- LINE MAINTENANCE Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - GTO 52 PRINTING MACHINE
SN 1 2 3 4 5
GENERAL MAINTENANCE Apply oil Manually on the Swing Arm gripper shaft ♦ Apply oil Manually on the Cam follower ♦ Apply Grease Manually on the feeder shaft and Delivary chain █ Clean all the Air filters on the Compressor Unit • Check the Oil Circulation points on the Central Lubrication Unit ♦ PRINTING UNITS
6 7 8 9 10 11 12 13 14
Check the Roller setting (Apply the Strip) Check the Condution of the Inking Rollers for ( Ø & Damage ) Check the Damper Roller Setting Check the Condution of the Damper Roller for ( Ø & Damage ) Check the Washing Duct Blade Check the Quick Clamp Plate Check the setting of Monkey girpper pad Check the setting od Swing Arim Gripper Inspect all the Bearing and Cam Follower Bearing
15
Check the Monkey Gripper Pad , Impression Gripper Pad & Swing Arm Gripper Pad
16
Inking & Dampening Brackets
OK
NOK
OK
NOK
Remarks:
Prepared By Maintenance Engineer
Checked By Assist Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016
Operator Name: Operator Sign: Machine No: SN 1 2 3 4 5
PREVENTIVE MAINTENANCE ACTION PLAN GTO 52 PRINTING MACHINE
ELECTRICAL SYSTEM Clean the Stablizer Unit Check all the limit Switch Check all the Safety Limit Switch Check the Main Pannel Terminal ∞
OK
NOK
OK
NOK
Check all the Contactor PRINTING UNITS
6 Check the Impression Cut off Limit Switch 7 Check the sheet in feed limit switch 8 Check the Podwer Spray Motor 9 Check the Main motor Terminal ∞ 10 Check the Machine Counter 11 Clean all the limit Switch 13 Check the Earth Value Remarks:
Prepared By Maintenance Engineer
Checked By Assist Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - SORK -Z PRINTING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
GENERAL MAINTENANCE
1 2 3 4 5
Apply oil Manually on the Swing Arm gripper shaft ♦ Apply oil Manually on the Cam follower ♦ Apply Grease Manually on the feeder shaft and Feeder chain █ Clean all the Air filters on the Compressor Unit • Check the Oil Circulation points on the Central Lubrication Unit ♦ PRINTING UNITS
Monthly Quaterly Quaterly Monthly Quaterly
6 7 8 9 10 11 12 13
Check the Roller setting (Apply the Strip) Check the Condution of the Inking Rollers for ( Ø & Damage ) Check the Damper Roller Setting Check the Condution of the Damper Roller for ( Ø & Damage ) Check the Washing Duct Blade Check the Quick Clamp Plate Check all the Swing Arm Gripper Pad Inspect all the Bearing and Cam Follower Bearing DELIVERY UNIT
Halfyeary Halfyeary Monthly Halfyeary Quaterly Halfyeary Quaterly Quaterly
14 15 16 17 18
Check the delivery chain tenssion Apply Grease Manually on the Delivery Chain █ Apply Grease Manually on the Delivery Pile Chain █ Clean the Podwer Spray unit Check all the Delivery Gripper Pad
Monthly Monthly Monthly Quaterly Quaterly
Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
- Monthly - Quaterly - Halfyearly - Yearly Checked By Assist Production Manager
Note: ♦ █ •
USE OIL HP 150 USE SERVO 22O GREASE USE WD 40 Anti Rust Spray Checked By Production Manager
Dec
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - SORK -Z PRINTING MACHINE Freequency Jan
SN 1 2 3 4 5
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
ELECTRICAL SYSTEM Clean the Stablizer Unit Check the motor Carbon Brush Check all the Safety Limit Switch Check the Main Pannel Terminal ∞ Check all the Contactor
Monthly Quaterly Monthly Quaterly Quaterly
PRINTING UNITS 6 Check the Impression Cut off Limit Switch 7 Check the sheet in feed limit switch 8 Check the Double Sheet Sensor 9 Check the Podwer Spray Motor 10 Check the Main motor Terminal ∞ 11 Check the Machine Counter 12 Clean all the limit Switch 13 Check the Earth Value Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Quaterly Quaterly Monthly Quaterly Halfyearly Monthly Halfyearly Quaterly - Monthly - Quaterly - Halfyearly - Yearly Checked By Assist Production Manager
Note:
∞
USE CRC 2-26 Contact Spray
Checked By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - CD 102 PRINTING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
GENERAL MAINTENANCE
1 2 3 4 5
Apply oil Manually on the Swing Arm gripper shaft ♦ Apply oil Manually on the Cam follower ♦ Apply Grease Manually on the feeder shaft and Feeder chain █ Clean all the Air filters on the Compressor Unit • Check the Oil Circulation points on the Central Lubrication Unit ♦ PRINTING UNITS
Quaterly Quaterly Monthly Monthly Halfyearly
6 7 8 9 10 11 12 13
Check the Roller setting (Apply the Strip) Check the Condution of the Inking Rollers for ( Ø & Damage ) Check the Damper Roller Setting Check the Condution of the Damper Roller for ( Ø & Damage ) Check the Washing Duct Blade Check the Auto plate chase Check all the Swing Arm Gripper Pad Inspect all the Bearing and Cam Follower Bearing DELIVERY UNIT
Halfyearly Halfyearly Halfyearly Halfyearly Quaterly Halfyearly Halfyearly Halfyearly
14 Check the delivery chain tenssion 15 Apply Grease Manually on the Delivery Chain █ 16 Apply Grease Manually on the Delivery Pile Chain █ 17 Check all the Delivery Gripper Pad 18 Clean the Podwer Spray unit Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Quaterly Quaterly Quaterly Halfyearly Quaterly - Monthly - Quaterly - Halfyearly - Yearly
Prepared By Maintenance Engineer
Checked By Assist Production Manager
Note: ♦ █
USE OIL HP 150 USE SERVO 22O GREASE
•
USE WD 40 Anti Rust Spray Checked By Production Manager
Nov
Dec
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - CD 102 PRINTING MACHINE Freequency Jan
SN 1 2 3 4 5 6
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
ELECTRICAL SYSTEM Clean the Stablizer Unit Check all the limit Switch Check all the Safety Limit Switch Check the Main Pannel Terminal ∞ Check all the Contactor Check all the Solvinoid Valves PRINTING UNITS
6 Check all the Porximate Switch & Sensors 7 Check the sheet in feed limit switch 8 Check the Double Sheet Sensor 9 Check the Podwer Spray Motor 10 Check the Main motor Terminal ∞ 11 Check the Motot Carbon Brush 12 Inspect all the motors 13 Clean the Electrical Pannel 14 Inspect the IR Dryer Lamp 15 Inspect the Air Dryer & Auto Drain Valve 16 Inspect the Chiller Unit 17 Check the Earth Valvue Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Monthly Halfyearly Monthly Halfyearly Halfyearly Halfyearly Halfyearly Halfyearly Halfyearly Halfyearly Halfyearly Halfyearly Halfyearly Halfyearly Halfyearly Monthly Quaterly Monthly - Monthly - Quaterly - Halfyearly
Note :
∞
USE CRC 2-26 Contact Spray
- Yearly Prepared By Maintenance Engineer
Checked By Assist Production Manager
Checked By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - EVEREST 35 DIE CUTTING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
GENERAL MAINTENANCE
Quartely 1 Check the Pressure Adjusting Bold 2 Check the Side arm Halfyearly 3 Remove the both side arm sleave and apply oil ♦ Monthly 4 Remove the Side doors and clean the exess grease Monthly Monthly 5 Apply Grease Manually on the Main gear and shaft █ Monthly 6 Check the Belt Tenssion Monthly 7 Check the oil level ♦ Quartely 8 Apply Grease Manually on the bottom Plate █ Quartely 9 Apply Grease Manually on the Pulley █ Monthly 10 Check all the Mechanical Safety Devices Quartely 11 Inspect all the Bearing & Bushes Quartely 12 Inspect the Flywheel Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
Note: - Monthly - Quaterly - Halfyearly - Yearly
♦ █ ∞ •
USE OIL HP 150 USE SERVO 22O GREASE CRC 2 - 26 Contact Spray USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - EVEREST 35 DIE CUTTING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
ELECTRICAL SYSTEM
1 Check for Loose wire Or Terminal ∞ Quartely 2 Check the Carbon Brush Quartely 3 Check the Main motor Terminal ∞ Quartely 4 Check all the Safety limit switch Monthly 5 Inspect the Central Wiring Halfyearly 6 Check all the contators ∞ Halfyearly 7 Check the Earth Value Monthly 8 Clean the Electrical Pannel Quartely Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
Note: - Monthly - Quaterly - Halfyearly - Yearly
♦ █
USE OIL HP 150 USE SERVO 22O GREASE
∞ •
CRC 2 - 26 Contact Spray USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - PRINTOGRAPH DIE CUTTING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
GENERAL MAINTENANCE
Quartely 1 Check the Pressure Adjusting Bold Halfyearly 2 Check the Side arm Monthly 3 Remove the both side arm sleave and apply oil ♦ Monthly 4 Remove the Side doors and clean the exess grease Monthly 5 Apply Grease Manually on the Main gear and shaft █ Monthly 6 Check the Belt Tenssion Monthly 7 Check the oil level ♦ Quartely 8 Apply Grease Manually on the bottom Plate █ Quartely 9 Apply Grease Manually on the Pulley █ Monthly 10 Check all the Mechanical Safety Devices Quartely 11 Inspect all the Bearing & Bushes Quartely 12 Inspect the Flywheel Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
Note: - Monthly - Quaterly - Halfyearly - Yearly
♦ █ ∞ •
USE OIL HP 150 USE SERVO 22O GREASE CRC 2 - 26 Contact Spray USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - PRINTOGRAPH DIE CUTTING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
ELECTRICAL SYSTEM
1 Check for Loose wire Or Terminal ∞ Quartely 2 Check the Carbon Brush Quartely 3 Check the Main motor Terminal ∞ Quartely 4 Check all the Safety limit switch Monthly 5 Inspect the Central Wiring Halfyearly 6 Check all the contators ∞ Halfyearly 7 Check the Earth Value Monthly 8 Clean the Electrical Pannel Quartely Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
Note: - Monthly - Quaterly
♦ █
USE OIL HP 150 USE SERVO 22O GREASE
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - COATING MACHINE Freequency Jan
SN 1 2 3 4
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
GENERAL MAINTENANCE
6 7 8 9
Check the Oil level on the Gear Box ♦ Check the Chain Tenssion Apply Grease manually on the Chain █ Inspect the sprockets and Nylon Gear Check the Condution of Coating Rubber Roller for (Ø and Damage ) Apply Grease Manually on the Bearing Inspect the condution of Bearing Check the Condution of the guiding belt Check the condution of the ir dryer belt
10
Inspect all the Pipes
5
Feb
Monthly Monthly Monthly Quartely Quartely Quartely Halfyearly Halfyearly Halfyearly Quartely
Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
Note: - Monthly - Quaterly - Halfyearly
♦ █ ∞
USE OIL HP 150 USE SERVO 22O GREASE CRC 2 - 26 Contact Spray
- Yearly
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - COATING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
ELECTRICAL SYSTEM Check the Power Terminal ∞
1 Halfyearly 2 Check the Earth Valve Monthly 3 Clean the Electrical Pannel Halfyearly 4 Inspect the Main Motor Quartely 5 Inspect the coating Motor Quartely 6 Inspect the IR Dryer Unit Halfyearly 7 Check the Carbon Brush Quartely Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
Note: - Monthly - Quaterly
♦ █
USE OIL HP 150 USE SERVO 22O GREASE
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly
•
USE WD 40 Anti Rust Spray Approved By Production Manager
Dec
REASE Spray
st Spray
Dec
REASE
Spray
st Spray
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - POLAR -92 CUTTING MACHINE Freequency Jan
SN
GENERAL MAINTENANCE
Feb
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Quartely Quartely Halfyearly Halfyearly Monthly Monthly Quartely Quartely Quartely Monthly Quartely Yearly
1 Check the Hydrualic Oil level ♦ 2 Check the Gear Oil level • 3 Check the Main motor Belt Tenssion 4 Check the Clutch Break 5 Apply Grease manually on all the Greasing Points █ 6 Check the False clamp pressure 7 Check the Knife pressure 8 Check the Backgauge belt 9 Check the Vaccum air 10 Clean all the excess Grease 11 Clean the Hydrualic Oil Tank Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Mar
Checked By Assist Production Manager
Note: - Monthly - Quaterly - Halfyearly - Yearly
♦ █ ∞ •
USE OIL HP 150 USE SERVO 22O GREASE CRC 2 - 26 Contact Spray USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - POLAR -92 CUTTING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
ELECTRICAL SYSTEM
1 Clean the Stablizer Unit Monthly 2 Check the Power Terminal ∞ Halfyearly 3 Check the Earth Valve Monthly 4 Clean the Electrical Pannel Quartely 5 Inspect the Main Motor Halfyearly 6 Clean and Inspect all the Sensors & Proximate Switch Monthly 7 Check the false clamp lever limit switch Monthly 8 Check electrical loose wire Quartely Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
Note: - Monthly - Quaterly
♦ █
USE OIL HP 150 USE SERVO 22O GREASE
- Halfyearly - Yearly
∞ •
CRC 2 - 26 Contact Spray USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - PROTECK -92 CUTTING MACHINE Freequency Jan
SN
GENERAL MAINTENANCE
1 2 3 4 5
Feb
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Note: ♦ █ •
USE Hyduralic Oil SERVO 66 USE SERVO 22O GREASE USE HP 150 GEAR OIL
Quartely Quartely Halfyearly Halfyearly Monthly Monthly Quartely Quartely Quartely Monthly Quartely Yearly Halfyearly
Check the Hydrualic Oil level ♦ Check the Gear Oil level • Check the Main motor Belt Tenssion Check the Clutch Break Apply Grease manually on all the Greasing Points █ Check the False clamp pressure 6 Check the Knife pressure 7 Check the Backgauge belt 8 Check the Vaccum air 9 Clean all the excess Grease 10 Check the Hydrualic Cylinder Spring Tenssion 11 Inspect all the Hydrualic Hose Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Mar
Checked By Assist Production Manager
- Monthly - Quaterly - Halfyearly - Yearly
Dec
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - PROTECK -92 CUTTING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
ELECTRICAL SYSTEM
1
Clean the Stablizer Unit
Monthly
2
Check the Power Terminal ∞
3
Check the Earth Valve
Monthly
4
Clean the Electrical Pannel
Quartely
5
Inspect the Main Motor
6
Clean and Inspect all the Sensors & Proximate Switch
Monthly
7
Check the false clamp lever limit switch
Monthly
8
Check electrical loose wire
Quartely
Halfyearly
Halfyearly
Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
Note: - Monthly - Quaterly - Halfyearly
♦ █ ∞
- Yearly
•
USE OIL HP 150 USE SERVO 22O GREASE CRC 2 - 26 Contact Spray USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - FLEXO PRINTING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
GENERAL MAINTENANCE
1
Apply Grease Manually on all the Greasing Points █
Monthly
2
Inspect all the Bearing and Bushes
Quartely
3
Clean the Compressed Air Filters
Monthly
4
Check the Main motor Belt Tenssion
Quartely
5
Inspect all the Gears and Sprockets
Halfyearly
6
Apply Oil Manually on all the Spindle Rods ♦
Quartely
7
Check the Winder and Re winder unit
Quartely
8
Check all the Air Pipes
Quartely
9
Check all the Blower lines
10
Check all the Mechanical Guards
Halfyearly Monthly
Remarks:
Note:
All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
- Monthly
♦
USE OIL HP 150
- Quaterly
█
USE SERVO 22O GREASE
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name:
PREVENTIVE MAINTENANCE ACTION PLAN - FLEXO PRINTING MACHINE
Operator Sign: Machine No:
Freequency Jan SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
ELECTRICAL SYSTEM
1
Clean the Stablizer Unit
Monthly
2
Check all the limit Switch
Quaterly
3
Check all the Safety Limit Switch ∞
Halfyearly
4
Check the Main Pannel Terminal ∞
Halfyearly
5
Check all the Contactor
Quaterly
PRINTING UNITS 6
Inspect the Main Motor
Halfyearly
7
Inspect the Blower Motor
Halfyearly
8
Check the Main motor Terminal ∞
Halfyearly
9
Check the Machine Counter
Halfyearly
10
Check the Earth Value
Monthly
11
Clean all the limit Switch
Quaterly
Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Note: - Monthly
♦
USE OIL HP 150
- Quaterly
█
USE SERVO 22O GREASE
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly Prepared By Maintenance Engineer
Checked By Assist Production Manager
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - FOCUS PRINTING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
GENERAL MAINTENANCE
1
Inspect the condution of Timing Belts
Quaterly
2
Inspect the condution of all Nylon gears
Quaterly
3
Apply Grease Manually on all the Greasing Points █
Monthly
4
Inspect all the Bearing and Bushes
Quaterly
5
Apply Oil Manually on all moving parts ♦
Monthly
6
Check all the Printing cylinders
7
Check all the Ink duct Units
Quaterly
8
Check all the Ink duct knife
Quaterly
9
Apply Grease Manually on the main gear at the back █
Monthly
10
Check the Motor Pulley
Halfyearly
Halfyearly
Remarks:
Note:
All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
- Monthly
♦
USE OIL HP 150
- Quaterly
█
USE SERVO 22O GREASE
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - FOCUS PRINTING MACHINE Freequency Jan
SN 1 2 3 4 5
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
ELECTRICAL SYSTEM Clean the Stablizer Unit Check the Heater Regulater Check all the Safety Limit Switch ∞ Check the Main Pannel Terminal ∞ Check the Room Temperator PRINTING UNITS
Monthly Quartely Halfyearly Halfyearly Monthly
6 Inspect the Main Motor Halfyearly 7 Check the IP & OP Voltage Quartely 8 Check the Carbon Brush Halfyearly 9 Check the Counting Sensor Quartely 10 Check the Earth Value Monthly 11 Check the Power cable Halfyearly Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
Note: - Monthly - Quaterly - Halfyearly - Yearly
♦ █ ∞ •
USE OIL HP 150 USE SERVO 22O GREASE CRC 2 - 26 Contact Spray USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - ULTRASONIC CUTTING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
GENERAL MAINTENANCE
1
Inspect all the Belts
Monthly
2
Apply Oil Manually on all moving Part ♦
Monthly
3
Check all the Bolts tighten
Monthly
4
Inspect the Ultrasonic Stem and Horn (Position and Tight )
Monthly
5
Inspect the Delivery Unit
Quartely
6 Apply Grease Manually on Bearings & Spindles █ Monthly Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
Note: - Monthly
♦
USE OIL HP 150
- Quaterly
USE SERVO 22O GREASE
- Halfyearly
█ ∞
- Yearly
•
USE WD 40 Anti Rust Spray
CRC 2 - 26 Contact Spray
Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - ULTRASONIC CUTTING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
ELECTRICAL SYSTEM
1
Clean the Stablizer Unit
Monthly
2
Check the Heater Regulater
Quartely
3
Check the Main Pannel Terminal ∞
Quartely
4
Check the Room Temperator
Monthly
5
Inspect the Steper Motor
Quartely
6
Check the IP & OP Voltage
Quartely
7
Check the Ultrasonic Generator
Quartely
8
Check the Earth Value
Monthly
9
Check the Machine Display Unit
Quartely
10
Check the UPS Battery Terminal
Monthly
Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Note: - Monthly
♦
USE OIL HP 150
- Quaterly
█
USE SERVO 22O GREASE
Prepared By Maintenance Engineer
Checked By Assist Production Manager
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - CTP PLATE EXPOCESSING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
GENERAL MAINTENANCE
1
Inspect all the Guiders
Quartely
2
Apply Grease Manually on all moving Part █
Monthly
3
Inspect all the AIR DRYER
Quately
4
Inspect all the Air Hose
Halfyearly
5
Inspect all the Penumatic Controllers
Halfyearly
6
Clean all the Air Filters
Monthly
Remarks:
Note:
All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
- Monthly
♦
USE OIL HP 150
- Quaterly
█
USE SERVO 22O GREASE
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - CTP PLATE EXPOCESSING MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
ELECTRICAL SYSTEM
1
Check the UPS Distilled Water level
Monthly
2
Check the Emergency Stop Switch
Quartely
3
Check all the Safety Limit Switch ∞
Quartely
4
Check the Main Pannel Terminal ∞
Halfyearly
5
Check the Room Temperator
Monthly
6
Check the Auto Drain Valve
Monthly
7
Check the IP & OP Voltage
Quartely
8
Check the Earth Value
Monthly
9
Check the UPS Battery Terminal
Monthly
Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Note: - Monthly
♦
USE OIL HP 150
- Quaterly
█
USE SERVO 22O GREASE
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly Prepared By Maintenance Engineer
Checked By Assist Production Manager
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - PLATE PROCESSOR MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
GENERAL MAINTENANCE
1
Inspect all the Belts
Monthly
2
Apply Oil Manually on all moving Part ♦
Monthly
3
Check the Condution of the Washing Rollers for ( Ø & Damage )
Halfyearly
4
Check the Condution of the Developer Rollers for ( Ø & Damage )
Halfyearly
5
Check the Nylon Gears
Quaterly
6
Check the bushes and Blocks
Quaterly
7
Check all the Penumatic Air Hoses
Monthly
Remarks:
Note:
All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
- Monthly
♦
USE OIL HP 150
- Quaterly
█
USE SERVO 22O GREASE
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - PLATE PROCESSOR MACHINE Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
ELECTRICAL SYSTEM
1 Clean the Stablizer Unit Monthly 2 Check the Developer CirculatIng Pump Quaterly 3 Check all the Safety Limit Switch ∞ Quaterly 4 Check the Main Pannel Terminal ∞ Halfyearly 5 Check the Room Temperator Monthly 6 Check the IP & OP Voltage Halfyearly 7 Check the Gum circulating Pump Quaterly 8 Check the Earth Value Monthly Remarks: All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
Note: - Monthly - Quaterly - Halfyearly
♦ █ ∞
- Yearly
•
USE OIL HP 150 USE SERVO 22O GREASE CRC 2 - 26 Contact Spray USE WD 40 Anti Rust Spray Approved By Production Manager
Dec
REASE
Spray
st Spray
Dec
REASE
Spray st Spray
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - AIR COMPRESSOR 15 HP Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
GENERAL MAINTENANCE
1
Inspect all the Belts
Monthly
2
Apply Oil Manually on all moving Part ♦
Monthly
3
Check the Oil Level █
Monthly
4
Check the Auto Drain Valve
Quartely
5
Check the Air Leakage
Monthly
6
Check the Pressure CUT OFF VALVE
Halfyearly
7
Clean the Blade •
Halfyearly
8
Check the Control Pannel Terminal ∞
Halfyearly
9
Check the Motor Terminal ∞
Quartely
10
Check the Earth Value
Monthly
11
Clean the AIR Filter
Monthly
Remarks:
Note:
All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
- Monthly
♦
USE OIL HP 150
- Quaterly
█
USE SERVO 22O GREASE
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - AIR COMPRESSOR 7.5 HP Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
GENERAL MAINTENANCE
1
Inspect all the Belts
Monthly
2
Apply Oil Manually on all moving Part ♦
Monthly
3
Check the Oil Level █
Monthly
4
Check the Auto Drain Valve
Quartely
5
Check the Air Leakage
Monthly
6
Check the Pressure CUT OFF VALVE
Halfyearly
7
Clean the Blade •
Halfyearly
8
Check the Control Pannel Terminal ∞
Halfyearly
9
Check the Motor Terminal ∞
Quartely
10
Check the Earth Value
Monthly
11
Clean the AIR Filter
Monthly
Remarks:
Note:
All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
- Monthly
♦
USE OIL HP 150
- Quaterly
█
USE SERVO 22O GREASE
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - FIRE HYDRANT SYSTEM Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
GENERAL MAINTENANCE
1
Apply Grease Manually on all Greasing Points █
Monthly
2
Apply Oil Manually on all moving Part ♦
Monthly
3
Check all the Pressure Gauge
Monthly
4
Check the Water level
Monthly
5
Check the Nylon Bushes & Block
Quaterly
6
Check the Main Control Pannel
Halfyearly
7
Check the Motor Terminal ∞
Halfyearly
Remarks:
Note:
All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
- Monthly
♦
USE OIL HP 150
- Quaterly
█
USE SERVO 22O GREASE
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - AIR HANDLING UNIT Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
GENERAL MAINTENANCE
1
Inspect all the Belts
Quaterly
2
Apply Oil Manually on all moving Part ♦
Monthly
3
Clean all the Air Filters
Monthly
4
Apply Grease on all Grease Point █
Monthly
5
Clear the Air lock
Quaterly
6
Check the Motor Terminal & Contorl Pannel ∞
7
Check the Water Level
Halfyearly Quaterly
Remarks:
Note:
All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
- Monthly
♦
USE OIL HP 150
- Quaterly
█
USE SERVO 22O GREASE
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - CHILLER PLANT Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
GENERAL MAINTENANCE
1
Check the Control Pannel & Compressor Terminal ∞
2
Check the Water Level
Monthly
3
Check the Temperature Controller
Monthly
4
Check the Chiller Pump Motor & Terminal ∞
5
Clean the Chiller Condencer Coil
Quaterly
6
Check the Compressor Air Exhaust Fan
Monthly
7
Check the Oil Level
Monthly
8
Apply Grease on all Greasing Point █
Monthly
9
Check the Earth Value
Monthly
Halfyearly
Halfyearly
Remarks:
Note
All these Preventive Maintenance Done by the Maintenance Technician
Prepared By Maintenance Engineer
Checked By Assist Production Manager
- Monthly
♦
USE OIL HP 150
- Quaterly
█
USE SERVO 22O GREASE
- Halfyearly
∞
CRC 2 - 26 Contact Spray
- Yearly
•
USE WD 40 Anti Rust Spray Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - GENERATIOR - 250 KVA Freequency Jan
Aug
Sep
- Monthly
•
USE OIL 15 W 40
B - Check done afer every 300hrs OR 3 Months
- Quaterly
█
SERVO
C - Check done afer every 1500hrs OR 6 Months
- Halfyearly
SN
Feb
Mar
Apr
May
Jun
Jul
Oct
Nov
GENERAL MAINTENANCE
1
Check the Control Pannel Terminal ∞
2
Check the Radiator Water Level
3
C Check
4
Check the Battery Terminal ∞
Monthly
5
B Check
Monthly
6
Check the Exhaust Fan
Quartely
7
Check the Oil Level
Monthly
8
Apply Grease on all Greasing Point █
Monthly
9
Check the Earth Value
Monthly
Halfyearly Monthly Halfyearly
Remarks
Note :
Note:
- Yearly Prepared By Maintenance Engineer
Checked By Assist Production Manager
Approved By Production Manager
Dec
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - GENERATIOR - 380 KVA Freequency Jan
Aug
Sep
- Monthly
•
USE OIL 15 W 40
B - Check done afer every 300hrs OR 3 Months
- Quaterly
█
SERVO
C - Check done afer every 1500hrs OR 6 Months
- Halfyearly
SN
Feb
Mar
Apr
May
Jun
Jul
Oct
Nov
GENERAL MAINTENANCE
1
Check the Control Pannel Terminal
Halfyearly
2
Check the Radiator Water Level
3
C Check
4
Check the Battery Terminal & Distilled Water
Monthly
5
B Check
Monthly
6
Check the Exhaust Fan
Quartely
7
Check the Oil Level •
Monthly
8
Apply Grease on all Greasing Point █
Monthly
9
Check the Earth Value
Monthly
Monthly Halfyearly
Remarks
Note :
Note:
- Yearly Prepared By Maintenance Engineer
Checked By Assist Production Manager
Approved By Production Manager
Dec
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - HIGH TENSSION Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
GENERAL MAINTENANCE
1
Check the HT insulator
Yearly
2
Check the HT CT Terminal
Yearly
3
Check the Bolt & Nut Tight
Yearly
4
Check the DO Fuse Terminal ©
Yearly
5
Check the Moving Knife Part ©
Yearly
6
Check the HT cable Meagering
Yearly
7
Check the Neutral & Body Earth Bit
Yearly
8
Check the Lightning Insulator
Yearly
9
Over all HT Breaker Service
Yearly
Remarks
Note : - Monthly
Note :
© USE Petrolium Jelly
- Quaterly
All this activities done by the A grade Lisence Holder
- Halfyearly - Yearly Prepared By Maintenance Engineer
Checked By Assist Production Manager
Approved By Production Manager
Dec
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - Low Tenssion Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
GENERAL MAINTENANCE
1
Check the LT EB & DG ACB
Yearly
2
Check the MV Pannel Bus bar
Yearly
3
Check the SSB, MLSB, EDB, LDB, SDB, ACDB (Power Distrubution Pannel)
Halfyearly
4
Check the Capacitor Pannel & Terminal
Halfyearly
5
Check the RTC Pannel
Yearly
Remarks - Monthly
Note :
- Quaterly
All this activities done by the A grade Lisence Holder
- Halfyearly - Yearly Prepared By Maintenance Engineer
Checked By Assist Production Manager
Approved By Production Manager
CHECKPOINT ENGINEERING DEPARTMENT - LINE MAINTENANCE - 2016 Operator Name: Operator Sign: Machine No:
PREVENTIVE MAINTENANCE ACTION PLAN - TRANSFORMER Freequency Jan
SN
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
GENERAL MAINTENANCE
1
Oil Filtration Process
Yearly
2
Check the Silica gell
Quaterly
3
Check the Neutral & Body Earth Bit Value
4
Check the Automatic Tap changing control pannel
5
Check the Temperature controller
6
Measure the HT & LT Cable (Meagering Value)
Yearly
7
Check the Insulator
Yearly
Yearly Halfyearly Quaterly
Remarks - Monthly
Note :
- Quaterly
All this activities done by the A grade Lisence Holder
- Halfyearly - Yearly Prepared By Maintenance Engineer
Checked By Assist Production Manager
Approved By Production Manager
Dec
onthly
uaterly
alfyearly
arly