wood.
Manual Requisition Materials
BGC I UNIT 20 STRUCTURAL STRENGTHENING F01
CLIENT I PROJECT:
CONTRACT No:
REQUISITION NUMBER:
0082-9500-WGEL-N003-ISGPGOOOOO-CS-7303-00002
-
SITE MATERIALS REQUEST No.
PROJECT No:
SITE LOCATION:
WG0082
TASK No:
WORKPACK I WORK ORDER:
EXPENDITURE TYPE:
ATEXZONE:
EXPENDITURE ORGANISATION:
ITEM
PART I CODE NUMBER
-
-
SUGGESTED SUPPLIERS:
-
-
K/Jor Al Zubair (KAZ) Gas Plant
x x x
DRAWING I BOM WG0082
SDRL WELD PROCEDURE APPROVAL SHT
CHECK: QA:
BGC APPROVED VENFOR LIST
x
SPECIAL INSTRUCTIONS
2
COST:
lA..IC)
J
€.)! r-,
12l cv.
-Ill-
IV
LINE COST
TOTAL COST
SHIPPING INSTRUCTIONS:
©--�
-
�
INSPECTION LEVEL DEFINITIONS
DATE
SIGNATURE
K.Ananda Ganesh
-II-
QUOTATIONS
-
Dhaval Dhorajia
+
SOLE I SINGLE SOURCE:
THE STRUCTURAL STEEL CONTRACTOR TO COMPLY WITH THE REQUIREMENTS AS PER "SCOPE OF WORK FOR STRUCTURAL STEEL FABRICATION" DOC NO: 0082-9500-WGEL-N003-ISGP-GOOOOO-CS-5793-00001_02A
NAME
f/Jo I v
EQUIPMENT CRITICALITY:
DATA SHEETS SPECIFICATIONS
ESTIMATED COST
ORIGINATOR:
DESK
INSPECTION LEVEL
FAO:
POSITION
x x
FIELD
EXPEDITING:
CERTIFICATION CODE
DELIVERY ADDRESS:
TBA
REQUIRED DELIVERY DATE:
SEE ATTACHED (X - AS APPLICABLE)
Page 1 of 2
01/07/2018
DATE RAISED
LINE DESCRIPTION
UOM
QTY
REQUISITION DESCRIPTION:
Material Requisition for Structural Steel Fabrication & Erection
Ol
I o 1-/
2.01
¥
01),)�ts \1f/O(o(t
-
TOTAL COST
NOTES
REVISION
LEVEL 1 - Surveillance and I or Final Inspection and Release at Supplier's premises by Wood Group LEVEL 1 D - Inspection by Discipline Engineer I Designer (Report/ IRC must be produced)
LEVEL 2 - Goods Receipt Inspection at Warehouse by Wood Group
Issued for Proposal/Quotation 01A
BUDGET HOLDER: FINANCIAL AUTHORITY:
Form No: SCM-FRM-1001 Rev/Date: C9 04-Sep-2017
LEVEL 3 - No Wood Group Inspection. Reliance placed on the Supplier's Quality System (including OS&D check)
© 2017 Wood Group Limited This document is uncontrolled once printed. Check iMAP for the current version.
Page 1 of 2
Manual Requisition Materials
MATERIAL REQUIISITION CONTINUATION PAGE BGC / UNIT 20 STRUCTURAL STRENGTHENING F01
CLIENT / PROJECT: ITEM
PART / CODE NUMBER
QTY
REQUISITION NUMBER:
UOM
0082-9500-WGEL-N003-ISGPG00000-CS-7303-00002
REQUISITION DESCRIPTION:
Material Requisition for Structural Steel Fabrication & Erection
DATE RAISED
01/07/2018
Page 2 of 2
LINE DESCRIPTION
CERTIFICATION CODE
INSPECTION LEVEL
LINE COST
TOTAL COST
SCOPE OF WORK FOR STRUCTURAL STEEL FABRICATION (Doc. No. 0082-9500-WGEL-N003-ISGP-G00000-CS-5793-00001_02A)
-
-
-
-
-
-
-
-
-
-
-
-
Applicable Documents 1
Attachment-1
-
-
2
Attachment-2
-
-
3 4
Attachment-3 Attachment-4
-
-
Form No: SCM-FRM-1001 Rev/Date: C9 04-Sep-2017
CIVIL/STRUCTURAL DRAWINGS 1. 0082-9500-WGEL-N003-ISGP-G00000-CG-2331-00001_02C 2.0082-9500-WGEL-N003-ISGP-G00000-CS-2386-00001_02C 3.0082-9500-WGEL-N003-ISGP-G00000-CS-2386-00002_02C 4.7100-TCN-N003-ISGP-G00000-CX-2386-00001_02C SPECIFICATION FOR STRUCTURAL STEEL WORKS (Doc. No. 7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A) SDRL for Structural Steel Fabrication & Erection (Doc. No. 0082-9500-WGEL-N003-ISGP-G00000-CS-6611-00001-Rev.01A)
© 2017 Wood Group Limited This document is uncontrolled once printed. Check iMAP for the current version.
Attachment-1 SCOPE OF WORK FOR STRUCTURAL STEEL FABRICATION (Doc. No. 0082-9500-WGEL-N003-ISGP-G00000-CS-5793-00001_02A)
0082-9500-WGEL-N003-ISGPG00000-CS-5793-00001
COMPANY CONTRACT
Doc. No.
UNIT 20 STRUCTURAL STRENGTHENING F01
Job No.
WG0082
Rev No.:
02A
Page
Page 2 of 13
SOW for Structural Steel Fabrication
Table of Contents 1. INTRODUCTION 1.1. PROJECT LOCATION 2. DEFINITIONS & ABBREVIATIONS 2.1. DEFINITIONS 2.2. ABBREVIATIONS 3. HEALTH SAFETY AND ENVIRONMENT REQUIREMENTS 4. PURPOSE OF THE DOCUMENT 5. REFERENCE DOCUMENTS 6. DETAILED SCOPE OF WORK 6.1. SITE SURVEY 6.2. FABRICATION DRAWINGS 6.3. FABRICATION 6.4. BLAST & PAINTING 6.5. ASSEMBLY / ERECTION DRAWINGS 6.6. PACKAGE & DELIVER 6.7. ERECTION AT SITE 6.8. QUALITY CONTROL DOCUMENTS 7. STRUCTURAL STEEL CONTRACTOR’S WORKS DELIVERABLES 8. QUALITY CONTROL 9. BILL OF QUANTITY 10. INSPECTION & TESTING 10.1. MATERIAL AND EQUIPMENT INSPECTION 10.2. SHOP INSPECTION 10.3. VISUAL INSPECTION 10.4. DIMENSIONAL MEASUREMENT 10.5. NON-DESTRUCTIVE TESTS APPENDIX A – PLOT PLAN & DRAWINGS FOR STRENGTHENING OF REGENERATION GAS HEATER 20-F-01
3 3 4 4 4 5 5 5 6 6 6 7 7 7 7 8 8 8 8 9 10 11 11 11 11 12 13
0082-9500-WGEL-N003-ISGPG00000-CS-5793-00001
COMPANY CONTRACT
Doc. No.
UNIT 20 STRUCTURAL STRENGTHENING F01
Job No.
WG0082
Rev No.:
02A
Page
Page 3 of 13
SOW for Structural Steel Fabrication
1. INTRODUCTION Basrah Gas Company (COMPANY) handles gas produced in southern Iraq fields operated by third parties. COMPANY is carrying out rehabilitation, expansion, upgrading and construction of associated gas processing facilities to reduce flaring, increase the gas production capacity and thereby capturing value for the Iraqi economy.
This document covers the scope of works for structural steel fabrication required for strengthening of existing regeneration heater support 20-F-01.
1.1.
Project Location This project is located at Khor Al Zubair (KAZ) Gas Plant – Basra – Iraq. Location of 20-F-01 heater is marked in the Plot plan at Appendix – A.
0082-9500-WGEL-N003-ISGPG00000-CS-5793-00001
COMPANY CONTRACT
Doc. No.
UNIT 20 STRUCTURAL STRENGTHENING F01
Job No.
WG0082
Rev No.:
02 A
Page
Page 4 of 13
SOW for Structural Steel Fabrication
2.
DEFINITIONS & ABBREVIATIONS
2.1.
Definitions The following Definitions shall apply for this document; Shall - The word 'shall' is to be understood as mandatory. Should - The word 'should' is to be understood as strongly recommended. May - The word 'may' is to be understood as indicating a possible course of action. Company
- Basrah Gas Company
Wood - Engineering, Procurement & Services Contractor. Contract
- A contract agreement entered between the Company and Contractor
Project - An Agreement between the Company and Early Civil Works Contractor to prepare the BNGL Site to perform the Early Civil Works. Structural Steel Contractor – A nominated party by Company who shall be responsible for Structural Steel fabrication and erection. Vendor /Supplier /Manufacturer – is the party (parties) which manufactures and / or supplies materials, equipment, technical documents or drawings and/ or services to perform the duties specified by the Wood / Structural Steel Contractor in the scope of supply & services. Sub-Contractor - Any other party appointed by Wood / Structural Steel Contractor for supply of any work / services. Inspector - Any person/party certified as acting for and on behalf of COMPANY or Structural Steel Contractor to inspect items to be purchased and/or the work done by the Vendor. Substitutions - The Vendor/ Structural Steel Contractor shall submit in writing to the COMPANY, for approval, any proposals for substitutions due to non-availability of materials or changes to the proposed design, prior to the commencement of work.
2.2.
Abbreviations BGC NGL KAZ DEP HSE AISC ASTM EN
Basrah Gas Company Natural Gas Liquid Khor Al Zubair – Basra - Iraq Design and Engineering Practice Health, Safety and Environment American Institute of Steel Construction American Society of Testing Materials European Norm
0082-9500-WGEL-N003-ISGPG00000-CS-5793-00001
COMPANY CONTRACT
Doc. No.
UNIT 20 STRUCTURAL STRENGTHENING F01
Job No.
WG0082
Rev No.:
02 A
Page
Page 5 of 13
SOW for Structural Steel Fabrication
ISO SI BS HSE
International Organization for Standardization International System of Units
OSHA PTW JSA ITP
British Standards Health, Safety & Environment Occupational Safety and Administration Permit To Work Job Safety Analysis Inspection & Test Plan
SDRL
Supplier Data Requirements List
Health
3. HEALTH SAFETY AND ENVIRONMENT REQUIREMENTS HSE requirements shall be as per the Contract HSSE requirements. All activities at site shall be covered under Mode 1. All activities at fabrication contractor's facilities shall be Mode 2.
4. PURPOSE OF THE DOCUMENT This document describes the Scope of Works for Structural Steel Fabrication & Erection for strengthening of Regenerator Gas Heater 20-F-01 at KAZ Gas plant. The Structural Steel Contractor to comply with the requirements of this Scope of Work. Materials like structural steel sections, plates, structural bolts, washers & nuts, Hilti anchor are issued as free material by COMPANY at time of fabrication & erection. Detailed Scope of works is given at Section 6 of this document.
5. REFERENCE DOCUMENTS Following documents shall be used by the Structural Steel Contractor for performing the works
COMPANY Specifications Document Number
Description
Specifications For Structural Steel Works External Painting Specification Equipment, Structural Steel and Piping
for
Rev
7100-TCN-N003-ISGP-G00000-CX7880-00001
03A
1000-COMPANY-G000-ISGP-G00000RA-7754-00001 Rev-04A
04A
0082-9500-WGEL-N003-ISGPG00000-CS-5793-00001
COMPANY CONTRACT
Doc. No.
UNIT 20 STRUCTURAL STRENGTHENING F01
Job No.
WG0082
Rev No.:
02 A
Page
Page 6 of 13
SOW for Structural Steel Fabrication
COMPANY Drawings Document Number
6.
Description
Rev
General Notes for Structural Steel Works
7100-TCN-N003-ISGP-G00000-CX-238600001
02C
Strengthening of Regeneration Gas Heater Foundation 20-F-01
0082-9500-WGEL-N003-ISGP-G00000CG-2331-00001
02C
Strengthening of Regeneration Gas Heater Foundation 20-F-01 Structural General Arrangement
0082-9500-WGEL-N003-ISGP-G00000CS-2386-00001
02C
Strengthening of Regeneration Gas Heater Foundation 20-F-01 Structural Details
0082-9500-WGEL-N003-ISGP-G00000CS-2386-00002
02C
DETAILED SCOPE OF WORK Detailed Scope of Works for Structural Steel for strengthening of Regenerator Gas Heater 20-F-01 at KAZ Gas plant
6.1.
Site survey
Fabrication Drawings
Fabrication
Blast & Painting
Assembly / Erection Drawings
Package & Deliver
Erection at site
Quality Control documents
Site Survey Site survey is required to verify field dimensions on existing stack trial fit to the structure prior to start fabrication & delivery to site.
6.2.
Fabrication Drawings Structural Steel Contractor shall prepare fabrication shop drawings based on COMPANY Engineering drawings (as per Section – 5) and Structural Steel Works Specifications. Substitutions of member sizes or changes in details or dimensions shall not be permitted without written authorization from the company. A minimum of 2 working days is required by Wood for review of fabrication drawings.
0082-9500-WGEL-N003-ISGPG00000-CS-5793-00001
COMPANY CONTRACT
Doc. No.
UNIT 20 STRUCTURAL STRENGTHENING F01
Job No.
WG0082
Rev No.:
02 A
Page
Page 7 of 13
SOW for Structural Steel Fabrication
Wood Approval does not relieve the Structural Steel contractor from his responsibility for quality and timely completion of works.
6.3.
Fabrication Fabrication shall comply with Structural Steel Fabrication Specification 7100-TCN-N003ISGP-G00000-CX-7880-00001. All welds shall be done at fabrication shop except the connection with existing heater structure. Trial fit for structure shall be carried out at fabricators facility prior to shipping.
6.4.
Blast & Painting Blasting shall be as per BGC specification 1000-BGC-G000-ISGP-G00000-RA-775400001. 2 hours fire Proofing is required for steel structure. Structural steel shall be fireproofed with an intumescent paint which has following requirements.
100% Solids Epoxy
Pool Fire protection 120 Minutes
(By JOTACHAR 1709 or equal approved by company)
6.5.
Assembly / Erection Drawings Structural Steel Contractor shall prepare assembly / erection drawings to enable erection at site and submit for Wood Approval. Only minimum weld will be done at site as required. Erection drawings shall be developed to suit installation of the frame with congested space around it and limited lifting assistance as per site conditions. Erection drawings shall include the item marks of fabricated steel members, detail of bolts and detail of welds. A minimum of 2 working days is required by Wood for review of erection drawings. Wood approval does not relieve the Fabrication/Erection contractor from his responsibility for quality and timely completion of works.
6.6.
Package & Deliver Structural Steel Contractor shall provide Packing List, clearly identifying various steel members, bolts, washers and nuts.
0082-9500-WGEL-N003-ISGPG00000-CS-5793-00001
COMPANY CONTRACT
Doc. No.
UNIT 20 STRUCTURAL STRENGTHENING F01
Job No.
WG0082
Rev No.:
02 A
Page
Page 8 of 13
SOW for Structural Steel Fabrication
All structural steel members, bolts, washers, and nuts shall be packaged and delivered in rigid (not cardboard), weatherproof containers.
6.7.
Erection at site Structural Steel Contractor should erect at site as per approved Erection drawings & Specifications for Structural Steel Works 7100-TCN-N003-ISGP-G00000-CX-788000001.
6.8.
Quality Control Documents Structural Steel Contractor shall submit all quality control documents as provided by SDRL.
7.
STRUCTURAL STEEL CONTRACTOR’S WORKS DELIVERABLES Structural Steel Contractor shall submit the necessary documents as a minimum to Wood for review and acceptance as given below, but is not limited to the following only:
8.
Fabrication drawings showing member sizes and exact cut lengths, connection details including bolt sizes and lengths, type of welds and weld lengths with shop and field weld symbols, erection markings and bill of materials for all fabricated items.
Erection plans including list of equipment and tools to be used.
Material safety data sheets for paints/galvanizing and safety precautions to be taken.
Welding Procedure Specifications (WPS) and Procedure Qualification Records (PQR). (For approval)
Inspection and test plan (ITP) and QA/QC procedures. (For approval & mark-up) Welder qualification test records. (For review only)
Inspection and non-destructive examination (NDE) records. Weld quality surveillance records.
Repair procedures.
Painting procedures
QUALITY CONTROL Structural Steel Contractor shall ensure that the work performed under the contract meets the requirements of this specification and the Contract Documents. Structural Steel Contractor shall maintain Quality standards as set out in Section 10 of this document.
0082-9500-WGEL-N003-ISGPG00000-CS-5793-00001
COMPANY CONTRACT
Doc. No.
UNIT 20 STRUCTURAL STRENGTHENING F01
Job No.
WG0082
Rev No.:
02 A
Page
Page 9 of 13
SOW for Structural Steel Fabrication
During fabrication, the Company shall have access to all the Contractor’s facilities and records for the purpose of conducting performance inspection/audits. During an audit by the Company, any inspection and test reports, and/or engineering analyses and calculations associated with the scope of work shall be provided upon request. Structural Steel Contractor shall submit Material Test Certificates and WPS prior to fabrication and trial fit prior to delivery.
9.
BILL OF QUANTITY
The Structural Steel Contractor shall follow the quantities listed in the below table; Table 1 – Summary of Estimated Quantity for Strengthening of Regeneration Gas Heater Foundation Sl. No. 1. 2.
Description
UPN220 UPN140
Unit
Quantity
KG
175
KG
100
3.
L80X80X10
KG
800
4.
L60X60X8
KG
850
5.
PLATE 25 THK.
KG
150
6.
PLATE 20 THK.
KG
45
7.
PLATE 16 THK.
KG
300
8.
PLATE 12 THK.
KG
730
9.
PLATE 10 THK.
KG
80
10.
PLATE 6 THK.
KG
5
11.
HVU M24x210 HILTI ANCHOR
Nos.
64
0082-9500-WGEL-N003-ISGPG00000-CS-5793-00001
COMPANY CONTRACT
Doc. No.
UNIT 20 STRUCTURAL STRENGTHENING F01
Job No.
WG0082
Rev No.:
02 A
Page
Page 10 of 13
SOW for Structural Steel Fabrication
12.
GRADE ASTM A325 M20 STRUCTURAL BOLT SET (LENGTH 100MM)
Nos.
10
13.
GRADE ASTM A325 M20 STRUCTURAL BOLT SET (LENGTH 80MM)
Nos.
40
14.
GRADE ASTM A325 M20 STRUCTURAL BOLT SET (LENGTH 60MM)
Nos.
510
15.
HEAVY HEXAGON NUTS, THREAD CLASS 6AX, PROPERTY CLASS 9 CONFORMING TO ASTM A563DH (TYP) FOR M20 BOLTS
Nos.
560
16.
WASHERS FOR M20 BOLTS CONFORMING TO ASTM F436M
Nos.
1120
Note: Materials like structural steel sections, plates, structural bolts, washers & nuts, Hilti anchor are issued as free material by COMPANY at time of fabrication & Erection. Structural Steel contractor has to return back safely the balance material to company after completion of erection works.
10.
INSPECTION & TESTING Structural Steel Contractor shall perform at all stages of the Work, all the responsibilities and duties of inspection and testing through his qualified and COMPANY approved inspectors, to meet fully the requirements of fabrication and welding as per AWS D1.1 and this scope of works. However, COMPANY reserves the right of independent inspection of the material and workmanship at all times to assure conformance to the relevant drawings, approved fabrication drawings, standards and specifications. Structural Steel Contractor shall prepare and submit a detailed quality plan for COMPANY approval prior to implementation. The quality plan shall consist of the following: Inspection and Test Plan (ITP) The ITP shall list the sequence of all inspection and testing activities. The plan shall include inspection & testing of fabrication, assembly, and packing for shipment in a chronological order, showing the frequency of control, the acceptance
0082-9500-WGEL-N003-ISGPG00000-CS-5793-00001
COMPANY CONTRACT
Doc. No.
UNIT 20 STRUCTURAL STRENGTHENING F01
Job No.
WG0082
Rev No.:
02 A
Page
Page 11 of 13
SOW for Structural Steel Fabrication
criteria, and the governing code and whether a document or report is produced for each activity. Pre-inspection Meeting (PIM) PIM shall be held by the Structural Steel Contractor their premise with COMPANY before commencing of the fabrication work. During the PIM the Structural Steel Contractor and COMPANY will review and finalize the mark-up of the ITP, confirm the requirements for witnessing (W), surveillance (S), monitoring (M), reviewing (R), in the plan. The approved quality plan shall be strictly adhered to throughout the entire fabrication, assembly, inspection, and testing period.
10.1. Material and Equipment inspection All materials shall be supplied with traceable material test certificates. It shall be ensured that traceability is not lost during fabrication process.
10.2. Shop inspection Shop fabrication inspection and tests shall be performed by the Structural Steel Contractor as per ITP and in accordance with AWS D1.1
10.3. Visual inspection All structural steel welding shall be subjected to close visual inspection by the qualified welding inspectors of the Structural Steel Contractor as the work progresses; and all deficiencies, faults or bad practices shall be corrected as soon as possible.
10.4. Dimensional Measurement Dimensional tolerances shall be in accordance with Section 6 of the AISC Code of Standard Practice for Steel Buildings and Bridges (AISC 303), hereafter referred to as the Code of Standard Practice. Tolerances for shop fabrication in accordance with Section 6 of the Code of Standard Practice. Tolerances for field erection in accordance with Section 7.13 of the Code of Standard Practice. Material identification procedures shall comply with the requirements of Section 6.1 of the Code of Standard Practice, and shall be monitored by the fabricator’s quality control inspector (QCI).
0082-9500-WGEL-N003-ISGPG00000-CS-5793-00001
COMPANY CONTRACT
Doc. No.
UNIT 20 STRUCTURAL STRENGTHENING F01
Job No.
WG0082
Rev No.:
02 A
Page
Page 12 of 13
SOW for Structural Steel Fabrication
10.5. Non-destructive Tests Non-destructive examinations (NDE) of structural welds, whenever required, shall be conducted by means of ultrasonic (UT), magnetic particle (MP), dye penetrant (DP) or radiography tests to evaluate the soundness of weld metal for the integrity of structural welded connections and critical joints. Testing shall be as per AWS D1.1. Location of the spot testing shall be determined by COMPANY. All welds shall be inspected and accepted by MP or DP tests as per Section 6 of AWS D1.1. Welds, if found to be unsatisfactory and unacceptable, shall be subjected to the requirements of this specification and shall be repaired as per AWS D1.1.
0082-9500-WGEL-N003-ISGPG00000-CS-5793-00001
COMPANY CONTRACT
Doc. No.
UNIT 20 STRUCTURAL STRENGTHENING F01
Job No.
WG0082
Rev No.:
02 A
Page
Page 13 of 13
SOW for Structural Steel Fabrication
APPENDIX A – Plot plan & Drawings for Strengthening of Regeneration Gas Heater 20-F-01
REFERENCE DRAWINGS.
DRAWING No.
KAZ - NGL SITE MASTER PLAN
NOTES: 02R 01R
17-JAN-2015 10-Feb-2015
KAZ-NGL SITE MASTER PLAN
REV DATE
DESCRIPTION
KAZ-NGL SITE MASTER PLAN DRAWN
CHKD
APPD
CLIENT
DRG No.
02R
A 0
Attachment-2 CIVIL/STRUCTURAL DRAWINGS 1. 0082-9500-WGEL-N003-ISGP-G00000-CG-2331-00001_02C 2.0082-9500-WGEL-N003-ISGP-G00000-CS-2386-00001_02C 3.0082-9500-WGEL-N003-ISGP-G00000-CS-2386-00002_02C 4.7100-TCN-N003-ISGP-G00000-CX-2386-00001_02C
Attachment-3 SPECIFICATION FOR STRUCTURAL STEEL WORKS (Doc. No. 7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A)
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
REVISION TRACKING Rev.No.
Date
Description of Revisions
01R
14/07/2014
Issued for Review
02A
23/07/2014
Issued for Approval
03A
02/09/2014
Approved for Use
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
Rev. 03A Agreement No. SIGUP-12-064 Page 2 / 21
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Rev. 03A Agreement No. SIGUP-12-064 Page 3 / 21
CONTENTS
1.
INTRODUCTION ......................................................................................................... 5
2.
PURPOSE ................................................................................................................... 5
3.
DEFINITIONS & ABBREVIATIONS ............................................................................. 6
4.
REFERENCE DOCUMENTS....................................................................................... 6 4.1
Project Documents ........................................................................................... 7
4.2
Company Documents....................................................................................... 7
4.3
Codes and Standards ...................................................................................... 7
5.
CONFLICTS AND DEVIATIONS ................................................................................. 9
6.
LANGUAGE ................................................................................................................ 9
7.
UNITS ......................................................................................................................... 9
8.
MATERIALS ................................................................................................................ 9
9.
DESIGN .................................................................................................................... 10 9.1
Design Loads ................................................................................................. 10
9.2
Load Combinations ........................................................................................ 10
9.3
Stresses ......................................................................................................... 10
9.4
Connections ................................................................................................... 10
9.5
Steel Flooring ................................................................................................. 11
9.6
Platforms........................................................................................................ 11
9.7
Stairways ....................................................................................................... 12
9.8
Ladders .......................................................................................................... 12
9.9
Handrails and Toe Plates ............................................................................... 13
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
10.
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Rev. 03A Agreement No. SIGUP-12-064 Page 4 / 21
FABRICATION .......................................................................................................... 13 10.1
General .......................................................................................................... 13
10.2
Connections ................................................................................................... 14
10.2.1 Bolted connections ......................................................................................... 14 10.2.2 Welded connections ....................................................................................... 15 10.3
Welding and Weld Inspection ......................................................................... 15
10.3.1 Welding Procedures ....................................................................................... 16 10.4 11.
12.
13.
Handling, Shipping and Delivery .................................................................... 18
PROTECTION AGAINST CORROSION.................................................................... 18 11.1
Shop Painting ................................................................................................ 18
11.2
Site Painting ................................................................................................... 18
ERECTION ................................................................................................................ 19 12.1
Transporting and Preparation......................................................................... 19
12.2
Erection.......................................................................................................... 19
12.3
Correction of Errors ........................................................................................ 20
12.4
Coating Repairs ............................................................................................. 20
QUALITY CONTROL REQUIREMENT ...................................................................... 21
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
1.
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Rev. 03A Agreement No. SIGUP-12-064 Page 5 / 21
INTRODUCTION The Khor Al Zubair NGL Plant is located approximately 30kms to the south of Basra and currently operated by the South Gas Company. Train -1 and 2 design production capacity is 350MMscf/d for each train. Current production is well below the design capacity. COMPANY requires inspection assessment and rehabilitation of the FACILITIES. CONTRACTOR will define, through Work Orders, the scope of work, followed by engineering, procurement and construction management services to rehabilitate the FACILITIES. The FACILITIES' rehabilitation will be executed in accordance with COMPANY's MASTER PLAN. COMPANY MASTER PLAN shows the requirement to bring Train 2 into full design capacity and thereafter rehabilitate Train 1. COMPANY has identified Priority Works that requires immediate attention. These works should be performed concurrently with Train-2 work. The FACILITIES includes three LPG production units of which one unit is out of operation. Rehabilitation Phase will result in reduced flaring, with the objective of returning assets to operation in a safe manner. Later, rejuvenation will address FACILITIES’ life extension and return to nameplate capacity. Two Contracts have been awarded to CONTRACTOR, one for In-Country Works and the other for Out-of-Country Works.
2.
PURPOSE This specification defines the minimum general requirements for materials and construction methods to be applied for the STRUCTURAL STEEL WORKS for Iraq South Gas Utilization Project.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
3.
4.
COMPANY Doc. No :
Rev. 03A
7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Agreement No. SIGUP-12-064 Page 6 / 21
DEFINITIONS & ABBREVIATIONS COMPANY
:
BASRA GAS COMPANY (BGC)
CONTRACTOR
:
TECHNIP FRANCE, ABU DHABI
AGREEMENT / CONTRACT
:
PROJECT
:
The SIGNATURE AGREEMENT executed by the PARTIES (COMPANY and CONTRACTOR), the Articles of AGREEMENT, ANNEX(ES), APPENDIX(ICES), EXHIBIT(S) and ATTACHMENT(S). Agreement No. SIGUP-12-064 IRAQ SOUTH GAS UTILIZATION PROJECT
VENDOR/SUPPLIER/ MANUFACTURER
:
SUBCONTRACTOR
:
FABRICATOR
:
ENGINEER
:
SPECIALIST CONTRACTOR
:
Entity, Company or Group of Companies entrusted by the COMPANY to perform part of the PROJECT.
SITE
:
SHALL
:
The place where Construction / Erection activities take place which is delimited by a fenced perimeter and the access to which requires an authorization. The site is divided into construction site(s) and temporary facilities areas. Indicates a mandatory requirement
Any and all persons, firms, partnerships, companies, bodies, entities or a combination thereof including subvendors and suppliers, who are providing GOODS & SERVICES. Any and all persons, firms, partnerships, companies or a combination thereof to whom any part of the WORK has been sub-contracted by CONTRACTOR. The party responsible for furnishing fabricated structural and miscellaneous steel. TECHNIP FRANCE ABU DHABI
REFERENCE DOCUMENTS Codes, standards and other documents generally applicable to this project have been listed as below.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
4.1
COMPANY Doc. No :
Rev. 03A
7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Agreement No. SIGUP-12-064 Page 7 / 21
Project Documents 9466P-000-JSD-1780-001
:
Civil Structural and Architectural Design Basis
5741-R-00-1810-01 Rev 1
:
Steel Works (Design) Specification for Existing Steel Works
9466P-000-JSS-1790-002 4.2
Specification for fire proofing
:
External Painting Specification for Equipment, Structural Steel and Piping
Company Documents 1000-BGC-G000-ISGPG00000-RA-7754-00001
4.3
:
Codes and Standards AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 303
:
Code of standard practice for structural steel buildings and bridges
AISC 325
:
Steel Construction Manual 13th Edition
AISC 360
:
Specification for Structural Steel Buildings
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) OSHA-CR29, 1926/1910
AMERICAN WELDING SOCIETY (AWS) AWS D1.1/D1.1M
:
Structural Welding Code – Steel
AWS D1.4/D1.4M
:
Structural Welding Code – Reinforcing Steel
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTMA6 / A6M
:
Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes and Sheet Piling for Structural Use
ASTM A36/A36M
:
Specification for Carbon Structural Steel
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Rev. 03A Agreement No. SIGUP-12-064 Page 8 / 21
ASTM A53 /53M
:
Specification for Pipe, Steel, Black and Hot Dipped ZincCoated, Welded and Seamless
ASTM A123/A123M
:
Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A143/A143M
:
Standard Practice for Safeguarding Against Embrittlement of Hot-Dip Galvanized Structural Steel Products and Procedures for Detecting Embrittlement
ASTM A563/A563M
:
Specification for carbon and alloy steel nuts.
ASTM A193/A193M
:
Specification for Alloy-Steel and Stainless Steel Bolting Material for High Temperature or High pressure Service and Other Special Applications.
ASTM A307
:
Specification for Carbon Steel Bolts and Studs, 60,000 PSI Tensile Strength
ASTM A325
:
Specification for Structural Bolts, Steel, Heat Treated, 830 MPa, Minimum Tensile Strength
ASTM A490
:
Specification for Structural Bolts, Alloy steel, heat treated, 150 ksi, minimum tensile strength.
ASTM A500
:
Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A653/653M
:
Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A1011/A 1011M
:
Specification for steel, sheet and strip, hot rolled, carbon, structural, high strength low alloy, high strength low alloy with improved formability and ultra high strength.
ASTM A786/A786M
:
Specification for hot rolled carbon, low alloy, high strength low alloy and alloy steel floor plates.
ASTM F436
:
Specification for Hardened Steel Washers
ASTM F959
:
Specification for Compressible-Washer-Type Direct Tension Indicator for use with Structural Fasteners
ASTM F1554
:
Standard Specification for Anchor Bolts, Steel, 36, 55 & 105 ksi Yield Strength
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Rev. 03A Agreement No. SIGUP-12-064 Page 9 / 21
RESEARCH COUNCIIL ON STRUCTURAL CONNECTIONS (RCSC) RCSC Specification for connections with high strength structural bolts.
5.
CONFLICTS AND DEVIATIONS a) The VENDOR shall contact the CONTRACTOR for written resolution, in the event of a conflict between this specification, requisition data and the referenced codes, standards and specifications mentioned herein. Unless otherwise stated, the most stringent requirements shall apply. b) Written COMPANY confirmation/ approval on conflicts and interpretations shall be sought as per document: 000-BGC-G000-GE00-G00000-AA-7205-00001 “Technical Query and Deviation Control Procedure”, before proceeding with design/ manufacture, and materials being processed or supplied. COMPANY’s interpretation shall be final & binding to the VENDOR.
6.
LANGUAGE All Documents and correspondence shall be written in English language.
7.
UNITS All documents, calculations and drawings shall be carried out using International System Units (S.I.).
8.
MATERIALS Structural steel of European profiles conforming to the requirements of ASTM A36/A36M / Grade 275JR of BS EN 10025 or ASTM A572/572M Grade 50 (Yield strength of 350MPa) or equivalent. Ladders and associated materials shall be ASTM A36/A36M Grade 36 (Yield strength of 250MPa) or equivalent. Handrails shall be of pipe material as per ASTM A53/A53M Type E or S, Grade B or ASTM A106/A106M Grade B or equivalent.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Rev. 03A Agreement No. SIGUP-12-064 Page 10 / 21
Standard structural bolts, nuts and washers shall conform to the ASTM 325 / A490 / A307, ASTM A563 and ASTM F436. Cladding shall be profiled colour coated steel of minimum thickness 0.70mm, matching the existing profiles and colour.
9.
DESIGN
9.1
Design Loads Design loadings shall be as specified in Project Specification for “Civil Structural and Architectural design basis - 7100-TCN-N003-ISGP-G00000-CX-7704-00001”.
9.2
Load Combinations Load Combinations shall be as specified in Project Specification “Civil Structural and Architectural design basis - 7100-TCN-N003-ISGP-G00000-CX-7704-00001”.
9.3
Stresses Permissible stresses shall be as specified in Project Specification “Civil Structural and Architectural design basis - 7100-TCN-N003-ISGP-G00000-CX-7704-00001”.
9.4
Connections High strength bolts in accordance with ASTM A325 or A490 shall be used for all main site connections. Main connections shall include main beam-to-beam, main beam to column, column splices, main bracing, and crane brackets and all beams carrying equipment loads, except as noted on the drawings. Connections for structural steel shall be shop welded and field bolted, unless otherwise shown on the design drawings. Field welding shall be avoided as far as practicable. Field welding (such as embedded plates to miscellaneous pipe supports member etc) shall be as per design drawings. In such case touch up shall be carried out.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No :
Rev. 03A
7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Agreement No. SIGUP-12-064 Page 11 / 21
Bolts 20mm dia and higher diameter in accordance with ASTM A325 or A490 shall be used for main steel connections. 16mm dia bolts in accordance with ASTM A307 and ASTM 193 shall be used for ladders, stair tread, purlin etc. All bolted connections shall be designed based on bearing type connections. All bolted connections shall use a minimum of two (2) bolts. The minimum thickness of any part of a structural steel shape shall be 6mm and minimum thickness of plate material used for structural connections shall be 10mm. Except where butt welds or fillet weld leg sizes are called for, all welds shall be continuous fillet weld with minimum leg size of 6mm. All nuts, bolts and washers shall be hot dip galvanized.
9.5
Steel Flooring Flooring shall normally be of rectangular pattern, open-type, and metal flooring with main bearing bars approximately 5 mm thick and with a flat top surface. The width of opening between load bearing bars should not exceed 30 mm. Depth of bearing bars shall be 30mm minimum and shall match with existing grating where applicable. Open type, metal flooring shall be hot dip galvanized and coated in accordance with ASTM A123/123M & A143/143M. Chequered plate flooring shall be used as per requirements of safety. Where chequered plate flooring is used it shall be 8 mm thick over the beam, and shall be fixed using screws countersunk flush with the top of the plate or welded. Solid plates shall include stiffeners if necessary. Solid plate shall be hot dip galvanized and coated in accordance with ASTM A123/123M & A143/143M.
9.6
Platforms The minimum width of walkway, platform and stair shall be 750mm. The minimum headroom for platform shall be 2100mm.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Rev. 03A Agreement No. SIGUP-12-064 Page 12 / 21
Where pipes or fittings encroach on a walkway, a minimum clearway of 450 mm is required. Openings in the floor for piping or equipment shall be sized to avoid fouling of insulation or other ancillaries. The flooring shall split on the centre of the opening to permit removal and shall be banded around the opening to provide a toe plate. Toe plates shall be provided along all edges protected by hand railing, at openings in flooring around equipment but not across the entrance to platforms served by a side step or step through ladder. Toe plate up stand should be 100 mm.
9.7
Stairways Stairways shall be provided for access to platforms serving equipment, which requires regular and frequent operational attendance or rapid escape or access in the event of an emergency. Stairs shall have a minimum width of 800 mm and shall be in accordance with Drawings. Stairs shall be arranged with the angle of slope between 34° and 38° to the horizontal. For particular cases up to 45° slope may be considered. Stair handrails shall be continuous with platform handrails. Stair treads shall be painted rectangular pattern open grid type to match platform with visible slip resistant front edges to treads. Maximum vertical rise in a single flight shall be 4000 mm.
9.8
Ladders Ladders shall be provided: For access to all other platforms. As an emergency escape from a platform which is already served by a stairway. For access to locations where no platform is necessary but where observations of a process condition is required, involving no manual efforts and which will not create a hazardous situation, e.g. check level indication. For access to platforms provided at high-level monitors of corrosion monitoring points.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Rev. 03A Agreement No. SIGUP-12-064 Page 13 / 21
Permanent ladders shall be in accordance with Project Standard Drawings. Landings shall be provided at intervals of not more than 9 meters. Changes of inclination should be avoided as far as possible but if this is impracticable, intermediate platforms shall be provided to avoid a change of inclination within a "flight". Ladders from small-elevated platforms shall be caged. Where the height between platforms will not permit access to a full cage, partial caging permitting side entry shall be provided. Where access to an upper platform is from the side or front of a ladder, the ladder shall be extended for a distance of not less than 1000 mm or equivalent handholds shall be provided. Additional safety rails shall be provided where ladders start close to the edge of an elevated platform. The safety rails shall prevent personnel falling from the platform when starting to climb up.
9.9
Handrails and Toe Plates Handrails shall extend around edges of all platforms, landings, walkways and stairs and shall be bolted or welded to supporting members. The spacing of handrail posts shall not exceed 1500 mm. Toe plates shall extend continuously around the edges of all platforms, landings, walkways and openings except at stair and ladder landings. Toe plates shall also be provided for elevated platforms and stairways. Platform with height less than 2000 mm above grade does not require toe plates.
10.
FABRICATION
10.1
General The works shall be performed in accordance with the approved CONTRACTOR´s drawings and CONTRACTOR’s specifications and standards. Fabrication cannot start before approval of the corresponding drawings. All materials used shall be of new stock.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No :
Rev. 03A
7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Agreement No. SIGUP-12-064 Page 14 / 21
Identification marks shall be shown and marked on all fabricated steel pieces. Fabricated pieces shall be shop assembled in the most advanced state of preassembly into as large and complete units as can be transported and erected. Platforms, stairways and handrails shall be separately shop assembled in the largest unit suitable for handling, shipping transportation and erection. CONTRACTOR shall take precautions to prevent damage to protective coatings. Shop splice shall not be permitted without the prior written acceptance of COMPANY. In case of COMPANY´s approval, the shop splices shall develop 100 percent of the member capacity. Butt weld shall be full penetration and 100 percent weld soundness established by radiographic or ultrasonic inspection. Connections for structural steelwork shall preferably be shop welded and field bolted. Fabrication accuracy shall be within the following limits: a) Length : 3 mm b) Twist and Deviation : 1 in 1000
10.2
Connections
10.2.1
Bolted connections All holes for high strength bolts shall be drilled. Drifting shall not be allowed. Holes shall be clear of burrs or rough edges and countersunk if required. The diameter of all holes shall not exceed: The diameter of the bolts + 2 mm for bolts < 24 mm The diameter of the bolts + 3 mm for bolts larger than ≥ 24 mm The threaded portion of each bolt shall project beyond the nut by at least 3 threads.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
10.2.2
COMPANY Doc. No :
Rev. 03A
7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Agreement No. SIGUP-12-064 Page 15 / 21
Welded connections Welding electrodes shall be in accordance with relevant codes and specifications and comply with steel grade. All shop welding shall be performed in an area protected from adverse conditions, e.g. rain, wind, dust and sand. Parts to be welded shall be carefully prepared and be firmly held before welding to avoid warping, buckling and residual stresses as far as possible. All welded seams shall be continuous. Tack welds shall be made in at least two passes that way that filler metal is deposited over the whole thickness of the joint. Weld profiles shall be controlled by gauges in accordance with the relevant standards. Tack welds not incorporated in the final weld shall be removed by grinding after completion of the work in order to produce a smooth regular finish. Visual examination for all categories of weld shall reveal no cracks.
10.3
Welding and Weld Inspection Prior to the commencement of fabrication activities, the Contractor shall submit the following documentation to the COMPANY for approval. a) Weld procedure b) Inspection and Test procedure c) Test procedure qualifications d) Test acceptance criteria e) Associated weld procedure specifications covering all joint configurations f) Welder qualification records, and work histories
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No :
Rev. 03A
7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Agreement No. SIGUP-12-064 Page 16 / 21
All welding and welding procedures shall be in accordance with ANSI / AWS D1.1 or CONTRACTOR approved equivalent. Records of all data, tests and examinations relating to welder qualifications and all welding procedures used during construction and erection shall be made available to the COMPANY. Run-off bars and extension tabs shall be removed before corrosion protection coatings are applied or before being sent to the field for erection.
10.3.1
Welding Procedures The following welding process can be used; any other welding process proposed by SUPPLIER shall have prior approval of CONTRACTOR/COMPANY: SMAW - Shielded Metal Arc Welding GTAW - Gas Tungsten Arc Welding GMAW - Gas Metal Arc Welding FCAW - Flux Core Arc Welding SAW - Submerged Arc Welding For the above welding processes following limitation shall apply in case of Root pass of Single sided butt welds without backing (open root): SMAW: ♦
EXX12 and EXX13 shall not be used
♦
Electrode polarity DC + shall not be used other than for E6010.
GTAW: ♦
Use of GTAW-P (Pulsed Gas Tungsten Arc Welding) will require qualification of the proposed equipment and systems, as well as the specific consumables including manufacturer, brand and diameter.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Rev. 03A Agreement No. SIGUP-12-064 Page 17 / 21
GMAW:♦
Short circuiting transfer (short-arc) requires the use of solid wire and shielding gas.
♦
Globular transfer mode shall not be used.
♦
Pulsed spray transfer is not restricted.
Following limitation shall apply for passes other than root passes (including fill and cap, fillet welds): SMAW: ♦
Only low hydrogen electrodes (defined as electrodes with diffusible hydrogen content of the less than 8ml/100mg deposited weld metal H8) shall be used.
GTAW: - Use of GTAW-P (Pulsed Gas Tungsten Arc Welding) will require qualification of the proposed equipment and systems, as well as the specific consumables including manufacturer, brand and diameter. GMAW: ♦
Short circuiting transfer (short-arc) shall not be used.
♦
Globular transfer – maximum based metal thickness shall be 10 mm.
♦
Pulsed spray transfer – no limitations
♦
Spray transfer - no limitations
FCAW: ♦
Arc shielding gas is required for all applications.
♦
Shall only be used on P-No.1 materials or material listed in the section 8 of API RP2A-WSD.
♦
For structural welds the diffusible hydrogen limit for FCAW electrodes (as manufactured) shall meet the values shown in table 2 of API RP 582. Documented evidence of compliance with the diffusible hydrogen limit shall be available at the CONTRACTOR works for review.
♦
Metal cored electrodes shall not be used.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Rev. 03A Agreement No. SIGUP-12-064 Page 18 / 21
SAW:
10.4
♦
Neutral flux (i.e. fluxes with basicity index of <1.0 according to Boniszewski formula) is required.
♦
Run On/Run Off tabs of the same grade of materials as that being welded shall be used.
♦
Manually held (semi-automatic) SAW is not permitted.
♦
The WPS shall specify the same brand, trade name, and product number of the flux and shall be the same as that used for PQR.
♦
Single Pass welds are not permitted for critical welds. Two pass welds shall be subject to CONTRACTOR/COMPANY approval.
Handling, Shipping and Delivery Delivery of steel shall be made in the order needed for erection. The delivery sequence for the fabricated steel shall be arranged by the CONTRACTOR. All bolts, washers, and nuts shall be packaged and delivered in rigid (not cardboard), weatherproof containers. Railcars and/or trucks shall be loaded so that others may readily unload them. Items shall be loaded in such a manner that continuous drainage will occur.
11.
PROTECTION AGAINST CORROSION
11.1
Shop Painting All fabricated structural steel work for modules, except for gratings and stair treads, shall be prepared and fully painted up to and including final top coating, in accordance with Project Specifications prior to dispatch. Gratings, Handrails, Cage Ladders and Treads shall be Hot-Dip Galvanized and Coated in accordance with Project specifications.
11.2
Site Painting Areas adjacent to welds and other areas where shop painting has been damaged or omitted shall be prepared and painted in accordance with Project Specification.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
12.
ERECTION
12.1
Transporting and Preparation
Rev. 03A Agreement No. SIGUP-12-064 Page 19 / 21
When transporting fabricated materials, care shall be taken so as not to deform or damage them. Fabricated steel found bent or twisted shall be duly corrected prior to erection. Fabricated materials shall not be laid on the muddy or corrosive ground directly during storage. Prior to erection, surfaces of structural steel in high strength bolt connection to come in contact with each other shall be cleaned of any loose mill scale, dust, oil, paint, or other foreign matter.
12.2
Erection To safeguard against gusts, earthquakes, or other sudden loads during erection, the steel shall be supported with wire rope and turnbuckles. Temporary bolts and welds for erection shall be of sufficient strength to withstand erection loads. Unless otherwise specified in the drawings, all temporary bolts in welded connections need not be removed. Those bolts shall be finished bolts. Structures shall be aligned and inspected. Aligned position shall be maintained accurately during bolting and welding work. All anchor bolts at column bases shall be tightened immediately after alignment of structures. Ladders, lugs and hooks welded to structures for the purpose of erection and safety in accordance with the drawings shall not be removed, unless otherwise specified or requested.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Rev. 03A Agreement No. SIGUP-12-064 Page 20 / 21
The Manufacturer/Supplier shall be responsible for: Setting out of the works and for accurately positioning, plumbing, lining and levelling of all steelwork in accordance with the drawing., Unless otherwise specified, tolerances for erection of structural steelwork shall be: ♦
Levelling +/- 3 mm (1/8 in).
♦
Alignment and plumb +/- 3 mm (1/8 in)
The adequacy and installation of any temporary bracing or guy cables required to counteract loadings imposed during erection. This responsibility shall also extend to temporary bracing required to ensure safe and stable conditions of partially completed structural assemblies. The structure shall be plumbed, levelled, and braced before any final bolted or welded connections are made.
12.3
Correction of Errors Fit up bolts and drift pins shall not be used to bring improperly fabricated members and parts into place (springing). Drift pins shall not be driven with such a force as to injure adjacent metal areas. When approved by the Contractor, standard holes may be enlarged by 1 mm (1/16 in) when necessary to make connections resulting from minor misfit. Holes in connections that misfit by more than 1 mm (1/16 in) shall be corrected unless otherwise approved. Enlargement of holes shall be made by reaming or drilling only. Flame cutting, burning, gouging, chipping, or drift punching shall not be permitted. No packing, shimming, filling, or wedging shall be permitted to correct faulty work unless otherwise approved by the Contractor. One filler plate up to 3 mm (1/8 in) thickness may be used as required in spaces between members to be bolted.
12.4
Coating Repairs All erection damage to hot-dip galvanized or to shop-applied paint coatings shall be repaired in accordance with the project’s specifications.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
SPECIFICATION FOR STRUCTURAL STEEL WORKS
Iraq South Gas Utilisation Project Inspection, Assessment and Rehabilitation of the Khor Al Zubair Gas Plant
13.
COMPANY Doc. No : 7100-TCN-N003-ISGP-G00000-CX-7880-00001
TECHNIP Doc. No : 9466P-000-JSS-1890-001
Rev. 03A Agreement No. SIGUP-12-064 Page 21 / 21
QUALITY CONTROL REQUIREMENT The CONTRACTOR shall maintain an effective QA/QC program which is clearly establishing the authority and responsibility of those responsible for CONTRACTOR’s quality system. Persons performing quality functions shall have sufficient and well defined authority to enforce quality requirements that initiate, identify, recommend and provide solutions to quality problems and verify the effectiveness of the corrective actions. The CONTRACTOR shall identify in purchase documents to its subcontractors all applicable QA/QC requirements imposed by CONTRACTOR, and shall ensure compliance thereto. The CONTRACTOR shall submit certified reports of production tests as soon as the tests are completed satisfactorily. Inspection and test plan (ITP) shall be prepared by SUB-CONTRACTOR and approved by COMPANY/CONTRACTOR.
O:\9466P\Secretaries\Project_Document\JSS\1890-001\03A\7100-TCN-N003-ISGP-G00000-CX-7880-00001_03A.doc
Attachment-4 SDRL for Structural Steel Fabrication & Erection (Doc. No. 0082-9500-WGEL-N003-ISGP-G00000-CS-6611-00001-Rev.01A)
Supplier Document Requirement Listing (SDRL)
GENERAL NOTES All documents must be prepared and submitted in accordance with WGPSN Procedure: IMT-PRC-1017 Instruction to Supplier / Fabricators: Drawing and Data Requirements The first issue date specified is the latest that is considered acceptable. The Bidder/Supplier shall complete the Supplier Document Register (SDR, Issued with the Starter Pack) with the agreed issue dates. THE SDR (A01) SHALL BE THE FIRST DOCUMENT SUBMITTED - NATIVE FORMAT (EXCEL) ALL OTHER DOCUMENTS WILL BE .PDF
Columns 3 & 4 The documents required with the Bid, at first and final issues are indicated by a X within column 3 - With Bid, column 4 - First Issue. Column 5 P T D Q U E C
= Date of purchase order = Date of test = Date of dispatch = Date of process = Use of procedure = Final inspection = Date of Call Off
P+X = X weeks after purchase order or fax of intent T-X= X weeks after or prior test D-X= X weeks after or prior to dispatch Q-X = X weeks prior to manufacture/job process U-X= X weeks prior to use of procedure E+X = X weeks after final inspection C+X = X weeks after Call Off
Column 6 An 'X' in this column indicates that an Electronic Copy (Native Format of Drawing i.e. AutoCad) is required with Final Issue. SDRL codes J01 & K01, where 3 & 2 indicates Hard Copies are required after approval (amend as per Project Requirements)
Column 7 This column identifies the region that the SDRL code is applicable to: 1 - GLOBAL 2 - RUSSIA only
Column 8 O = Review at Purchasers Office S = Review by WGPSN Representative at Suppliers Works - include in relevant Manual as instructed on column 9 and/or 10 of SDRL Matrix I = Submit to Purchasers office for information Only - include in relevant Manual as instructed on column 9 and/or 10 of SDRL Matrix Issued for Proposal/Quotation
Columns 9 & 10 An ‘X’ indicates documents (Certified Final issue) that are required to be included within the Certification and/or Installation, Operating and Maintenance Manuals.
Form No: IMT-FRM-1025 Rev/Date: C3-29-Mar-2016
© 2016 Wood Group Limited This document is uncontrolled once printed. Check iMAP for the current version.
Document Number: Document Revision:
0082-9500-WGEL-N003-ISGP-G00000-CS-6611-00001 01A
SUPPLIER DOCUMENT REQUIREMENTS LISTING (SDRL) CODE
DOCUMENT DESCRIPTION
1 A-
CONTROL DOCUMENTS
2
A01 A02 A03 A04 A05 A06 A07 A99 CC04 C99 GG01 G02 G03 HH01 H02 H03
Supplier’s Document Register (SDR) Fabrication/Production Schedule Progress Reports (Weekly / Monthly) Sub-order Schedule Design Deviation Request (DDR) Sub Orders (Copies) Exceptions / Deviation Listing Special SYSTEM DIAGRAMS AND DATA SHEETS Bill of Materials Special - Catalogues / Product Information HANDLING, INSTALLATION AND SITE PRESERVATION Erection and Installation Procedure Unpacking and Preservation Procedure Packing, Handling and Shipping Procedure MANUFACTURING AND QUALITY PROCEDURES Quality Manual Quality Plan Detailed Fabrication Drawing
H04 H05 H09 H12 H13 LL01 L02 L03 L05 L07 L11 MM01
WITH FIRST BID ISSUE DOCUMENTS REQUIRED
P+1 P+2 P+2 P+2
1 1 1 1 1 1 1 1
O O O O O O O O
X
P+4
1 1
O O
X X X
D-6 D-6 D-6
1 1 1
O O O
X X X
X X
P+2 P+2 P+4
1 1 1
O O O
X X X
Weld Procedure Specification (WPS) and Qualification (WPQ) Records
X
U-4
1
O
X
Non-destructive Examination Procedure (NDE) Surface Preparation & Painting Procedure Inspection & Test Plan ISO 9001 Certification TEST AND INSPECTION REPORTS Material Test Certificate Welder Performance Qualification Certificate NDE Operator Qualifications NDE Records Material Traceability Records Dimensional Report PACKING AND SHIPPING DOCUMENTS Packing and Shipping Schedule
X X X X
U-4 Q-4 P+2 P+2
1 1 1 1
O O O O
X X X X
X X X X X X
E U-4 U-4 E E E
1 1 1 1 1 1
S S S S S S
X X X X X X
X
D-1
1
O
X
5
X X X X X X X
X
X
X X
© 2016 Wood Group Limited This document is uncontrolled once printed. Check iMAP for the current version.
6
WITHIN MANUAL J01 K01
8
X
4
FINAL PSN REVIEW ISSUE REGION CLASS
7
Form No: IMT-FRM-1025 Rev/Date: C3-29-Mar-2016
3
DATE REQD
9
10
X
X
X
X
Document Number: Document Revision:
0082-9500-WGEL-N003-ISGP-G00000-CS-6611-00001 01A
SUPPLIER DOCUMENT REQUIREMENTS LISTING (SDRL) - LONG DESCRIPTION CODE
DOCUMENT
FORMAT
A-
CONTROL DOCUMENTS
A01
Supplier’s Document Register (SDR) Initial issue by completion of Purchaser's format. Updates by mark-up of Purchaser's computerised register.
PURPOSE
To establish and update Purchaser's registered
INFORMATION TO BE SHOWN ON DOCUMENT
• Listing by category and title of all Suppliers’ documents to be issued per SDRL. • Date of first submission of each document to Purchaser. • Listing to contain both Purchaser's and Supplier's document numbers. • Refer to Purchaser's specification 'Drawing and Data Requirements Instructions to Suppliers' included in the purchase order documentation. WHERE PURCHASE ORDER REQUIRES THE ISSUE OF A MONTHLY REPORT THIS SCHEDULE SHALL BE INCLUDED UNDER DATA CODE A03 AFTER FIRST SUBMISSION.
A02
Fabrication/Production Schedule
Bar Chart (A3 size maximum)
Control document
• Schedule to barchart form, showing design, manufacture, inspection, testing and delivery of all equipment, materials and components to be delivered by Supplier and his sub-suppliers. • Earliest and latest completion dates shall be entered alongside each activity with float indicated. • Once agreed with Purchaser, the "planned" dates shall not change without prior approval by purchaser. • Progress to date shall be clearly shown against each activity. • Procurement and delivery of sub-supplier items with names and references to be included. • Summary schedule of issue dates required for all documents in Data Code A01 above grouped by prime category, in bar chart format to show relationship with the Fabrication/Production Schedule. • Schedule to show calendar dates. WHERE PURCHASE ORDER REQUIRES THE ISSUE OF A MONTHLY REPORT THIS DOCUMENT SHALL BE INCLUDED UNDER DATA CODE A03 AFTER FIRST SUBMISSION.
A03
Progress Reports (Weekly / Monthly)
A4 document
Control document
• Reports to be submitted on the Friday of each week giving: • activities completed this week and % complete; • activities planned for the next week; • any problems encountered, with corrective actions proposed; • identification of areas in which Purchaser is delaying Supplier's progress; • Confirmation that contracted delivery date(s) will be maintained; • Monthly report to be submitted three working days after the last Friday in each calendar month; • Report to contain the following information as a minimum:a) Narrative explaining salient features of work carried out during the month, problems encountered of both an engineering and programme nature, steps being taken to overcome them, and confirmation that contracted delivery date(s) will be achieved. b) Running log of all commercial changes or requests made (whether or not approved by Purchaser) together with status. c) Running log of all design concessions requested by Supplier (whether or not approved by Purchaser) together with current status. d) Updated fabrication/production schedule 'front-lined' to shown actual progress at cut-off (Ref Data Code A02). e) Updated sub-order schedule indicating all sub-orders to be placed by Supplier (Ref Data Code A04). f) Updated Supplier Document Schedule showing status of all drawings to be produced against the order (Ref Data Code A01). g) If purchase order is subject to CA appraisal prior to delivery, certification status report identifying documentation submitted to and approvals received from CA together with any details of any concerns highlighted by the CA.
A04
Sub-order Schedule
Purchasers forms
Control document
• Schedule shall show all sub-orders to be placed by Supplier. Against each entry Supplier shall indicate anticipated award date and the latest data by which sub-order must be placed to meet the overall schedule. Supplier shall submit un-priced copies of sub-orders at the time of order placement. WHERE PURCHASE ORDER REQUIRES THE ISSUE OF A MONTHLY REPORT THIS SCHEDULE TO BE INCLUDED UNDER DATA CODE A03 AFTER FIRST SUBMISSION
A05
Design Deviation Request (DDR)
Form No: IMT-FRM-1025 Rev/Date: C3-29-Mar-2016
A4 Document (Starter Pack)
Control document
See WGPSN Procedure ENG-PRC-1122 and ENG-FRM-1170.
© 2016 Wood Group Limited This document is uncontrolled once printed. Check iMAP for the current version.
Document Number: Document Revision:
0082-9500-WGEL-N003-ISGP-G00000-CS-6611-00001 01A
SUPPLIER DOCUMENT REQUIREMENTS LISTING (SDRL) - LONG DESCRIPTION CODE
A06
DOCUMENT
Sub Orders DOCUMENTS (Copies) CONTROL
FORMAT
Purchasers forms
PURPOSE
Control document
INFORMATION TO BE SHOWN ON DOCUMENT
Schedule shall show all sub-orders to be placed by Supplier. Against each entry Supplier shall indicate anticipated award date and the latest data by which sub-order must be placed to meet the overall schedule. Supplier shall submit unpriced copies of sub-orders at the time of order placement. WHERE PURCHASE ORDER REQUIRES THE ISSUE OF A MONTHLY REPORT THIS SCHEDULE TO BE INCLUDED UNDER DATA CODE A03 AFTER FIRST SUBMISSION
A07
Exceptions / Deviation Listing
Purchasers forms
Control document
Schedule shall show all sub-orders to be placed by Supplier. Against each entry Supplier shall indicate anticipated award date and the latest data by which sub-order must be placed to meet the overall schedule. Supplier shall submit unpriced copies of sub-orders at the time of order placement. List of all Deviations / Exceptions to Purchase orders or standards or specifications
A99
Special
As described in the procurement documents and on SDRL.
C-
SYSTEM DIAGRAMS & DATA SHEETS
C04
Bill of Materials
C99
Special
Form No: IMT-FRM-1025 Rev/Date: C3-29-Mar-2016
A4 listing
Design and review and • Each tagged item on the P&ID (SDRL Code C01) shall be identified and operation and maintenance the following information shall be given (as appropriate): • Purchaser's tag number of Supplier's tag number (as applicable). • Service description. • Rating or range of operation. • Materials of construction. • Signal output. • Manufacturer and model number. • Contacts for switches. • Shipped loose items required for offshore installation and assembly shall clearly highlighted. • This document shall always be submitted together with drawing/P&ID/ HVAC flow diagrams to which it refers. • As described in the procurement documents and on SDRL.
© 2016 Wood Group Limited This document is uncontrolled once printed. Check iMAP for the current version.
Document Number: Document Revision:
0082-9500-WGEL-N003-ISGP-G00000-CS-6611-00001 01A
SUPPLIER DOCUMENT REQUIREMENTS LISTING (SDRL) - LONG DESCRIPTION CODE
DOCUMENT
FORMAT
PURPOSE
INFORMATION TO BE SHOWN ON DOCUMENT
G-
CONTROL HANDLING,DOCUMENTS INSTALLATION & SITE PRESERVATION
G01
Erection and Installation Procedure
A4 manuals and drawings
Installation
• lifting points • lifting weights • shipping break points for panels and switchboard assemblies • erection match markings • fixing points • levelling procedures • alignment procedures • erection fasteners summary list • details of any special unpacking/handling requirements shall be stated
G02
Unpacking and Preservation Procedure
A4 procedure
Traffic and design review
G03
Packing, Handling and Shipping Procedure
A4 procedure
Traffic and design review
• Detail preservation procedure detailing inspection periods, materials required, for both onshore and offshore requirements and materials needing disposal. Any special unpacking/handling requirements shall be stated. • Supplier to propose packing details and handling and shipping techniques. Indicate type and size of container, number off, weight, identification and contents.
H-
MANUFACTURING & QUALITY PROCEDURES
H01
Quality Manual
A4 bound volume
QA/QC
• Where the Supplier has a quality system approved in accordance with ISO 9000 series, only a copy of the approval certificate and the index of the Quality Manual are to be submitted to the Purchaser unless specifically requested. Purchaser reserves the right to request a copy of the complete Quality Manual at any time during the life of the purchase order.
H02
Quality Plan
A4 sheets
QA/QC
H03
Detailed Fabrication Drawing
Max. size A1
Design Review
• A document specifying which procedures and associated resource shall be applied by whom and when to a specific project, product, process or contract • For all vessels, tanks and other fabricated items, the following information shall be shown and a detail drawing to scale: - all dimensions with tolerances - plate layouts - weld joint design - weld procedure specification references for each and every weld - nozzle locations and orientations. - Internal details - When applicable, weld location plans shall be verified by the Purchaser and/or third party inspection authority. - Code of Construction - Post weld heat treatment requirements - Hydrostatic/pneumatic test conditions - Internal coating/painting/insulation requirements of applicable weight equipment.
H04
Weld Procedure Specification (WPS) Supplier's standard and Qualification (WPQ) Records forms in accordance with Purchaser's requirements
Materials Engineering review and QA/QC.
• Define all shop, field and repair welding procedures in accordance with Purchaser's requirements. The Welding Procedure Specification (WPS) shall be cross referenced to the applicable weld location plan (SDRL Code H03) and Weld Procedure Qualification (WPQ). All WPS documents shall be issued in a single submission, together with the WPQ and a listing register to show status of approval. Qualification records describe parameters used in qualification of WPS's together with mechanical testing and results in accordance with Purchaser's requirements. WPQ test records are to be cross referenced to the WPS's and when applicable stamped by the third party inspection authority. • Fabrication shall not commence before the appropriate weld procedure has been approved by Purchaser unless notified otherwise in writing.
H05
Non-destructive Examination Procedure (NDE)
Supplier's procedures
Materials Engineering review and QA/QC
• Define method, extent and acceptance levels of all NDE used to verify that materials and/or formed or welded fabrications comply with Purchaser's requirements. To include as applicable, visual, radiographic, ultrasonic, magnetic particle, dye penetrant, hardness tests and other techniques. Including Positive Material Identification (PMI). • When applicable, procedures shall comply with the requirements of the third party inspection authority. Procedures shall also be cross referenced to the weld location plan. (SDRL Code H03)
H09
Surface Preparation & Painting Procedure
A4 procedure
Design review and QA/QC
• This shall be supplied for equipment, especially where exception to Purchaser specification has been agreed (in writing), and shall include: - surface cleaning - preparation - shop or field painting - linings (where applicable) - repairs to damaged finishes
H12
Inspection & Test Plan
Suppliers Procedures
QA/QC
• The inspection and test plan shall be job specific and shall clearly identify all Quality Control activities performed by the Supplier including all hold and witness points for Purchaser to comment and indicate those activities to be witnessed by Purchaser; third party inspectorate and IVB as appropriate
Form No: IMT-FRM-1025 Rev/Date: C3-29-Mar-2016
© 2016 Wood Group Limited This document is uncontrolled once printed. Check iMAP for the current version.
Document Number: Document Revision:
0082-9500-WGEL-N003-ISGP-G00000-CS-6611-00001 01A
SUPPLIER DOCUMENT REQUIREMENTS LISTING (SDRL) - LONG DESCRIPTION CODE
H13
DOCUMENT
ISO 9001 Certification CONTROL DOCUMENTS
FORMAT
PURPOSE
INFORMATION TO BE SHOWN ON DOCUMENT
Certificate
QA/QC
• Where the vendor has been certified as compliant with ISO 9001 by an accredited Third Party and where prior agreement has been made between Purchaser and Supplier, the certificate may be submitted in place of the Quality Manual (H02)
• Certificates in compliance with E.N. 10204 3.1 or 3.2. or otherwise as required by PO Documentation shall include as a minimum chemical analysis, specification range analysis, mechanical test results, heat treated condition for the product supplied to the Purchaser. Unless otherwise requested in Design Specification and Quality Requirements Specification included in the Purchase documentation. Certificates must be fully traceable to each component by means of a unique numbering system, together with supplementary material placement drawings when necessary. Certificates and material placement drawings (when required) shall be verified by inspection authority. Each certificate shall state that it is to EN 10204 3.1 or 3.2, or 2.2. for non-pressure retaining equipment.
L-
TEST & INSPECTION REPORTS
L01
Material Test Certificate
A4 certificate
Certification
L02
Welder Performance Qualification Certificate
Supplier's format A4 report
QA/QC and to be approved • Welders name, identification and positions to be recorded to code by Purchaser prior to start requirements with approval by third party inspection authority when of manufacture. applicable, using approved weld procedure.
L03
NDE Operator Qualifications
L05
NDE Records
• Copies of Qualification Certificates for the technicians/operators signing certificates within Data Code L05. Certificates to state Purchaser's purchase order number. A4 certificates
QC.
a) Radiography • Results of radiography tests carried out and signed by a qualified technician. Detailed reports are to state Purchaser's order number, and to include the procedure used, acceptance level and results obtained in accordance with Purchaser's specified standard. Reference shall be made to applicable operator qualification certificates, and approvals by third party inspection authority shall be gained when necessary. b) Ultrasonic Examination • Certificate confirming that acceptable results have been obtained on examinations carried out to the specified standard and stating the equipment used, calibration standard and procedure adopted. The certificate shall be signed by a qualified operator. Reference shall be made to applicable NDT operation qualification certificates, and approvals by third party inspection authority shall be gained when necessary. c) Crack Detection, covering Magnetic Particle Inspection (MPI) and DYE Penetrant Inspection (DPI). • Details as in (B) above. d) Positive Material Identification (PMI) • Results of PMI testing shall be maintained on a standardised format and signed by a Qualified Technician. Standardised format and incorporated into the Suppliers Manufacturing Data Manual (K01) Note: When applicable, NDE Records shall be supplemented with weld history drawings verified by Purchaser (and the third party inspection authority, when necessary).
L07
Material Traceability Records
Suppliers format, QC Maximum drawing size A1
• Location plans/records with an identification system cross-referring to the individual material certificates. • When applicable, material placement drawings shall be verified by the Purchaser and/or third party inspection authority.
L11
Dimensional Report
A4 report
QC
• Report to verify all critical dimensions, including Purchaser interconnection points are in accordance with Supplier's approved drawings
M-
PACKING & SHIPPING DOCUMENTS
M01
Packing and Shipping Schedule
Traffic
• For equipment shipped in more that one piece, a schedule is to be submitted which identifies all the major components of the package for use as a Check List at the receiving point to ensure all items have been received. Copy of document to accompany shipment.
Form No: IMT-FRM-1025 Rev/Date: C3-29-Mar-2016
A4 listing
© 2016 Wood Group Limited This document is uncontrolled once printed. Check iMAP for the current version.