Paper And Notes.docx

  • Uploaded by: Anonymous Wcl6mazi8M
  • 0
  • 0
  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Paper And Notes.docx as PDF for free.

More details

  • Words: 135
  • Pages: 1
Convert a dual supervisory ethernet node to an FTE node Use this checklist to convert a dual supervisory node to an FTE node before migrating the node to a newer release. Considerations If the dual supervisory node does not have an FTE-qualified network card, install it in the node even if the node is replaced. The migration software looks for the FTE-qualified network card. Honeywell recommends you use the card in the new platform (temporarily) or purchase an FTE-qualified dual NIC. Checklist The beginning of this checklist refers to the prior release of this document FTE Installation and Service Guide for R3XX. Unless otherwise stated for conversion from the dual supervisory network to FTE must occur on the prior release before migration. After performing each procedure, return to the checklist to reference the next procedure.

Related Documents

Paper And Notes.docx
October 2019 13
Pulp And Paper
May 2020 5
Paper And Climate Change
November 2019 17
Agency Visit And Paper
April 2020 5
Concept Paper And Matrix
October 2019 24

More Documents from ""

Paper And Notes.docx
October 2019 13
Class1_1_88
October 2019 10
Notes 32_class.docx
October 2019 17
Class 45
October 2019 19
Notes In Class 3
October 2019 18