Page 1 of 2 Radiogram No. 4920u Form 24 for 03/23/07 PURGING AND VENTING OF PROGRESS 358 FUEL AND OXIDIZER REFILLING DEVICES [ЗУГ], [ЗУО] GMT CREW ACTIVITY 12:00-12:05
CDR
12:00-12:10
FE-1, FE-2
12:05-12:10
CDR
12:10-12:30
CDR, FE-2
12:10-12:40
FE-1
12:30-13:15
CDR, FE-2
12:40-13:30
FE-1
13:15-13:30
CDR, FE-2
13:30-13:55
SLEEP - data logging Morning inspection Post-sleep BREAKFAST TV PAO with cadets of test-pilot school (S + Ku-band) Prep for Work
13:55-14:10
Daily Planning Conference (S-band)
14:10-14:25
ISS crew and ГОГУ (RSA Flight Control Team) weekly conference (S-band)
14:25-17:20
FE-2
14:25-17:25
CDR
Integrated Station Lan (ISL) Installation in LAB forward
14:25-14:45
PLASMA CRYSTAL-3 PLUS. Telescience Hardware removal from SM
14:45-15:00
IMS tagup (S-band)
15:00-15:15 15:15-16:45
FE-1
Pressure monitoring in Liquid Unit БЖ #056 (Elektron-VM) Physical Exercise (TVIS), day 2
16:45-16:55
Private medical conference (with counter-measure system specialist) (VHF)
16:55-17:45
PILLE dosimeter reading
17:20-18:20
FE-2
Physical Exercise (RED)
17:25-18:55
CDR
Physical Exercise (TVIS + CEVIS)
17:45-18:45
FE-1
On MCC-M Go: Removing УС-21 box from Progress №358
18:20-18:50
FE-2
СОЖ Maintenance
18:45-18:55
FE-1
Progress 358 Stowage Completion Status Calldown (S-band)
18:50-18:55
FE-2
On MCC-M GO ISS O2 repress from Progress 358 СрПК (start)
18:55-19:55
LUNCH
19:55-21:25
CDR
Equipment prepack for return on Soyuz
19:55-20:00
FE-2
ISS O2 repress from Progress 359 СрПК (terminate)
19:55-20:55
FE-1
Equipment prepack for return on Soyuz
20:00-20:20
TRAC - hardware setup
20:20-20:30
TRAC - video equipment set up
20:30-21:05
FE-2
TRAC - data Inspection of Portable Breathing Apparatus (PBA) and Portable Fire Extinguisher (PFE)
21:05-21:45 21:05-21:40
FE-1
TRAC - data
21:25-21:55
CDR
CWC inspection
21:40-22:40
FE-1
Physical Exercise (VELO+RED) day 2
21:45-22:15
FE-2
Post-ISL installation in Lab Closeout Ops
21:55-22:10
CDR
Food frequency questionnaire
22:15-22:30
FE-2
22:30-22:40
Crew discretionary conference (S-band) O2 level check
Page 2 of 2 22:40-22:45
Rebooting OCA SSC router.
22:40-00:40
FE-1
Surface samples from FGB equipment and structures
22:40-23:15
CDR
TRAC - data
22:45-00:15
FE-2
Physical Exercise (CEVIS)
23:15-23:30 23:30-00:30 00:15-00:30 00:30-00:45
CDR FE-2
TRAC - equipment stow Physical Exercise (RED) Evening work prep Food frequency questionnaire
00:30-00:55
CDR
Evening work prep
00:40-00:55
FE-1
Reactivation of condensate transfer from СКВ-1
00:45-00:50 00:50-00:55
FE-2
Payload status check Transfer TVIS/RED/CEVIS/HRM data to MEC
00:55-01:10
Daily planning conference (S-band)
01:10-01:45
DINNER
01:45-02:15
Daily food prep
02:15-02:35
Flight Director / ISS Crew Tagup (S-band)
02:35-03:30
Pre-sleep
03:30-12:00
SLEEP ТБУ (Universal Bioengineering Thermostat). Temperature check
Task List
FE-1
RASTENIYA-2. Status check
URAGAN. Observation and photography Note. See OSTP for references to US activities. End of Radiogram