P2.pdf

  • Uploaded by: Rec Alfonso Cinco
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View P2.pdf as PDF for free.

More details

  • Words: 416
  • Pages: 1
2

4.00

3

10.00 3.00

4

1.50

3.00

to water source

1

1

1.50

2

4.00

10.00 3.00 3.00

W1

A

REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE BUILDING OFFICIAL MUNICIPALITY OF SOGOD PROVINCE OF SOUTHERN LEYTE

4

0.80 1.20

r

A

3

1.00

RECOMMENDING APPROVAL:

r

B

W1

0.85 0.94

3.50

3.50

2.00

Fire Exit

C

3.00

10.00

3.00

10.00

B

BUILDING OFFICIAL

DATE

W2

septic tank detail

GREASE TRAP DETAIL 3.50

3.50

section

storage

0.20

C

GROUND FLOOR WATER LINE LAYOUT SCALE

1

:

100

W1

M

SECOND FLOOR D

D1

D

WATER LINE LAYOUT SCALE

ELEV. +00

TERRACE

1

:

100

M

TERRACE

PLUMBING SPECIFICATIONS 1. ALL PIPES PASSING THROUGH OR UNDER DRIVEWAYS SHALL BE PROPERLY PROTECTED AGAINST BREAKAGE WITH REINFORCED CONCRETE. 2. ALL HORIZONTAL PIPINGS SHALL RUN IN A PRACTICAL ALIGNMENT AND AT UNIFORM GRADE NOT LESS THAN ONE PERCENT (1%) AND SHALL BE ANCHORED OR SUPPORTED AT AN INTERVAL NOT TO EXCEED 1.50 METERS. 3. ALL WALLS WITH PLUMBING ROUGH-IN SHALL BE 150 mm THICK CHB. 4. WORKMANSHIP SHALL BE OF CHARACTERISTICS AS TO FULLY SECURE THE RESULT SOUGHT IN ALL THE PROVISIONS OF THE NATIONAL PLUMBING CODE OF THE PHILIPPINES. 5. INSTALL ALL PIPING IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND SPECIFICATIONS. 6. UPON COMPLETION OF THE WATER SYSTEM, FLUSH OUT LINES TO CLEAR SYSTEM OF PARTICLES, DIRT AND CLEAN ALL VALVES. 7. ALL PLUMBING INSTALLATIONS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY LICENSED MASTER PLUMBER.

4"0 x 45 ELBOW

4"0 x 4"0 WYE

4"0 x 4"0 WYE

HORIZONTAL TO VERTICAL

4"0 x 45 ELBOW

MAIN VENT STACK

CERTIFICATION: THIS IS TO CERTIFY THAT THERE IS NO EXISTING ARTESIAN WELL WITHIN A RADIUS OF 25.00 M FROM THE PROPOSED SEPTIC TANK.

0.10

0.70

0.10

0.50

0.10

MASTER PLUMBER FIN. FLOOR LINE

0.70

R.C. FLOOR SLAB

0.50

CONCRETE GROUT

0.10

4" THK. FLOOR DRAIN

PLAN

4"0 x 45 ELBOW

0.70

CONCRETE COVER 4"0 x 4"0 WYE 0.70

VERTICAL TO HORIZONTAL FLOOR DRAIN DETAIL

4" THK. CHB

0.10

PLUMBING JOINTS

ELEVATION/SECTION

CATCH BASIN DETAIL FROM THE OFFICE OF:

C:\Users\user\Documents\calimbas plan\logo copy.bmp

NO PORTION OF THIS SET OF PLAN SHOULD BE COPIED EITHER MANUALY OR ELECTRONICALLY WITHOUT THE WRITTEN CONSENT OF THIS OFFICE.

SEAL

NAME OF PROJECT:

APPROVED AS PER PLAN:

SLSU ALUMNI OWNER

MASTER PLUMBER PRC No.: PTR No.

Date Reg.

T I N No.

Date:

Place:

LOCATION: BRGY. SAN ROQUE,SOGOD, SOUTHERN LEYTE

LOCATION: BRGY. SAN ROQUE,SOGOD, SOUTHERN LEYTE

SHEET CONTENTS:

SHEET NUMBER

More Documents from "Rec Alfonso Cinco"

E2.pdf
May 2020 5
P2.pdf
May 2020 4
A3.pdf
May 2020 3
Elmer.pdf
May 2020 3
E1.pdf
May 2020 1
S1.pdf
May 2020 7