Sl. Description No 1 Excavation Tower foundation Normal soil Soft rock DG bed Normal soil Soft rock OD BTS 2
PCC Tower foundation DG DG Bedtop DG Bedstep OD foundation OD Bedtop
3
4
RCC as per drawing Tower DG OD Centring Roof Column
5
6
Steel as per drawing Tower 5% waste DG OD Random rubble masonary and stone masonary (as per drawing)
Unit
Nos
Length
Width
Height
Qty
Total
Cum Cum
4 4
4.00 4.00
4.00 4.00
0.60 3.00
9.6 48
38.4 192
Cum Cum Cum Cum Cum Cum
2 2 2 2 2 2
1.270 3.620 1.270 3.620 2.455 3.005
0.60 0.60 0.60 0.60 0.60 0.60
0.60 0.60 0.10 0.10 0.60 0.60
0.4572 1.3032 0.0762 0.2172 0.8838 1.0818
0.9144 2.6064 0.1524 0.4344 1.7676 2.1636
Cum Cum Cum Cum Cum Cum Cum Cum Cum
4 2 2 1 1 2 2 1 2
4.00 1.270 3.620 2.790 0.8 2.455 3.005 2.710 1.00
4.00 0.60 0.60 1.040 4.25 0.60 0.60 2.060 0.350
0.1 0.1 0.1 0.075 0.075 0.10 0.10 0.10 0.075
1.6 0.0762 0.2172 0.21762 0.255 0.1473 0.1803 0.5582 0.02655
6.4 0.1524 0.4344 0.21762 0.255 0.2946 0.3606 0.5582 0.0525 36.08 0.7313 1.403
Sq.m Sq,m Sq.m Sq.m Sq.m
4 4 4 1 1
15.2 9.6 12.6 9.5 12.3
0.3 0.4 0.85 0.15 0.15
4.56 3.84 10.71 1.425
18.24 15.36 42.84 1.425 1.875 3918 195.00 56.67 82.62
6.663