Universal Projector Bracket
(forward/ground projection 2 into 1)
Installation Instructions Model No.: 91-AR series
Ⅰ Safety Instructions 1. Please require professional installers to assemble, and at least two personnel to assemble and shakedown test; follow the instructions strictly. 2. Please do not modify or change the product without authorization. Do not install it where it is easy to shake or fall. 3. Check the strength of the wall before installation, if the strength is not enough, please strengthen; after installation, do not hang the heavy weight (this product limit load is within 30kg) or make the product come under a violent impact; once damaged, it's not allowed to continue to use, otherwise, at the risk of the consequences; Our Company is not responsible for damage and loss caused by failure to install and operate properly.
Ⅱ Component List Componen Upper t Name segment of outer tube Qty
1
Upper segment of inner tube
Lower segment of outer tube
Lower segment of inner tube
1
1
1
Photo
Fastener Name Qty
Expansion screw 4sets
Ⅲ Installation step
M8*16 M8×65 screw&gasket&nu screw&gasket&nut t 2sets
each 4sets
M8×25 screw&gasket
M4,M5,M6 cross head screw
2sets
each 4pcs
Wall conditions-ordinary concrete wall thickness must be more than 100 mm, drilling depth 55 mm, and use expansion screw fastening; if you have questions about the installation of wall materials, please contact the manufacturer expert consultation. Step1: Determine the installation position of the hanger, drill holes in the "+", the bit is Φ 6, as shown in figure 1
figure 1
Step2: Connect 1 with 2 and 3 with 4, and combine them together. After combination, the hanger will be fastened with the wall with expansion screws, as shown in the figure below. NO.
Component Name
1
Upper segment of outer tube
2
Upper segment of inner tube
3
Lower segment of outer tube
4
Lower segment of inner tube
1
2
3 4
M8×16 screw&gasket& Fastener nut s Used M8×65
screw&gasket&nu t
Step3: Install the projection product, determine the position of the claw head according to the location of the projection installation hole (if the hole spacing to be installed is small, remove the claw head to install directly), as shown in the following figure
Ⅳ Regulation method-----Please adjust as actual requirement 1. The bottom plate is equipped with a long hole, which can adjust the projection position front&back and left&right, and the maximum adjustment distance is 50mm: Adjust left and right projection position
Adjust front and back projection position
2. Adjust up and down projection position:
Up and down projection position adjustment
3. Projection angle fine-tuning:
Front-Back Sway
Left-Rignt turn
4. Frontal/ Ground projection effect conversion:
l Pro ject oin Effe ct
Gr ou nd Pro ject oin Eff ect
Fro nta l Pro ject oin Effe ct
Ground locking hole Forward locking hole
into 1)
and shakedown test; follow
it is easy to shake or fall.
ngthen; after installation, do under a violent impact; once Company is not responsible
Connecting Plate 1
M4,M5,M6 cross head screw each 4pcs
55 mm, and use expansion the manufacturer expert
as shown in figure 1
nger will be fastened with the
qty
1
1
1
1 4sets 2sets
he location of the projection irectly), as shown in the
ont&back and left&right, and
sition
ition
tment
Universal Projector Bracket Installation Instruction Model No.: 91-NS series
Ⅰ Safety Instructions 1.In order to ensure safe and correct use, read and understand all instructions, and strictly follow the instructions to operate, keep it properly for future reference. 2.Please authorize the relevant professional installation company to install it or require professional installers to assemble, and require at least two personnel to assemble and shakedown test. 3.Before installation check whether the wall has enough strength to install projector and hanger. If the strength is not enough, please reinforce it before installing it. 4.After installation, do not hang heavy objects on this hanger or cause the product to be hit violently. If damaged, do not continue to use, otherwise the consequences are at your own expense. 5.We are not responsible for any damage or loss caused by failure to install and operate properly. Ⅱ Component List No.
Component Name
Photo
Qty
1
Inner and outer tube
1set
2
Connector
1set
3
Connecting claw
1set
4
Extended claw
1set
5
M4,M5,M6 cross head screw
each 4pcs
6
M6*10 cross head screw
8pcs
7
Φ6 Flat gasket
8pcs
8
M8×55 Bolt &Nut
1set
9
Expansion screw
4sets
Ⅲ Installation step
Ⅳ Regulation method Loosen screws slightly, left and right, back and forth swing angle
Loosen the screw slightly and rotate from left to right
The connecting claw head can be rotated according to the projector connecting hole site
ate properly.