BUDGET OVERALL

ACCENTAGE SDN BHD CADANGAN MENAIKTARAF JALAN KESANG TASEK, MUAR, JOHOR NO KONTRAK - JKR/NEG/J/10/2002 BILL NO. 5 - ROAD FURNITURE

ITEM

DESCRIPTION

QTY

UNIT Labour

RATIONALIZED RATE RATE Material Machinery

AMOUNT (RM) Total

Labour

BUDGET RATE Material Machinery

AMOUNT (RM)

PROFIT (RM)

Total

ALL QUANTITIES ARE PROVISIONAL 5.1 5.1.1 a)

CORRUGATED SHEET STEEL BEAM HIGHWAY GUARDRAIL Supply and install corrugated sheet steel beam guardrail:Single sided galvanized corrugated beam, including galvanized steel post with 100mm x 45mm high intensity reflective sheeting, and other elements.

3,240

Lin.m

-

104.00

-

104.00

336,960.00

-

91.10

-

91.10

295,164.00

Galvanized terminal anchorage unit Type 3 (with single sided sheet steel beam)

16

No.

-

550.00

-

550.00

8,800.00

-

550.00

-

550.00

8,800.00

-

c)

Galvanized terminal anchorage unit Type 2

10

No.

-

350.00

-

350.00

3,500.00

-

350.00

-

350.00

3,500.00

-

d)

Galvanized terminal anchorage unit Type 1

10

No.

-

130.00

-

130.00

1,300.00

-

120.00

-

120.00

1,200.00

100.00

Supply and install in position all Guide and information traffic signals (mounted on 2 posts) of High Intensity Retro Reflective plastic sheeting including all posts brackets, painting and everything complete as shown in the drawings and as directed by the S.O.

64

Sq.m

-

600.00

-

600.00

38,400.00

-

510.00

-

510.00

32,640.00

5,760.00

Supply and install in position all standard Warning and Regulatory traffic signs (mounted on 1 post) of High Intensity Retroreflective plastic sheeting including all posts brackets, painting and everything complete as shown in the drawings and as directed by the S.O.

5

Sq.m

-

550.00

-

550.00

2,750.00

-

510.00

-

510.00

2,550.00

200.00

Continous lines:(a) 100mm wide double line (b) 150mm wide edge line (c) 200mm Yellow transverse bar

336 5,800 180

Lin.m Lin.m Lin.m

-

1.61 2.42 3.22

-

1.61 2.42 3.22

540.96 14,036.00 579.60

-

1.40 2.10 2.80

-

1.40 2.10 2.80

470.40 12,180.00 504.00

70.56 1,856.00 75.60

Intermittent line:(a) 100mm wide and 450mm long with 7500mm gap centre line (b) 200mm wide and 1000mm long with 1000mm gap (c) Hatch line

1,500 250 100

Lin.m Lin.m Lin.m

-

1.61 3.22 3.22

-

1.61 3.22 3.22

2,415.00 805.00 322.00

-

1.40 2.80 2.80

-

1.40 2.80 2.80

2,100.00 700.00 280.00

315.00 105.00 42.00

Arrows:(a) Single straight (b) Single turning (c) Double arrows - straight and turning

10 8 8

No. No. No.

-

69.00 46.00 103.50

-

69.00 46.00 103.50

690.00 368.00 828.00

-

60.00 40.00 90.00

-

60.00 40.00 90.00

600.00 320.00 720.00

90.00 48.00 108.00

Road Studs

120

No.

-

57.50

-

57.50

6,900.00

-

50.00

-

50.00

6,000.00

900.00

367,728.40

51,466.20

b)

5.2 5.2.1

5.2.2

5.3 5.3.1

41,796.00

SIGNBOARDS

ROAD MARKINGS Reflective White Thermoplastic With Applied Solid Glass Beads Class A

5.3.2

5.3.3

5.3.4

5.4

TOTAL CARRIED FORWARD (RM)

419,194.60

ROADFURNITURE - Budget Overall

1/2

BUDGET OVERALL

ACCENTAGE SDN BHD CADANGAN MENAIKTARAF JALAN KESANG TASEK, MUAR, JOHOR NO KONTRAK - JKR/NEG/J/10/2002 BILL NO. 5 - ROAD FURNITURE

ITEM

DESCRIPTION

QTY

UNIT Labour

RATIONALIZED RATE RATE Material Machinery

AMOUNT (RM) Total

TOTAL BROUGHT FORWARD (RM)

5.5 5.5.1

Labour

BUDGET RATE Material Machinery

AMOUNT (RM)

PROFIT (RM)

Total

419,194.60

367,728.40

51,466.20

20,000.00

5,600.00

387,728.40

57,066.20

CONCRETE KERB Supply and lay 150mm x 300mm high kerb type A once splayed cast in 600mm length, bedded and jointed in cement and sand (1:3) mortar and including 50mm thk x 350mm wide lean concrete as described bed including 100mm thick mass concrete grade 20 to bottom and both sides of kerb with similar concrete including all necessary excavation, formwork, painting exposed surface with two coat of synthetic enamel road paint in black and white colour and disposal of surplus material from site 800

TOTAL CARRIED OF BILL NO.5 TO FINAL SUMMARY

Lin.m

-

32.00

-

32.00

25,600.00

444,794.60