Pdn

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Pdn as PDF for free.

More details

  • Words: 354
  • Pages: 7
2000

500

4000

500

TAMPAK DEPAN

2750

2750

800

10000

800

TAMPAK SAMPING

RENCANA PEMASANGAN MOBIL PROVER DI UPDN REWULU & MAOS TITLE DRAWING

TAMPAK

PT. PUTRA MUSTIKA CEMERLANG DRAWING BY IMRON FAUZI. ST CHECKED BY SUWARNO APROVED BY

ATAP ASBES GEL BESAR KUDA2 BETON 25/20 GORDING CANAL C 15 x 65 x 20 PASANGAN BATA

4.00

4.00

BLOCK CONCRETE

0.50

4.00

0.50

0.80

10.00

POTONGAN A – A

0.80

POTONGAN B - B RENCANA PEMASANGAN MOBIL PROVER DI UPDN REWULU & MAOS TITLE DRAWING

POTONGAN

PT. PUTRA MUSTIKA CEMERLANG DRAWING BY IMRON FAUZI. ST CHECKED BY SUWARNO APROVED BY

PASANGAN BATA SLOOF 15 X 20 1:2:3 PONDASI BATU BELAH WAYER MESS 8MM BETON BERTULANG 100 KG / M3 K 225 LANTAI KERJA BETON TUMBUK . 5 cm SIRTU 10 CM

± 0.00

BETON TUMBUK 10 CM 15 CM 5 CM 10 CM

PASIR URUG PASIR PASANG - 0.60 - 065

50 RENCANA PEMASANGAN MOBIL PROVER DI UPDN REWULU & MAOS

60

TITLE DRAWING

DETAIL PONDASI

DETAIL PONDASI

PT. PUTRA MUSTIKA CEMERLANG DRAWING BY IMRON FAUZI. ST CHECKED BY SUWARNO APROVED BY

15/12 15/12

12/12

15/15 12/12

Ø 10 mm Ø 8 mm

15/12

0.15 0.12

2.00

0.50 Ø 10 mm 8 mm

0.12 0.12

DETAIL KUDA - KUDA

RENCANA PEMASANGAN MOBIL PROVER DI UPDN REWULU & MAOS TITLE DRAWING

DETAIL KUDA - KUDA

PT. PUTRA MUSTIKA CEMERLANG DRAWING BY IMRON FAUZI. ST CHECKED BY SUWARNO APROVED BY

12/12

12/12 0.80

KUDA KUDA 15/12

Block d 10.00

CANAL C 12 CM

ASBES GEL BESAR

RENCANA PEMASANGAN MOBIL PROVER DI UPDN REWULU & MAOS

50 0.80

TITLE DRAWING

400

DENAH & RENC. ATAP

DENAH

RENC. ATAP

PT. PUTRA MUSTIKA CEMERLANG DRAWING BY IMRON FAUZI. ST CHECKED BY SUWARNO APROVED BY

C

5.00

C 18.00

JALAN MOBIL PROVER

WAYER MESS 8 MM

COR BETON 225 SIRTU 15 cm PONDASI BATU BELAH 7 CM 15 cm 5 cm 10 cm 7 cm

POTONGAN C-C

RENCANA PEMASANGAN MOBIL PROVER DI UPDN REWULU & MAOS TITLE DRAWING

DETAIL JALAN PROVER

PT. PUTRA MUSTIKA CEMERLANG DRAWING BY IMRON FAUZI. ST CHECKED BY SUWARNO APROVED BY

RENCANA PEMBUATAN SHELTER

GAMBAR RENCANA

Related Documents

Pdn
May 2020 1
Pdn-teorija.docx
November 2019 6
Laporan Makalah Pdn 1.docx
December 2019 11
18 Aprile Ore 9 Pdn E Qqq
November 2019 9