IBC International Builders Corporation Project

:

Location

:

Project Code

:

Item No.

Inclusive Date:

RDA Ho1-1017-13

Project In-Charge: Duration

Preventive Maitenance of Barotac Viejo-San Rafael Road K0017+321 to K0076+840, San Rafael, Iloilo 17GO0089 Effectivity Date:

Max Pareja

Expiry Date:

:

Revised Expiry Date:

Description

CONTRACT QTY

Unit Cost

Amount

% Previous

A./1.1.(8)

Field Office For the Engineers (Rental Basis)

13,377.93

22,742.48

0.20%

m2

59.95

636,189.40

5.56%

m2

949.41

10,075,138.92

88.00%

m2

1,111.40

509,765.84

4.45%

151,631.91

151,631.91

1.32%

8,128.51

32,514.04

0.28%

21,017.41

0.18%

1.70 month 302(2)

Bituminous Tackt Coat 10,612.00

310(2) 612(1)

B.9

B.5

Bituminus Concrete Surface Course (50mm) Ref. Thermoplastic Pvmt. Markings(White) Mobilization and Demobilization

10,612.00

458.67

1.00 l.s

Project Billboard/ Sign Board (DPWH & COA)

4.00 each 1.70 month

B.7

Operational Safety and Health Program

TOTAL

12,363.18

11,449,000.00

Submitted By: Mike Jayme Project Engineer

100.00%

Inclusive Date: Effectivity Date:

Proj. Accomp.:

Expiry Date:

Actual Accomp.:

0.00% Slippage :

evised Expiry Date:

Quantity Accompli shment Previous

Present

Noted By: Maximo Pareja Project Coordinator

To Date

Percent Accompli shment Previous

Present

%

Balance Quantity

0.00%

0.00%

To Date