuala a terenurilor si platformelor,cu denivelari de 10-20 cm,in:...teren mijlociu

3

mc

4

5=3x4

15.70

material: manopera: utilaj: transport: 100 mp

0.18

material: manopera: utilaj: transport:

3

4

TSD04B1

TRB01C13

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 30m

mc

0.35

material: manopera: utilaj: transport: tona

8.16

material: manopera: utilaj: transport:

5

CA01B1

Turnarea betonului simplu în fundatii continue, izolate, socluri cu volum peste 3 mc, precum si în ziduri de sprijin

mc

0.35

material: manopera: utilaj: transport:

6

7

8

CZ0105A1

CB03A1

CC02B1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Cofraje pentru beton armat în pereti drepti si diafragme, din panouri refolosibile, cu astereala din scânduri de rasinoase scurte si subscurte inclusiv sprijinirile la constructii având înaltimea pâna la 20 m inclusiv, cu planseu din beton monolit Montarea armaturilor din otel-beton în elemente de constructii, exclusiv cele din constructiile executate în cofraje glisante la constructii executate la o înaltime pâna la 35 m inclusiv, din bare fasonate având diametrul de 10 si 12 mm, în pereti si diafragme cu distantier din plastic

mc

0.35

material: manopera: utilaj: transport: mp

19.40

material: manopera: utilaj: transport: kg

445.00

material: manopera: utilaj: transport:

Pag 53 Page 400 of 556

STADIUL FIZIC: CAMIN GRATAR SP2AU

0 9

10

1 CZ0301B1

CA02E1

2

Confectionarea armaturilor din otel beton pentru beton armat în fundatii fasonarea barelor pentru fundatii izolate (inclusiv fundatii pahar) continui si radiere, în ateliere centralizate OB 37, D= 10-16 mm ;

kg

Turnarea betonului armat in elementele constructiilor, exclusiv cele executate in cofraje glisante în rezervoare sau bazine subterane

mc

Beton marca B 250, cu agregate grele, sortate cu granulatia pâna la 16 mm, pentru executarea prin glisare a unor constructii înalte cu sectiune variabila (cosuri de fabrica, turnuri de racire, castele de apa etc), preparat cu ciment Pa 35 în instalatii necentralizate, la constructii cu înaltimea pâna la 50 m inclusiv; Sustineri din elemente de schela metalica, tubulara pentru cofrajele planseelor pentru cofraje amplasate la parter, cu înaltimea sustinerilor intre 3 si 6 m inclusiv

mc

Confectii metalice diverse înglobate total sau partial in beton din profile laminate, tabla, tabla striata, otel beton, tevi pentru sustineri sau acoperiri

kg

Confectie metalice inglobate in beton Confectii metalice diverse, montate aparent balustrazi grile, chepeng, opritori, gratare

kg

3

4

5=3x4

458.00

material: manopera: utilaj: transport: 2.60

material: manopera: utilaj: transport:

11

12

13

13.L 14

CZ0107A1

CB41B1

CL21A1

6309886 CL20B1

2.62

material: manopera: utilaj: transport:

mp

3.00

material: manopera: utilaj: transport: 16.00 material: manopera: utilaj: transport: 16.00

kg

125.00

material: manopera: utilaj:

14.L 15

6306274 CF12A1

Grilaj pentru scari,balcoane ornam.simpl. otel profil. Tencuieli speciale de protectie impermeabile, la cuve, bazine, rezervoare, castele de apa etc, la care presiunea apei nu depaseste 2 daN/cm2

kg

Curatarea de rugina cu peria de sârma a confectiilor si constructiilor metalice executate din profile cu grosimi între 8 mm si 12 mm inclusiv

tona

Vopsirea confectiilor si constructiilor metalice cu un strat de vopsea de din profile, cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

Vopsire confectiilor si constructiilor metalice cu vopsea de ulei in doua straturi, executate din profile cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

transport: 125.00

mp

10.00

material: manopera: utilaj: transport:

16

IZD02A

0.15

material: manopera: utilaj: transport:

17

IZD03A

0.15

material: manopera: utilaj: transport:

18

IZD04A

0.15

material: manopera: utilaj: transport:

Pag 54 Page 401 of 556

STADIUL FIZIC: CAMIN GRATAR SP2AU

0 19

1 TRA06A30

2

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

3

tona

4

5=3x4

7.50

material: manopera: utilaj: transport:

20

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

0.60

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 55 Page 402 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

INSTALATII HIDRAULICE STATIE POMPARE SP2AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

SA26C1

2

RACORD COMPRESIE TIP FE 90x2'

3

buc

4

5=3x4

1.00

material: manopera: utilaj: transport: 1.L 2

20020519 ACA15D1

Racord <waterkit> compres.d. 90x2 fe MONTARE CONDUCTA PEHD PE8O, PN6

1.00

buc m

5.75

material: manopera: utilaj: transport: 3

6702001

CONDUCTA PEHD PE80 PN6 DN 63 MM

M

0.50

material: manopera: utilaj: transport: 4

6701128

Teava HDPE 80 312uni7611.7615 pn6 DN 90x5.1 cod 64000091

m

5.25

material: manopera: utilaj: transport:

5

SA35D1

TEU COMPRESIUNE EGAL DE 90 MM

buc

1.00

material: manopera: utilaj: transport: 6

4105548

TEU COMPRESIUNE EGAL DE 90 MM

BUC

1.00

material: manopera: utilaj: transport: 7

SA26D1

MUFA REDUSA DE COMPRESIUNE De 110/90

buc

1.00

material: manopera: utilaj: transport:

8

4105158

MUFA REDUSA DE COMPRESIUNE De 110/90

BUC

1.00

material: manopera: utilaj: transport:

Pag 56 Page 403 of 556

STADIUL FIZIC: INSTALATII HIDRAULICE STATIE POMPARE SP2AU

0 9

1 SA26C1

2

MUFA REDUSA COMPRESIUNE De 90/63

3

buc

4

5=3x4

1.00

material: manopera: utilaj: transport: 10

4105159

MUFA REDUSA COMPRESIUNE De 90/63

BUC

1.00

material: manopera: utilaj: transport: 11

SD30C1

COT COMPRESIUNE LA 90 GR TIP FI 63 X 1 1/2 TOLI DN 1 1/2 TOL

buc

1.00

material: manopera: utilaj: transport:

12

4105160

COT COMPRESIUNE LA 90 GR TIP FI 63 X 1 1/2 TOLI DN 1 1/2 TOL

BUC

1.00

material: manopera: utilaj: transport:

13

SF07A1

Capac sau gratar cu rama din fonta pentru camine de vizitare,gura scurgere...capac tip 1 necaros. 45kg

buc

1.00

material: manopera: utilaj: transport:

14

ACD01L1

Capac si rama STAS 2308-81 pentru camine cu piesa suport carosabil IV

buc

2.00

material: manopera: utilaj: transport:

15

SD14D1

Robinet trecere cu ventil si mufe (cu descarcare) pentru tevi din otel cu...d=1 1/2

buc

1.00

material: manopera: utilaj: transport:

15.L 16

4202503 ACA10A1

Robinet trec. fonta 1 1/2 A vent+mufa pn10 s6480 RACORD FURTUN

1.00

buc m

1.00

material: manopera: utilaj: 17

SA43K1

COLIER DE FIXARE CU DIBLU SI FURTUN DIAMETRU BRATARA 4 TOLI

buc

transport: 10.00 material: manopera: utilaj: transport:

18

IZB04A2

Protectia anticoroziva a strapungerilor (la conducte, sifoane etc.) cu folie tip , într-un strat, lipita cu adeziv Prenadez, montare ;

buc

2.00

material: manopera: utilaj:

19

ACD02A1

Trepte din otel beton d=20 mm pentru camine din tuburi beton la retele de conducte

buc

transport: 48.00 material: manopera: utilaj: transport: Pag 57

Page 404 of 556

STADIUL FIZIC: INSTALATII HIDRAULICE STATIE POMPARE SP2AU

0 20

1 5842738

2

Piulita hexagonala semiprecise M 12 gr. 5 s 4071

3

buc

4

5=3x4

16.00

material: manopera: utilaj:

21

5881265

Saiba gros.plata pentru metale M 12, OL 34, s 1388

buc

transport: 16.00 material: manopera: utilaj: transport:

22

5881270

BUC

DIBLU CONEXPOND M12-150

8.00

material: manopera: utilaj: transport: 24

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

5.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 58 Page 405 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

INSTALATII ELECTRICE SP2AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

ATD29D

2

Suporti, stelaje, constructii metalice confectionate pe santier pentru aparate,elem. automat,sust. cablu,cond.

3

kg

4

5=3x4

30.00

material: manopera: utilaj:

1.L 2

3500130 CK26C1

Cornier aripi eg.lam cald s 424 25x 25x 3 OL 37-1n Dibluri din lemn si bolturi împuscate bolturi metalice impuscate in plansee sau pereti din beton armat

kg

transport: 30.00

buc

10.00

material: manopera: utilaj:

3

CK26C1

buc

BOLTURI METALICE

transport: 10.00 material: manopera: utilaj:

4

4.L 5

6

EA12A1

7356549 EA06A1

EA16A1

Tub metalic, flexibil, de protectie, neetans cu spirale cu 2 renuri, de forma unui patrulater, tip SPD, având diametrul de 13,5-23mm

m

Tub metalic flex.prot.neetans tip spd-roman D = 23 mm Teava din otel, neagra, pentru instalatii, sudata longitudinal, montata îngropat sau aparent, în mediul normal, având diametrul interior de 1/2 toli montata îngropat în pardoseala

m

Doza de derivatie, pentru cabluri sau tevi de instalatii, montata în mediu exploziv, avînd diametrul de 1/2" - 1 1/4"

buc

transport: 10.00 material: manopera: utilaj: transport: 10.25

m

10.00

material: manopera: utilaj: transport: 5.00

material: manopera: utilaj: transport:

7

8

EA17B1

EB08B1

Doza de ramificatie si tragere, de tip rotund sau patrat, pentru instalatiile de antena colectiva R + TV si ramificatia circuitelor instalatiilor electrice, inglobate in beton tip patrat, RIPS, marimea 29

buc

Conducta de otel, pentru legarea la pamînt sau la nul, a receptoarelor sau aparatelor electrice, montata pe zid de caramida sau beton, conducta fiind banda de otel, laminate la cald, de 25x4 mm

m

4.00

material: manopera: utilaj: transport: 8.00

material: manopera: utilaj: transport: Pag 59

Page 406 of 556

STADIUL FIZIC: INSTALATII ELECTRICE SP2AU

0 9

10

10.L 11

11.L 12

12.L 13

13.L 14

1 EB15A1

EC03A1

4802573 EC03A1

4802597 EC03A1

4803072 EC03A1

4803022 EC10A1

2

3

4

Numere si etichete, pentru bransamente, coloane electrice, circuite telefonice sau cabluri electrice numere pentru bransamente sau coloane electrice

buc

Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

Cablu energie cyabzy 0,6/ 1 KV 3x 1,5 U s 8778 Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

20.60

m

15.00

5=3x4

10.00

material: manopera: utilaj: transport: 20.00 material: manopera: utilaj: transport:

material: manopera: utilaj: transport:

Cablu energie cyabzy 0,6/ 1 KV 3x 2,5 U s 8778 Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

15.45

m

20.00

Cablu energie cyaby 0,6/ 1 KV 4x 16 M s 8778 Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

20.60

m

24.00

Cablu energie cyabzy 0,6/ 1 KV 4x 6 U s 8778 Scoaterea învelisului de iuta de pe cabluri cu sectiunea conductorului de pana la 35 mmp

m

material: manopera: utilaj: transport:

material: manopera: utilaj: transport: 24.72

m

4.00

material: manopera: utilaj: transport:

15

EC19A1

Presetupa pentru fixarea cablurilorla electromotoare, tablouri sau aparate, având diametrul pana la 16 mm,

buc

6.00

material: manopera: utilaj: transport:

15.L 16

5217464 ED03I1

Presetupa pentru fixare cabluri latablouri,aparate D = 11 Comutator unipolar pentru scara (cruce de capat) constructie etansa în carcasa metalica, montat aparent pe dibluri de lemn

buc

Comutator cumpana st.simbol 0176 10 A ;250 v Corp de iluminat, pentru lampi fluorescente tubulare etans, montat pe dibluri de lemn

buc

6.00

buc

1.00

material: manopera: utilaj: transport:

16.L 17

5520366 EE12F1

1.00

buc

1.00

material: manopera: utilaj: transport: Pag 60

Page 407 of 556

STADIUL FIZIC: INSTALATII ELECTRICE SP2AU

0 17.L 18

1 5103687 ED07A1

2

3

4

Corp il.fl.fipra-01 240 220 V 2x 40w reflect+balast Contactor automat de 10 sau 25 A, racordat la conducte de aluminiu sau de cupru, exclusiv racordarea, montat pe dibluri de lemn

buc

1.00

buc

1.00

Contactor electromagn.cu releecaps.simb.3207 10a;500 V Tablou electric, format panou, dulap, celula sau pupitru, având greutatea pîna la 150 kg

buc

5=3x4

material: manopera: utilaj: transport:

18.L 19

5529570 EF03A1

1.00

buc

1.00

material: manopera: utilaj:

20

21

EF09A1

EF08B1

Racordarea conductelor din cupru, la borne (aparate, motoare, tablouri electrice), conducta având sectiunea de pîna la 10 mmp (exclusiv)

buc

Racordarea conductelor din aluminiu, la borne (aparate, motoare, tablouri electrice), conducta având sectiunea de 10 sau 16 mmp

buc

Cutie cu eclisa de legatura, pentru centura de împamîntare

buc

transport: 10.00 material: manopera: utilaj: transport: 30.00 material: manopera: utilaj: transport:

22

EG10A1

2.00

material: manopera: utilaj:

23

EH01A1

Încercarea cablurilor de energie electrica, de maximum 1 kV

buc

transport: 10.00 material: manopera: utilaj: transport:

24

25

EH05A1

W1P08A

Încercarea tablourilor de distributie, de comanda de protectie, de semnalizare, a pupitrelor de comanda si a cutiilor metalice cu cleme tablouri de marmura cu peste 6 circuite

buc

Verificarea prizelor de pamant pentru lucrari de instalatii electrice la...constructii

buc

1.00

material: manopera: utilaj: transport: 1.00

material: manopera: utilaj:

26

W1R06A1

Electrod din teava de otel de doi toli si jumatatepentru legarea la pamant in teren...normal

m

transport: 18.00 material: manopera: utilaj: transport:

27

EG09B1

Protectie pentru conducta de coborîre, pe lungime de 1,80 m, executata din otel cornier cu aripi egale, având dimensiunile 30 X 30 X 4 mm

buc

2.00

material: manopera: utilaj: transport:

Pag 61 Page 408 of 556

STADIUL FIZIC: INSTALATII ELECTRICE SP2AU

0 28

1 ATA01A

2

Montarea aparatelor in panouri,dulapuri,cutii,aparent sau ingropat cu greutatea:pina la 1 kg

3

buc

4

5=3x4

10.00

material: manopera: utilaj: transport:

29

W2E12A01

FIRIDA DE BRANSAMENT SI MASURA MONOFAZICA BPM

buc

1.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 62 Page 409 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSG02A1

2

Curatarea terenului...de iarba si buruieni

100 mp

3

4

5=3x4

0.52

material: manopera: utilaj:

2

3

TSA01C1

TRB01A12

Sapatura manuala de pamant in spatii inchise la deblee,in canale deschise,in gropi de imprumut la indepartarea stratului vegetal de 10-30 cm grosime etc....in spatii intinse in pamant cu umiditate natuala aruncarea in depozit sau vehicul la H<0.6 m teren tare Transportul materialelor cu roaba pe pneuri inc asezare desc asezare grupa...1-3 distanta 20m

mc

transport: 15.60 material: manopera: utilaj: transport:

tona

22.20

material: manopera: utilaj:

4

TRA01A05P

Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

tona

transport: 22.20 material: manopera: utilaj:

5

TSH32D1

Amenajari de alei de parc si terenuri de joc pentru copii ...cu imbracaminte din piatra de 8-16 mm in strat de 5 cm

mp

transport: 39.00 material: manopera: utilaj: transport:

6

TSH32A1

Amenajari de alei de parc si terenuri de joc pentru copii ...cu imbracaminte de balast de 10 cm grosime

mp

2.00

material: manopera: utilaj: transport:

7

CA01A1

Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

mc

1.67

material: manopera: utilaj: transport:

8

2100945

Beton de ciment

B 150 stas 3622

mc

1.68

material: manopera: utilaj: transport:

Pag 63 Page 410 of 556

STADIUL FIZIC: DRUM ACCES+SISTEMATIZARE VERTICALA L=1 M S=52 MP LA SP2AU

0 9

1 TRA06A30

2

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

3

4

tona

5=3x4

4.20

material: manopera: utilaj:

10

TSH26A1

Plantari pentru gard viu...arbusti foiosi,pe un rind

m

transport: 29.00 material: manopera: utilaj:

10.L 11

7202920 TSD01C1

Puiet arbust.foios.amorpha lfruticosa cal.1 H = 100cm Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

buc

transport: 103.36

mc

15.80

material: manopera: utilaj: transport:

12

13

TSD05A1

TRA01A30

Compactarea cu maiul mecanic de 150-200 Kg a umpluturilor in straturi succesive de 20-30 cm grosime,exclusiv udarea fiecarui strat in parte,umpluturile executandu-se din :...pamant necoeziv

100 mc

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

0.20

material: manopera: utilaj: transport: 0.40

material: manopera: utilaj: transport:

14

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

0.31

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 64 Page 411 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA02F1

TRB01C12

2

Sapatura manuala de pamant in spatii limitate,avand sub 1.00 m sau peste 1.00 m latime,executata fara sprijini,cu taluz vertical,la fundatii,canale,subsoluri,drenuri,trepte de infratire etc....in pamant coeziv mijlociu sau foarte coeziv adancime <1.5 m teren tare Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 20m

3

4

mc

5=3x4

11.60

material: manopera: utilaj: transport: tona

19.80

material: manopera: utilaj:

3

TSD01C1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

mc

transport: 11.60 material: manopera: utilaj:

4

5

TSD04D1

CA01A1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...20 cm grosime pamant coeziv Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

mc

transport: 11.60 material: manopera: utilaj: transport:

mc

13.50

material: manopera: utilaj:

6

2100945

Beton de ciment

B 150 stas 3622

mc

transport: 13.60 material: manopera: utilaj:

7

8

CO07B1

TRA06A30

Împrejmuiri din sârma, fixata pe stâlpi metalici cu panouri de gard din rama de otel rotund 0 16, mm si împletitura din sârma de otel zincata D= 2 mm cu ochiuri patrate de 16x16 mm, cu înaltimea la coama de 2,05 m Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

m

transport: 29.00 material: manopera: utilaj: transport:

tona

34.00

material: manopera: utilaj: transport:

Pag 65 Page 412 of 556

STADIUL FIZIC: ÎMPREJMUIRE STATIE SP2AU L = 29 M S=57 MP

0 9

1 TRA02A30

2

3

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

4

5=3x4

5.00

material: manopera: utilaj:

10

CP22C1

Sudarea pe contur a placilor de otel suprapuse 11-15mm inclusiv

m

transport: 58.00 material: manopera: utilaj: transport:

11

6101052

RAMA POARTA MICA 1220 X 2320 MM

BUC

1.00

material: manopera: utilaj: transport: 12

IZD04B

Vopsire confectiilor si constructiilor metalice cu vopsea de ulei in doua straturi, executate din profile cu grosimi peste 12 mm, cu pensula de mana

tona

0.20

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 66 Page 413 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

M1B13A1

2

Montarea...electropompei submersibile

3

m

4

5=3x4

20.00

material: manopera: utilaj: transport: 2

M7D07A1

Blindaje la galerii orizontale cu grosimea tolei...pina la 12 mm

tona

0.20

material: manopera: utilaj: transport:

3

M7C03A1

Revizia agregatelor rotative...polietajate cu greut 0,50-8 t

tona

0.50

material: manopera: utilaj: transport:

4

M7C04A1

Forte de munca pentru proba de punere in funct a agregrotative cu el mot cu putere...p la 100 kw

buc

1.00

material: manopera: utilaj:

5

M7C06A1

Energie electrica pentru...proba de punere in funct. a agreg. rotative cu motoare pina la 100 kw

kw

transport: 15.00 material: manopera: utilaj: transport:

6

M7G01A1

Forte de munca pentru probe la term....montaj. Instalatie anexe de ulei,pacura sau apa de racire

buc

1.00

material: manopera: utilaj:

7

M7G02A1

Energie electrica pentru probe la term. montaj. Instalatie anexe de...ulei,pacura sau apa de racire

kw

transport: 15.00 material: manopera: utilaj: transport:

8

IZD05B

Grunduirea manuala cu un strat de vopsea de miniu plumb a utilajelor tehnologice si a constructiilor metalice aferente acestora (suporti, sustineri, tiranti, console, platforme) la constructii metalice aferente utilajelor tehnologice

tona

1.00

material: manopera: utilaj: transport:

Pag 67 Page 414 of 556

STADIUL FIZIC: INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP2AU

0 9

1 IZK08D

2

Vopsirea cu vopsea pe baza de ulei în doua straturi a...conductelor cu Dn pâna la 400 mm

3

tona

4

5=3x4

1.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 68 Page 415 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

BY PASS VARSARE SP2AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA02E1

CA01A1

2

Sapatura manuala de pamant in spatii limitate,avand sub 1.00 m sau peste 1.00 m latime,executata fara sprijini,cu taluz vertical,la fundatii,canale,subsoluri,drenuri,trepte de infratire etc....in pamant coeziv mijlociu sau foarte coeziv adancime <1.5 m teren mijlociu Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

3

mc

4

5=3x4

13.53

material: manopera: utilaj: transport:

mc

11.70

material: manopera: utilaj:

3

4

5

CZ0105A1

IFB10A1

IFB07B1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Filtru invers din straturi succesive din nisip si pietris sau piatra sparta , in grosime dupa compactare de :...30 cm cu nisip si pietris

mc

Pereu zidit din piatra bruta, in grosime de: 20 cm;

mp

transport: 11.70 material: manopera: utilaj: transport:

mp

15.00

material: manopera: utilaj: transport: 15.00 material: manopera: utilaj:

5.L 6

7

2201335 CZ0204B1

TSD01B1

Piatra bruta sortata r.magmatice pentru drum,anroc,pereuri Mortar de var - ciment pentru zidarie marca M 100-Z preparat cu ciment M 30, în instalatii centralizate cu adaos de var pasta ;

kg

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren mijlociu

mc

transport: 4,725.00

mc

1.05

material: manopera: utilaj: transport: 13.53 material: manopera: utilaj: transport:

Pag 69 Page 416 of 556

STADIUL FIZIC: BY PASS VARSARE SP2AU

0 8

1 TRA01A30

2

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

3

tona

4

5=3x4

7.65

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 70 Page 417 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

BY PASS SP2AU L=9 M

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

3

4

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA04C1

TSA04F1

TSA14C1

TRB01C15

2

Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-1,5 m teren tare Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 1,5-3 m teren tare. Sapatura manuala de pamant,de pana la 6 m adancime,in gropi cu sectiunea poligonala sau circulara,avand latimea sau diametrul cercului de 1.50-6 m,executata cu sprijiniri,cu evacuare manuala,la fundatii,puturi,rezervoare etc...in pamant cu umiditate naturala adancimea sapaturii 0-2 m teren tare Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 50m

3

4

mc

5=3x4

9.60

material: manopera: utilaj: transport: mc

1.80

material: manopera: utilaj: transport: mc

2.00

material: manopera: utilaj: transport:

tona

5.00

material: manopera: utilaj:

5

TSD01C1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

mc

transport: 13.40 material: manopera: utilaj:

6

7

TSD04B1

TSF05B1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv Sprijiniri de maluri,cu dulapi metalici asezati orizontal,la sapaturi executate in spatii limitate,avand latimea de pana la 1.50 m intre maluri ...adancimea sapaturii pana la 4 m interspatii intre dulapi de 0.21-0.60 m

mc

transport: 13.40 material: manopera: utilaj: transport:

mp

33.50

material: manopera: utilaj: transport:

Pag 71 Page 418 of 556

STADIUL FIZIC: BY PASS SP2AU L=9 M

0 8

1 ACE16A1

2

Montarea parapetelor si podetelor metalice de inventar la santuri pentru conducte

3

m

4

5=3x4

16.00

material: manopera: utilaj: transport:

9

ACE08A1

Umplutura in sant. la cond. de alim. cu apa si canalizare cu: nisip

mc

3.00

material: manopera: utilaj: transport:

10

TRA01A30

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

5.50

material: manopera: utilaj: transport:

11

ACD01L1

Capac si rama STAS 2308-81 pentru camine cu piesa suport carosabil IV

buc

1.00

material: manopera: utilaj: transport:

12

ACD08H1

Camin vane beton mon. sect. circ. pr. tip 1785-2 Di=1,25 m. h 2,0 fara apa subterana carosabil

buc

1.00

material: manopera: utilaj: transport:

13

ACB08G1

Montare teava otel pentru conducte imbinare prin sudura el. Dn 250

m

1.50

material: manopera: utilaj: transport:

13.L 14

3112646 ACA15G1

Teava pentru constructii fara sudura LC 250 x10 / OLT 35 s 404/2 Montare tuburi de presiune din poliestiren armate cu fibra sticla prin infas. in pamant exterioare clad. mf+cep p,d250

1.51

m m

8.00

material: manopera: utilaj: transport:

15

6270043

TUB CANALIZARE GOFRAT CU MUFA SH8 D.250 MM

M

8.40

material: manopera: utilaj: transport:

16

6607628

Garnitura de etansare ans plan pn6/2,5 D = 250 M 100-500 g2x4 s1733

buc

2.00

material: manopera: utilaj: transport:

17

3270029

BANDA AVERTIZOARE CONDUCTE CANALIZARE

M

8.40

material: manopera: utilaj: transport:

18

IZL01A

Izolatie usoara (citomare) executata manual ...pe traseu la tevi de otel

mp

2.40

material: manopera: utilaj: transport: Pag 72

Page 419 of 556

STADIUL FIZIC: BY PASS SP2AU L=9 M

0 19

1 IZL08A

2

Izolare manuala a conductelor montate in pamant cu...doua straturi de bitum si un rand de hartie tip sulfit tip I

3

mp

4

5=3x4

2.40

material: manopera: utilaj: transport:

20

ACE09H1

Montarea armaturilor cu actionare manuala sau mecanica (robinet vane ventile clap. compens. etc. )dn: 250

buc

1.00

material: manopera: utilaj: transport:

20.L 21

4502496 ACB10G1

Robinet sp t.ol i.al ets.in.bz des.3104.0 pn4 DN 250 Flansa din otel rotunda montata prin sudura electr. avand dn = 250

buc

1.00

buc

2.00

material: manopera: utilaj: transport:

21.L 22

4401537 ACB12G1

Flansa plata pn 6 250- 273 OL 37-2 et pu s 8012 Imbinare prin sudura electr. piese legatura executata la pozitie avand dn 250

2.00

buc buc

2.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 73 Page 420 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

BAZIN SP3AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

3

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA21B1

TSA21E1

TRI1AA01C1

2

Sapatura manuala de pamant,executata in cheson deschis,de pana la 18 m adancime,cu evacuarea pamantului cu macara Pionier...in pamant cu umiditate naturala adancimea sapaturii 2-6 m,teren tare Sapatura manuala de pamant,executata in cheson deschis,de pana la 18 m adancime,cu evacuarea pamantului cu macara Pionier...in pamant cu umiditate naturala adancimea sapaturii 6.01-10 m,teren tare Incarcarea materialelor, grupa a-grele si...marunte,prin aruncare rampa sau teren-auto categ.1

3

mc

4

5=3x4

75.40

material: manopera: utilaj: transport: mc

20.10

material: manopera: utilaj: transport: tona

172.00

material: manopera: utilaj: transport:

4

5

TSD04B1

TRA01A05P

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

mc

2.50

material: manopera: utilaj: transport: tona

172.00

material: manopera: utilaj: transport:

6

ACE08E1

Umplutura in sant la cond. de alim. cu apa si canalizare cu balast

mc

2.50

material: manopera: utilaj: transport:

7

TSD01B1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren mijlociu

mc

2.50

material: manopera: utilaj: transport:

8

TRA01A30

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

4.00

material: manopera: utilaj: transport:

Pag 74 Page 421 of 556

STADIUL FIZIC: BAZIN SP3AU

0 9

1 TSA25B1

2

Epuizarea mecanica a apei din sapaturi,in terenuri nisipoase cu:...instalatie de filtre aciculare cu motor Diesel de 37 CP

3

ora

4

5=3x4

240.00

material: manopera: utilaj: transport:

10

11

TSD04D1

CA01B1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...20 cm grosime pamant coeziv Turnarea betonului simplu în fundatii continue, izolate, socluri cu volum peste 3 mc, precum si în ziduri de sprijin

mc

2.50

material: manopera: utilaj: transport: mc

2.50

material: manopera: utilaj: transport:

12

13

14

15

16

17

18

CZ0105A1

CB03A1

CC02B1

CZ0301B1

CA02E1

CZ0107A1

CB41B1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Cofraje pentru beton armat în pereti drepti si diafragme, din panouri refolosibile, cu astereala din scânduri de rasinoase scurte si subscurte inclusiv sprijinirile la constructii având înaltimea pâna la 20 m inclusiv, cu planseu din beton monolit Montarea armaturilor din otel-beton în elemente de constructii, exclusiv cele din constructiile executate în cofraje glisante la constructii executate la o înaltime pâna la 35 m inclusiv, din bare fasonate având diametrul de 10 si 12 mm, în pereti si diafragme cu distantier din plastic Confectionarea armaturilor din otel beton pentru beton armat în fundatii fasonarea barelor pentru fundatii izolate (inclusiv fundatii pahar) continui si radiere, în ateliere centralizate OB 37, D= 10-16 mm ;

mc

Turnarea betonului armat in elementele constructiilor, exclusiv cele executate in cofraje glisante în rezervoare sau bazine subterane

mc

Beton marca B 250, cu agregate grele, sortate cu granulatia pâna la 16 mm, pentru executarea prin glisare a unor constructii înalte cu sectiune variabila (cosuri de fabrica, turnuri de racire, castele de apa etc), preparat cu ciment Pa 35 în instalatii necentralizate, la constructii cu înaltimea pâna la 50 m inclusiv; Sustineri din elemente de schela metalica, tubulara pentru cofrajele planseelor pentru cofraje amplasate la parter, cu înaltimea sustinerilor intre 3 si 6 m inclusiv

mc

2.50

material: manopera: utilaj: transport: mp

204.00

material: manopera: utilaj: transport: kg

4,079.00

material: manopera: utilaj: transport: kg

4,202.00

material: manopera: utilaj: transport: 57.30 material: manopera: utilaj: transport: 58.69 material: manopera: utilaj: transport:

mp

60.00

material: manopera: utilaj: transport:

Pag 75 Page 422 of 556

STADIUL FIZIC: BAZIN SP3AU

0 19

20

20.L 21

1 CB47C1

CL21A1

6309886 CL20B1

2

3

4

Schela metalica tubulara lucrari de finisaje la tavane si lucrari de monolitizari a prefabricatelor de beton armat, amplasate la înaltimi pâna la 7 m inclusiv;

mp

Confectii metalice diverse înglobate total sau partial in beton din profile laminate, tabla, tabla striata, otel beton, tevi pentru sustineri sau acoperiri

kg

Confectie metalice inglobate in beton Confectii metalice diverse, montate aparent balustrazi grile, chepeng, opritori, gratare

kg

transport: 263.00

kg

100.00

5=3x4

60.00

material: manopera: utilaj: transport: 263.00 material: manopera: utilaj:

material: manopera: utilaj:

21.L 22

6306274 CF12A1

Grilaj pentru scari,balcoane ornam.simpl. otel profil. Tencuieli speciale de protectie impermeabile, la cuve, bazine, rezervoare, castele de apa etc, la care presiunea apei nu depaseste 2 daN/cm2

kg

Curatarea de rugina cu peria de sârma a confectiilor si constructiilor metalice executate din profile cu grosimi între 8 mm si 12 mm inclusiv

tona

Vopsirea confectiilor si constructiilor metalice cu un strat de vopsea de din profile, cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

Vopsire confectiilor si constructiilor metalice cu vopsea de ulei in doua straturi, executate din profile cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

Transport utilaj...10km-65123003-automacara 0,045-0,059mn,h. max. 6,5m,des. max. 5,5m,moment max. 15tfm

buc

Ora pr. automacara cu brat zabrele 4,5-5,8 tf 2 schimburi

ora

transport: 100.00

mp

58.80

material: manopera: utilaj: transport:

23

IZD02A

1.00

material: manopera: utilaj: transport:

24

IZD03A

1.00

material: manopera: utilaj: transport:

25

IZD04A

1.00

material: manopera: utilaj: transport:

26

27

MDTC4641010

AUT1233

2.00

material: manopera: utilaj: transport: 150.00 material: manopera: utilaj:

28

29

TSA24C1

MDTC5506010

Epuizarea mecanica a apelor din sapaturi,in teren cu infiltratii puternice de apa,executate cu:...motopompa de apa de joasa presiune montata pe tractor U650,debit 200-500 Mc/h

ora

Transport utilaj...10 km 90100011 schela metalica tubulara de exterior cu s=640mp g=11-13,5t

buc

transport: 100.00 material: manopera: utilaj: transport: 1.00

material: manopera: utilaj: transport: Pag 76

Page 423 of 556

STADIUL FIZIC: BAZIN SP3AU

0 30

1 TRA06A30

2

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

3

tona

4

5=3x4

153.00

material: manopera: utilaj: transport:

31

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

4.20

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 77 Page 424 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

CAMIN GRATAR SP3AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA06A1

TSE01B1

2

Sapatura manuala de pamant,de la 2 m la 6 m adancime,in spatii limitate,peste 1 m latime,executata cu taluz inclinat,fara sprijiniri,pamantul fiind evacuat cu macara Pioner,la fundatii,subsoluri,canale etc....in pamant cu umiditate naturala teren mijlociu Nivelarea manuala a terenurilor si platformelor,cu denivelari de 10-20 cm,in:...teren mijlociu

3

mc

4

5=3x4

15.70

material: manopera: utilaj: transport: 100 mp

0.18

material: manopera: utilaj: transport:

3

4

TSD04B1

TRB01C13

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 30m

mc

0.35

material: manopera: utilaj: transport: tona

8.16

material: manopera: utilaj: transport:

5

CA01B1

Turnarea betonului simplu în fundatii continue, izolate, socluri cu volum peste 3 mc, precum si în ziduri de sprijin

mc

0.35

material: manopera: utilaj: transport:

6

7

8

CZ0105A1

CB03A1

CC02B1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Cofraje pentru beton armat în pereti drepti si diafragme, din panouri refolosibile, cu astereala din scânduri de rasinoase scurte si subscurte inclusiv sprijinirile la constructii având înaltimea pâna la 20 m inclusiv, cu planseu din beton monolit Montarea armaturilor din otel-beton în elemente de constructii, exclusiv cele din constructiile executate în cofraje glisante la constructii executate la o înaltime pâna la 35 m inclusiv, din bare fasonate având diametrul de 10 si 12 mm, în pereti si diafragme cu distantier din plastic

mc

0.35

material: manopera: utilaj: transport: mp

19.40

material: manopera: utilaj: transport: kg

445.00

material: manopera: utilaj: transport:

Pag 78 Page 425 of 556

STADIUL FIZIC: CAMIN GRATAR SP3AU

0 9

10

1 CZ0301B1

CA02E1

2

Confectionarea armaturilor din otel beton pentru beton armat în fundatii fasonarea barelor pentru fundatii izolate (inclusiv fundatii pahar) continui si radiere, în ateliere centralizate OB 37, D= 10-16 mm ;

kg

Turnarea betonului armat in elementele constructiilor, exclusiv cele executate in cofraje glisante în rezervoare sau bazine subterane

mc

Beton marca B 250, cu agregate grele, sortate cu granulatia pâna la 16 mm, pentru executarea prin glisare a unor constructii înalte cu sectiune variabila (cosuri de fabrica, turnuri de racire, castele de apa etc), preparat cu ciment Pa 35 în instalatii necentralizate, la constructii cu înaltimea pâna la 50 m inclusiv; Sustineri din elemente de schela metalica, tubulara pentru cofrajele planseelor pentru cofraje amplasate la parter, cu înaltimea sustinerilor intre 3 si 6 m inclusiv

mc

Confectii metalice diverse înglobate total sau partial in beton din profile laminate, tabla, tabla striata, otel beton, tevi pentru sustineri sau acoperiri

kg

Confectie metalice inglobate in beton Confectii metalice diverse, montate aparent balustrazi grile, chepeng, opritori, gratare

kg

3

4

5=3x4

458.00

material: manopera: utilaj: transport: 2.60

material: manopera: utilaj: transport:

11

12

13

13.L 14

CZ0107A1

CB41B1

CL21A1

6309886 CL20B1

2.62

material: manopera: utilaj: transport:

mp

3.00

material: manopera: utilaj: transport: 16.00 material: manopera: utilaj: transport: 16.00

kg

125.00

material: manopera: utilaj:

14.L 15

6306274 CF12A1

Grilaj pentru scari,balcoane ornam.simpl. otel profil. Tencuieli speciale de protectie impermeabile, la cuve, bazine, rezervoare, castele de apa etc, la care presiunea apei nu depaseste 2 daN/cm2

kg

Curatarea de rugina cu peria de sârma a confectiilor si constructiilor metalice executate din profile cu grosimi între 8 mm si 12 mm inclusiv

tona

Vopsirea confectiilor si constructiilor metalice cu un strat de vopsea de din profile, cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

Vopsire confectiilor si constructiilor metalice cu vopsea de ulei in doua straturi, executate din profile cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

transport: 125.00

mp

10.00

material: manopera: utilaj: transport:

16

IZD02A

0.15

material: manopera: utilaj: transport:

17

IZD03A

0.15

material: manopera: utilaj: transport:

18

IZD04A

0.15

material: manopera: utilaj: transport:

Pag 79 Page 426 of 556

STADIUL FIZIC: CAMIN GRATAR SP3AU

0 19

1 TRA06A30

2

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

3

tona

4

5=3x4

7.50

material: manopera: utilaj: transport:

20

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

0.60

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 80 Page 427 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

INSTALATII HIDRAULICE STATIE POMPARE SP3AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

SA26C1

2

RACORD COMPRESIE TIP FE 90x2'

3

buc

4

5=3x4

1.00

material: manopera: utilaj: transport: 1.L 2

20020519 ACA15D1

Racord <waterkit> compres.d. 90x2 fe MONTARE CONDUCTA PEHD PE8O, PN6

1.00

buc m

5.75

material: manopera: utilaj: transport: 3

6702001

CONDUCTA PEHD PE80 PN6 DN 63 MM

M

0.50

material: manopera: utilaj: transport: 4

6701128

Teava HDPE 80 312uni7611.7615 pn6 DN 90x5.1 cod 64000091

m

5.25

material: manopera: utilaj: transport:

5

SA35D1

TEU COMPRESIUNE EGAL DE 90 MM

buc

1.00

material: manopera: utilaj: transport: 6

4105548

TEU COMPRESIUNE EGAL DE 90 MM

BUC

1.00

material: manopera: utilaj: transport: 7

SA26D1

MUFA REDUSA DE COMPRESIUNE De 110/90

buc

1.00

material: manopera: utilaj: transport:

8

4105158

MUFA REDUSA DE COMPRESIUNE De 110/90

BUC

1.00

material: manopera: utilaj: transport:

Pag 81 Page 428 of 556

STADIUL FIZIC: INSTALATII HIDRAULICE STATIE POMPARE SP3AU

0 9

1 SA26C1

2

MUFA REDUSA COMPRESIUNE De 90/63

3

buc

4

5=3x4

1.00

material: manopera: utilaj: transport: 10

4105159

MUFA REDUSA COMPRESIUNE De 90/63

BUC

1.00

material: manopera: utilaj: transport: 11

SD30C1

COT COMPRESIUNE LA 90 GR TIP FI 63 X 1 1/2 TOLI DN 1 1/2 TOL

buc

1.00

material: manopera: utilaj: transport:

12

4105160

COT COMPRESIUNE LA 90 GR TIP FI 63 X 1 1/2 TOLI DN 1 1/2 TOL

BUC

1.00

material: manopera: utilaj: transport:

13

SF07A1

Capac sau gratar cu rama din fonta pentru camine de vizitare,gura scurgere...capac tip 1 necaros. 45kg

buc

1.00

material: manopera: utilaj: transport:

14

ACD01L1

Capac si rama STAS 2308-81 pentru camine cu piesa suport carosabil IV

buc

2.00

material: manopera: utilaj: transport:

15

SD14D1

Robinet trecere cu ventil si mufe (cu descarcare) pentru tevi din otel cu...d=1 1/2

buc

1.00

material: manopera: utilaj: transport:

15.L 16

4202503 ACA10A1

Robinet trec. fonta 1 1/2 A vent+mufa pn10 s6480 RACORD FURTUN

1.00

buc m

1.00

material: manopera: utilaj: 17

SA43K1

COLIER DE FIXARE CU DIBLU SI FURTUN DIAMETRU BRATARA 4 TOLI

buc

transport: 10.00 material: manopera: utilaj: transport:

18

IZB04A2

Protectia anticoroziva a strapungerilor (la conducte, sifoane etc.) cu folie tip , într-un strat, lipita cu adeziv Prenadez, montare ;

buc

2.00

material: manopera: utilaj:

19

ACD02A1

Trepte din otel beton d=20 mm pentru camine din tuburi beton la retele de conducte

buc

transport: 48.00 material: manopera: utilaj: transport: Pag 82

Page 429 of 556

STADIUL FIZIC: INSTALATII HIDRAULICE STATIE POMPARE SP3AU

0 20

1 5842738

2

Piulita hexagonala semiprecise M 12 gr. 5 s 4071

3

buc

4

5=3x4

16.00

material: manopera: utilaj:

21

5881265

Saiba gros.plata pentru metale M 12, OL 34, s 1388

buc

transport: 16.00 material: manopera: utilaj: transport:

22

5881270

BUC

DIBLU CONEXPOND M12-150

8.00

material: manopera: utilaj: transport: 24

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

5.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 83 Page 430 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

INSTALATII ELECTRICE SP3AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

ATD29D

2

Suporti, stelaje, constructii metalice confectionate pe santier pentru aparate,elem. automat,sust. cablu,cond.

3

kg

4

5=3x4

30.00

material: manopera: utilaj:

1.L 2

3500130 CK26C1

Cornier aripi eg.lam cald s 424 25x 25x 3 OL 37-1n Dibluri din lemn si bolturi împuscate bolturi metalice impuscate in plansee sau pereti din beton armat

kg

transport: 30.00

buc

10.00

material: manopera: utilaj:

3

CK26C1

buc

BOLTURI METALICE

transport: 10.00 material: manopera: utilaj:

4

4.L 5

6

EA12A1

7356549 EA06A1

EA16A1

Tub metalic, flexibil, de protectie, neetans cu spirale cu 2 renuri, de forma unui patrulater, tip SPD, având diametrul de 13,5-23mm

m

Tub metalic flex.prot.neetans tip spd-roman D = 23 mm Teava din otel, neagra, pentru instalatii, sudata longitudinal, montata îngropat sau aparent, în mediul normal, având diametrul interior de 1/2 toli montata îngropat în pardoseala

m

Doza de derivatie, pentru cabluri sau tevi de instalatii, montata în mediu exploziv, avînd diametrul de 1/2" - 1 1/4"

buc

transport: 10.00 material: manopera: utilaj: transport: 10.25

m

10.00

material: manopera: utilaj: transport: 5.00

material: manopera: utilaj: transport:

7

8

EA17B1

EB08B1

Doza de ramificatie si tragere, de tip rotund sau patrat, pentru instalatiile de antena colectiva R + TV si ramificatia circuitelor instalatiilor electrice, inglobate in beton tip patrat, RIPS, marimea 29

buc

Conducta de otel, pentru legarea la pamînt sau la nul, a receptoarelor sau aparatelor electrice, montata pe zid de caramida sau beton, conducta fiind banda de otel, laminate la cald, de 25x4 mm

m

4.00

material: manopera: utilaj: transport: 8.00

material: manopera: utilaj: transport: Pag 84

Page 431 of 556

STADIUL FIZIC: INSTALATII ELECTRICE SP3AU

0 9

10

10.L 11

11.L 12

12.L 13

13.L 14

1 EB15A1

EC03A1

4802573 EC03A1

4802597 EC03A1

4803072 EC03A1

4803022 EC10A1

2

3

4

Numere si etichete, pentru bransamente, coloane electrice, circuite telefonice sau cabluri electrice numere pentru bransamente sau coloane electrice

buc

Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

Cablu energie cyabzy 0,6/ 1 KV 3x 1,5 U s 8778 Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

20.60

m

15.00

5=3x4

10.00

material: manopera: utilaj: transport: 20.00 material: manopera: utilaj: transport:

material: manopera: utilaj: transport:

Cablu energie cyabzy 0,6/ 1 KV 3x 2,5 U s 8778 Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

15.45

m

20.00

Cablu energie cyaby 0,6/ 1 KV 4x 16 M s 8778 Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

20.60

m

24.00

Cablu energie cyabzy 0,6/ 1 KV 4x 6 U s 8778 Scoaterea învelisului de iuta de pe cabluri cu sectiunea conductorului de pana la 35 mmp

m

material: manopera: utilaj: transport:

material: manopera: utilaj: transport: 24.72

m

4.00

material: manopera: utilaj: transport:

15

EC19A1

Presetupa pentru fixarea cablurilorla electromotoare, tablouri sau aparate, având diametrul pana la 16 mm,

buc

6.00

material: manopera: utilaj: transport:

15.L 16

5217464 ED03I1

Presetupa pentru fixare cabluri latablouri,aparate D = 11 Comutator unipolar pentru scara (cruce de capat) constructie etansa în carcasa metalica, montat aparent pe dibluri de lemn

buc

Comutator cumpana st.simbol 0176 10 A ;250 v Corp de iluminat, pentru lampi fluorescente tubulare etans, montat pe dibluri de lemn

buc

6.00

buc

1.00

material: manopera: utilaj: transport:

16.L 17

5520366 EE12F1

1.00

buc

1.00

material: manopera: utilaj: transport: Pag 85

Page 432 of 556

STADIUL FIZIC: INSTALATII ELECTRICE SP3AU

0 17.L 18

1 5103687 ED07A1

2

3

4

Corp il.fl.fipra-01 240 220 V 2x 40w reflect+balast Contactor automat de 10 sau 25 A, racordat la conducte de aluminiu sau de cupru, exclusiv racordarea, montat pe dibluri de lemn

buc

1.00

buc

1.00

Contactor electromagn.cu releecaps.simb.3207 10a;500 V Tablou electric, format panou, dulap, celula sau pupitru, având greutatea pîna la 150 kg

buc

5=3x4

material: manopera: utilaj: transport:

18.L 19

5529570 EF03A1

1.00

buc

1.00

material: manopera: utilaj:

20

21

EF09A1

EF08B1

Racordarea conductelor din cupru, la borne (aparate, motoare, tablouri electrice), conducta având sectiunea de pîna la 10 mmp (exclusiv)

buc

Racordarea conductelor din aluminiu, la borne (aparate, motoare, tablouri electrice), conducta având sectiunea de 10 sau 16 mmp

buc

Cutie cu eclisa de legatura, pentru centura de împamîntare

buc

transport: 10.00 material: manopera: utilaj: transport: 30.00 material: manopera: utilaj: transport:

22

EG10A1

2.00

material: manopera: utilaj:

23

EH01A1

Încercarea cablurilor de energie electrica, de maximum 1 kV

buc

transport: 10.00 material: manopera: utilaj: transport:

24

25

EH05A1

W1P08A

Încercarea tablourilor de distributie, de comanda de protectie, de semnalizare, a pupitrelor de comanda si a cutiilor metalice cu cleme tablouri de marmura cu peste 6 circuite

buc

Verificarea prizelor de pamant pentru lucrari de instalatii electrice la...constructii

buc

1.00

material: manopera: utilaj: transport: 1.00

material: manopera: utilaj:

26

W1R06A1

Electrod din teava de otel de doi toli si jumatatepentru legarea la pamant in teren...normal

m

transport: 18.00 material: manopera: utilaj: transport:

27

EG09B1

Protectie pentru conducta de coborîre, pe lungime de 1,80 m, executata din otel cornier cu aripi egale, având dimensiunile 30 X 30 X 4 mm

buc

2.00

material: manopera: utilaj: transport:

Pag 86 Page 433 of 556

STADIUL FIZIC: INSTALATII ELECTRICE SP3AU

0 28

1 ATA01A

2

Montarea aparatelor in panouri,dulapuri,cutii,aparent sau ingropat cu greutatea:pina la 1 kg

3

buc

4

5=3x4

10.00

material: manopera: utilaj: transport:

29

W2E12A01

FIRIDA DE BRANSAMENT SI MASURA MONOFAZICA BPM

buc

1.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 87 Page 434 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC: Beneficiar:

DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MP COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

LA SP3AU

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSG02A1

2

Curatarea terenului...de iarba si buruieni

100 mp

3

4

5=3x4

0.25

material: manopera: utilaj: transport:

2

3

TSA01C1

TRB01A12

Sapatura manuala de pamant in spatii inchise la deblee,in canale deschise,in gropi de imprumut la indepartarea stratului vegetal de 10-30 cm grosime etc....in spatii intinse in pamant cu umiditate natuala aruncarea in depozit sau vehicul la H<0.6 m teren tare Transportul materialelor cu roaba pe pneuri inc asezare desc asezare grupa...1-3 distanta 20m

mc

7.50

material: manopera: utilaj: transport: tona

11.10

material: manopera: utilaj:

4

TRA01A05P

Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

tona

transport: 11.10 material: manopera: utilaj:

5

TSH32D1

Amenajari de alei de parc si terenuri de joc pentru copii ...cu imbracaminte din piatra de 8-16 mm in strat de 5 cm

mp

transport: 12.00 material: manopera: utilaj: transport:

6

TSH32A1

Amenajari de alei de parc si terenuri de joc pentru copii ...cu imbracaminte de balast de 10 cm grosime

mp

4.00

material: manopera: utilaj: transport:

7

CA01A1

Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

mc

1.87

material: manopera: utilaj: transport:

8

2100945

Beton de ciment

B 150 stas 3622

mc

1.88

material: manopera: utilaj: transport:

Pag 88 Page 435 of 556

STADIUL FIZIC: DRUM ACCES+SISTEMATIZARE VERTICALA L =2 M 5=25 MP

0 9

1 TRA06A30

2

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

LA SP3AU

3

tona

4

5=3x4

4.70

material: manopera: utilaj:

10

TSH26A1

Plantari pentru gard viu...arbusti foiosi,pe un rind

m

transport: 29.00 material: manopera: utilaj:

10.L 11

7202920 TSD01C1

Puiet arbust.foios.amorpha lfruticosa cal.1 H = 100cm Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

buc

transport: 103.36

mc

7.90

material: manopera: utilaj: transport:

12

13

TSD05A1

TRA01A30

Compactarea cu maiul mecanic de 150-200 Kg a umpluturilor in straturi succesive de 20-30 cm grosime,exclusiv udarea fiecarui strat in parte,umpluturile executandu-se din :...pamant necoeziv

100 mc

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

0.08

material: manopera: utilaj: transport: 0.80

material: manopera: utilaj: transport:

14

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

0.31

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 89 Page 436 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA02F1

TRB01C12

2

Sapatura manuala de pamant in spatii limitate,avand sub 1.00 m sau peste 1.00 m latime,executata fara sprijini,cu taluz vertical,la fundatii,canale,subsoluri,drenuri,trepte de infratire etc....in pamant coeziv mijlociu sau foarte coeziv adancime <1.5 m teren tare Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 20m

3

mc

4

5=3x4

12.00

material: manopera: utilaj: transport: tona

20.40

material: manopera: utilaj:

3

TSD01C1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

mc

transport: 12.00 material: manopera: utilaj:

4

5

TSD04D1

CA01A1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...20 cm grosime pamant coeziv Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

mc

transport: 12.00 material: manopera: utilaj: transport:

mc

13.92

material: manopera: utilaj:

6

2100945

Beton de ciment

B 150 stas 3622

mc

transport: 14.03 material: manopera: utilaj:

7

8

CO07B1

TRA06A30

Împrejmuiri din sârma, fixata pe stâlpi metalici cu panouri de gard din rama de otel rotund 0 16, mm si împletitura din sârma de otel zincata D= 2 mm cu ochiuri patrate de 16x16 mm, cu înaltimea la coama de 2,05 m Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

m

transport: 30.00 material: manopera: utilaj: transport:

tona

35.10

material: manopera: utilaj: transport:

Pag 90 Page 437 of 556

STADIUL FIZIC: ÎMPREJMUIRE STATIE SP3AU L - 30 M S-56 MP

0 9

1 TRA02A30

2

3

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

4

5=3x4

5.00

material: manopera: utilaj:

10

CP22C1

Sudarea pe contur a placilor de otel suprapuse 11-15mm inclusiv

m

transport: 64.00 material: manopera: utilaj: transport:

11

6101052

RAMA POARTA MICA 1220 X 2320 MM

BUC

1.00

material: manopera: utilaj: transport: 12

IZD04B

Vopsire confectiilor si constructiilor metalice cu vopsea de ulei in doua straturi, executate din profile cu grosimi peste 12 mm, cu pensula de mana

tona

0.20

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 91 Page 438 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

M1B13A1

2

Montarea...electropompei submersibile

3

m

4

5=3x4

20.00

material: manopera: utilaj: transport: 2

M7D07A1

Blindaje la galerii orizontale cu grosimea tolei...pina la 12 mm

tona

0.20

material: manopera: utilaj: transport:

3

M7C03A1

Revizia agregatelor rotative...polietajate cu greut 0,50-8 t

tona

0.50

material: manopera: utilaj: transport:

4

M7C04A1

Forte de munca pentru proba de punere in funct a agregrotative cu el mot cu putere...p la 100 kw

buc

1.00

material: manopera: utilaj:

5

M7C06A1

Energie electrica pentru...proba de punere in funct. a agreg. rotative cu motoare pina la 100 kw

kw

transport: 15.00 material: manopera: utilaj: transport:

6

M7G01A1

Forte de munca pentru probe la term....montaj. Instalatie anexe de ulei,pacura sau apa de racire

buc

1.00

material: manopera: utilaj:

7

M7G02A1

Energie electrica pentru probe la term. montaj. Instalatie anexe de...ulei,pacura sau apa de racire

kw

transport: 15.00 material: manopera: utilaj: transport:

8

IZD05B

Grunduirea manuala cu un strat de vopsea de miniu plumb a utilajelor tehnologice si a constructiilor metalice aferente acestora (suporti, sustineri, tiranti, console, platforme) la constructii metalice aferente utilajelor tehnologice

tona

1.00

material: manopera: utilaj: transport:

Pag 92 Page 439 of 556

STADIUL FIZIC: INSTALATII HIDROMECANICE - MONTAJ UTILAJ SP3AU

0 9

1 IZK08D

2

Vopsirea cu vopsea pe baza de ulei în doua straturi a...conductelor cu Dn pâna la 400 mm

3

tona

4

5=3x4

1.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 93 Page 440 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

BY PASS VARSARE SP3AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA02E1

CA01A1

2

Sapatura manuala de pamant in spatii limitate,avand sub 1.00 m sau peste 1.00 m latime,executata fara sprijini,cu taluz vertical,la fundatii,canale,subsoluri,drenuri,trepte de infratire etc....in pamant coeziv mijlociu sau foarte coeziv adancime <1.5 m teren mijlociu Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

3

mc

4

5=3x4

13.53

material: manopera: utilaj: transport:

mc

11.70

material: manopera: utilaj:

3

4

5

CZ0105A1

IFB10A1

IFB07B1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Filtru invers din straturi succesive din nisip si pietris sau piatra sparta , in grosime dupa compactare de :...30 cm cu nisip si pietris

mc

Pereu zidit din piatra bruta, in grosime de: 20 cm;

mp

transport: 11.70 material: manopera: utilaj: transport:

mp

15.00

material: manopera: utilaj: transport: 15.00 material: manopera: utilaj:

5.L 6

7

2201335 CZ0204B1

TSD01B1

Piatra bruta sortata r.magmatice pentru drum,anroc,pereuri Mortar de var - ciment pentru zidarie marca M 100-Z preparat cu ciment M 30, în instalatii centralizate cu adaos de var pasta ;

kg

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren mijlociu

mc

transport: 4,725.00

mc

1.05

material: manopera: utilaj: transport: 13.53 material: manopera: utilaj: transport:

Pag 94 Page 441 of 556

STADIUL FIZIC: BY PASS VARSARE SP3AU

0 8

1 TRA01A30

2

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

3

tona

4

5=3x4

7.65

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 95 Page 442 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

BY PASS SP3AU L-13 M

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

3

4

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA04C1

TSA04F1

TSA14C1

TRB01C15

2

Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-1,5 m teren tare Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 1,5-3 m teren tare. Sapatura manuala de pamant,de pana la 6 m adancime,in gropi cu sectiunea poligonala sau circulara,avand latimea sau diametrul cercului de 1.50-6 m,executata cu sprijiniri,cu evacuare manuala,la fundatii,puturi,rezervoare etc...in pamant cu umiditate naturala adancimea sapaturii 0-2 m teren tare Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 50m

3

mc

4

5=3x4

15.60

material: manopera: utilaj: transport: mc

5.20

material: manopera: utilaj: transport: mc

2.00

material: manopera: utilaj: transport:

tona

8.00

material: manopera: utilaj:

5

TSD01C1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

mc

transport: 22.80 material: manopera: utilaj:

6

7

TSD04B1

TSF05B1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv Sprijiniri de maluri,cu dulapi metalici asezati orizontal,la sapaturi executate in spatii limitate,avand latimea de pana la 1.50 m intre maluri ...adancimea sapaturii pana la 4 m interspatii intre dulapi de 0.21-0.60 m

mc

transport: 22.80 material: manopera: utilaj: transport:

mp

57.00

material: manopera: utilaj: transport:

Pag 96 Page 443 of 556

STADIUL FIZIC: BY PASS SP3AU L-13 M

0 8

1 ACE16A1

2

Montarea parapetelor si podetelor metalice de inventar la santuri pentru conducte

3

m

4

5=3x4

26.00

material: manopera: utilaj: transport:

9

ACE08A1

Umplutura in sant. la cond. de alim. cu apa si canalizare cu: nisip

mc

4.80

material: manopera: utilaj: transport:

10

TRA01A30

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

8.90

material: manopera: utilaj: transport:

11

ACD01L1

Capac si rama STAS 2308-81 pentru camine cu piesa suport carosabil IV

buc

1.00

material: manopera: utilaj: transport:

12

ACD08H1

Camin vane beton mon. sect. circ. pr. tip 1785-2 Di=1,25 m. h 2,0 fara apa subterana carosabil

buc

1.00

material: manopera: utilaj: transport:

13

ACB08G1

Montare teava otel pentru conducte imbinare prin sudura el. Dn 250

m

1.50

material: manopera: utilaj: transport:

13.L 14

3112646 ACA15G1

Teava pentru constructii fara sudura LC 250 x10 / OLT 35 s 404/2 Montare tuburi de presiune din poliestiren armate cu fibra sticla prin infas. in pamant exterioare clad. mf+cep p,d250

1.51

m m

13.00

material: manopera: utilaj:

15

6270043

TUB CANALIZARE GOFRAT CU MUFA SH8 D.250 MM

M

transport: 13.70 material: manopera: utilaj: transport:

16

6607628

Garnitura de etansare ans plan pn6/2,5 D = 250 M 100-500 g2x4 s1733

buc

3.00

material: manopera: utilaj:

17

3270029

BANDA AVERTIZOARE CONDUCTE CANALIZARE

M

transport: 13.70 material: manopera: utilaj: transport:

18

IZL01A

Izolatie usoara (citomare) executata manual ...pe traseu la tevi de otel

mp

2.40

material: manopera: utilaj: transport: Pag 97

Page 444 of 556

STADIUL FIZIC: BY PASS SP3AU L-13 M

0 19

1 IZL08A

2

Izolare manuala a conductelor montate in pamant cu...doua straturi de bitum si un rand de hartie tip sulfit tip I

3

mp

4

5=3x4

2.40

material: manopera: utilaj: transport:

20

ACE09H1

Montarea armaturilor cu actionare manuala sau mecanica (robinet vane ventile clap. compens. etc. )dn: 250

buc

1.00

material: manopera: utilaj: transport:

20.L 21

4502496 ACB10G1

Robinet sp t.ol i.al ets.in.bz des.3104.0 pn4 DN 250 Flansa din otel rotunda montata prin sudura electr. avand dn = 250

buc

1.00

buc

2.00

material: manopera: utilaj: transport:

21.L 22

4401537 ACB12G1

Flansa plata pn 6 250- 273 OL 37-2 et pu s 8012 Imbinare prin sudura electr. piese legatura executata la pozitie avand dn 250

2.00

buc buc

2.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 98 Page 445 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC: Beneficiar:

GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE AERISIRE I COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

2 BUCJ VENTIL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA04C1

ACD08H1

2

Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-1,5 m teren tare Camin vane beton mon. sect. circ. pr. tip 1785-2 Di=1,25 m. h 2,0 fara apa subterana carosabil

3

mc

4

5=3x4

5.00

material: manopera: utilaj: transport: buc

2.00

material: manopera: utilaj: transport:

3

ACB08A1

Montare teava otel pentru conducte imbinare prin sudura el. Dn 50

m

1.00

material: manopera: utilaj: transport:

3.L 4

3108229 ACB08C1

Teava pentru constructii fara sudura LC 57 x 3 / OLT 35 s 404/2 Montare teava otel pentru conducte imbinare prin sudura el. Dn 100

1.01

m m

2.00

material: manopera: utilaj: transport:

4.L 5

3110117 ACB05A1

Teava pentru constructii fara sudura LC 108 x 6 / OLT 35 s 404/2 Imbinare cu flanse piese leg. flanse armaturi si contoare cu dn 50 mm si pn 2,5-25 at.

m

2.01

buc

2.00

material: manopera: utilaj: transport:

Garnitura de etansare ans plan pn6/2,5 D = 50 M 100-500 g2x4 s1733

buc

2.02

5801071

Surub cap hexagonal precis gr. 5.8 s4272

M 12 x 40

buc

8.00

5842738

Piulita hexagonala semiprecise M 12 gr. 5 s 4071 Imbinare cu flanse piese leg. flanse armaturi si contoare cu dn 100 mm si pn 2,5- 6 at.

buc

8.00

5.L

6607551

5.L 5.L 6

ACB05C1

buc

4.00

material: manopera: utilaj: transport:

6.L

6607587

Garnitura de etansare ans plan pn6/2,5 D = 100 M 100-500 g2x4 s1733

buc

4.04

Pag 99 Page 446 of 556

STADIUL FIZIC: GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE

0 6.L 7

1 5801320 ACE09A1

2 BUCJ VENTIL

2

Surub cap hexagonal precis M 12 x100 gr. 5.8 s4272 Montarea armaturilor cu actionare manuala sau mecanica (robinet vane ventile clap. compens. etc. )dn: 50

3

AERISIRE I

4

buc

16.00

buc

1.00

5=3x4

material: manopera: utilaj: transport:

8

7319000

BUC

VENTIL AERISIRE 1 1/2 TOLI

1.00

material: manopera: utilaj: transport: 9

ACE09D1

Montarea armaturilor cu actionare manuala sau mecanica (robinet vane ventile clap. compens. etc. )dn: 100

buc

2.00

material: manopera: utilaj: transport:

10

7500112

BUC

VANA GOLIRE DN 100 MM

2.00

material: manopera: utilaj: transport: 11

ACB10A1

buc

Flansa din otel rotunda montata prin sudura electr. avand dn = 50

2.00

material: manopera: utilaj: transport:

11.L 12

4400791 ACB10C1

Flansa plata pn 6 50- 60 OL 37-2 pu s 8012 Flansa din otel rotunda montata prin sudura electr. avand dn = 100

et

2.00

buc buc

4.00

material: manopera: utilaj: transport:

12.L 13

4401147 IZL01A

Flansa plata pn 6 100- 114 OL 37-2k pu s 8012 Izolatie usoara (citomare) executata manual ...pe traseu la tevi de otel

et

buc

4.00

mp

2.00

material: manopera: utilaj: transport:

14

IZL08A

Izolare manuala a conductelor montate in pamant cu...doua straturi de bitum si un rand de hartie tip sulfit tip I

mp

2.00

material: manopera: utilaj: transport:

15

ACD01L1

Capac si rama STAS 2308-81 pentru camine cu piesa suport carosabil IV

buc

2.00

material: manopera: utilaj: transport:

procent

material

manopera

utilaj

transport

total

Total Cheltuieli directe:

Pag 100 Page 447 of 556

STADIUL FIZIC: GOLIRE SI AERISIRE TRAVERSARE SP3AU; CAHIN GOLIRE

0 Recapitulatia: Contributie asiguratorie pentru munca (CAM)

1 Recap 1 ianuarie 2018

2

2 BUCJ VENTIL

3

4

AERISIRE I

5=3x4

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 101 Page 448 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

BAZIN SP4AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

3

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA21B1

TSA21E1

TRI1AA01C1

2

Sapatura manuala de pamant,executata in cheson deschis,de pana la 18 m adancime,cu evacuarea pamantului cu macara Pionier...in pamant cu umiditate naturala adancimea sapaturii 2-6 m,teren tare Sapatura manuala de pamant,executata in cheson deschis,de pana la 18 m adancime,cu evacuarea pamantului cu macara Pionier...in pamant cu umiditate naturala adancimea sapaturii 6.01-10 m,teren tare Incarcarea materialelor, grupa a-grele si...marunte,prin aruncare rampa sau teren-auto categ.1

3

mc

4

5=3x4

75.40

material: manopera: utilaj: transport: mc

20.10

material: manopera: utilaj: transport: tona

172.00

material: manopera: utilaj: transport:

4

5

TSD04B1

TRA01A05P

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

mc

2.50

material: manopera: utilaj: transport: tona

172.00

material: manopera: utilaj: transport:

6

ACE08E1

Umplutura in sant la cond. de alim. cu apa si canalizare cu balast

mc

2.50

material: manopera: utilaj: transport:

7

TSD01B1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren mijlociu

mc

2.50

material: manopera: utilaj: transport:

8

TRA01A30

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

4.00

material: manopera: utilaj: transport:

Pag 102 Page 449 of 556

STADIUL FIZIC: BAZIN SP4AU

0 9

1 TSA25B1

2

Epuizarea mecanica a apei din sapaturi,in terenuri nisipoase cu:...instalatie de filtre aciculare cu motor Diesel de 37 CP

3

ora

4

5=3x4

240.00

material: manopera: utilaj: transport:

10

11

TSD04D1

CA01B1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...20 cm grosime pamant coeziv Turnarea betonului simplu în fundatii continue, izolate, socluri cu volum peste 3 mc, precum si în ziduri de sprijin

mc

2.50

material: manopera: utilaj: transport: mc

2.50

material: manopera: utilaj: transport:

12

13

14

15

16

17

18

CZ0105A1

CB03A1

CC02B1

CZ0301B1

CA02E1

CZ0107A1

CB41B1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Cofraje pentru beton armat în pereti drepti si diafragme, din panouri refolosibile, cu astereala din scânduri de rasinoase scurte si subscurte inclusiv sprijinirile la constructii având înaltimea pâna la 20 m inclusiv, cu planseu din beton monolit Montarea armaturilor din otel-beton în elemente de constructii, exclusiv cele din constructiile executate în cofraje glisante la constructii executate la o înaltime pâna la 35 m inclusiv, din bare fasonate având diametrul de 10 si 12 mm, în pereti si diafragme cu distantier din plastic Confectionarea armaturilor din otel beton pentru beton armat în fundatii fasonarea barelor pentru fundatii izolate (inclusiv fundatii pahar) continui si radiere, în ateliere centralizate OB 37, D= 10-16 mm ;

mc

Turnarea betonului armat in elementele constructiilor, exclusiv cele executate in cofraje glisante în rezervoare sau bazine subterane

mc

Beton marca B 250, cu agregate grele, sortate cu granulatia pâna la 16 mm, pentru executarea prin glisare a unor constructii înalte cu sectiune variabila (cosuri de fabrica, turnuri de racire, castele de apa etc), preparat cu ciment Pa 35 în instalatii necentralizate, la constructii cu înaltimea pâna la 50 m inclusiv; Sustineri din elemente de schela metalica, tubulara pentru cofrajele planseelor pentru cofraje amplasate la parter, cu înaltimea sustinerilor intre 3 si 6 m inclusiv

mc

2.50

material: manopera: utilaj: transport: mp

204.00

material: manopera: utilaj: transport: kg

4,079.00

material: manopera: utilaj: transport: kg

4,202.00

material: manopera: utilaj: transport: 57.30 material: manopera: utilaj: transport: 58.69 material: manopera: utilaj: transport:

mp

60.00

material: manopera: utilaj: transport:

Pag 103 Page 450 of 556

STADIUL FIZIC: BAZIN SP4AU

0 19

20

20.L 21

1 CB47C1

CL21A1

6309886 CL20B1

2

3

4

Schela metalica tubulara lucrari de finisaje la tavane si lucrari de monolitizari a prefabricatelor de beton armat, amplasate la înaltimi pâna la 7 m inclusiv;

mp

Confectii metalice diverse înglobate total sau partial in beton din profile laminate, tabla, tabla striata, otel beton, tevi pentru sustineri sau acoperiri

kg

Confectie metalice inglobate in beton Confectii metalice diverse, montate aparent balustrazi grile, chepeng, opritori, gratare

kg

transport: 263.00

kg

100.00

5=3x4

60.00

material: manopera: utilaj: transport: 263.00 material: manopera: utilaj:

material: manopera: utilaj:

21.L 22

6306274 CF12A1

Grilaj pentru scari,balcoane ornam.simpl. otel profil. Tencuieli speciale de protectie impermeabile, la cuve, bazine, rezervoare, castele de apa etc, la care presiunea apei nu depaseste 2 daN/cm2

kg

Curatarea de rugina cu peria de sârma a confectiilor si constructiilor metalice executate din profile cu grosimi între 8 mm si 12 mm inclusiv

tona

Vopsirea confectiilor si constructiilor metalice cu un strat de vopsea de din profile, cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

Vopsire confectiilor si constructiilor metalice cu vopsea de ulei in doua straturi, executate din profile cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

Transport utilaj...10km-65123003-automacara 0,045-0,059mn,h. max. 6,5m,des. max. 5,5m,moment max. 15tfm

buc

Ora pr. automacara cu brat zabrele 4,5-5,8 tf 2 schimburi

ora

transport: 100.00

mp

58.80

material: manopera: utilaj: transport:

23

IZD02A

1.00

material: manopera: utilaj: transport:

24

IZD03A

1.00

material: manopera: utilaj: transport:

25

IZD04A

1.00

material: manopera: utilaj: transport:

26

27

MDTC4641010

AUT1233

2.00

material: manopera: utilaj: transport: 150.00 material: manopera: utilaj:

20

29

TSA24C1

MDTC5506010

Epuizarea mecanica a apelor din sapaturi,in teren cu infiltratii puternice de apa,executate cu:...motopompa de apa de joasa presiune montata pe tractor U650,debit 200-500 Mc/h

ora

Transport utilaj...10 km 90100011 schela metalica tubulara de exterior cu s=640mp g=11-13,5t

buc

transport: 100.00 material: manopera: utilaj: transport: 1.00

material: manopera: utilaj: transport: Pag 104

Page 451 of 556

STADIUL FIZIC: BAZIN SP4AU

0 30

1 TRA06A30

2

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

3

tona

4

5=3x4

153.00

material: manopera: utilaj: transport:

31

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

4.20

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 105 Page 452 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

CAMIN GRATAR SP4AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA06A1

TSE01B1

2

Sapatura manuala de pamant,de la 2 m la 6 m adancime,in spatii limitate,peste 1 m latime,executata cu taluz inclinat,fara sprijiniri,pamantul fiind evacuat cu macara Pioner,la fundatii,subsoluri,canale etc....in pamant cu umiditate naturala teren mijlociu Nivelarea manuala a terenurilor si platformelor,cu denivelari de 10-20 cm,in:...teren mijlociu

3

mc

4

5=3x4

15.70

material: manopera: utilaj: transport: 100 mp

0.18

material: manopera: utilaj: transport:

3

4

TSD04B1

TRB01C13

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 30m

mc

0.35

material: manopera: utilaj: transport: tona

8.16

material: manopera: utilaj: transport:

5

CA01B1

Turnarea betonului simplu în fundatii continue, izolate, socluri cu volum peste 3 mc, precum si în ziduri de sprijin

mc

0.35

material: manopera: utilaj: transport:

6

7

8

CZ0105A1

CB03A1

CC02B1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Cofraje pentru beton armat în pereti drepti si diafragme, din panouri refolosibile, cu astereala din scânduri de rasinoase scurte si subscurte inclusiv sprijinirile la constructii având înaltimea pâna la 20 m inclusiv, cu planseu din beton monolit Montarea armaturilor din otel-beton în elemente de constructii, exclusiv cele din constructiile executate în cofraje glisante la constructii executate la o înaltime pâna la 35 m inclusiv, din bare fasonate având diametrul de 10 si 12 mm, în pereti si diafragme cu distantier din plastic

mc

0.35

material: manopera: utilaj: transport: mp

19.40

material: manopera: utilaj: transport: kg

445.00

material: manopera: utilaj: transport:

Pag 106 Page 453 of 556

STADIUL FIZIC: CAMIN GRATAR SP4AU

0 9

10

1 CZ0301B1

CA02E1

2

Confectionarea armaturilor din otel beton pentru beton armat în fundatii fasonarea barelor pentru fundatii izolate (inclusiv fundatii pahar) continui si radiere, în ateliere centralizate OB 37, D= 10-16 mm ;

kg

Turnarea betonului armat in elementele constructiilor, exclusiv cele executate in cofraje glisante în rezervoare sau bazine subterane

mc

Beton marca B 250, cu agregate grele, sortate cu granulatia pâna la 16 mm, pentru executarea prin glisare a unor constructii înalte cu sectiune variabila (cosuri de fabrica, turnuri de racire, castele de apa etc), preparat cu ciment Pa 35 în instalatii necentralizate, la constructii cu înaltimea pâna la 50 m inclusiv; Sustineri din elemente de schela metalica, tubulara pentru cofrajele planseelor pentru cofraje amplasate la parter, cu înaltimea sustinerilor intre 3 si 6 m inclusiv

mc

Confectii metalice diverse înglobate total sau partial in beton din profile laminate, tabla, tabla striata, otel beton, tevi pentru sustineri sau acoperiri

kg

Confectie metalice inglobate in beton Confectii metalice diverse, montate aparent balustrazi grile, chepeng, opritori, gratare

kg

3

4

5=3x4

458.00

material: manopera: utilaj: transport: 2.60

material: manopera: utilaj: transport:

11

12

13

13.L 14

CZ0107A1

CB41B1

CL21A1

6309886 CL20B1

2.62

material: manopera: utilaj: transport:

mp

3.00

material: manopera: utilaj: transport: 16.00 material: manopera: utilaj: transport: 16.00

kg

125.00

material: manopera: utilaj:

14.L 15

6306274 CF12A1

Grilaj pentru scari,balcoane ornam.simpl. otel profil. Tencuieli speciale de protectie impermeabile, la cuve, bazine, rezervoare, castele de apa etc, la care presiunea apei nu depaseste 2 daN/cm2

kg

Curatarea de rugina cu peria de sârma a confectiilor si constructiilor metalice executate din profile cu grosimi între 8 mm si 12 mm inclusiv

tona

Vopsirea confectiilor si constructiilor metalice cu un strat de vopsea de din profile, cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

Vopsire confectiilor si constructiilor metalice cu vopsea de ulei in doua straturi, executate din profile cu grosimi între 8 mm si 12 mm inclusiv, cu pensula de de mana

tona

transport: 125.00

mp

10.00

material: manopera: utilaj: transport:

16

IZD02A

0.15

material: manopera: utilaj: transport:

17

IZD03A

0.15

material: manopera: utilaj: transport:

18

IZD04A

0.15

material: manopera: utilaj: transport:

Pag 107 Page 454 of 556

STADIUL FIZIC: CAMIN GRATAR SP4AU

0 19

1 TRA06A30

2

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

3

tona

4

5=3x4

7.50

material: manopera: utilaj: transport:

20

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

0.60

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 108 Page 455 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

INSTALATII HIDRAULICE STATIE POMPARE SP4AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

SA26C1

2

RACORD COMPRESIE TIP FE 90x2'

3

buc

4

5=3x4

1.00

material: manopera: utilaj: transport: 1.L 2

20020519 ACA15D1

Racord <waterkit> compres.d. 90x2 fe MONTARE CONDUCTA PEHD PE8O, PN6

1.00

buc m

5.75

material: manopera: utilaj: transport: 3

6702001

CONDUCTA PEHD PE80 PN6 DN 63 MM

M

0.50

material: manopera: utilaj: transport: 4

6701128

Teava HDPE 80 312uni7611.7615 pn6 DN 90x5.1 cod 64000091

m

5.25

material: manopera: utilaj: transport:

5

SA35D1

TEU COMPRESIUNE EGAL DE 90 MM

buc

1.00

material: manopera: utilaj: transport: 6

4105548

TEU COMPRESIUNE EGAL DE 90 MM

BUC

1.00

material: manopera: utilaj: transport: 7

SA26D1

MUFA REDUSA DE COMPRESIUNE De 110/90

buc

1.00

material: manopera: utilaj: transport:

8

4105158

MUFA REDUSA DE COMPRESIUNE De 110/90

BUC

1.00

material: manopera: utilaj: transport:

Pag 109 Page 456 of 556

STADIUL FIZIC: INSTALATII HIDRAULICE STATIE POMPARE SP4AU

0 9

1 SA26C1

2

MUFA REDUSA COMPRESIUNE De 90/63

3

buc

4

5=3x4

1.00

material: manopera: utilaj: transport: 10

4105159

MUFA REDUSA COMPRESIUNE De 90/63

BUC

1.00

material: manopera: utilaj: transport: 11

SD30C1

COT COMPRESIUNE LA 90 GR TIP FI 63 X 1 1/2 TOLI DN 1 1/2 TOL

buc

1.00

material: manopera: utilaj: transport:

12

4105160

COT COMPRESIUNE LA 90 GR TIP FI 63 X 1 1/2 TOLI DN 1 1/2 TOL

BUC

1.00

material: manopera: utilaj: transport:

13

SF07A1

Capac sau gratar cu rama din fonta pentru camine de vizitare,gura scurgere...capac tip 1 necaros. 45kg

buc

1.00

material: manopera: utilaj: transport:

14

ACD01L1

Capac si rama STAS 2308-81 pentru camine cu piesa suport carosabil IV

buc

2.00

material: manopera: utilaj: transport:

15

SD14D1

Robinet trecere cu ventil si mufe (cu descarcare) pentru tevi din otel cu...d=1 1/2

buc

1.00

material: manopera: utilaj: transport:

15.L 16

4202503 ACA10A1

Robinet trec. fonta 1 1/2 A vent+mufa pn10 s6480 RACORD FURTUN

1.00

buc m

1.00

material: manopera: utilaj: 17

SA43K1

COLIER DE FIXARE CU DIBLU SI FURTUN DIAMETRU BRATARA 4 TOLI

buc

transport: 10.00 material: manopera: utilaj: transport:

18

IZB04A2

Protectia anticoroziva a strapungerilor (la conducte, sifoane etc.) cu folie tip , într-un strat, lipita cu adeziv Prenadez, montare ;

buc

2.00

material: manopera: utilaj:

19

ACD02A1

Trepte din otel beton d=20 mm pentru camine din tuburi beton la retele de conducte

buc

transport: 48.00 material: manopera: utilaj: transport: Pag 110

Page 457 of 556

STADIUL FIZIC: INSTALATII HIDRAULICE STATIE POMPARE SP4AU

0 20

1 5842738

2

Piulita hexagonala semiprecise M 12 gr. 5 s 4071

3

buc

4

5=3x4

16.00

material: manopera: utilaj:

21

5881265

Saiba gros.plata pentru metale M 12, OL 34, s 1388

buc

transport: 16.00 material: manopera: utilaj: transport:

22

5881270

BUC

DIBLU CONEXPOND M12-150

8.00

material: manopera: utilaj: transport: 24

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

5.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 111 Page 458 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

INSTALATII ELECTRICE SP4AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

ATD29D

2

Suporti, stelaje, constructii metalice confectionate pe santier pentru aparate,elem. automat,sust. cablu,cond.

3

kg

4

5=3x4

30.00

material: manopera: utilaj:

1.L 2

3500130 CK26C1

Cornier aripi eg.lam cald s 424 25x 25x 3 OL 37-1n Dibluri din lemn si bolturi împuscate bolturi metalice impuscate in plansee sau pereti din beton armat

kg

transport: 30.00

buc

10.00

material: manopera: utilaj:

3

CK26C1

buc

BOLTURI METALICE

transport: 10.00 material: manopera: utilaj:

4

4.L 5

6

EA12A1

7356549 EA06A1

EA16A1

Tub metalic, flexibil, de protectie, neetans cu spirale cu 2 renuri, de forma unui patrulater, tip SPD, având diametrul de 13,5-23mm

m

Tub metalic flex.prot.neetans tip spd-roman D = 23 mm Teava din otel, neagra, pentru instalatii, sudata longitudinal, montata îngropat sau aparent, în mediul normal, având diametrul interior de 1/2 toli montata îngropat în pardoseala

m

Doza de derivatie, pentru cabluri sau tevi de instalatii, montata în mediu exploziv, avînd diametrul de 1/2" - 1 1/4"

buc

transport: 10.00 material: manopera: utilaj: transport: 10.25

m

10.00

material: manopera: utilaj: transport: 5.00

material: manopera: utilaj: transport:

7

8

EA17B1

EB08B1

Doza de ramificatie si tragere, de tip rotund sau patrat, pentru instalatiile de antena colectiva R + TV si ramificatia circuitelor instalatiilor electrice, inglobate in beton tip patrat, RIPS, marimea 29

buc

Conducta de otel, pentru legarea la pamînt sau la nul, a receptoarelor sau aparatelor electrice, montata pe zid de caramida sau beton, conducta fiind banda de otel, laminate la cald, de 25x4 mm

m

4.00

material: manopera: utilaj: transport: 8.00

material: manopera: utilaj: transport: Pag 112

Page 459 of 556

STADIUL FIZIC: INSTALATII ELECTRICE SP4AU

0 9

10

10.L 11

11.L 12

12.L 13

13.L 14

1 EB15A1

EC03A1

4802573 EC03A1

4802597 EC03A1

4803072 EC03A1

4803022 EC10A1

2

3

4

Numere si etichete, pentru bransamente, coloane electrice, circuite telefonice sau cabluri electrice numere pentru bransamente sau coloane electrice

buc

Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

Cablu energie cyabzy 0,6/ 1 KV 3x 1,5 U s 8778 Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

20.60

m

15.00

5=3x4

10.00

material: manopera: utilaj: transport: 20.00 material: manopera: utilaj: transport:

material: manopera: utilaj: transport:

Cablu energie cyabzy 0,6/ 1 KV 3x 2,5 U s 8778 Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

15.45

m

20.00

Cablu energie cyaby 0,6/ 1 KV 4x 16 M s 8778 Cablu pentru energie electrica, montat cu scoabe (cleme de prindere) pe console sau pe pod de cabluri, cablul având conducte cu sectiunea pîna la 10 mmp, montat pe console fixate cu dibluri (bolturi) metalice

m

20.60

m

24.00

Cablu energie cyabzy 0,6/ 1 KV 4x 6 U s 8778 Scoaterea învelisului de iuta de pe cabluri cu sectiunea conductorului de pana la 35 mmp

m

material: manopera: utilaj: transport:

material: manopera: utilaj: transport: 24.72

m

4.00

material: manopera: utilaj: transport:

15

EC19A1

Presetupa pentru fixarea cablurilorla electromotoare, tablouri sau aparate, având diametrul pana la 16 mm,

buc

6.00

material: manopera: utilaj: transport:

15.L 16

5217464 ED03I1

Presetupa pentru fixare cabluri latablouri,aparate D = 11 Comutator unipolar pentru scara (cruce de capat) constructie etansa în carcasa metalica, montat aparent pe dibluri de lemn

buc

Comutator cumpana st.simbol 0176 10 A ;250 v Corp de iluminat, pentru lampi fluorescente tubulare etans, montat pe dibluri de lemn

buc

6.00

buc

1.00

material: manopera: utilaj: transport:

16.L 17

5520366 EE12F1

1.00

buc

1.00

material: manopera: utilaj: transport: Pag 113

Page 460 of 556

STADIUL FIZIC: INSTALATII ELECTRICE SP4AU

0 17.L 18

1 5103687 ED07A1

2

3

4

Corp il.fl.fipra-01 240 220 V 2x 40w reflect+balast Contactor automat de 10 sau 25 A, racordat la conducte de aluminiu sau de cupru, exclusiv racordarea, montat pe dibluri de lemn

buc

1.00

buc

1.00

Contactor electromagn.cu releecaps.simb.3207 10a;500 V Tablou electric, format panou, dulap, celula sau pupitru, având greutatea pîna la 150 kg

buc

5=3x4

material: manopera: utilaj: transport:

18.L 19

5529570 EF03A1

1.00

buc

1.00

material: manopera: utilaj:

20

21

EF09A1

EF08B1

Racordarea conductelor din cupru, la borne (aparate, motoare, tablouri electrice), conducta având sectiunea de pîna la 10 mmp (exclusiv)

buc

Racordarea conductelor din aluminiu, la borne (aparate, motoare, tablouri electrice), conducta având sectiunea de 10 sau 16 mmp

buc

Cutie cu eclisa de legatura, pentru centura de împamîntare

buc

transport: 10.00 material: manopera: utilaj: transport: 30.00 material: manopera: utilaj: transport:

22

EG10A1

2.00

material: manopera: utilaj:

23

EH01A1

Încercarea cablurilor de energie electrica, de maximum 1 kV

buc

transport: 10.00 material: manopera: utilaj: transport:

24

25

EH05A1

W1P08A

Încercarea tablourilor de distributie, de comanda de protectie, de semnalizare, a pupitrelor de comanda si a cutiilor metalice cu cleme tablouri de marmura cu peste 6 circuite

buc

Verificarea prizelor de pamant pentru lucrari de instalatii electrice la...constructii

buc

1.00

material: manopera: utilaj: transport: 1.00

material: manopera: utilaj:

26

W1R06A1

Electrod din teava de otel de doi toli si jumatatepentru legarea la pamant in teren...normal

m

transport: 18.00 material: manopera: utilaj: transport:

27

EG09B1

Protectie pentru conducta de coborîre, pe lungime de 1,80 m, executata din otel cornier cu aripi egale, având dimensiunile 30 X 30 X 4 mm

buc

2.00

material: manopera: utilaj: transport:

Pag 114 Page 461 of 556

STADIUL FIZIC: INSTALATII ELECTRICE SP4AU

0 28

1 ATA01A

2

Montarea aparatelor in panouri,dulapuri,cutii,aparent sau ingropat cu greutatea:pina la 1 kg

3

buc

4

5=3x4

10.00

material: manopera: utilaj: transport:

29

W2E12A01

FIRIDA DE BRANSAMENT SI MASURA MONOFAZICA BPM

buc

1.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 115 Page 462 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC: Beneficiar:

DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MP COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

LA SP4AU

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSG02A1

2

Curatarea terenului...de iarba si buruieni

100 mp

3

4

5=3x4

0.25

material: manopera: utilaj: transport:

2

3

TSA01C1

TRB01A12

Sapatura manuala de pamant in spatii inchise la deblee,in canale deschise,in gropi de imprumut la indepartarea stratului vegetal de 10-30 cm grosime etc....in spatii intinse in pamant cu umiditate natuala aruncarea in depozit sau vehicul la H<0.6 m teren tare Transportul materialelor cu roaba pe pneuri inc asezare desc asezare grupa...1-3 distanta 20m

mc

7.50

material: manopera: utilaj: transport: tona

11.10

material: manopera: utilaj:

4

TRA01A05P

Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

tona

transport: 11.10 material: manopera: utilaj:

5

TSH32D1

Amenajari de alei de parc si terenuri de joc pentru copii ...cu imbracaminte din piatra de 8-16 mm in strat de 5 cm

mp

transport: 12.00 material: manopera: utilaj: transport:

6

TSH32A1

Amenajari de alei de parc si terenuri de joc pentru copii ...cu imbracaminte de balast de 10 cm grosime

mp

4.00

material: manopera: utilaj: transport:

7

CA01A1

Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

mc

1.87

material: manopera: utilaj: transport:

8

2100945

Beton de ciment

B 150 stas 3622

mc

1.88

material: manopera: utilaj: transport:

Pag 116 Page 463 of 556

STADIUL FIZIC: DRUM ACCES+SISTEHATIZARE VERTICALA L -2 M S-25 MP

0 9

1 TRA06A30

LA SP4AU

2

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

3

tona

4

5=3x4

4.70

material: manopera: utilaj:

10

TSH26A1

Plantari pentru gard viu...arbusti foiosi,pe un rind

m

transport: 20.00 material: manopera: utilaj:

10.L 11

7202920 TSD01C1

Puiet arbust.foios.amorpha lfruticosa cal.1 H = 100cm Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

buc

transport: 71.28

mc

7.90

material: manopera: utilaj: transport:

12

13

TSD05A1

TRA01A30

Compactarea cu maiul mecanic de 150-200 Kg a umpluturilor in straturi succesive de 20-30 cm grosime,exclusiv udarea fiecarui strat in parte,umpluturile executandu-se din :...pamant necoeziv

100 mc

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

0.08

material: manopera: utilaj: transport: 0.80

material: manopera: utilaj: transport:

14

TRA02A30

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

0.30

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 117 Page 464 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA02F1

TRB01C12

2

Sapatura manuala de pamant in spatii limitate,avand sub 1.00 m sau peste 1.00 m latime,executata fara sprijini,cu taluz vertical,la fundatii,canale,subsoluri,drenuri,trepte de infratire etc....in pamant coeziv mijlociu sau foarte coeziv adancime <1.5 m teren tare Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 20m

3

4

mc

5=3x4

9.60

material: manopera: utilaj: transport: tona

16.40

material: manopera: utilaj: transport:

3

TSD01C1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

mc

9.60

material: manopera: utilaj: transport:

4

5

TSD04D1

CA01A1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...20 cm grosime pamant coeziv Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

mc

9.60

material: manopera: utilaj: transport: mc

11.20

material: manopera: utilaj:

6

2100945

Beton de ciment

B 150 stas 3622

mc

transport: 11.30 material: manopera: utilaj:

7

8

CO07B1

TRA06A30

Împrejmuiri din sârma, fixata pe stâlpi metalici cu panouri de gard din rama de otel rotund 0 16, mm si împletitura din sârma de otel zincata D= 2 mm cu ochiuri patrate de 16x16 mm, cu înaltimea la coama de 2,05 m Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

m

transport: 24.00 material: manopera: utilaj: transport:

tona

28.30

material: manopera: utilaj: transport:

Pag 118 Page 465 of 556

STADIUL FIZIC: ÎMPREJMUIRE STATIE SP4AU L = 24 M S-36 MP

0 9

1 TRA02A30

2

3

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km.

4

5=3x4

5.00

material: manopera: utilaj:

10

CP22C1

Sudarea pe contur a placilor de otel suprapuse 11-15mm inclusiv

m

transport: 48.00 material: manopera: utilaj: transport:

11

6101052

RAMA POARTA MICA 1220 X 2320 MM

BUC

1.00

material: manopera: utilaj: transport: 12

IZD04B

Vopsire confectiilor si constructiilor metalice cu vopsea de ulei in doua straturi, executate din profile cu grosimi peste 12 mm, cu pensula de mana

tona

0.20

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 119 Page 466 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

M1B13A1

2

Montarea...electropompei submersibile

3

m

4

5=3x4

20.00

material: manopera: utilaj: transport: 2

M7D07A1

Blindaje la galerii orizontale cu grosimea tolei...pina la 12 mm

tona

0.20

material: manopera: utilaj: transport:

3

M7C03A1

Revizia agregatelor rotative...polietajate cu greut 0,50-8 t

tona

0.50

material: manopera: utilaj: transport:

4

M7C04A1

Forte de munca pentru proba de punere in funct a agregrotative cu el mot cu putere...p la 100 kw

buc

1.00

material: manopera: utilaj:

5

M7C06A1

Energie electrica pentru...proba de punere in funct. a agreg. rotative cu motoare pina la 100 kw

kw

transport: 15.00 material: manopera: utilaj: transport:

6

M7G01A1

Forte de munca pentru probe la term....montaj. Instalatie anexe de ulei,pacura sau apa de racire

buc

1.00

material: manopera: utilaj:

7

M7G02A1

Energie electrica pentru probe la term. montaj. Instalatie anexe de...ulei,pacura sau apa de racire

kw

transport: 15.00 material: manopera: utilaj: transport:

8

IZD05B

Grunduirea manuala cu un strat de vopsea de miniu plumb a utilajelor tehnologice si a constructiilor metalice aferente acestora (suporti, sustineri, tiranti, console, platforme) la constructii metalice aferente utilajelor tehnologice

tona

1.00

material: manopera: utilaj: transport:

Pag 120 Page 467 of 556

STADIUL FIZIC: INSTALAT!I HIDROMECANICE - MONTAJ UTILAJ SP4AU

0 9

1 IZK08D

2

Vopsirea cu vopsea pe baza de ulei în doua straturi a...conductelor cu Dn pâna la 400 mm

3

tona

4

5=3x4

1.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 121 Page 468 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

BY PASS VARSARE SP4AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA02E1

CA01A1

2

Sapatura manuala de pamant in spatii limitate,avand sub 1.00 m sau peste 1.00 m latime,executata fara sprijini,cu taluz vertical,la fundatii,canale,subsoluri,drenuri,trepte de infratire etc....in pamant coeziv mijlociu sau foarte coeziv adancime <1.5 m teren mijlociu Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

3

mc

4

5=3x4

13.53

material: manopera: utilaj: transport:

mc

11.70

material: manopera: utilaj:

3

4

5

CZ0105A1

IFB10A1

IFB07B1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Filtru invers din straturi succesive din nisip si pietris sau piatra sparta , in grosime dupa compactare de :...30 cm cu nisip si pietris

mc

Pereu zidit din piatra bruta, in grosime de: 20 cm;

mp

transport: 11.70 material: manopera: utilaj: transport:

mp

15.00

material: manopera: utilaj: transport: 15.00 material: manopera: utilaj:

5.L 6

7

2201335 CZ0204B1

TSD01B1

Piatra bruta sortata r.magmatice pentru drum,anroc,pereuri Mortar de var - ciment pentru zidarie marca M 100-Z preparat cu ciment M 30, în instalatii centralizate cu adaos de var pasta ;

kg

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren mijlociu

mc

transport: 4,725.00

mc

1.05

material: manopera: utilaj: transport: 13.53 material: manopera: utilaj: transport:

Pag 122 Page 469 of 556

STADIUL FIZIC: BY PASS VARSARE SP4AU

0 8

1 TRA01A30

2

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

3

tona

4

5=3x4

7.65

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 123 Page 470 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

BY PASS SP4AU L=4 M

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

3

4

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA04C1

TSA04F1

TSA14C1

TRB01C15

2

Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-1,5 m teren tare Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 1,5-3 m teren tare. Sapatura manuala de pamant,de pana la 6 m adancime,in gropi cu sectiunea poligonala sau circulara,avand latimea sau diametrul cercului de 1.50-6 m,executata cu sprijiniri,cu evacuare manuala,la fundatii,puturi,rezervoare etc...in pamant cu umiditate naturala adancimea sapaturii 0-2 m teren tare Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 50m

3

4

mc

5=3x4

4.80

material: manopera: utilaj: transport: mc

1.60

material: manopera: utilaj: transport: mc

2.00

material: manopera: utilaj: transport:

tona

2.50

material: manopera: utilaj: transport:

5

TSD01C1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

mc

8.40

material: manopera: utilaj: transport:

6

7

TSD04B1

TSF05B1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv Sprijiniri de maluri,cu dulapi metalici asezati orizontal,la sapaturi executate in spatii limitate,avand latimea de pana la 1.50 m intre maluri ...adancimea sapaturii pana la 4 m interspatii intre dulapi de 0.21-0.60 m

mc

8.40

material: manopera: utilaj: transport: mp

21.00

material: manopera: utilaj: transport:

Pag 124 Page 471 of 556

STADIUL FIZIC: BY PASS SP4AU L=4 M

0 8

1 ACE16A1

2

Montarea parapetelor si podetelor metalice de inventar la santuri pentru conducte

3

m

4

5=3x4

8.00

material: manopera: utilaj: transport:

9

ACE08A1

Umplutura in sant. la cond. de alim. cu apa si canalizare cu: nisip

mc

1.48

material: manopera: utilaj: transport:

10

TRA01A30

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

2.80

material: manopera: utilaj: transport:

11

ACD01L1

Capac si rama STAS 2308-81 pentru camine cu piesa suport carosabil IV

buc

1.00

material: manopera: utilaj: transport:

12

ACD08H1

Camin vane beton mon. sect. circ. pr. tip 1785-2 Di=1,25 m. h 2,0 fara apa subterana carosabil

buc

1.00

material: manopera: utilaj: transport:

13

ACB08G1

Montare teava otel pentru conducte imbinare prin sudura el. Dn 250

m

1.50

material: manopera: utilaj: transport:

13.L 14

3112646 ACA15G1

Teava pentru constructii fara sudura LC 250 x10 / OLT 35 s 404/2 Montare tuburi de presiune din poliestiren armate cu fibra sticla prin infas. in pamant exterioare clad. mf+cep p,d250

1.51

m m

4.00

material: manopera: utilaj: transport:

15

6270043

TUB CANALIZARE GOFRAT CU MUFA SH8 D.250 MM

M

4.20

material: manopera: utilaj: transport:

16

6607628

Garnitura de etansare ans plan pn6/2,5 D = 250 M 100-500 g2x4 s1733

buc

1.00

material: manopera: utilaj: transport:

17

3270029

BANDA AVERTIZOARE CONDUCTE CANALIZARE

M

4.20

material: manopera: utilaj: transport:

18

IZL01A

Izolatie usoara (citomare) executata manual ...pe traseu la tevi de otel

mp

2.40

material: manopera: utilaj: transport: Pag 125

Page 472 of 556

STADIUL FIZIC: BY PASS SP4AU L=4 M

0 19

1 IZL08A

2

Izolare manuala a conductelor montate in pamant cu...doua straturi de bitum si un rand de hartie tip sulfit tip I

3

mp

4

5=3x4

2.40

material: manopera: utilaj: transport:

20

ACE09H1

Montarea armaturilor cu actionare manuala sau mecanica (robinet vane ventile clap. compens. etc. )dn: 250

buc

1.00

material: manopera: utilaj: transport:

20.L 21

4502496 ACB10G1

Robinet sp t.ol i.al ets.in.bz des.3104.0 pn4 DN 250 Flansa din otel rotunda montata prin sudura electr. avand dn = 250

buc

1.00

buc

2.00

material: manopera: utilaj: transport:

21.L 22

4401537 ACB12G1

Flansa plata pn 6 250- 273 OL 37-2 et pu s 8012 Imbinare prin sudura electr. piese legatura executata la pozitie avand dn 250

2.00

buc buc

2.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 126 Page 473 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC: Beneficiar:

GOLIRE SI AERISIRE TRAVERSARE SP4AU; COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

CAMIN GOLIRE 2 BUCr VENTIL AERISIRE

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA04C1

ACD08H1

2

Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-1,5 m teren tare Camin vane beton mon. sect. circ. pr. tip 1785-2 Di=1,25 m. h 2,0 fara apa subterana carosabil

3

4

mc

5=3x4

5.00

material: manopera: utilaj: transport: buc

2.00

material: manopera: utilaj: transport:

3

ACB08A1

Montare teava otel pentru conducte imbinare prin sudura el. Dn 50

m

1.00

material: manopera: utilaj: transport:

3.L 4

3108229 ACB08C1

Teava pentru constructii fara sudura LC 57 x 3 / OLT 35 s 404/2 Montare teava otel pentru conducte imbinare prin sudura el. Dn 100

1.01

m m

2.00

material: manopera: utilaj: transport:

4.L 5

3110117 ACB05A1

Teava pentru constructii fara sudura LC 108 x 6 / OLT 35 s 404/2 Imbinare cu flanse piese leg. flanse armaturi si contoare cu dn 50 mm si pn 2,5-25 at.

2.01

m buc

2.00

material: manopera: utilaj: transport:

5.L

6607551

Garnitura de etansare ans plan pn6/2,5 D = 50 M 100-500 g2x4 s1733

buc

2.02

5.L

5801071

Surub cap hexagonal precis gr. 5.8 s4272

M 12 x 40

buc

8.00

5.L

5842738

Piulita hexagonala semiprecise M 12 gr. 5 s 4071 Imbinare cu flanse piese leg. flanse armaturi si contoare cu dn 100 mm si pn 2,5- 6 at.

buc

8.00

buc

4.00

6

ACB05C1

material: manopera: utilaj: transport:

6.L

6607587

6.L

5801320

Garnitura de etansare ans plan pn6/2,5 D = 100 M 100-500 g2x4 s1733

buc

4.04

Surub cap hexagonal precis gr. 5.8 s4272

buc

16.00

M 12 x100

Pag 127 Page 474 of 556

STADIUL FIZIC: GOLIRE SI AERISIRE TRAVERSARE SP4AU;

0 7

CAMIN GOLIRE 2 BUCr VENTIL AERISIRE

1 ACE09A1

2

Montarea armaturilor cu actionare manuala sau mecanica (robinet vane ventile clap. compens. etc. )dn: 50

3

buc

4

5=3x4

1.00

material: manopera: utilaj: transport:

8

7319000

BUC

VENTIL AERISIRE 1 1/2 TOLI

1.00

material: manopera: utilaj: transport: 9

ACE09D1

Montarea armaturilor cu actionare manuala sau mecanica (robinet vane ventile clap. compens. etc. )dn: 100

buc

2.00

material: manopera: utilaj: transport:

10

7500112

BUC

VANA GOLIRE DN 100 MM

2.00

material: manopera: utilaj: transport: 11

ACB10A1

buc

Flansa din otel rotunda montata prin sudura electr. avand dn = 50

2.00

material: manopera: utilaj: transport:

11.L 12

4400791 ACB10C1

Flansa plata pn 6 50- 60 OL 37-2 pu s 8012 Flansa din otel rotunda montata prin sudura electr. avand dn = 100

et

2.00

buc buc

4.00

material: manopera: utilaj: transport:

12.L 13

4401147 IZL01A

Flansa plata pn 6 100- 114 OL 37-2k pu s 8012 Izolatie usoara (citomare) executata manual ...pe traseu la tevi de otel

et

4.00

buc mp

2.00

material: manopera: utilaj: transport:

14

IZL08A

Izolare manuala a conductelor montate in pamant cu...doua straturi de bitum si un rand de hartie tip sulfit tip I

mp

2.00

material: manopera: utilaj: transport:

15

ACD01L1

Capac si rama STAS 2308-81 pentru camine cu piesa suport carosabil IV

buc

2.00

material: manopera: utilaj: transport:

procent

material

manopera

utilaj

transport

total

Total Cheltuieli directe:

Pag 128 Page 475 of 556

STADIUL FIZIC: GOLIRE SI AERISIRE TRAVERSARE SP4AU;

0 Recapitulatia: Contributie asiguratorie pentru munca (CAM)

CAMIN GOLIRE 2 BUCr VENTIL AERISIRE

1 Recap 1 ianuarie 2018

2

3

4

5=3x4

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 129 Page 476 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC: Beneficiar:

CONDUCTA REFULARE-POMPARE SPlAU PEID COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

PN6 DN 110 KM L = 75 M

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA04C1

3270029

2

Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-1,5 m teren tare BANDA AVERTIZOARE CONDUCTE CANALIZARE

3

mc

4

5=3x4

84.00

material: manopera: utilaj: transport: M

78.80

material: manopera: utilaj:

3

4

TSF05A1

ACE08A1

Sprijiniri de maluri,cu dulapi metalici asezati orizontal,la sapaturi executate in spatii limitate,avand latimea de pana la 1.50 m intre maluri ...adancimea sapaturii pana la 4 m interspatii intre dulapi de 0.00-0.20 m Umplutura in sant. la cond. de alim. cu apa si canalizare cu: nisip

mp

transport: 210.00 material: manopera: utilaj: transport:

mc

24.00

material: manopera: utilaj:

5

ACA11D1-asim

Asim - Montare Teava din PEHD in pamant , in exteriorlul cladirilor avand dn 110

m

transport: 75.00 material: manopera: utilaj:

6

6710468

TEAVA PEID PE100 PN6 DN 110 MM

M

transport: 79.00 material: manopera: utilaj:

7

8

CO30A1

CO41A1

Strat termoizolant cu placi aglomerate lemnoase de 18 cm grosime, asezate pe un strat de carton bitumat si lipit cu bitum, la usile si ferestrele cu obloane de la complexele avicole

mp

Strat de carton bitumat peste drenuri in vederea turnarii betoanelor in fundatii

mp

transport: 15.00 material: manopera: utilaj: transport: 15.00 material: manopera: utilaj: transport:

Pag 130 Page 477 of 556

STADIUL FIZIC: CONDUCTA REFULARE-POMPARE SPlAU PEID

0 9

PN6 DN 110 KM L = 75 M

1 2602362

2

Placa polistiren expandat baumit at-n1 8 mm.gros.

3

mp

4

5=3x4

15.00

material: manopera: utilaj:

10

3606001

TABLA ZINCATA DE 1 MM GROSIME

MP

transport: 15.00 material: manopera: utilaj:

11

12

13

13.L 14

IZL02C

IZL04A

CL21A1

6309886 TSD01B1

Izolare anticoroziva executata manual pe traseu la tevi de otel cu protectie exterioara din impaslitura din fibre de sticla, izolatia fiind...foarte intarita

mp

Protejare cu sipci a izolatiei la tevi otel pentru subtraversari de drumuri si cai ferate in tuburi de protectie avand Dn ...pina la 150 mm

m

Confectii metalice diverse înglobate total sau partial in beton din profile laminate, tabla, tabla striata, otel beton, tevi pentru sustineri sau acoperiri

kg

Confectie metalice inglobate in beton Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren mijlociu

kg

transport: 15.00 material: manopera: utilaj: transport: 10.00 material: manopera: utilaj: transport: 50.00 material: manopera: utilaj: transport: 50.00

mc

84.00

material: manopera: utilaj:

15

16

TSD04A1

TRA01A30

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant necoeziv Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

mc

transport: 84.00 material: manopera: utilaj: transport:

tona

44.40

material: manopera: utilaj:

17

ACE16A1

Montarea parapetelor si podetelor metalice de inventar la santuri pentru conducte

m

transport: 150.00 material: manopera: utilaj: transport:

18

ACB13D1

Inchidere capete conducta otel pentru proba presiune avand dn 125

buc

2.00

material: manopera: utilaj:

19

ACE06B1

Sustineri din lemn pentru cabluri si conducte intilnite in sapatura : usoare

m

transport: 10.00 material: manopera: utilaj: transport:

Pag 131 Page 478 of 556

STADIUL FIZIC: CONDUCTA REFULARE-POMPARE SPlAU PEID

0 20

PN6 DN 110 KM L = 75 M

1 CA01A1

2

Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

3

mc

4

5=3x4

2.00

material: manopera: utilaj: transport:

21

22

CZ0105A1

TRA06A30

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

mc

2.02

material: manopera: utilaj: transport: tona

4.84

material: manopera: utilaj: transport:

23

TRA04A30

Transport rutier materiale semifabricate cu autoremorchere cu remorci treiler sub 20t pe...dis.30 km.

tona

5.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 132 Page 479 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC: Beneficiar:

CONDUCTA REFULARE-POMPARE SP2AU PEID COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

PN6 DN 110 MM L = 195 M

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA04C1

3270029

2

Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-1,5 m teren tare BANDA AVERTIZOARE CONDUCTE CANALIZARE

3

mc

4

5=3x4

219.00

material: manopera: utilaj: transport: M

205.00

material: manopera: utilaj:

3

4

TSF05A1

ACE08A1

Sprijiniri de maluri,cu dulapi metalici asezati orizontal,la sapaturi executate in spatii limitate,avand latimea de pana la 1.50 m intre maluri ...adancimea sapaturii pana la 4 m interspatii intre dulapi de 0.00-0.20 m Umplutura in sant. la cond. de alim. cu apa si canalizare cu: nisip

mp

transport: 546.00 material: manopera: utilaj: transport:

mc

62.40

material: manopera: utilaj:

5

ACA11D1-asim

Asim - Montare Teava din PEHD in pamant , in exteriorlul cladirilor avand dn 110

m

transport: 195.00 material: manopera: utilaj:

6

6710468

TEAVA PEID PE100 PN6 DN 110 MM

M

transport: 205.00 material: manopera: utilaj:

7

ACB08H1

Montare teava otel pentru conducte imbinare prin sudura el. Dn 300

m

transport: 15.00 material: manopera: utilaj:

8

3500011

TEAVA OTEL 355,6 X 8 MM

M

transport: 15.00 material: manopera: utilaj: transport:

Pag 133 Page 480 of 556

STADIUL FIZIC: CONDUCTA REFULARE-POMPARE SP2AU PEID

0 9

10

PN6 DN 110 MM L = 195 M

1 IZL02C

TSD01B1

2

Izolare anticoroziva executata manual pe traseu la tevi de otel cu protectie exterioara din impaslitura din fibre de sticla, izolatia fiind...foarte intarita

mp

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren mijlociu

mc

3

4

5=3x4

16.00

material: manopera: utilaj: transport: 219.00 material: manopera: utilaj:

11

12

TSD04A1

TRA01A30

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant necoeziv Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

mc

transport: 219.00 material: manopera: utilaj: transport:

tona

116.00

material: manopera: utilaj: transport:

13

TRB01A19

Transportul materialelor cu roaba pe pneuri inc asezare desc asezare grupa...1-3 distanta 90m

tona

2.80

material: manopera: utilaj:

14

ACE16A1

Montarea parapetelor si podetelor metalice de inventar la santuri pentru conducte

m

transport: 390.00 material: manopera: utilaj: transport:

15

ACB13D1

Inchidere capete conducta otel pentru proba presiune avand dn 125

buc

2.00

material: manopera: utilaj:

16

ACE06B1

Sustineri din lemn pentru cabluri si conducte intilnite in sapatura : usoare

m

transport: 50.00 material: manopera: utilaj: transport:

17

CA01A1

Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

mc

2.00

material: manopera: utilaj: transport:

18

19

CZ0105A1

TRA06A30

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

mc

2.02

material: manopera: utilaj: transport: tona

4.84

material: manopera: utilaj: transport: Pag 134

Page 481 of 556

STADIUL FIZIC: CONDUCTA REFULARE-POMPARE SP2AU PEID

0 20

PN6 DN 110 MM L = 195 M

1 TRA04A30

2

Transport rutier materiale semifabricate cu autoremorchere cu remorci treiler sub 20t pe...dis.30 km.

3

tona

4

5=3x4

5.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 135 Page 482 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC:

CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA04C1

3270029

2

Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-1,5 m teren tare BANDA AVERTIZOARE CONDUCTE CANALIZARE

3

mc

4

5=3x4

95.20

material: manopera: utilaj: transport: M

89.30

material: manopera: utilaj:

3

4

TSF05A1

ACE08A1

Sprijiniri de maluri,cu dulapi metalici asezati orizontal,la sapaturi executate in spatii limitate,avand latimea de pana la 1.50 m intre maluri ...adancimea sapaturii pana la 4 m interspatii intre dulapi de 0.00-0.20 m Umplutura in sant. la cond. de alim. cu apa si canalizare cu: nisip

mp

transport: 238.00 material: manopera: utilaj: transport:

mc

27.20

material: manopera: utilaj:

5

ACA11D1-asim

Asim - Montare Teava din PEHD in pamant , in exteriorlul cladirilor avand dn 110

m

transport: 85.00 material: manopera: utilaj:

6

6710468

TEAVA PEID PE100 PN6 DN 110 MM

M

transport: 89.30 material: manopera: utilaj:

7

8

CO30A1

CO41A1

Strat termoizolant cu placi aglomerate lemnoase de 18 cm grosime, asezate pe un strat de carton bitumat si lipit cu bitum, la usile si ferestrele cu obloane de la complexele avicole

mp

Strat de carton bitumat peste drenuri in vederea turnarii betoanelor in fundatii

mp

transport: 15.00 material: manopera: utilaj: transport: 15.00 material: manopera: utilaj: transport:

Pag 136 Page 483 of 556

STADIUL FIZIC: CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

0 9

1 2602362

2

Placa polistiren expandat baumit at-n1 8 mm.gros.

3

mp

4

5=3x4

15.00

material: manopera: utilaj:

10

3606001

TABLA ZINCATA DE 1 MM GROSIME

MP

transport: 15.00 material: manopera: utilaj:

11

12

13

13.L 14

IZL02C

IZL04A

CL21A1

6309886 TSD01B1

Izolare anticoroziva executata manual pe traseu la tevi de otel cu protectie exterioara din impaslitura din fibre de sticla, izolatia fiind...foarte intarita

mp

Protejare cu sipci a izolatiei la tevi otel pentru subtraversari de drumuri si cai ferate in tuburi de protectie avand Dn ...pina la 150 mm

m

Confectii metalice diverse înglobate total sau partial in beton din profile laminate, tabla, tabla striata, otel beton, tevi pentru sustineri sau acoperiri

kg

Confectie metalice inglobate in beton Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren mijlociu

kg

transport: 15.00 material: manopera: utilaj: transport: 10.00 material: manopera: utilaj: transport: 50.00 material: manopera: utilaj: transport: 50.00

mc

93.00

material: manopera: utilaj:

15

16

TSD04A1

TRA01A30

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant necoeziv Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

mc

transport: 93.00 material: manopera: utilaj: transport:

tona

50.32

material: manopera: utilaj:

17

ACE16A1

Montarea parapetelor si podetelor metalice de inventar la santuri pentru conducte

m

transport: 170.00 material: manopera: utilaj: transport:

18

ACB13D1

Inchidere capete conducta otel pentru proba presiune avand dn 125

buc

2.00

material: manopera: utilaj:

19

ACE06B1

Sustineri din lemn pentru cabluri si conducte intilnite in sapatura : usoare

m

transport: 20.00 material: manopera: utilaj: transport:

Pag 137 Page 484 of 556

STADIUL FIZIC: CONDUCTA REFULARE-POMPARE SP3AU PEID PH6 DN 110 KM L = 85 M

0 20

1 CA01A1

2

Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

3

mc

4

5=3x4

2.00

material: manopera: utilaj: transport:

21

22

CZ0105A1

TRA06A30

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

mc

2.02

material: manopera: utilaj: transport: tona

4.84

material: manopera: utilaj: transport:

23

TRA04A30

Transport rutier materiale semifabricate cu autoremorchere cu remorci treiler sub 20t pe...dis.30 km.

tona

5.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 138 Page 485 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

STADIUL FIZIC: Beneficiar:

CONDUCTA REFULARE-POMPARE SP4AU PEID COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

PN6 DN 110 MM L - 40 M

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA04C1

3270029

2

Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-1,5 m teren tare BANDA AVERTIZOARE CONDUCTE CANALIZARE

3

mc

4

5=3x4

44.80

material: manopera: utilaj: transport: M

42.00

material: manopera: utilaj:

3

4

TSF05A1

ACE08A1

Sprijiniri de maluri,cu dulapi metalici asezati orizontal,la sapaturi executate in spatii limitate,avand latimea de pana la 1.50 m intre maluri ...adancimea sapaturii pana la 4 m interspatii intre dulapi de 0.00-0.20 m Umplutura in sant. la cond. de alim. cu apa si canalizare cu: nisip

mp

transport: 112.00 material: manopera: utilaj: transport:

mc

12.80

material: manopera: utilaj:

5

ACA11D1-asim

Asim - Montare Teava din PEHD in pamant , in exteriorlul cladirilor avand dn 110

m

transport: 40.00 material: manopera: utilaj:

6

6710468

TEAVA PEID PE100 PN6 DN 110 MM

M

transport: 42.00 material: manopera: utilaj:

7

8

CO30A1

CO41A1

Strat termoizolant cu placi aglomerate lemnoase de 18 cm grosime, asezate pe un strat de carton bitumat si lipit cu bitum, la usile si ferestrele cu obloane de la complexele avicole

mp

Strat de carton bitumat peste drenuri in vederea turnarii betoanelor in fundatii

mp

transport: 15.00 material: manopera: utilaj: transport: 15.00 material: manopera: utilaj: transport:

Pag 139 Page 486 of 556

STADIUL FIZIC: CONDUCTA REFULARE-POMPARE SP4AU PEID

0 9

PN6 DN 110 MM L - 40 M

1 2602362

2

Placa polistiren expandat baumit at-n1 8 mm.gros.

3

mp

4

5=3x4

15.00

material: manopera: utilaj:

10

3606001

TABLA ZINCATA DE 1 MM GROSIME

MP

transport: 15.00 material: manopera: utilaj:

11

12

13

13.L 14

IZL02C

IZL04A

CL21A1

6309886 TSD01B1

Izolare anticoroziva executata manual pe traseu la tevi de otel cu protectie exterioara din impaslitura din fibre de sticla, izolatia fiind...foarte intarita

mp

Protejare cu sipci a izolatiei la tevi otel pentru subtraversari de drumuri si cai ferate in tuburi de protectie avand Dn ...pina la 150 mm

m

Confectii metalice diverse înglobate total sau partial in beton din profile laminate, tabla, tabla striata, otel beton, tevi pentru sustineri sau acoperiri

kg

Confectie metalice inglobate in beton Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren mijlociu

kg

transport: 15.00 material: manopera: utilaj: transport: 10.00 material: manopera: utilaj: transport: 50.00 material: manopera: utilaj: transport: 50.00

mc

44.80

material: manopera: utilaj:

15

16

TSD04A1

TRA01A30

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant necoeziv Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

mc

transport: 44.80 material: manopera: utilaj: transport:

tona

23.70

material: manopera: utilaj:

17

ACE16A1

Montarea parapetelor si podetelor metalice de inventar la santuri pentru conducte

m

transport: 80.00 material: manopera: utilaj: transport:

18

ACB13D1

Inchidere capete conducta otel pentru proba presiune avand dn 125

buc

2.00

material: manopera: utilaj:

19

ACE06B1

Sustineri din lemn pentru cabluri si conducte intilnite in sapatura : usoare

m

transport: 10.00 material: manopera: utilaj: transport:

Pag 140 Page 487 of 556

STADIUL FIZIC: CONDUCTA REFULARE-POMPARE SP4AU PEID

0 20

PN6 DN 110 MM L - 40 M

1 CA01A1

2

Turnarea betonului simplu în fundatii continue, izolate si socluri cu volum pâna la 3 mc, inclusiv

3

mc

4

5=3x4

2.00

material: manopera: utilaj: transport:

21

22

CZ0105A1

TRA06A30

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 in instalatii centralizate ; Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

mc

2.02

material: manopera: utilaj: transport: tona

4.84

material: manopera: utilaj: transport:

23

TRA04A30

Transport rutier materiale semifabricate cu autoremorchere cu remorci treiler sub 20t pe...dis.30 km.

tona

5.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 141 Page 488 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Boura

STADIUL FIZIC: Beneficiar:

RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S74 M SAT BOURA COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

ACA15G1

2

Montare tuburi de presiune din poliestiren armate cu fibra sticla prin infas. in pamant exterioare clad. mf+cep p,d250

3

m

4

5=3x4

1,574.00

material: manopera: utilaj:

2

6270043

TUB CANALIZARE GOFRAT CU MUFA SH8 D.250 MM

M

transport: 1,653.00 material: manopera: utilaj:

3

6607628

Garnitura de etansare ans plan pn6/2,5 D = 250 M 100-500 g2x4 s1733

buc

transport: 263.00 material: manopera: utilaj:

4

ACD04B1

Camin vizitare STAS 2448-73 cu camera lucru hc=2m din tub beton cu cep si buza la canale cu dn 250

buc

transport: 46.00 material: manopera: utilaj:

5

ACD01L1

Capac si rama STAS 2308-81 pentru camine cu piesa suport carosabil IV

buc

transport: 46.00 material: manopera: utilaj: transport:

6

ACD07B1

Elemente la camine STAS cu h>2 m cuprinzind:cos acces din tuburi beton dn 800 l= 2 m cu mufa

m

5.50

material: manopera: utilaj: transport:

7

CZ0209A1

Mortar de var - ciment pentru zidarie marca M 100-T preparat cu ciment M 30, în instalatii centralizate, fara adaos de var;

mc

1.84

material: manopera: utilaj: transport:

8

CZ0204A1

Mortar de var - ciment pentru zidarie marca M 100-Z preparat cu ciment M 30, în instalatii centralizate fara adaos de var;

mc

0.10

material: manopera: utilaj: transport:

Pag 142 Page 489 of 556

STADIUL FIZIC: RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S74 M SAT BOURA

0 9

1 CA01B1

2

Turnarea betonului simplu în fundatii continue, izolate, socluri cu volum peste 3 mc, precum si în ziduri de sprijin

3

mc

4

5=3x4

52.10

material: manopera: utilaj:

10

11

12

13

14

15

16

CZ0105B1

TSA07C1

TSA07F1

TSC02B2

TSA24A1

TSF05A1

ACE08A1

Beton marca B 150, cu agregate grele, sortate cu granulatia pâna la 16 mm (pentru beton simplu sau armat în placi, grinzi, diafragme, scari, elemente cu sectiuni mici la constructii cu 2—3 nivele si deschideri sub 5 m), preparat cu ciment M 30 în instalatii necentralizate ; Sapatura manuala de pamant,in spatii limitate,avand peste 1 m latime si maximum 6 m adancime,executata cu sprijiniri,cu evacuare manuala,in fundatii,subsoluri,canale,drenuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-2 m teren tare Sapatura manuala de pamant,in spatii limitate,avand peste 1 m latime si maximum 6 m adancime,executata cu sprijiniri,cu evacuare manuala,in fundatii,subsoluri,canale,drenuri etc...in pamant cu umiditate naturala adancimea sapaturii 2.01-4 m teren tare Sapatura mecanica cu excavator pe pneuri de 0.21-0.39 mc,cu comanda hidraulica,in :...pamant imbibat cu apa descarcare in depozit teren catg 2

mc

Epuizarea mecanica a apelor din sapaturi,in teren cu infiltratii puternice de apa,executate cu:...motopompa de apa 6.6-12 Kw (9-16 CP)

ora

Sprijiniri de maluri,cu dulapi metalici asezati orizontal,la sapaturi executate in spatii limitate,avand latimea de pana la 1.50 m intre maluri ...adancimea sapaturii pana la 4 m interspatii intre dulapi de 0.00-0.20 m Umplutura in sant. la cond. de alim. cu apa si canalizare cu: nisip

mp

transport: 50.60 material: manopera: utilaj: transport:

mc

1,813.00

material: manopera: utilaj: transport: mc

1,178.00

material: manopera: utilaj: transport: 100 mc

9.10

material: manopera: utilaj: transport: 250.00 material: manopera: utilaj: transport: 7,691.00 material: manopera: utilaj: transport:

mc

1,212.00

material: manopera: utilaj:

17

18

TSC02D1

3270029

Sapatura mecanica cu excavator pe pneuri de 0.21-0.39 mc,cu comanda hidraulica,in :...pamant cu umiditate naturala descarcare auto in teren catg 2

100 mc

BANDA AVERTIZOARE CONDUCTE CANALIZARE

M

transport: 12.20 material: manopera: utilaj: transport: 1,653.00 material: manopera: utilaj: transport:

Pag 143 Page 490 of 556

STADIUL FIZIC: RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S74 M SAT BOURA

0 19

1 TRA01A30

2

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

3

tona

4

5=3x4

2,241.00

material: manopera: utilaj:

20

TSD01C1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...pamant coeziv

mc

transport: 2,321.00 material: manopera: utilaj:

21

22

TSD04A1

TRI1AA06F1

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant necoeziv Incarcarea materialelor, grupa a-usoare in prafuri...prin transport pina la 10m rampa,teren-auto categ

mc

transport: 1,813.00 material: manopera: utilaj: transport:

tona

2,539.00

material: manopera: utilaj:

23

TRI1AA08C1

Descarcarea materialelor,grupa a-grele si marunte prin...aruncare auto-rampa,teren categ.1

tona

transport: 2,539.00 material: manopera: utilaj:

24

TRA01A05P

Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

tona

transport: 5,077.00 material: manopera: utilaj: transport:

25

26

27

TSD03A1

TSD05A1

TRA01A05P

Imprastierea pamantului afanat provenit din teren categoria 1 sau 2 si categoria 3 sau 4,executata cu buldozer pe tractor cu senile de 81-180 CP,in straturi cu grosimea de :...15-20 cm,teren catg. 1 sau 2 Compactarea cu maiul mecanic de 150-200 Kg a umpluturilor in straturi succesive de 20-30 cm grosime,exclusiv udarea fiecarui strat in parte,umpluturile executandu-se din :...pamant necoeziv

100 mc

Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

tona

9.07

material: manopera: utilaj: transport:

100 mc

9.07

material: manopera: utilaj: transport: 1,987.00 material: manopera: utilaj:

28

29

TSD02B1

ACE06A1

Imprastierea pamantului afanat provenit din teren categoria 1 sau 2,executata cu buldozer pe tractor cu senile de 65-80 CP,in straturi cu grosimea de:...21-30 cm

100 mc

Sustineri din lemn pentru cabluri si conducte intilnite in sapatura : grele

m

transport: 14.20 material: manopera: utilaj: transport: 150.00 material: manopera: utilaj: transport:

Pag 144 Page 491 of 556

STADIUL FIZIC: RETEA DE CANALIZARE DIN TUBURI PVC GOFRAT DN 250 MM SN9 L-1S74 M SAT BOURA

0 30

1 ACE06B1

2

Sustineri din lemn pentru cabluri si conducte intilnite in sapatura : usoare

3

m

4

5=3x4

300.00

material: manopera: utilaj:

31

ACE16A1

Montarea parapetelor si podetelor metalice de inventar la santuri pentru conducte

m

transport: 3,148.00 material: manopera: utilaj:

32

33

DF27A1

Piloti pentru dirijarea circulatiei rutiere in scopul asigurarii fluentei traficului pe sectoarele de drum cu restrictii de circulatie, impuse de calamitati sau executarea unor lucrari de constructii, reparatii sau intretinerea de drumuri Semnalizarea rutiera pentru asigurarea continuitatii circulatiei in timpul executarii lucrarilor, cu indicatoare metalice

DF24A1

ora

transport: 200.00 material: manopera: utilaj: transport:

ps

70.00

material: manopera: utilaj:

34

TRA06A30

Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km

tona

transport: 130.30 material: manopera: utilaj:

35

TRA04A30

Transport rutier materiale semifabricate cu autoremorchere cu remorci treiler sub 20t pe...dis.30 km.

tona

transport: 18.77 material: manopera: utilaj:

36

ACE17A1

Placa indicatoare montata la camine rezerv. sau alte constructii pentru alimentari cu apa si canaliz.

buc

transport: 46.00 material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL: 1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 145 Page 492 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Boura

STADIUL FIZIC:

SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

10.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

2

3

4

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

TSA04D1

TSA04G1

TSF05A1

ACE06B1

2

Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 0-1,5 m teren foarte tare Sapatura manuala de pamant in spatii limitate,avand sub 1 m latime si maximum 4.50 m adancime,executata cu sprijiniri,cu evacuare manuala,la fundatii,canale,drumuri etc...in pamant cu umiditate naturala adancimea sapaturii 1,5-3 teren foarte tare Sprijiniri de maluri,cu dulapi metalici asezati orizontal,la sapaturi executate in spatii limitate,avand latimea de pana la 1.50 m intre maluri ...adancimea sapaturii pana la 4 m interspatii intre dulapi de 0.00-0.20 m Sustineri din lemn pentru cabluri si conducte intilnite in sapatura : usoare

3

mc

4

5=3x4

52.70

material: manopera: utilaj: transport: mc

25.60

material: manopera: utilaj: transport: mp

125.30

material: manopera: utilaj: transport: m

20.00

material: manopera: utilaj:

5

ACA15G1

Montare tuburi de presiune din poliestiren armate cu fibra sticla prin infas. in pamant exterioare clad. mf+cep p,d250

m

transport: 64.00 material: manopera: utilaj:

6

6270043

TUB CANALIZARE GOFRAT CU MUFA SH8 D.250 MM

M

transport: 67.20 material: manopera: utilaj:

7

ACB08K1

Montare teava otel pentru conducte imbinare prin sudura el. Dn 500

m

transport: 64.00 material: manopera: utilaj:

8

3314984

CONDUCTA PROTECTIE PENTRU SUBTRAVERSARE 500X5MM

M

transport: 65.00 material: manopera: utilaj: transport:

Pag 146 Page 493 of 556

STADIUL FIZIC: SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

0 11

1 IZL01A

2

Izolatie usoara (citomare) executata manual ...pe traseu la tevi de otel

3

mp

4

5=3x4

101.00

material: manopera: utilaj:

12

IZL08A

Izolare manuala a conductelor montate in pamant cu...doua straturi de bitum si un rand de hartie tip sulfit tip I

mp

transport: 101.00 material: manopera: utilaj: transport:

13

14

IZI05F1

TRB01C15

Protectia termoizolatiei la conducte, executata cu ...folie din aluminiu de 0,05 mm grosime pe suport de folie de aluminiu de 0,04 mm grosime ondulata, legata cu sârma din otel moale zincata 0 0,8 mm grosime Transportul...materialelor cu roaba pe pneuri inc aruncare desc rasturnare grup1-3 distanta 50m

mp

6.40

material: manopera: utilaj: transport: tona

219.30

material: manopera: utilaj:

15

TRA01A05P

Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km

tona

transport: 48.00 material: manopera: utilaj:

16

TRA01A30

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km.

tona

transport: 29.00 material: manopera: utilaj:

17

TRA04A30

Transport rutier materiale semifabricate cu autoremorchere cu remorci treiler sub 20t pe...dis.30 km.

tona

transport: 10.00 material: manopera: utilaj:

18

ACE16A1

Montarea parapetelor si podetelor metalice de inventar la santuri pentru conducte

m

transport: 100.00 material: manopera: utilaj:

19

20

DF27A1

DF24A1

Piloti pentru dirijarea circulatiei rutiere in scopul asigurarii fluentei traficului pe sectoarele de drum cu restrictii de circulatie, impuse de calamitati sau executarea unor lucrari de constructii, reparatii sau intretinerea de drumuri Semnalizarea rutiera pentru asigurarea continuitatii circulatiei in timpul executarii lucrarilor, cu indicatoare metalice

ora

transport: 50.00 material: manopera: utilaj: transport:

ps

20.00

material: manopera: utilaj:

21

TSD01D1

Imprastierea cu lopata a pamant. afinat,strat uniform 10-30cm. gros cu sfarim. bulg. teren...teren foarte tare

mc

transport: 78.30 material: manopera: utilaj: transport:

Pag 147 Page 494 of 556

STADIUL FIZIC: SUBTRAVERSARE DRUM IN SAPATURA DESCHISA L-64 M SAT BOURA

0 22

1 TSD04B1

2

Compactarea cu maiul de mana a umpluturilor executate in sapaturi orizontale sau inclinate la 1/4,inclusiv udarea fiecarui strat de pamant in parte,avand :...10 cm grosime pamant coeziv

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

3

mc

4

5=3x4

78.30

material: manopera: utilaj: transport:

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 148 Page 495 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Lucrari racordare la energie electrica

STADIUL FIZIC:

Bransament electric SP1AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

12.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

W2A05A#

2

Stâlp de sustinere din beton, montat cu automacaraua în fundatie burata...în teren normal;

3

4

buc

5=3x4

1.00

material: manopera: utilaj: transport:

1.L 2

6420874 W2K09A#

Stilp lin.el.aer.se 4 1 KV 10 M bpsbp.vibr.ipct831/ii Conductor torsadat ...pentru bransament TYIR

1.00

buc m

28.00

material: manopera: utilaj:

2.L 3

4832367 W2K08A#

Conductor TYIR 3x16+25 Bratara cu cârlig sau tija ...pentru legarea bransamentului pe stâlp, inclusiv bratara pentru fixarea fascicolului la stâlp

m

transport: 28.00

buc

1.00

material: manopera: utilaj: transport:

3.L

5211331

3.L

5211226

4

W2K08A#

Bratara cu cirlig pentru brans.m1 pe stilpi se 10 bbr-5

buc

1.00

Bratara de fixare pe stilpi tip se 10 sc-10005 b-1180 Bratara cu cârlig sau tija ...pentru legarea bransamentului pe stâlp, inclusiv bratara pentru fixarea fascicolului la stâlp

buc

1.00

buc

1.00

material: manopera: utilaj: transport:

4.L

5211355

Bratara cu cirlig pentru brans.m1 pe stilpi se3 se4 bbr-5

buc

1.00

4.L

5211226

Bratara de fixare pe stilpi tip se 10 sc-10005 b-1180 Clema de întindere ...bransament

buc

1.00

5

W2K11A#

buc

2.00

material: manopera: utilaj: transport: 5.L 6

5206901 W2E12D#

Clema de intindere bransament cibt trifazic Bloc de masura si protectie cu limitator de putere si loc pentru contori, tip BMPT, trifazic...pe stâlp.

2.00

buc buc

1.00

material: manopera: utilaj: transport:

6.L

7322301

Bloc de masura si protectie - td - M -16 cu loc de contori alpha-a1r

buc

1.00

Pag 149 Page 496 of 556

STADIUL FIZIC: Bransament electric SP1AU

0 6.L 7

1 6311401 W2G23F#

2

Bratara zincata pentru prinderea blocului de masura trifazat pe stalp SE 4 Teava de protectie din PVC-C. având diametrul...de 50mm montata pe stâlp, cablu cu sectiunea de 16-5 0mmp;

3

4

buc

2.00

m

4.00

5=3x4

material: manopera: utilaj: transport:

7.L

6700602

Teava din p.v.c.rigid tip G 50x3,7 6675/2

7.L

6311612

Bratara de fixare teava PVC-g ? 50mm pe stilp sc 10005 Coturi...pvc-u,pentru canalizare,cu imbinare prin lipirela 45;67 1/2;87 1/2 grade,avand d= 50 mm

8

SB17C1

stas

m

4.08

set

4.00

buc

2.00

material: manopera: utilaj: transport:

8.L 9

6712241 W2K12A#

Cot PVC tip U la 45 grade DN 50 nii 2167 Clema de derivatie ...cu dinti pentru bransament

2.00

buc buc

5.00

material: manopera: utilaj: transport:

9.L 10

11

5206700 EC11D1

W2J04A#

Clema de derivatie cu dinti cdd 45 Cap terminal uscat de interior, inclusiv legarea la bornele instalatiei a cablurilor cu izolatie si manta din PVC, cu conducte de aluminiu, având sectiunea de 4x16 mmp, sau 3x25 + 16 mmp

buc

Verificarea si încercarea tablourilor...firidelor de distributie, cutiilor de distributie

buc

5.00

buc

1.00

material: manopera: utilaj: transport: 1.00

material: manopera: utilaj: transport:

12

W2J05A#

Scoaterea de sub tensiune a retelei electrice în vederea repararii sau racordarii bransamentelor si repunerea în functiune...retea electrica aeriana;

buc

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...50 km.

tona

1.00

material: manopera: utilaj: transport:

13

TRA02A50

1.00

material: manopera: utilaj:

14

TRA01A49

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 49 km.

tona

transport: 60.00 material: manopera: utilaj: transport:

15

4978816

buc

Contor electronic 100 A

1.00

material: manopera: utilaj: transport:

procent

material

manopera

utilaj

transport

total

Total Cheltuieli directe:

Pag 150 Page 497 of 556

STADIUL FIZIC: Bransament electric SP1AU

0 Recapitulatia: Contributie asiguratorie pentru munca (CAM)

1 Recap 1 ianuarie 2018

2

3

4

5=3x4

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 151 Page 498 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Lucrari racordare la energie electrica

STADIUL FIZIC:

Coloana electrica SP1AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

12.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

1.L 2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

W2G05A#

7500122 W2H02A#

2

Cablu de energie electrica armat, cu conductoare din cupru de 1KV, pozat în sant pe pat de nisip, cu tractiune manuala...sectiunea pâna la 4x16 mmp, fara obstacole sau cu greutatea specifica pâna la 1,4kg/m; Cablu electric CYABY 5x10 Profil pentru cable de 1 KV cu strat protector din nisip si bnnda din PVC...pt. cable - profil M;

3

m

4

5=3x4

20.00

material: manopera: utilaj: transport: 20.00

buc m

18.00

material: manopera: utilaj: transport:

3

W2G23F#

Teava de protectie din PVC-C. având diametrul...de 50mm montata pe stâlp, cablu cu sectiunea de 16-5 0mmp;

m

2.00

material: manopera: utilaj: transport:

3.L

6311612

Bratara de fixare teava PVC-g ? 50mm pe stilp sc 10005

set

2.00

3.L

6700602

Teava din p.v.c.rigid tip G 50x3,7 stas 6675/2 Sapatura manuala de pamant,in spatii limitate,in transee de pana la 4 m adancime,pentru cabluri electrice de inalta tensiune...in pamant cu umiditate naturala fara sprijiniri latime < 1m adancime < 1.5m,teren tare Umlutura compactata in santuri,pentru cablurile ingropate ale liniilor electrice de inalta tensiune,executata cu pamant provenit din :...teren tare

m

2.04

mc

7.30

Cap terminal uscat de interior, inclusiv legarea la bornele instalatiei a cablurilor cu izolatie si manta din PVC, cu conducte de cupru, având sectiunea de 4x16 mmp, sau 3x25 + 16 mmp

buc

Priza de pamant 4 OHMI

buc

4

5

TSA16C1

TSD18C1

material: manopera: utilaj: transport: mc

7.30

material: manopera: utilaj: transport:

6

7

EC12D1

$22755

2.00

material: manopera: utilaj: transport: 1.00

material: manopera: utilaj: transport:

Pag 152 Page 499 of 556

STADIUL FIZIC: Coloana electrica SP1AU

0 7.1

7.2

7.3

1 EG08D1

EA06C1

SA11D1

2

Conducta de legare la pamînt, a instalatiei de paratrasnet sau a instalatiei de protectie prin legarea la pamânt, montata în pamânt, inclusiv saparea si umplerea santului, conducta fiind din otel lat zineat, de 40x5 mm, montata în teren usor sau mijlociu Teava din otel, neagra, pentru instalatii, sudata longitudinal, montata îngropat sau aparent, în mediul normal, având diametrul interior de 2 toli montata îngropat în pardoseala

m

Teava pvc neplastifiata tip g montare la constr. industr. in conducte de distributie...d= 50 mm

m

3

4

5=3x4

40.00

material: manopera: utilaj: transport: m

9.00

material: manopera: utilaj: transport: 0.50

material: manopera: utilaj: transport:

7.4

W2I06A#

Imbinarea prizei de legare la pamânt ...cu suruburi zincate

buc

1.00

material: manopera: utilaj: transport:

7.5

W2J03A#

buc

Verificarea prizelor ...de pamânt

1.00

material: manopera: utilaj: transport: 7.6

W2J02A#

Verificarea si încercarea retelei electrice subterane în vederea receptiei si punerii în functiune...cablu nou;

buc

1.00

material: manopera: utilaj: transport:

7.7

TRA02A50

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...50 km.

1.00

material: manopera: utilaj:

7.8

TRA01A49

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 49 km.

tona

transport: 60.00 material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

Pag 153 Page 500 of 556

STADIUL FIZIC: Coloana electrica SP1AU

0

1

2

3

4

5=3x4

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 154 Page 501 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Lucrari racordare la energie electrica

STADIUL FIZIC:

Bransament electric SP2AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

12.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

W2A05A#

2

Stâlp de sustinere din beton, montat cu automacaraua în fundatie burata...în teren normal;

3

4

buc

5=3x4

1.00

material: manopera: utilaj: transport:

1.L 2

6420874 W2K09A#

Stilp lin.el.aer.se 4 1 KV 10 M bpsbp.vibr.ipct831/ii Conductor torsadat ...pentru bransament TYIR

1.00

buc m

35.00

material: manopera: utilaj:

2.L 3

4832367 W2K08A#

Conductor TYIR 3x16+25 Bratara cu cârlig sau tija ...pentru legarea bransamentului pe stâlp, inclusiv bratara pentru fixarea fascicolului la stâlp

m

transport: 35.00

buc

1.00

material: manopera: utilaj: transport:

3.L

5211331

3.L

5211226

4

W2K08A#

Bratara cu cirlig pentru brans.m1 pe stilpi se 10 bbr-5

buc

1.00

Bratara de fixare pe stilpi tip se 10 sc-10005 b-1180 Bratara cu cârlig sau tija ...pentru legarea bransamentului pe stâlp, inclusiv bratara pentru fixarea fascicolului la stâlp

buc

1.00

buc

1.00

material: manopera: utilaj: transport:

4.L

5211355

Bratara cu cirlig pentru brans.m1 pe stilpi se3 se4 bbr-5

buc

1.00

4.L

5211226

Bratara de fixare pe stilpi tip se 10 sc-10005 b-1180 Clema de întindere ...bransament

buc

1.00

5

W2K11A#

buc

2.00

material: manopera: utilaj: transport: 5.L 6

5206901 W2E12D#

Clema de intindere bransament cibt trifazic Firida de masura si protectie cu limitator de putere si loc pentru contori, tip BMPT, trifazic...pe stâlp.

2.00

buc buc

1.00

material: manopera: utilaj: transport:

Pag 155 Page 502 of 556

STADIUL FIZIC: Bransament electric SP2AU

0 6

1 7322390

2

3

buc

Firida fdcp 2

4

5=3x4

1.00

material: manopera: utilaj: transport: 6

6311401

Bratara zincata pentru prinderea blocului de masura trifazat pe stalp SE 4

buc

2.00

material: manopera: utilaj: transport:

7

W2G23F#

Teava de protectie din PVC-C. având diametrul...de 50mm montata pe stâlp, cablu cu sectiunea de 16-5 0mmp;

m

4.00

material: manopera: utilaj: transport:

7.L

6700602

Teava din p.v.c.rigid tip G 50x3,7 6675/2

7.L

6311612

Bratara de fixare teava PVC-g ? 50mm pe stilp sc 10005 Coturi...pvc-u,pentru canalizare,cu imbinare prin lipirela 45;67 1/2;87 1/2 grade,avand d= 50 mm

8

SB17C1

stas

m

4.08

set

4.00

buc

2.00

material: manopera: utilaj: transport:

8.L 9

6712241 W2K12A#

Cot PVC tip U la 45 grade DN 50 nii 2167 Clema de derivatie ...cu dinti pentru bransament

2.00

buc buc

5.00

material: manopera: utilaj: transport:

9.L 10

11

5206700 EC11D1

W2J04A#

Clema de derivatie cu dinti cdd 45 Cap terminal uscat de interior, inclusiv legarea la bornele instalatiei a cablurilor cu izolatie si manta din PVC, cu conducte de aluminiu, având sectiunea de 4x16 mmp, sau 3x25 + 16 mmp

buc

Verificarea si încercarea tablourilor...firidelor de distributie, cutiilor de distributie

buc

5.00

buc

1.00

material: manopera: utilaj: transport: 1.00

material: manopera: utilaj: transport:

12

W2J05A#

Scoaterea de sub tensiune a retelei electrice în vederea repararii sau racordarii bransamentelor si repunerea în functiune...retea electrica aeriana;

buc

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...50 km.

tona

1.00

material: manopera: utilaj: transport:

13

TRA02A50

1.00

material: manopera: utilaj:

14

TRA01A49

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 49 km.

tona

transport: 60.00 material: manopera: utilaj: transport: Pag 156

Page 503 of 556

STADIUL FIZIC: Bransament electric SP2AU

0 15

1 4978816

2

3

buc

Contor electronic 100 A

4

5=3x4

1.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 157 Page 504 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Lucrari racordare la energie electrica

STADIUL FIZIC:

Coloana electrica SP2AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

12.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

1.L 2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

W2G05A#

7500122 W2H02A#

2

Cablu de energie electrica armat, cu conductoare din cupru de 1KV, pozat în sant pe pat de nisip, cu tractiune manuala...sectiunea pâna la 4x16 mmp, fara obstacole sau cu greutatea specifica pâna la 1,4kg/m; Cablu electric CYABY 5x10 Profil pentru cable de 1 KV cu strat protector din nisip si bnnda din PVC...pt. cable - profil M;

3

m

4

5=3x4

10.00

material: manopera: utilaj: transport: 10.00

buc m

8.00

material: manopera: utilaj: transport:

3

W2G23F#

Teava de protectie din PVC-C. având diametrul...de 50mm montata pe stâlp, cablu cu sectiunea de 16-5 0mmp;

m

2.00

material: manopera: utilaj: transport:

3.L

6311612

Bratara de fixare teava PVC-g ? 50mm pe stilp sc 10005

set

2.00

3.L

6700602

Teava din p.v.c.rigid tip G 50x3,7 stas 6675/2 Sapatura manuala de pamant,in spatii limitate,in transee de pana la 4 m adancime,pentru cabluri electrice de inalta tensiune...in pamant cu umiditate naturala fara sprijiniri latime < 1m adancime < 1.5m,teren tare Umlutura compactata in santuri,pentru cablurile ingropate ale liniilor electrice de inalta tensiune,executata cu pamant provenit din :...teren tare

m

2.04

mc

3.24

Cap terminal uscat de interior, inclusiv legarea la bornele instalatiei a cablurilor cu izolatie si manta din PVC, cu conducte de cupru, având sectiunea de 4x16 mmp, sau 3x25 + 16 mmp

buc

Priza de pamant 4 OHMI

buc

4

5

TSA16C1

TSD18C1

material: manopera: utilaj: transport: mc

3.24

material: manopera: utilaj: transport:

6

7

EC12D1

$22755

2.00

material: manopera: utilaj: transport: 1.00

material: manopera: utilaj: transport:

Pag 158 Page 505 of 556

STADIUL FIZIC: Coloana electrica SP2AU

0 7.1

7.2

7.3

1 EG08D1

EA06C1

SA11D1

2

Conducta de legare la pamînt, a instalatiei de paratrasnet sau a instalatiei de protectie prin legarea la pamânt, montata în pamânt, inclusiv saparea si umplerea santului, conducta fiind din otel lat zineat, de 40x5 mm, montata în teren usor sau mijlociu Teava din otel, neagra, pentru instalatii, sudata longitudinal, montata îngropat sau aparent, în mediul normal, având diametrul interior de 2 toli montata îngropat în pardoseala

m

Teava pvc neplastifiata tip g montare la constr. industr. in conducte de distributie...d= 50 mm

m

3

4

5=3x4

40.00

material: manopera: utilaj: transport: m

9.00

material: manopera: utilaj: transport: 0.50

material: manopera: utilaj: transport:

7.4

W2I06A#

Imbinarea prizei de legare la pamânt ...cu suruburi zincate

buc

1.00

material: manopera: utilaj: transport:

7.5

W2J03A#

buc

Verificarea prizelor ...de pamânt

1.00

material: manopera: utilaj: transport: 7.6

W2J02A#

Verificarea si încercarea retelei electrice subterane în vederea receptiei si punerii în functiune...cablu nou;

buc

1.00

material: manopera: utilaj: transport:

7.7

TRA02A50

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...50 km.

1.00

material: manopera: utilaj:

7.8

TRA01A49

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 49 km.

tona

transport: 60.00 material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

Pag 159 Page 506 of 556

STADIUL FIZIC: Coloana electrica SP2AU

0

1

2

3

4

5=3x4

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 160 Page 507 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Lucrari racordare la energie electrica

STADIUL FIZIC:

Bransament electric SP3AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

12.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

U.M. Cantitatea

0 15

SECTIUNEA FINANCIARA

1 4978816

2

3

buc

Contor electronic 100 A

4

5=3x4

1.00

material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 161 Page 508 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Lucrari racordare la energie electrica

STADIUL FIZIC:

Coloana electrica SP3AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

12.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

1.L 2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

W2G05A#

7500122 W2H02A#

2

Cablu de energie electrica armat, cu conductoare din cupru de 1KV, pozat în sant pe pat de nisip, cu tractiune manuala...sectiunea pâna la 4x16 mmp, fara obstacole sau cu greutatea specifica pâna la 1,4kg/m; Cablu electric CYABY 5x10 Profil pentru cable de 1 KV cu strat protector din nisip si bnnda din PVC...pt. cable - profil M;

3

m

4

5=3x4

80.00

material: manopera: utilaj: transport: 80.00

buc m

75.00

material: manopera: utilaj: transport:

3

W2G23F#

Teava de protectie din PVC-C. având diametrul...de 50mm montata pe stâlp, cablu cu sectiunea de 16-5 0mmp;

m

2.00

material: manopera: utilaj: transport:

3.L

6311612

Bratara de fixare teava PVC-g ? 50mm pe stilp sc 10005

set

2.00

3.L

6700602

Teava din p.v.c.rigid tip G 50x3,7 stas 6675/2 Profil pentru cable de 1 KV în zona de traversare...profil T1

m

2.04

m

10.00

4

W2H03A#

material: manopera: utilaj:

4.L 5

6

6700638 TSA16C1

TSD18C1

Teava din p.v.c.rigid tip G 90x6,7 stas 6675/2 Sapatura manuala de pamant,in spatii limitate,in transee de pana la 4 m adancime,pentru cabluri electrice de inalta tensiune...in pamant cu umiditate naturala fara sprijiniri latime < 1m adancime < 1.5m,teren tare Umlutura compactata in santuri,pentru cablurile ingropate ale liniilor electrice de inalta tensiune,executata cu pamant provenit din :...teren tare

m

Cap terminal uscat de interior, inclusiv legarea la bornele instalatiei a cablurilor cu izolatie si manta din PVC, cu conducte de cupru, având sectiunea de 4x16 mmp, sau 3x25 + 16 mmp

buc

transport: 10.20

mc

30.40

material: manopera: utilaj: transport: mc

30.40

material: manopera: utilaj: transport:

7

EC12D1

2.00

material: manopera: utilaj: transport:

Pag 162 Page 509 of 556

STADIUL FIZIC: Coloana electrica SP3AU

0 8

1 $22755

2

3

buc

Priza de pamant 4 OHMI

4

5=3x4

1.00

material: manopera: utilaj: 8.1

8.2

8.3

EG08D1

EA06C1

SA11D1

Conducta de legare la pamînt, a instalatiei de paratrasnet sau a instalatiei de protectie prin legarea la pamânt, montata în pamânt, inclusiv saparea si umplerea santului, conducta fiind din otel lat zineat, de 40x5 mm, montata în teren usor sau mijlociu Teava din otel, neagra, pentru instalatii, sudata longitudinal, montata îngropat sau aparent, în mediul normal, având diametrul interior de 2 toli montata îngropat în pardoseala

m

Teava pvc neplastifiata tip g montare la constr. industr. in conducte de distributie...d= 50 mm

m

transport: 40.00 material: manopera: utilaj: transport:

m

9.00

material: manopera: utilaj: transport: 0.50

material: manopera: utilaj: transport:

8.4

W2I06A#

Imbinarea prizei de legare la pamânt ...cu suruburi zincate

buc

1.00

material: manopera: utilaj: transport:

8.5

W2J03A#

buc

Verificarea prizelor ...de pamânt

1.00

material: manopera: utilaj: transport: 8.6

W2J02A#

Verificarea si încercarea retelei electrice subterane în vederea receptiei si punerii în functiune...cablu nou;

buc

1.00

material: manopera: utilaj: transport:

8.7

TRA02A50

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...50 km.

1.00

material: manopera: utilaj:

8.8

TRA01A49

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 49 km.

tona

transport: 60.00 material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

Pag 163 Page 510 of 556

STADIUL FIZIC: Coloana electrica SP3AU

0

1

2

3

4

5=3x4

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 164 Page 511 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Lucrari racordare la energie electrica

STADIUL FIZIC:

Bransament electric SP4AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

12.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

W2A05A#

2

Stâlp de sustinere din beton, montat cu automacaraua în fundatie burata...în teren normal;

3

4

buc

5=3x4

1.00

material: manopera: utilaj: transport:

1.L 2

6420874 W2K09A#

Stilp lin.el.aer.se 4 1 KV 10 M bpsbp.vibr.ipct831/ii Conductor torsadat ...pentru bransament TYIR

1.00

buc m

33.00

material: manopera: utilaj:

2.L 3

4832367 W2K08A#

Conductor TYIR 3x16+25 Bratara cu cârlig sau tija ...pentru legarea bransamentului pe stâlp, inclusiv bratara pentru fixarea fascicolului la stâlp

m

transport: 33.00

buc

1.00

material: manopera: utilaj: transport:

3.L

5211331

3.L

5211226

4

W2K08A#

Bratara cu cirlig pentru brans.m1 pe stilpi se 10 bbr-5

buc

1.00

Bratara de fixare pe stilpi tip se 10 sc-10005 b-1180 Bratara cu cârlig sau tija ...pentru legarea bransamentului pe stâlp, inclusiv bratara pentru fixarea fascicolului la stâlp

buc

1.00

buc

1.00

material: manopera: utilaj: transport:

4.L

5211355

Bratara cu cirlig pentru brans.m1 pe stilpi se3 se4 bbr-5

buc

1.00

4.L

5211226

Bratara de fixare pe stilpi tip se 10 sc-10005 b-1180 Clema de întindere ...bransament

buc

1.00

5

W2K11A#

buc

2.00

material: manopera: utilaj: transport: 5.L 6

5206901 W2E12D#

Clema de intindere bransament cibt trifazic Bloc de masura si protectie cu limitator de putere si loc pentru contori, tip BMPT, trifazic...pe stâlp.

2.00

buc buc

1.00

material: manopera: utilaj: transport:

6.L

7322301

Bloc de masura si protectie - td - M -16 cu loc de contori alpha-a1r

buc

1.00

Pag 165 Page 512 of 556

STADIUL FIZIC: Bransament electric SP4AU

0 6.L 7

1 6311401 W2G23F#

2

Bratara zincata pentru prinderea blocului de masura trifazat pe stalp SE 4 Teava de protectie din PVC-C. având diametrul...de 50mm montata pe stâlp, cablu cu sectiunea de 16-5 0mmp;

3

4

buc

2.00

m

4.00

5=3x4

material: manopera: utilaj: transport:

7.L

6700602

Teava din p.v.c.rigid tip G 50x3,7 6675/2

7.L

6311612

Bratara de fixare teava PVC-g ? 50mm pe stilp sc 10005 Coturi...pvc-u,pentru canalizare,cu imbinare prin lipirela 45;67 1/2;87 1/2 grade,avand d= 50 mm

8

SB17C1

stas

m

4.08

set

4.00

buc

2.00

material: manopera: utilaj: transport:

8.L 9

6712241 W2K12A#

Cot PVC tip U la 45 grade DN 50 nii 2167 Clema de derivatie ...cu dinti pentru bransament

2.00

buc buc

5.00

material: manopera: utilaj: transport:

9.L 10

11

5206700 EC11D1

W2J04A#

Clema de derivatie cu dinti cdd 45 Cap terminal uscat de interior, inclusiv legarea la bornele instalatiei a cablurilor cu izolatie si manta din PVC, cu conducte de aluminiu, având sectiunea de 4x16 mmp, sau 3x25 + 16 mmp

buc

Verificarea si încercarea tablourilor...firidelor de distributie, cutiilor de distributie

buc

5.00

buc

1.00

material: manopera: utilaj: transport: 1.00

material: manopera: utilaj: transport:

12

W2J05A#

Scoaterea de sub tensiune a retelei electrice în vederea repararii sau racordarii bransamentelor si repunerea în functiune...retea electrica aeriana;

buc

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...50 km.

tona

1.00

material: manopera: utilaj: transport:

13

TRA02A50

1.00

material: manopera: utilaj:

14

TRA01A49

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 49 km.

tona

transport: 60.00 material: manopera: utilaj: transport:

15

4978816

buc

Contor electronic 100 A

1.00

material: manopera: utilaj: transport:

procent

material

manopera

utilaj

transport

total

Total Cheltuieli directe:

Pag 166 Page 513 of 556

STADIUL FIZIC: Bransament electric SP4AU

0 Recapitulatia: Contributie asiguratorie pentru munca (CAM)

1 Recap 1 ianuarie 2018

2

3

4

5=3x4

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 167 Page 514 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Lucrari racordare la energie electrica

STADIUL FIZIC:

Coloana electrica SP4AU

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F3 - LISTA cuprinzand cantitatile de lucrari - lei -

12.05.2018 SECTIUNEA TEHNICA

Nr.

Capitolul de lucrari

0 1

1.L 2

SECTIUNEA FINANCIARA

U.M. Cantitatea 1

W2G05A#

7500122 W2H02A#

2

Cablu de energie electrica armat, cu conductoare din cupru de 1KV, pozat în sant pe pat de nisip, cu tractiune manuala...sectiunea pâna la 4x16 mmp, fara obstacole sau cu greutatea specifica pâna la 1,4kg/m; Cablu electric CYABY 5x10 Profil pentru cable de 1 KV cu strat protector din nisip si bnnda din PVC...pt. cable - profil M;

3

m

4

5=3x4

50.00

material: manopera: utilaj: transport: 50.00

buc m

45.00

material: manopera: utilaj: transport:

3

W2G23F#

Teava de protectie din PVC-C. având diametrul...de 50mm montata pe stâlp, cablu cu sectiunea de 16-5 0mmp;

m

2.00

material: manopera: utilaj: transport:

3.L

6311612

Bratara de fixare teava PVC-g ? 50mm pe stilp sc 10005

set

2.00

3.L

6700602

Teava din p.v.c.rigid tip G 50x3,7 stas 6675/2 Sapatura manuala de pamant,in spatii limitate,in transee de pana la 4 m adancime,pentru cabluri electrice de inalta tensiune...in pamant cu umiditate naturala fara sprijiniri latime < 1m adancime < 1.5m,teren tare Umlutura compactata in santuri,pentru cablurile ingropate ale liniilor electrice de inalta tensiune,executata cu pamant provenit din :...teren tare

m

2.04

mc

18.22

Cap terminal uscat de interior, inclusiv legarea la bornele instalatiei a cablurilor cu izolatie si manta din PVC, cu conducte de cupru, având sectiunea de 4x16 mmp, sau 3x25 + 16 mmp

buc

Priza de pamant 4 OHMI

buc

4

5

TSA16C1

TSD18C1

material: manopera: utilaj: transport: mc

18.22

material: manopera: utilaj: transport:

6

7

EC12D1

$22755

2.00

material: manopera: utilaj: transport: 1.00

material: manopera: utilaj: transport:

Pag 168 Page 515 of 556

STADIUL FIZIC: Coloana electrica SP4AU

0 7.1

7.2

7.3

1 EG08D1

EA06C1

SA11D1

2

Conducta de legare la pamînt, a instalatiei de paratrasnet sau a instalatiei de protectie prin legarea la pamânt, montata în pamânt, inclusiv saparea si umplerea santului, conducta fiind din otel lat zineat, de 40x5 mm, montata în teren usor sau mijlociu Teava din otel, neagra, pentru instalatii, sudata longitudinal, montata îngropat sau aparent, în mediul normal, având diametrul interior de 2 toli montata îngropat în pardoseala

m

Teava pvc neplastifiata tip g montare la constr. industr. in conducte de distributie...d= 50 mm

m

3

4

5=3x4

40.00

material: manopera: utilaj: transport: m

9.00

material: manopera: utilaj: transport: 0.50

material: manopera: utilaj: transport:

7.4

W2I06A#

Imbinarea prizei de legare la pamânt ...cu suruburi zincate

buc

1.00

material: manopera: utilaj: transport:

7.5

W2J03A#

buc

Verificarea prizelor ...de pamânt

1.00

material: manopera: utilaj: transport: 7.6

W2J02A#

Verificarea si încercarea retelei electrice subterane în vederea receptiei si punerii în functiune...cablu nou;

buc

1.00

material: manopera: utilaj: transport:

7.7

TRA02A50

tona

Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...50 km.

1.00

material: manopera: utilaj:

7.8

TRA01A49

Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 49 km.

tona

transport: 60.00 material: manopera: utilaj: transport:

procent Total Cheltuieli directe: Recapitulatia: Contributie asiguratorie pentru munca (CAM)

material

manopera

utilaj

transport

total

Recap 1 ianuarie 2018

Total Inclusiv Cheltuieli directe:

Cheltuieli indirecte Total Inclusiv Cheltuieli indirecte:

Profit Total Inclusiv Beneficiu:

Pag 169 Page 516 of 556

STADIUL FIZIC: Coloana electrica SP4AU

0

1

2

3

4

5=3x4

TOTAL GENERAL (fara TVA): TVA: TOTAL GENERAL:

1 euro =

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 170 Page 517 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

OBIECTUL:

Extindere retea de canalizare în sat Manolea

LISTA:

Lista echipamente

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

F4 - LISTA cu cantitatile de utilaje si echipamente tehnologice, inclusiv dotari si active necorporale la data de 5/10/2018 Nr. crt. 0

Denumirea

1

- lei -

U.M.

Cantitatea

Pret unitar - lei/um -

2

3

4

Valoarea (exclusiv TVA) - lei 5=3x4

Furnizorul

6

1

Electropompa cu tocător SP1AU

buc

3,00

3D CONFORT Bucuresti

2

Electropompa cu tocător SP2AU

buc

3,00

3D CONFORT Bucuresti

3

Electropompa cu tocător SP3AU

buc

2,00

3D CONFORT Bucuresti

4

Electropompa cu tocător SP4AU

buc

2,00

3D CONFORT Bucuresti

5

Ventilator model TURBO 150

buc

4,00

3D CONFORT Bucuresti

6

Senzor concentraţie gaze toxice si/sau potential explozive

buc

4,00

3D CONFORT Bucuresti

7

GRUP ELECTROGEN 35 KVA VARIANTA MOBIL

buc

2,00

3D CONFORT Bucuresti

8

GRUP ELECTROGEN DE 20 KVA VARIANTA MOBIL

buc

2,00

3D CONFORT Bucuresti

GRATAR TIP COS CONTOR TRIFAZAT ELECTRONIC DE EH.ACT,SI REACT.IN MONT. DIR CL 1%ACTI

buc buc

4,00 4,00

3D CONFORT Bucuresti 3D CONFORT Bucuresti

9 10

Fisa tehnica atasata 7 Fisa tehnica nr. 1 Fisa tehnica nr. 2 Fisa tehnica nr. 3 Fisa tehnica nr. 4 Fisa tehnica nr. 5 Fisa tehnica nr. 6 Fisa tehnica nr. 7 Fisa tehnica nr. 8

Pag 171 Page 518 of 556

LISTA Lista echipamente 0

1

2

3

5=3x4

4

6

7

Piese de rezerva: Cheltuieli de transport de la furnizor la depozit lei

TOTAL:

euro

19.00 %

TVA:

lei

TOTAL cu TVA:

1 euro =

lei

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 172 Page 519 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

C6cp - LISTA cuprinzand consumurile de resurse materiale cumulat pe proiect 09.05.2018 Nr. crt.

Denumirea resursei materiale

0

1

2

1 7300045 Acetilena

kg

1.57

DataConstruct

l

0.04

DataConstruct

kg

1.63

DataConstruct

4 5904811 Aliaj staniu-zinc (sn 65%, zn35%) 5 20012678 Apa

kg

1.31

DataConstruct

l

280.00

DataConstruct

6 6202806 Apa industriala pentru lucr.drumuri-terasamente in cisterne 7 6202818 Apa industriala pentru

mc

695.73

DataConstruct

2 7301142 Alcool tehnic de 90 grd,mia-ni614-61 3 5904782 Aliaj de lipit

U.M.

Consumul cuprins in oferta 3

Pret unitar (exclusiv TVA) -lei4

Valoarea (exclusiv TVA) -lei5=3x4

Furnizorul 6

Greutatea -tone7

staniu-plumb marca lp 60

mc

844.86

DataConstruct

mortare si betoane de la retea 8 6202820 Apa potabila

mc

0.06

DataConstruct

9 7302419 Apa stop

kg

118.34

DataConstruct

kg

12.39

DataConstruct

mc

2.86

DANLIN XXL

mc

10.25

DANLIN XXL

kg

0.04

DataConstruct

M

5,683.40

kg

29.20

DataConstruct

kg

29.20

DataConstruct

kg

25.92

DataConstruct

m

2.00

DataConstruct

m

3.70

DataConstruct

m

1.20

DataConstruct

l

3.79

PECO

kg

0.07

DataConstruct

l

34.15

PECO

mc

62.63

CONEST IASI .PCT LUCRU TG NEAMT

10 6202399 Azurinol , mp-ni 1025-57 11 2200393 Balast nespalat de riu 0-70 mm 12 2200408 Balast sortat nespalat de rau 0-30 mm 13 3704841 Banda aluminiu M 1 x 10 al99 s5681 14 3270029 BANDA AVERTIZOARE CONDUCTE CANALIZARE 15 6716953 Banda avertizoare

DEDEMAN

inscriptionata din PVC 250mm latime 16 6719826 Banda avertizoare neinscriptionata din PVC 250mm latime 17 3701265 Banda din otel lam.cald s908 4 x 25 OL 37-1n 18 6621519 Banda izolatoare din pinza cauc.tip pc 10mx10mm s 3658 19 6621533 Banda izolatoare din pinza cauc.tip pc 10mx20mm s 3658 20 7304467 Banda matase vegetala lacuita latimea 15 mm 21 6200535 Benzina de extractie tip 80/120

s 45

22 6200585 Benzina auto neetilata tip co/r 75 normala s 176 23 6200573 Benzina auto neetilata tip co/r 75 normala s 176 24 2100945 Beton de ciment 150 stas 3622

B

Pag 173 Page 520 of 556

LISTA cuprinzand consumurile de resurse materiale 0 1 2 3 25 2600220 Bitum pentru drumuri tip D 180/200 s 754 26 2600036 Bitum pentru materiale

4

5=3x4

6

kg

6.75

VASION

kg

41.75

VASION

kg

1,524.80

VASION

buc

2.00

DataConstruct

buc

1,077.00

DataConstruct

buc

40.00

buc

3.00

DataConstruct

buc

3.00

DataConstruct

buc

6.00

DataConstruct

set

20.00

DataConstruct

buc

576.00

DataConstruct

36 6311401 Bratara zincata pentru prinderea blocului de masura trifazat pe stalp SE 4 37 7306661 Bumbac de sters

buc

6.00

DataConstruct

kg

20.94

DataConstruct

38 4711009 Cablu dublu normal 6x37 140kgf D = 21 B mat z/s 39 7500122 Cablu electric CYABY

kg

1.14

buc

160.00

m

82.40

DEDEMAN

m

82.40

DEDEMAN

m

61.80

DEDEMAN

m

98.88

DEDEMAN

kg

2.44

DataConstruct

buc

4.00

FUSON

buc

182.00

FUSON

buc

12.12

DataConstruct

kg

6.65

DataConstruct

kg

17.51

DataConstruct

mp

50.40

DataConstruct

mp

45.90

DataConstruct

7

si lucrari pentru hidroizolatii tip h 68/75 s 7064 27 2600294 Bitum pentru prot conductelor metal ingropate spp 70 s 2484 28 7322301 Bloc de masura si protectie - td - M -16 cu loc de contori alpha-a1r 29 5893438 Bolt constr.genofix inel vent.b OLC45 D = 20 * 50 30 4204135 Bratara tevi instalatii apa si gaze 4 31 5211331 Bratara cu cirlig pentru

DEDEMAN

brans.m1 pe stilpi se 10 bbr-5 32 5211355 Bratara cu cirlig pentru brans.m1 pe stilpi se3 se4 bbr-5 33 5211226 Bratara de fixare pe stilpi tip se 10 sc-10005 b-1180 34 6311612 Bratara de fixare teava PVC-g ? 50mm pe stilp sc 10005 35 6311889 Bratara simpla 1 cirje mare

DEDEMAN Pret_Meu

5x10 40 4803072 Cablu energie cyaby 0,6/ 1 KV 4x 16 M s 8778 41 4802573 Cablu energie cyabzy 0,6/ 1 KV 3x 1,5

U s 8778

42 4802597 Cablu energie cyabzy 0,6/ 1 KV 3x 2,5 U s 8778 43 4803022 Cablu energie cyabzy 0,6/ 1 KV 4x 6

U s 8778

44 7307067 Calafat din cilti de cinepa, gudronat MIU-NII 16463-65 45 4203686 Capac cu rama fonta pentru cam.viz.tip 1 necarosab. s 2308 46 4203765 Capac cu rama fonta pentru cam.viz.tip 4a caros. s 2308 47 5601691 Capac portel.electroteh.joasa tens.pt.sig.fuz.d 3 63 a 48 7308164 Carbura calciu tehnica (carbid) stas 102-63 49 7309326 Carpe de sters, din bumbac de orice culoare 50 2601535 Carton bitumat fara strat acop (blanc) ci300 100cmx20m s 138 51 2601626 Carton bitumat fara strat de acoperire (blanc) CI 400 100cmx20m, s138

Pag 174 Page 521 of 556

LISTA cuprinzand consumurile de resurse materiale 0 1 2 3 52 2600749 Carton bitumat strat acop nisip ca300 100cmx10m s 138 53 7308451 Carton pentru izolatie

4

5=3x4

6

mp

0.98

DataConstruct

kg

1.60

DataConstruct

kg

0.05

DataConstruct

buc

1,077.00

DataConstruct

kg

527.04

DEDEMAN

kg

340.00

DataConstruct

kg

94,004.40

DEDEMAN

kg

66,741.30

DEDEMAN

kg

23,385.28

DEDEMAN

7

electrica tip t1160g/mp 700x1000x1mm 54 7308475 Carton triplex 70x100/355 55 7308499 Cartus pistol implintat bolturi calibru 6,3 mm umc 56 2100385 Ciment de furnal cu adaosuri F 25 saci s 1500 57 2100490 Ciment hidrotehnic cu adaosuri HZ 35 saci s 3011 58 2100440 Ciment II A 32,5 (Pa 35) saci 59 2100402 Ciment II B 32,5 (M 30) saci 60 2100397 Ciment II B 32,5(M 30) vrac 61 2600270 Citom stas 6800

kg

59.24

DataConstruct

buc

15.00

DataConstruct

buc

6.00

DataConstruct

buc

64.00

DataConstruct

kg

0.17

DataConstruct

buc

4.00

DEDEMAN

M

2.00

FUSION

M

65.00

DEDEMAN

M

240.00

DEDEMAN

m

1.60

DEDEMAN

m

0.98

DataConstruct

m

2.00

DataConstruct

m

96.00

DataConstruct

kg

1,266.00

kg

120.00

DataConstruct

kg

47.40

DataConstruct

buc

4.00

DEDEMAN

78 17000807998 Contactor releu termic CRA 10A 79 4978816 Contor electronic 100 A

buc

8.00

buc

4.00

ROMSTAL Bucuresti DataConstruct

80 3500130 Cornier aripi eg.lam cald s 424 25x 25x 3 OL 37-1n

kg

120.00

62 5206700 Clema de derivatie cu dinti cdd 45 63 5206901 Clema de intindere bransament cibt trifazic 64 20010586 Cleme de legatura tip LA 446363 65 6110467 Codez 100 adeziv nii 4721-76 66 5520366 Comutator cumpana st.simbol 0176 10 A ;250 v 67 6702001 CONDUCTA PEHD PE80 PN6 DN 63 MM 68 3314984 CONDUCTA PROTECTIE PENTRU SUBTRAVERSARE 500X5MM 69 3314984 CONDUCTA PROTECTIE PENTRU SUBTRAVERSARE 500XSMM 70 4828450 Conductor afy 1x 6 s 6865 71 4826660 Conductor fcti -750 1x 50

s 526

72 4831380 Conductor funie cupru ptr.l.e.a. 25 7x 2,14 cs 404 73 4832367 Conductor TYIR 3x16+25 74 6309886 Confectie metalice

VASION

inglobate in beton 75 8001572 Confectii metalice de prindere 76 6305098 Consola din otel lat 50x5 mm 77 5529570 Contactor electromagn.cu releecaps.simb.3207 10a;500 V

DEDEMAN

Pag 175 Page 522 of 556

LISTA cuprinzand consumurile de resurse materiale 0 1 2 3 81 3500427 Cornier aripi eg.lam cald s 424 40x 40x 5 OL 37-1n 82 3500623 Cornier cu aripi egale

4

5=3x4

6

kg

14.96

DEDEMAN

kg

21.20

DEDEMAN

kg

27.04

DEDEMAN

kg

0.18

DataConstruct

buc

4.01

DEDEMAN

BUC

4.00

FUSION

buc

7.98

FUSION

buc

0.10

DataConstruct

buc

6.00

DataConstruct

mp

86.40

DataConstruct

kg

87.64

DEDEMAN

tip

kg

28.72

DEDEMAN

tip

kg

538.86

DEDEMAN

kg

30.62

DEDEMAN

kg

0.08

DEDEMAN

buc

14.00

DEDEMAN

buc

12.60

dedeman

buc

8.00

DEDEMAN

99 7300010 Cutie de distributie etansa pentru exterior TIP LEGRAND 100 7315789 Decofrol

buc

4.00

DEDEMAN

kg

81.30

DEDEMAN

101 5881270 DIBLU CONEXPOND M12-150 102 6313306 Diblu metalic cu autofrezare pentru surub M 8 103 7317232 Dicloretan cs. 17/73

BUC

32.00

DEDEMAN

buc

16.00

DEDEMAN

kg

0.09

DataConstruct

kg

0.65

DataConstruct

buc

5,428.80

DEDEMAN

buc

49.21

DEDEMAN

7

laminare la cald, stas 424 50x 50x 5 mm, OL 37-1n 83 3500166 Cornier cu aripi egale laminat la clad, stas 424 30x30x4 mm, OL 37-1n 84 6001381 Corp abrazive electrocorindon+carbura si nid 125-75 85 5103687 Corp il.fl.fipra-01 240 220 V 2x 40w reflect+balast 86 4105160 COT COMPRESIUNE LA 90 GR TIP FI 63 X 1 1/2 TOLI DN 1 1/2 TOL 87 6712606 Cot pe80 pentru sudura pn10 90gr DN 110 cod 66130051 88 6712538 Cot PVC neplast.imbin.prin lip.pn 10 DN 50 tip g s7175 89 6712241 Cot PVC tip U la 45 grade DN 50

nii 2167

90 6716156 Covor PVC f.sup.tip A cal1 G = 2,0 laT = 1500 imprim. s7361 91 5886928 Cuie cu cap conic tip A 3,0 x 60

s 2111

92 5886954 Cuie cu cap conic a1 3 x 80 OL 34 s 2111 93 5887001 Cuie cu cap conic a1 4 x100 OL 34

s 2111

94 5886942 Cuie cu cap conic tip A pentru constructii 3x70 OL 34 s 2111 95 5887855 Cuie cu cap plat tip B 2 x 20 OL 34

s 2111

96 4116998 Curba fonta maleabila g1 s472 DN 15 1/2 97 4117095 Curba fonta maleabila g1 s472 DN 50 2 98 7312440 Cutie cu eclisa de separatle simbol ces.

104 6109080 Diluant pentru prenadez ntr 2830-75 105 6719093 Distantier din m.plasti.pt poz.arm.in beton pentru grinzi 106 2806616 Distantier pentru pozit.armat.in B.A. din mortar ciment

Pag 176 Page 523 of 556

LISTA cuprinzand consumurile de resurse materiale 0 1 2 3 107 7319307 Doza ramif.pt.tub.protej.tip. patrat simb.ripp mar.29 108 7319369 Doza ramificatie

4

5=3x4

6

buc

16.00

DEDEMAN

buc

37.92

DEDEMAN

mc

0.39

DataConstruct

mc

60.00

DataConstruct

mc

0.21

DataConstruct

buc

136.86

DataConstruct

mc

0.34

DataConstruct

mc

0.91

DataConstruct

mc

1.27

DataConstruct

kg

72.48

DEDEMAN

kg

3.60

DEDEMAN

kg

18.72

DEDEMAN

kg

362.70

DEDEMAN

kg

17.84

DEDEMAN

kg

15.66

DEDEMAN

7

bachelita pentru cablu ipe 4 iesiri 109 2918639 Dulap fag impregnati balotati lun G = 1,8- 5m cl a 110 2917685 Dulap fag lung tivit cls C gR = 50mm lun G = 2,50m s 8689 111 2918720 Dulap fag.lung.abur.cl.b.gr.50mm.L = 1,8-4m lT = 8cm 112 6310108 Dulap metalic pentru sprijinirea sapaturii 50x200x3000mm 113 2904339 Dulap rasinos tivit clasa A gR = 38mm lun G = 3,50m s 942 114 2904406 Dulap rasinos tivit clasa A gR = 48mm lun G = 3,50m s 942 115 2904418 Dulap rasinos tivit clasa A gR = 48mm lun G = 4,00m s 942 116 5901261 Electrod stas 1125/2 tip e51.5a1 1 dxl 5x450 mm 117 5900358 Electrod sud.ol s.7240-69 e42.26.13/bg.22fe D = 2,50mm 118 5900712 Electrod sud.ol.nealiat s 1125/2 e44c

2,5

119 5900827 Electrod sud.ol.nealiat s 1125/2 e48t superextra 3,25 120 5901259 Electrod sud.otel s 1125/2 e43.2

2x350 inv.supert.

121 6106117 Email alb e.101-8 ntr 90-73 122 6202727 Energie electrica la contor pentru consumatori forta 123 6202741 Energie electrica la

kwh

1,216.80

EON

kwh

1,112.46

EON

124 7361661 Etichete cabet din aluminiu 125 2100880 Filer de calcar tip 1,saci, s 539 126 7322390 Firida fdcp 2

buc

24.00

kg

5.17

FUSION

buc

1.00

DataConstruct

127 6312106 Fisie tabla pb pentru marcarea cablurilor 300x20x2 mm 128 4400791 Flansa plata pn 6 5060 OL 37-2 et pu s 8012 129 4401147 Flansa plata pn 6 100-

buc

11.00

DataConstruct

buc

6.00

FUSION

buc

12.00

FUSION

buc

8.00

FUSION

contor pentru lucrari de constructie-montaj

114 OL 37-2k

DataConstruct

et pu s 8012

130 4401537 Flansa plata pn 6 250273 OL 37-2 et pu s 8012 131 3667756 Folie aluminiu s10561

kg

2.82

DataConstruct

sul hd 0,05 x 20 al99,0 132 6716974 Folie reflectorizanta

mp

10.56

DataConstruct

133 7322940 Fuior cinepa

kg

0.38

DataConstruct

Pag 177 Page 524 of 556

LISTA cuprinzand consumurile de resurse materiale 0 1 2 3 134 6601820 Garnitura cauciuc cu inser.tip1 21-40%pinza fls.2-3 toli 135 7323425 Garnitura cinepa cu seu si impletit.ext.nr.02 D = 10 mm 136 6607587 Garnitura de etansare

4

5=3x4

6

kg

3.20

FUSION

kg

2.00

FUSION

buc

12.12

FUSION

buc

839.00

FUSION

buc

6.06

FUSION

kg

900.00

DataConstruct

kg

0.46

DataConstruct

kg

0.91

DataConstruct

kg

0.18

DataConstruct

buc

0.24

DataConstruct

buc

4.50

DataConstruct

kg

56.96

DataConstruct

mp

125.97

DataConstruct

buc

76.80

DataConstruct

buc

38.40

DataConstruct

buc

19.20

DataConstruct

buc

38.40

DataConstruct

buc

19.20

DataConstruct

buc

19.20

DataConstruct

buc

19.20

DataConstruct

buc

19.20

DataConstruct

kg

3.60

DEDEMAN

kg

0.09

DataConstruct

kg

41.75

DataConstruct

kg

174.75

DataConstruct

7

ans plan pn6/2,5 D = 100 M 100-500 g2x4 s1733 137 6607628 Garnitura de etansare ans plan pn6/2,5 D = 250 M 100-500 g2x4 s1733 138 6607551 Garnitura de etansare ans plan pn6/2,5 D = 50 M 100-500 g2x4 s1733 139 6306274 Grilaj pentru scari,balcoane ornam.simpl. otel profil. 140 6100034 Grund miniu anticoroziv g.351-4 stas 3097-80 141 6101234 Grund prenadez tip M ntr 2831-74 142 7324699 Hirtie de ziar 50g/mp stas 260-70 in suluri 143 6001678 Hirtie slef.usc.sticla foi 23x30 gr 40 s1581 144 6001616 Hirtie slef.usc.sticla foi 23x30 gr 6 s1581 145 7324986 Hirtie sulfit tip1, ptr. izolare conducta 80-100g/mp - sul 146 2601913 Impislitura fire sticla obisnuita I 60, stas 8050 147 7101217 Indicator circul.tbl.ol+fol.r. cerc mm f63a s1848 148 7101255 Indicator circul.tbl.ol+fol.r. cerc mm f66a s1848 149 7101322 Indicator circul.tbl.ol+fol.r. cerc mm f70 s1848 150 7101011 Indicator

D = 600

D = 600

D = 600

circul.tbl.ol+fol.r. patrat L = 600 mm f36 s1848 151 7100081 Indicator circul.tbl.ol+fol.r. triunghi L = 700mm f 8a s1848 152 7100093 Indicator circul.tbl.ol+fol.r. triunghi L = 700mm f 8b s1848 153 7100108 Indicator circul.tbl.ol+fol.r. triunghi L = 700mm f 8c s1848 154 7100213 Indicator circul.tbl.ol+fol.r. triunghi L = 700mm f21 s1848 155 2100830 Ipsos pentru constructii tip A, saci, s 545/1 156 6104987 Lac oleobituminos c.44(462)

nid 649-57

157 2959009 Lemn de foc foioase moi l 1m livrabil din depozit 158 2958990 Lemn de foc foioase tari l 1m livrabil din depozit

Pag 178 Page 525 of 556

LISTA cuprinzand consumurile de resurse materiale 0 1 2 3 159 2900888 Lemn rot cons rur coj fag l min 1m D sub min18cm s4342 160 2900890 Lemn rot cons rur coj

4

5=3x4

6

mc

9.52

DataConstruct

mc

0.00

DataConstruct

mc

0.61

DataConstruct

lei

1,083.00

DataConstruct

7

stej l min 1m D sub min18cm s4342 161 2901167 Manele D = 7-11cm L = 2-6m rasinoase s.1040 162 17000753832 Material marunt pt constructii 163 7329962 Miner siguranta pentru mare puterede rupere 315a si 600a 164 6100022 Minium de plumb tip ns

buc

4.00

VASION

kg

0.03

PECO

l

161.16

PECO

kg

217.68

PECO

kg

1.60

buc

43.88

buc

0.30

DataConstruct

BUC

4.00

FUSION

BUC

4.02

FUSION

mc

11.53

DANLIN XXL

mc

157.66

DANLIN XXL

mc

0.55

DANLIN XXL

mc

307.72

DANLIN XXL

mc

3,716.77

DANLIN XXL

kg

197.00

DEDEMAN

kg

18,826.40

DEDEMAN

kg

1,800.00

DEDEMAN

kg

7.68

DEDEMAN

kg

14.40

DEDEMAN

kg

256.00

DataConstruct

kg

0.20

DataConstruct

mc

12.16

DataConstruct

mp

58.08

DataConstruct

mp

13.94

DataConstruct

stas 429-67 165 6200937 Motorina aditivata pct congelare -25 s 240 166 6200951 Motorina pentru motor DIESEL-LD iarna vara s 240 167 7330399 Mucava tip1 pasta

DataConstruct

bruna lemn 1400g/mp, satinata, coli 168 6790028 Mufa demont pehd pe80 DN 110 pem110x110 cod 7010110 169 6713611 Mufa PVC

FUSION

neplast.imbin.prin lip.pn 10 DN 50 s 7176 170 4105159 MUFA REDUSA COMPRESIUNE De 90/63 171 4105158 MUFA REDUSA DE COMPRESIUNE De 110/90 172 2200575 Nisip sortat spalat de riu si lacuri 0,0-3,0 mm 173 2200642 Nisip sortat spalat de riu si lacuri 3,0-7,0 mm 174 2200496 Nisip sortat nespalat de rau si lacuri 0,0-1,0 mm 175 2200513 Nisip sortat nespalat de rau si lacuri 0,0-3,0 mm 176 2200525 Nisip sortat nespalat de rau si lacuri 0,0-7,0 mm 177 2000171 Otel beton profil neted OB 37

stas 438 D = 14mm

178 2000195 Otel beton profil neted OB 37 stas 438 D = 16mm 179 2000030 Otel beton profil neted OB 37, stas 438 D = 6 mm 180 3434305 Otel lat lam.cald s 395 OL 37-1N lT = 20 x 5 181 3435828 Otel lat lam.cald s 395 OL 37-1N lT = 40 x 6 182 3435658 Otel lat lam.cald s 395 OL 37-1N lT = 40 x 5 183 7331135 Oxid de zinc tehnic clitatea 2 continut minim 98,5 % stas 421 - 70 184 5904512 Oxigen tehnic gazos imbuteliat stas 2031 clasa A 185 2928361 Panou cofraj astereala scind. ras.scurte subscurte 186 2928347 Panou de cofraj tip p fag g 15mm pentru pereti

Pag 179 Page 526 of 556

LISTA cuprinzand consumurile de resurse materiale 0 1 2 3 187 2928335 Panou de cofraj tip p fag g 8 mm pentru pereti 188 5203255 Papuc stantat din

4

5=3x4

6

mp

32.80

DataConstruct

buc

4.00

DataConstruct

buc

3.00

DataConstruct

buc

8.00

DataConstruct

buc

24.00

DataConstruct

buc

9.00

DataConstruct

kg

0.72

DataConstruct

buc

12.12

DataConstruct

l

13.76

DataConstruct

kg

18,900.00

DataConstruct

buc

0.21

DataConstruct

mc

6.50

DataConstruct

buc

183.82

DataConstruct

mc

11.02

DANLIN XXL

mc

201.15

DANLIN XXL

mc

11.60

DANLIN XXL

buc

8.00

DataConstruct

buc

1,221.60

DataConstruct

buc

24.00

DataConstruct

buc

12.60

DataConstruct

buc

995.40

DataConstruct

buc

136.00

DataConstruct

buc

656.00

DataConstruct

buc

88.00

buc

414.72

DataConstruct

212 5841021 Piulita patrata M 10 gr. 6, s 926 213 5842728 Piulita zincata m12

buc

268.08

DataConstruct

buc

8.00

DataConstruct

214 6622159 Placa marsit M 100-500x3,0 mm s 3498

kg

1.40

DataConstruct

7

alama pentru cond.cupru 12x16,5 mmp 189 5203425 Papuc stantat din cupru pentru cond.cupru 6x 8,2 mmp 190 5203451 Papuc stantat din cupru pentru

cond.cupru 8x 6,8 mmp

191 5203463 Papuc stantat din cupru pentru cond.cupru 8x 8,2 mmp 192 5201453 Papuc stantat din cupru pentru cond cupru 8x 9,5 mmp 193 7332907 Pasta mec.de precizie pentru slef.artic.mec.de precizie 194 5537096 Patron fuzibil 65 A simbol

2270

195 6200755 Petrol distilat tip 0/200 np-nid 767 196 2201335 Piatra bruta sortata r.magmatice pentru drum,anroc,pereuri 197 6001329 Piatra poliz.cil.deg.electro.99% 125x60x40liant cer. 198 2201701 Piatra sparta pentru drumuri r.sediment mm.

8-15

199 6420771 Piesa B.A. b250 suport capac 200 2200240 Pietris ciuruit nespalat de mal 7-30 mm 201 2200288 Pietris ciuruit spalat de mal 7-15 mm 202 2200161 Pietris ciuruit spalat de rau 7-30 mm 203 6002012 Pinza pentru slef.usc.car.sil.nea.23x30 gr 16 foi s1582 204 5840405 Piulita hexagonala grosolana A M 6 gr. 5 s 922 205 5840766 Piulita hexagonala grosolana B M 8 gr. 5 s 922 206 5840376 Piulita hexagonala s8123 OLC35 A M 12 207 5842972 Piulita hexagonala speciala s 6218 OL 37 M 6 208 5840558 Piulita hexagonala grosolana A M 16 gr. 5, s 922 209 5842673 Piulita hexagonala semiprecisa M 6 gr. 5 s 4071 210 5842738 Piulita hexagonala semiprecise M 12 gr. 5 s 4071 211 5841007 Piulita patrata M 8 gr.

DEDEMAN

6 s 926

Pag 180 Page 527 of 556

LISTA cuprinzand consumurile de resurse materiale 0 1 2 3 215 2921832 Placa PAL ct cal C 3 normale 4100x1830x18mm s6438 216 2602362 Placa polistiren

4

5=3x4

6

mp

46.35

DataConstruct

mp

45.00

DataConstruct

kg

12.84

DataConstruct

kg

9.02

DataConstruct

buc

24.00

DataConstruct

kg

10.40

DataConstruct

buc

392.04

DataConstruct

buc

4.00

mp

218.50

DataConstruct

BUC

4.00

DataConstruct

buc

7.98

FUSION

buc

0.06

DataConstruct

buc

4.00

FUSION

buc

4.00

FUSION

buc

4.00

FUSION

buc

44.00

buc

128.00

buc

24.00

DataConstruct

buc

64.00

DataConstruct

buc

20.00

DataConstruct

buc

24.00

DataConstruct

kg

0.06

DataConstruct

kg

0.12

DataConstruct

kg

3.45

DataConstruct

kg

4.47

DataConstruct

kg

0.50

DataConstruct

kg

0.02

DataConstruct

kg

1.90

DataConstruct

7

expandat baumit at-n1 8 mm.gros. 217 7334840 Plumb rafinat marca pb4 (pb tc 2) 99,96 218 6110443 Prenadez 400 nii 2829-74 219 5217464 Presetupa pentru fixare cabluri latablouri,aparate D = 11 220 3518541 Profil U ar eg lam cald u14

OL 37-1N s 564

221 7202920 Puiet arbust.foios.amorpha lfruticosa cal.1 H = 100cm 222 20020519 Racord <waterkit>

FUSION

compres.d. 90x2 fe 223 7336525 Rama cu plasa sirma zinc. D = 16mm montat stilp teava 2t 224 6101052 RAMA POARTA MICA 1220 X 2320 MM 225 6714604 Reductie concentr hdpe80 pentru sud pn6 dn110x90 cod 66520016 226 6714471 Reductie PVC g tip B 50- 40

stas 7178

227 4500656 Robinet cep gaze nat.mufe, alama pn1000mmH2O, 5.812-1/4 228 4502496 Robinet sp t.ol i.al ets.in.bz des.3104.0 pn4 DN 250 229 4202503 Robinet trec. fonta 1 1/2 A vent+mufa pn10 s6480 230 5881083 Saiba gro.plata pentru met

M 9 OL 34

DataConstruct

s 1388

231 5881318 Saiba gros.plata pentru met M 16 OL 34 s 1388 232 5881241 Saiba gros.plata pentru

DEDEMAN

metale M 10, OL 34, s1388 233 5881265 Saiba gros.plata pentru metale M 12, OL 34, s 1388 234 5883421 Saiba grower s7666 M 10 235 5884085 Saiba grower seria mij. n M 16 arc6a s 7666/2 236 5883469 Saiba grower seria usor r M 6 arc6

s 7666/2

237 5882193 Saiba plata pentru m12 zn 238 5883005 Saiba plata pentru lemn A M 9 OL 34 s 7565 239 5883043 Saiba plata pentru lemn A M 11 OL 34

s 7565

240 5883067 Saiba plata pentru lemn A M 14 OL 34 s 7565 241 5882025 Saiba prec.plata pentru met A M 3 OL 34

s 5200

242 5882104 Saiba prec.plata pentru met A M 6 OL 34 s 5200

Pag 181 Page 528 of 556

LISTA cuprinzand consumurile de resurse materiale 0 1 2 3 243 5882257 Saiba prec.plata pentru met A M 18 OL 34 s 5200 244 7344211 Sapun de rufe tip 60%

4

5=3x4

6

kg

0.17

DataConstruct

kg

0.08

DataConstruct

kg

85.83

DataConstruct

kg

0.08

DataConstruct

kg

1.93

DataConstruct

kg

0.95

DataConstruct

mc

0.01

DataConstruct

mc

0.35

VASIONA

mc

0.71

DataConstruct

buc

957.48

DataConstruct

kg

28.09

DataConstruct

buc

4.00

DEDEMAN

buc

4.00

DEDEMAN

buc

4.00

DEDEMAN

buc

4.00

DEDEMAN

buc

12.00

DEDEMAN

mc

0.00

DataConstruct

kg

0.24

DataConstruct

kg

8.10

VASION

kg

180.96

VASION

kg

0.04

VASION

kg

0.22

VASION

buc

66.17

DataConstruct

buc

3.00

DataConstruct

kg

718.75

DEDEMAN

buc

364.80

DEDEMAN

buc

32.00

DEDEMAN

buc

414.72

7

acizi grasi stas 189-59 245 7344235 Sapun pasta 38% acizi grasi pentru zugraveli 246 3803142 Sarma moale obisnuita D = 1,25 mm, OL 32 s 889 247 3803116 Sarma moale obisnuita D = 1mm, OL 32 s 889 248 3805279 Sarma moale zincata D = 0,8 mm, OL 32 s 889 249 2914205 Scindura fag netiv.cl.c neab.gr.25-40,l.1,8-4m,l.>8cm 250 2914229 Scindura fag.lungi.neab.cl.a.gR = 40mm L = 1,8-4m lT = 6 st8689 251 2903995 Scindura rasin lunga tiv cls D gR = 24mm L = 4,00m s 942 252 7344376 Scoaba din rasini fenol formaldehidice (bachelita) 253 6311528 Scoaba otel pentru constructii din lemn, latime= 65-90mm, l.200-300 mm 254 7300011 Separator bipolar de protectie diferentiata 32 A 300mA 255 11283973 SIGURANTA AUTOMATA BIPOLARA 10 A 256 11283976 SIGURANTA AUTOMATA BIPOLARA 16A 257 17000058743 Siguranta bipolara automata 32 A 258 5500380 Siguranta mpr 630 a 259 2905955 Sipca rasinoase clasa I / II gros 18 / 24 - 24 / 48 mm L = 1,50 - 2,75 m 260 3810511 Sirma alum pentru electroteh D = 1 3033

tip A

s

261 3804330 Sirma moale alba-mata D = 2 OL 32 s 889 262 3803128 Sirma moale obisnuita D = 1,12 OL 32

s 889

263 3805293 Sirma moale zincata D = 1 OL 32 s 889 264 3805372 Sirma moale zincata D=2

OL 32

s 889

265 6827395 Sprait met.telescop.0,8mm(8tf)pt.sprij.lu ng.0,60-1,50m $ 266 6420874 Stilp lin.el.aer.se 4 1 KV 10 M bpsbp.vibr.ipct831/ii 267 6301822 Stilp metalic pentru fixat imprejm inclusiv piese fixare 268 6301690 Stilp pentru placi indicatoare dinteava otel D = 50 269 7346788 Suport centura legare la pamint 40x4 simbol s-47b 270 5824176 Surub cap bombat git patrat

DataConstruct

M 8x 80 gr. 4.8 s 925

Pag 182 Page 529 of 556

LISTA cuprinzand consumurile de resurse materiale 0 1 2 3 271 5810230 Surub cap hex.fil.sub cap prec.m 6 x 16 gr. 5.8 s4845 272 5819963 Surub cap hexagonal

4

5=3x4

6

buc

948.00

DataConstruct

buc

32.00

DataConstruct

buc

24.00

DataConstruct

buc

96.00

DEDEMAN

buc

24.00

DataConstruct

buc

656.00

DataConstruct

buc

24.00

DEDEMAN

buc

48.00

DataConstruct

buc

144.00

DataConstruct

buc

160.00

DataConstruct

buc

16.00

DataConstruct

buc

44.00

DataConstruct

buc

28.00

DataConstruct

buc

16.00

DataConstruct

buc

12.60

DataConstruct

buc

8.00

DataConstruct

buc

40.00

DataConstruct

buc

24.00

DataConstruct

buc

268.08

DataConstruct

buc

12.00

DataConstruct

buc

16.00

DataConstruct

kg

42.64

DataConstruct

kg

0.85

DataConstruct

MP

45.00

buc

4.00

m

22.44

DataConstruct

m

10.20

DataConstruct

7

grosolan M 6x 25 gr. 4.8 s 920 273 5820211 Surub cap hexagonal grosolan M 8x 40 gr. 4.8 s 920 274 5821708 Surub cap hexagonal grosolan M 16x 60 gr. 4.8 s 920 275 5821784 Surub cap hexagonal grosolan M 16x 75 gr. 4.8 s 920 276 5800390 Surub cap hexagonal precis M 6 x 30 gr. 5.8 s4272 277 5801071 Surub cap hexagonal precis

M 12 x 40 gr. 5.8 s4272

278 5801320 Surub cap hexagonal precis M 12 x100 gr. 5.8 s4272 279 5817446 Surub cap hexagonal semiprecis M 8x 30 gr. 5.8 s 6220 280 5829126 Surub cap inecat crestat sprec.m 6x 30 gr. 4.8 s 2571 281 5836492 Surub cu cap bombat crestat

l 5 x 60 f1 s 1451

282 5837745 Surub cu cap hexagonal l 8 x 25 f1 s 1454 283 5837757 Surub cu cap hexagonal 1454

l 8 x 30 f1 s

284 5837939 Surub cu cap hexagonal l 10 x 60 f1 s 1454 285 5838165 Surub cu cap hexagonal l 12 x 200 f1, s 1454 286 5805482 Surub cu cap hexagonal m12x40 zn 287 5836741 Surub cu cap inecat crestat

l 3 x 25 f1 s 1452

288 5836777 Surub cu cap inecat crestat l 3 x 40 f1 s 1452 289 5838579 Surub cu cap patrat pentru lemn l 10 x 140 f1 s 1455 290 5500445 Surub de calibrare d3 de 60a, din am 58t,desen p-44625 291 5827702 Surub pentru fundatii grosolan A M 16x 200 gr. 4.8 s 2350 292 3602366 Tabla constr.mecanice s901 1 x1000x2000 OL 34-1n 293 3615911 Tabla groasa 10x 1000 OL 37-1N s 437 294 3606001 TABLA ZINCATA DE 1 MM GROSIME 295 7348774 Tablou distrib.model

DEDEMAN

ideb mont.in firida 350a tip E 1 296 6700602 Teava din p.v.c.rigid tip G 50x3,7 stas 6675/2 297 6700638 Teava din p.v.c.rigid tip G 90x6,7 stas 6675/2

Pag 183 Page 530 of 556

LISTA cuprinzand consumurile de resurse materiale 0 1 2 3 298 6701128 Teava HDPE 80 312uni7611.7615 pn6 DN 90x5.1 cod 64000091 299 3500011 TEAVA OTEL 355,6 X 8

4

5=3x4

6

m

21.00

FUSION

M

15.00

DEDEMAN

M

415.30

m

3.02

DataConstruct

m

72.00

DataConstruct

m

6.03

DataConstruct

m

6.03

DataConstruct

m

11.00

DataConstruct

m

40.40

DataConstruct

m

36.36

DataConstruct

BUC

4.00

FUSION

buc

7.98

FUSION

buc

0.12

DataConstruct

buc

12.00

DataConstruct

kg

0.30

DataConstruct

kg

2,497.47

DataConstruct

buc

5.56

DataConstruct

buc

331.28

DataConstruct

7

MM 300 6710468 TEAVA PEID PE100 PN6 DN 110 MM 301 3108229 Teava pentru constructii

FUSION

fara sudura LC 57 x 3 / OLT 35 s 404/2 302 3108475 Teava pentru constructii fara sudura LC 60 x 5 / OLT 35 s 404/2 303 3110117 Teava pentru constructii fara sudura LC 108 x 6 / OLT 35 s 404/2 304 3112646 Teava pentru constructii fara sudura LC 250 x10 / OLT 35 s 404/2 305 3113080 Teava pentru constructii fara sudura LC 324 x10 / OLT 35 s 404/2 306 3305671 Teava pentru instalatii.neagra fl+mf M - 15( 1/2) OL 32 1 s 7656 307 3305724 Teava pentru instalatii.neagra fl+mf M - 50(2 OL 32 1 s 7656

)

308 4105548 TEU COMPRESIUNE EGAL DE 90 MM 309 6714904 Teu pe80 pentru sudura pn 10 DN 110 cod 66220051 310 6714861 Teu PVC pentru imbin.prin lip.pn 10 DN 50 stas 7174 311 5601160 Tila de portelan pentru tuburi izol.si de prot.t16

s5764

312 6109781 Toluen hidrocarbura aromatica 313 6306327 Treapta din otel rotund diam 14- 20 mm 314 2804204 Tub bet.s.circ.fara talpa mufa imb.usc. 800x2000 s816 315 2804216 Tub bet.s.circ.fara talpa mufa imb.usc. 1000x1000 s816 316 6270043 TUB CANALIZARE

M

5,586.50

m

1.08

m

41.00

buc

165.64

DataConstruct

kg

2.06

DataConstruct

kg

107.23

DataConstruct

GOFRAT CU MUFA SH8 D.250 MM 317 6619724 Tub cauc.norm ins.pinza cl.a pentru apa pn 10 DN int 19 mm 318 7356549 Tub metalic

EURO-EM PIATRA NEAMT DataConstruct

DEDEMAN

flex.prot.neetans tip spd-roman D = 23 mm 319 2804955 Tub tronconic pentru camin vizitare 800x1000 l0,5m s816 320 6108945 Ulei de in sicativat u.001-13 stas 16-80 321 6201084 Ulei emulsionabil pentru decofrare betoane stas 11382

Pag 184 Page 531 of 556

LISTA cuprinzand consumurile de resurse materiale 0 1 2 3 322 6202600 Unsori consistente de uz general U 85 ca 3 s 562 323 6202612 Unsori consistente de uz general u100 ca 4

4

5=3x4

6

kg

3.00

VASION

kg

0.00

DataConstruct

kg

0.75

DataConstruct

kg

2.20

DataConstruct

BUC

6.00

FUSION

mc

0.26

DataConstruct

kg

2.50

DataConstruct

kg

0.83

DataConstruct

BUC

3.00

FUSION

kg

3.28

DEDEMNA

kg

0.72

DEDEMNA

kg

0.08

DEDEMNA

kg

35.77

DEDEMNA

kg

27.12

DEDEMNA

kg

3.90

DataConstruct

l

2.81

DataConstruct

1,472.00

DataConstruct

7

s 562

324 6202571 Unsori lubrefiante uz general U 75 s 562 325 6202624 Unsori pe baza de sapunuri pentru rulmenti 100ca3 s1608 326 7500112 VANA GOLIRE DN 100 MM 327 2100713 Var pasta pentru constructii tip 2 328 6202507 Vaselina tehnica artificiala tip A

s 917

329 6202533 Vaselina tehnica artificiala tip D s 917 330 7319000 VENTIL AERISIRE 1 1/2 TOLI 331 6103220 Vopsea alba (fp) v.101-1 ntr 90-80 332 6104171 Vopsea anticoroziva pe baza de bitum strat ii v.813-66 333 6103581 Vopsea gri cenusiu v.841-1 ntr 90-80 334 6103294 Vopsea minium de plumb V 351-3 ntr 90-80 335 6103218 Vopsea ulei orice culoare 336 6200676 White spirit rafinat tip A stas 44 337 6200690 White spirit rafinat tip B stas 44 338 7358286 Zincarea la cald otel-bet.benzibare,profile,table ond. 339 7815045 Material marunt (banda

dmp

%

DataConstruct

%

DataConstruct

%

DataConstruct

%

DataConstruct

termocontractibila,tub PVC,varnish ) 340 7815020 Material marunt (bumbac,petrol) 341 7815026 Material marunt (bumbac,petrol,cherestea rasinoase) 342 7815036 Material marunt (bumbac,unsoare)

Valoare directa Recapitulatie

lei

TOTAL

1 euro =

lei lei euro

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 185 Page 532 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

C7cp - LISTA cuprinzand consumurile cu mana de lucru cumulat pe proiect 09.05.2018 Nr. crt. Denumirea meseriei

0

1

Consumul cu manopera - (om/ore) -

Tariful mediu - lei/ora -

Valoarea (exclusiv TVA) - lei -

Procentul

2

3

4=2x3

5

1 10251

Betonist

2 10741

Dulgher constructii

3 10821

Dulgher poduri

4 20521

Electrician automatizare

17.60

5 20251

Electrician cabluri subterane

72.31

6 20141

Electrician linii electrice aeriene

62.45

7 20351

Electrician post trafo

69.54

8 11131

Fierar beton

9 11321

Finisor terasamente

10 12031

Instalator alimentare apa

1,365.73 19,117.66 876.00

1,147.48 6.03 419.22

11 12051

Instalator alimentare cu apa

12 11551

Instalator electrician

13 11641

Instalator sanitar

67.38

14 12231

Izolator hidrofug

50.87

15 12441

Izolator lucrari antiacide

16 12341

Izolator termic

17 221421

Lacatus constr. metal-b

18 21441

Lacatus constructii metalice

19 221451

Lacatus constructii metalice-b

20 21841

Lacatus mecanic intretinere-reparatii

42.60

21 21661

Lacatus montaj agregate energetice

465.14

22 21741

Lacatus montaj masini electrice

3.72

23 21521

Lacatus montaj utilaj industrial

22.20

24 27851

Mecanic reparatii

12.80

25 26821

Montator c-tii metalice

26 25051

Montator conducte

27 26851

Montator constructii metalice

28 12521

Montator prefabricate beton

29 12631

Mozaicar

30 109921

Muncitor deservire

31 29921

Muncitor deservire c-tii masini

119.50

32 19911

Muncitor deservire c-tii.montaj

876.00

33 29931

Muncitor deservire constructii masini

8.23

34 19931

Muncitor deservire constructii montaj

1,533.06

35 19921

Muncitor deservire constructii-montaj

8,148.84

36 19821

Muncitor deservire st.beton

37 319711

2,350.96 419.32

9.60 285.91 0.93 50.64 3.12

36.00 295.54 36.00 25.30 126.59 3,305.40

13.48 8,250.80

38 12821

Muncitor incarcare-descarcare materiale Pavator

39 90331

Peisagist

40 12921

Pietrar

41 19621

Sapator

42 22751

Sudor electric

43 222721

Sudor electric-b

44 222831

Sudor gaze-b

12.00

45 13121

Tinichigiu santier

82.00

46 320111

Tractorist < 60cp

12.61

14.59 62.70 112.80 39,916.34 824.14 9.00

Pag 186 Page 533 of 556

LISTA cuprinzand consumurile cu mana de lucru 0 1 47 223021

Vopsitor industrial

48 223041

Vopsitor industrial-b

49 13451

Zidar

50 13331

Zugrav vopsitor

Total ore manopera: Total fara spor Sporuri deviz Valoare directa

2

3

5

58.47 1,763.88 86.59 92,684.23

lei lei lei lei

Recapitulatie

lei

TOTAL

1 euro =

4=2x3

15.14

euro

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 187 Page 534 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

C8cp - LISTA cuprinzand consumurile de ore de functionare a utilajelor de constructii cumulat pe proiect 09.05.2018 Nr. crt. Denumirea utilajului de constructii

0

1

Ore de functionare

Tariful unitar (exclusiv TVA) - lei / ora -

Valoarea (exclusiv TVA) - lei -

2

3

4=2x3

1 4803

Autolaborator mobil pt.verificari electrice pe auto 3t

10.00

2 4806

Autolaborator tip lm3 auto 5t pt verif.centrale si statii elect.

2.96

3 6751

Automacara 5 tf, Hmax = 6,5m deschidere max= 5,5m Automacara cu brat zabrele 4,5-5,8 tf 2 schimburi

600.00 843.02

4 1233

112.79

5 3702

Betoniera cu cadere libera actionata electric 101-250 l

6 3553

Buldozar pe senile 65-80cp

37.72

7 3554

Buldozer pe senile 81-180cp

16.49

8 3710

Centrala de beton semiautomatizata 21-40mc/ora

2.85

9 3709

Centrala de beton semiautomatizata 8-20mc/n

2.26

10 1003

Cheltuieli pentru transportul utilajelor

11 4004

Compactor autopropcu rulour.(valturi) pina la 12tf

12 3004

Convertizor sudura (inclus consum energie electrica) 1-14kw

13 2503

Electrocompresmobil de joasa presiune 1,1-3,9 mc/min

14 3521

Excavator pe pneuri motor termic (buldoexcavator) 0,21-0,39mc Grup termic de sudura 28-35kw

302.58

Instalatie pt.filtre aciculare cu motor diesel 104filtre 27kw Macara de fereastra 0,15tf

960.00

15 3006 16 3636 17 6702 18 7001

30.60 2.42 20.80 0.98

101.69

0.06 2.10

19 6727

Macara lansator de conducte pe traccu senile pina la 15tf Macara pionier 0,5-0,75tf

284.00

20 4021

Mai mecanic cu motor termic de 6cp 150-200kgf

270.45

21 4201 22 4205

Masina automata de taiat si indret.ot.bet.act.el. d=3-20mm 5-10 Masina de fasonat otel-beton d=pina la 40mm 2,2kw

23 4701

Motopompa 6- 8cp

14.21

24 4702

Motopompa 9-16cp

1,264.00

25 4704

Motopompa apa monoetaj de jpres.mont.pe tractor pn. 65cp Pod rulant electric 20,1-40tf

400.00

37.28

26 6902 27 4203 28 4030

Stanta electrica de taiat otel-beton, diam pina la 40 mm Topitor de bitum tractat (exclus tractorul) 500-1000l

29 5604

Tractor pe pneuri 65cp

30 6609

Troliu electric 3,1-5tf

31 3719

Vibrator de ext actelectric 0,25-1,1kw

32 3716

Vibrator de interior pentru beton actionat, electric 0,9-1,5 kw Vinci cu cremaliera sau hidraulic 16-25tf

33 6601

24.23 154.71

9.82

10.66 400.00 14.14 4.00 336.67 4.00

Pag 188 Page 535 of 556

LISTA cuprinzand consumurile de ore de functionare a utilajelor de constructii 2 0 1 Total ore utilaje: Valoare directa

4=2x3

lei lei

Recapitulatie

lei

TOTAL

1 euro =

3

6,277.49

euro

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 189 Page 536 of 556

OBIECTIV:

„Extindere retea de canalizare în satele Manolea si Boura"

Beneficiar:

COMUNA FORASTI

Proiectant:

________________________________________

Executant:

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL

C9cp - LISTA cuprinzand consumurile privind transporturile cumulat pe proiect Nr. crt.

Tone

Tipul de transport

0

1

Km

Ore de

tran-

par-

functio-

sportate

cursi

nare

2

3

4

Tariful unitar (exclusiv TVA) - lei/tona/km 5

09.05.2018 Valoarea (exclusiv TVA) - lei 6=2x3x5

Transport rutier 1 TRA04A30 Transport rutier materiale semifabricate cu autoremorchere cu remorci treiler sub 20t pe...dis.30 km. 2 TRA06A30 Transportul rutier al betonului-mortarului cu autobetoniera de...5,5 mc dist.=30 km 3 TRA02A30 Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...30 km. 4 TRA02A50 Transportul rutier al materialelor,semifabricatelor cu autocamionul pe dist.= ...50 km. 5 TRA01A30 Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 30 km. 6 TRA01A49 Transportul rutier al...materialelor,semifabricatelor cu autobasculanta pe dist.= 49 km. 7 TRA01A05P Transportul rutier al...pamantului sau molozului cu autobasculanta dist.= 5 km Cheltuieli transport 8

114.87

30.00

0.60

1,281.79

30.00

0.60

60.47

30.00

0.60

7.00

50.00

1.00

6,773.02

30.00

0.60

420.00

49.00

0.98

23,138.10

5.00

0.10

837.85

5.00

0.25

Valoare directa

lei

Recapitulatie

lei lei

TOTAL

1 euro =

euro

lei, curs la data de

OFERTANT: SC CONSORZIO STABILE EBG BOLOGNA SI SUCURSALA BUCURESTI SRL

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007

Pag 190 Page 537 of 556

OFERTANT, SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI S.R.L. DECLARAŢIE PRIVIND TERMENUL DE GARANTIE ACORDAT LUCRARILOR

Subsemnatul Dl. COLOMBO GIANCARLO, reprezentant al SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI S.R.L., cu sediulCIF 38969361 J40/3122/2018 Bdul. Nicolae Balcescu 18 Sectorul 1, în calitate de ofertant la procedura , „Extindere retea de canalizare în satele Manolea si Boura"  45232400-6 Lucrari de constructii de canalizare de ape reziduale (Rev.2) declar pe propria răspundere că termenul de garantie acordat lucrarilor este de 60 luni.

Data: 14.05.2018

Operator economic,

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI S.R.L.

Page 538 of 556

DECLARATIE PRIVIND RESPECTAREA LEGISLATIEI DE MEDIU, IN DOMENIUL SOCIAL SI AL RELATIILOR DE MUNCA

Prin această declaraţie Subsemnatul, Dl. COLOMBO GIANCARLO, reprezentant al SC CONSORZIO

STABILE EBG BOLOGNA SUCURSALA BUCURESTI S.R.L., in calitate de ofertant la procedura simplificata organizata de COMUNA FORASTI pentru atribuirea contractului de lucrari - „Extindere retea de canalizare în

satele Manolea si Boura" DECLAR PE PROPRIA RĂSPUNDERE, sub sancţiunile aplicate faptei de fals şi uz de fals în declaraţii, că la elaborarea ofertei am tinut cont de toate obligatiile referitoare la obligatiile relevante din domeniile medului, social si al relatiilor de munca pentru activitatile ce se vor desfasura pe parcursul indeplinirii contractului de lucrari, in conformitate cu prevederile Legii securitatii si sanatatii in munca nr. 319/2006, Legea 265/2006 privind aprobarea OUG 195/2005 privind protectia mediului si a celorlaltor reglementari aplicabile.

Data completării 14/05/2018

Operator economic

SC CONSORZIO STABILE EBG BOLOGNA SUCURSALA BUCURESTI SRL Dl. COLOMBO GIANCARLO

Page 539 of 556

Page 540 of 556

Page 541 of 556

Page 542 of 556

Page 543 of 556

Page 544 of 556

Page 545 of 556

Page 546 of 556

Page 547 of 556

Page 548 of 556

Page 549 of 556

Page 550 of 556

Page 551 of 556

Page 552 of 556

Page 553 of 556

Page 554 of 556

Page 555 of 556

Page 556 of 556