Painting Report (06-03-2019).xlsx

  • Uploaded by: Hassan Albrehawy
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Painting Report (06-03-2019).xlsx as PDF for free.

More details

  • Words: 51
  • Pages: 2
Painting Report For HM DGS Tie-in Project

Painted Spools Drawing No.

Spool No.

Primer

0001-9500-WGEL-C017-ISGPU08900-MP-2343-00072 0001-9500-WGEL-C017-ISGPU08900-MP-2343-00030 0001-9500-WGEL-C017-ISGPU08900-MP-2343-00072 0001-9500-WGEL-C017-ISGPU08900-MP-2343-00022 0001-9500-WGEL-C017-ISGPU08900-MP-2343-00073

SPL-02 SPL-02 SPL-02 SPL-01 SPL-01

Done Done Done Done Done

Tie-in Project

Date:06-03-2019

Spools intermediate

Final

Date

Done Done Done Done Done

Done Done Done Done Done

6-Mar 6-Mar 6-Mar 6-Mar 6-Mar

Related Documents

Painting
June 2020 40
Painting
November 2019 52
Painting
October 2019 68
Painting
October 2019 45
Painting
November 2019 43

More Documents from ""