BUDGET OVERALL
ACCENTAGE SDN BHD CADANGAN MENAIKTARAF JALAN KESANG TASEK, MUAR, JOHOR NO KONTRAK - JKR/NEG/J/10/2002 BILL NO. 4.0 - PAVEMENT
ITEM
DESCRIPTION
QTY
UNIT Labour
RATIONALIZED RATE RATE Material Machinery
AMOUNT (RM) Total
Labour
BUDGET RATE Material Machinery
AMOUNT (RM)
PROFIT (RM)
Total
ALL QUANTITIES ARE PROVISIONAL
4.0
PREPARATION OF FORMATION
4.1
Preparation of Formation
4.1.1
4.1.2
4.2
4.2.1
4.2.2
4.3
4.3.1
4.3.2
4.3.3
4.3.4
Preparation of subgrade as shown in the drawing and as directed by the S.O
28,000
Sq.m
-
-
18,850
Sq.m
-
21.00
Supply, lay and compact approved sub-base material of Type A or B or C to the compacted thickness 150mm thick
3,130
Cu.m
5.00
Supply,lay and compact road-base of approved crushed aggregate to the compacted thickness 400mm thick
8,292
Cu.m
5.00
20,300
Sq.m
to the compacted thickness of 60mm as shown in the drawings
20,300
Supply Bituminous Tack Coat RS-1K to the surface of Asphaltic Concrete Binder Course
1.00
1.00
28,000.00
-
-
-
21.00
395,850.00
1.00
18.00
33.00
-
38.00
118,940.00
5.00
35.00
-
40.00
331,680.00
5.00
-
1.08
-
1.08
21,924.00
Sq.m
-
14.00
-
14.00
284,200.00
22,700
Sq.m
-
1.08
-
1.08
24,516.00
22,700
Sq.m
-
10.70
-
10.70
242,890.00
2,600
Cu.m
-
13.00
-
13.00
33,800.00
0.50
0.50
14,000.00
14,000.00
-
19.00
358,150.00
37,700.00
30.00
-
35.00
109,550.00
9,390.00
29.50
-
34.50
286,074.00
45,606.00
0.80
-
0.80
16,240.00
5,684.00
8.50
-
9.70
196,910.00
87,290.00
0.90
-
0.90
20,430.00
4,086.00
1.20
6.50
-
7.70
174,790.00
68,100.00
2.00
11.00
-
13.00
33,800.00
Supply and lay Geogrid Tensar SS20 or equivalent as reinforcing element to embankment as shown in the drawing and as directed by the S.O
Unbound Pavement Courses
Bituminous Pavement Courses
Supply and apply Bituminous Prime Coat SS-1K to the surface of road-base as per Sub-Section 4.2.1
-
Supply, lay and compact Asphaltic Concrete Binder Course ACB 28 1.20
-
Supply, lay and compact Asphaltic Concrete Wearing Course ACW 20 to the compacted thickness of 40mm as shown in the drawing
4.4 4.4.1
Shoulder Supply, lay and compact suitable earth material for road shoulder on the sub-base layer to a finished average compacted thickness as shown in the drawings and as directed by the S.O.
TOTAL CARRIED OF BILL NO.4 TO FINAL SUMMARY
1,481,800.00
PAVEMENT - Budget Overall
1,209,944.00
-
271,856.00
1/1