ITEM 1 1.1 1.3 1.4 1.5 1.6

DESCRIPTION

UNIT

PRELIMINARIES Mobilization/Demobilization Bonds and Insurance Hauling & Disposals of Debris Cleaning & Housekeeping Safety Requirements Sub Total Item 1

2 2.1 2.2 2.3 2.4 2.5 2.6 3 3.1 3.2 3.3 3.4 3.5 4

SALES OFFICE Repainting of all white walls (Permacoat Latex Semi-Gloss) Panting of accent wall (Permacoat Latex Semi-Gloss; Red Color) Supply and installation of additional modular partitions Replacement of LED fluorescent bulb 32 watts Replacement of ceiling board including hangers Restoration of T-runner HALLWAY TO PANTRY Repainting of all walls Supply and installation of flush type door 0.9 x 2.1m Supply and installation of door lockset Supply and installation of door hinges Replacement of ceiling board including hangers Replacement of LED fluorescent bulb 32 watts

EXISTING MALE RESTROOM 4.1 Removal of existing vinyl wall tiles 4.2 Removal of existing pipe 4.3 Chipping of existing concrete wall 4.4 Installation of 30x30cm wall tiles; 1.2m high 4.5 Painting of remaining interior upper walls 4.6 Repainting of ceiling 4.7 Checking of electrical wiring and switch 4.8 Replacement of lighting fixture-1 gang switch 4.9 Replacement of mirror 0.70 x 0.70m 4.1 Provision of handheld bidet 4.11 Provision of tissue holder

6 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9

EXISTING FEMALE RESTROOM Removal of existing wall tiles & wall paper Installation of 30x30cm wall tiles; 1.2m high Painting of remaining interior walls Repainting of ceiling Checking of electrical wiring and switch Replacement of lighting fixture-1 gang switch Replacement of mirror 0.70 x 0.70m Provision of handheld bidet Provision of tissue holder

QUANTITY

7

PANTRY & CONFERENCE ROOM

7.4 7.5

Installation of partition wall 1/4" thk ficem board on metal furring between pantry & conference room Demolition of existing wall at storage area Replacement of ceiling board incl hangers 7.3.1 Pantry Area 7.3.2 Conference Room Restoration of T-runner Replacement of LED fluorescent bulb 32 watts

7.6

Repainting of walls including accent walls (Permacoat Latex Semi-Gloss)

7.1 7.2 7.3

8

EXECUTIVE RESTROOM AT CONFERENCE ROOM 8.1 Plumbing & water supply investigation 8.2 Removal of existing floor and wall tiles 8.3 Installation of new floor tiles 60 x 60cm textured tiles 8.4 Installation of new wall tiles 60 x 60cm light brown glossy w/ grain 8.5 Supply and installation of lavatory 8.6 Supply and installation of lavatory faucet 8.7 Repainting of ceiling 8.8 Replacement of lighting fixture-1 gang swicth 8.9 Supply and installation of mirror 0.30x0.40 8.1 Provision of handheld bidet 8.11 Provision of tissue holder

Unit Cost Material Cost

AMOUNT

Related Documents

Office Boq 2.xlsx
December 2019 17
Boq
October 2019 33
O And M Office Boq
December 2019 16
Boq
May 2020 18
Boq Sample
June 2020 17

More Documents from "NavVanOliveros"

Boq Scribd.xlsx
December 2019 16
Boq Scribd.xlsx
December 2019 22
Office Boq 2.xlsx
December 2019 17