Meeting regarding the project JRC (Jesenice Research Center) Working Group on the project in the composition of the JRC, Mr Massimo Mastrangelo, Mr. Darko and Mr Jarc Iztok Jenko is on Saturday, 18.7. and Sunday, 19.7. 2009, agreed activities, which must be carried out as follows: 1. Prepare the data on annual production of electricity produced from renewable sources in the Gorenjska and send them to Mr. Massimu to 21.07. 2009 (assignment Iztok JENKO) 2. Prepare a presentation for the mayor of Jesenice for mid August (assignment Iztok JENKO). a. 13.8 to 18.8. would be good to define the date of presentation. Iztok in interviews Monday with the Mayor. (The mayor will be to decide to 21.8.2009) i. 5Ha land must be for phase 1 and 2 satisfy ii. To view the church should be assured of lighting, as well in the rooms below the church iii. To view the facility to organize the opening of the facility for the Museum of Iron: - JRC Institute office - office loggia 3 countries b. The presentation must be defined by the activity of the center due to a change of land: i. Tourism ii. Commercial / residential (students, professors) iii. Education iv. Research (laboratories and development departments) (For the preparation of presentations assignment Massimo Mastrangelo) 3. The opening of offices in the JRC Institute of Iron Museum, a facility to 1.10.2009. (assignment Iztok JENKO and Tom Mencinger) 4. Before the present project of the JRC Mayor Jesenice, the preparation of documentation for the establishment of the JRC Institute (Jesenice Research Center) to conduct the project and the statute project and the participants of this project, including how many% will be participation. Until 13.8. 2009. (assignment Darko Jarc) 5. Preparing a letter of intent on the participation of municipalities with land in Jesenice Institute. (assignment Massimo Mastrangelo) 6. Signing a letter of intent by the mayor of Jesenice (assignment Iztok JENKO and Tom Mencinger). 7. The condition for the project to the central bank of 10.09.2009 is as follows: - sign a letter of intent the Mayor of Jesenice, - certified Swiss banks - set up institute of the JRC - and made presentation of the documentation project that will form the basis of the directors of the bank.
8. To prepare a business plan JRC project is time enough for one month! As we will adjust according to the green light. 9. Max will prepare a presentation in a week, once finalized, it is translated into English. (assignment Iztok JENKO) 10. Download Microsoft Project Professional 2003 -open version to Max (assignment Iztok JENKO) by the end of July 2009 11. Prepare a draft logo for the Institute of the JRC which should include: a. The historical value of Gorenjska b. European features c. The character box to be created in Slovenia (Massimo already given) Maximo has a company in Italy to prepare a logo for the value of 10,000 to 15,000 EUR, Iztok will be obtained from Robert Bitenc (brother in law) to manufacture of logo. The logo must be prepared to 25.8.2009. Until 27.7. 2009 should be known for logo ideas: Maximo gave the logo Teplarjev, Iztok and Darko, however, prepare the rest of base. (assignment Iztok JENKO and Jarc Darko)
Writen by: Iztok JENKO KRANJ
19.07.2009