ANNEX 2.1
PROJECT BRIEF AND SITE PROGRESS PHOTOS APPLICATION OF WATERPROOFING (KRYSTACEM X) AT LOWER GROUND: 2nd Coating: GRIDLINE I-K/30 APRIL 2018 GRID LINE M-R/24-23:
ANNEX 2.1 GRID LINE M-R/24-23:
ANNEX 2.1 APPLICATION OF WATERPROOFING (KRYSTACEM X) AT LOWER GROUND: 1ST Coating: GRIDLINE I-K/30: GRID LINE I-K/30:
GRID LINE I-K/30:
ANNEX 2.1 APPLICATION OF WATERPROOFING (KRYSTACEM X) AT LOWER GROUND: 2ND Coating: GRIDLINE I-K/30: GRID LINE I-K/30:
ANNEX 2.1 APPLICATION OF WATERPROOFING (KRYSTACEM X) AT LOWER GROUND: 1ST Coating: GRIDLINE Z’-B/30: GRID LINE Z’-B/30:
ANNEX 2.1 APPLICATION OF WATERPROOFING (KRYSTACEM X) AT GREASE TANK (FOUNDATION PLAN) : 1ST Coating: GRIDLINE F-H/29-30: GRID LINE F-H/29-30: