Projector Bracket (2)

  • Uploaded by: Sohail Khan
  • 0
  • 0
  • August 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Projector Bracket (2) as PDF for free.

More details

  • Words: 781
  • Pages: 11
Universal Projector Bracket

(forward/ground projection 2 into 1)

Installation Instructions Model No.: 91-AR series

Ⅰ Safety Instructions 1. Please require professional installers to assemble, and at least two personnel to assemble and shakedown test; follow the instructions strictly. 2. Please do not modify or change the product without authorization. Do not install it where it is easy to shake or fall. 3. Check the strength of the wall before installation, if the strength is not enough, please strengthen; after installation, do not hang the heavy weight (this product limit load is within 30kg) or make the product come under a violent impact; once damaged, it's not allowed to continue to use, otherwise, at the risk of the consequences; Our Company is not responsible for damage and loss caused by failure to install and operate properly.

Ⅱ Component List Component Upper Name segment of outer tube Qty

1

Upper segment of inner tube

Lower segment of outer tube

Lower segment of inner tube

1

1

1

Photo

Fastener Name Qty

Expansion screw 4sets

Ⅲ Installation step

M8×65 M8*16 screw&gasket&nut screw&gasket&nut 2sets

each 4sets

M8×25 screw&gasket

M4,M5,M6 cross head screw

2sets

each 4pcs

Wall conditions-ordinary concrete wall thickness must be more than 100 mm, drilling depth 55 mm, and use expansion screw fastening; if you have questions about the installation of wall materials, please contact the manufacturer expert consultation. Step1: Determine the installation position of the hanger, drill holes in the "+", the bit is Φ 6, as shown in figure 1

figure 1 Step2: Connect 1 with 2 and 3 with 4, and combine them together. After combination, the hanger will be fastened with the wall with expansion screws, as shown in the figure below.

1

2

3 4

NO.

Component Name

1

Upper segment of outer tube

2

Upper segment of inner tube

3

Lower segment of outer tube

4

Lower segment of inner tube

M8×16 screw&gasket& Fastener nut s Used M8×65

screw&gasket&nu t

Step3: Install the projection product, determine the position of the claw head according to the location of the projection installation hole (if the hole spacing to be installed is small, remove the claw head to install directly), as shown in the following figure

Ⅳ Regulation method-----Please adjust as actual requirement 1. The bottom plate is equipped with a long hole, which can adjust the projection position front&back and left&right, and the maximum adjustment distance is 50mm: Adjust left and right projection position

Adjust front and back projection position

2. Adjust up and down projection position:

Up and down projection position adjustment

3. Projection angle fine-tuning:

Front-Back Sway

Left-Rignt turn

4. Frontal/ Ground projection effect conversion:

l Pro ject oin Effe ct

Gr ou nd Pro ject oin Eff ect

Fro nta l Pro ject oin Effe ct

Ground locking hole Forward locking hole

into 1)

and shakedown test; follow

t is easy to shake or fall.

ngthen; after installation, do under a violent impact; once Company is not responsible

Connecting Plate 1

M4,M5,M6 cross head screw each 4pcs

5 mm, and use expansion the manufacturer expert

s shown in figure 1

nger will be fastened with the

qty

1

1

1

1 4sets 2sets

e location of the projection rectly), as shown in the

nt&back and left&right, and

sition

ition

tment

Universal Projector Bracket Installation Instruction Model No.: 91-NS series

Ⅰ Safety Instructions 1.In order to ensure safe and correct use, read and understand all instructions, and strictly follow the instructions to operate, keep it properly for future reference. 2.Please authorize the relevant professional installation company to install it or require professional installers to assemble, and require at least two personnel to assemble and shakedown test. 3.Before installation check whether the wall has enough strength to install projector and hanger. If the strength is not enough, please reinforce it before installing it. 4.After installation, do not hang heavy objects on this hanger or cause the product to be hit violently. If damaged, do not continue to use, otherwise the consequences are at your own expense. 5.We are not responsible for any damage or loss caused by failure to install and operate properly. Ⅱ Component List No.

Component Name

Photo

Qty

1

Inner and outer tube

1set

2

Connector

1set

3

Connecting claw

1set

4

Extended claw

1set

5

M4,M5,M6 cross head screw

each 4pcs

6

M6*10 cross head screw

8pcs

7

Φ6 Flat gasket

8pcs

8

M8×55 Bolt &Nut

1set

9

Expansion screw

4sets

Ⅲ Installation step

Ⅳ Regulation method Loosen screws slightly, left and right, back and forth swing angle

Loosen the screw slightly and rotate from left to right

The connecting claw head can be rotated according to the projector connecting hole site

ate properly.

Related Documents

Projector Bracket (2)
August 2019 28
Projector Bracket
August 2019 23
Projector
November 2019 15
Bracket
April 2020 14
Bracket
April 2020 14
Projector Dfma
October 2019 19

More Documents from "dwan"