Page 1 of 2 Radiogram No. 4920u Form 24 for 03/23/07 PURGING AND VENTING OF PROGRESS 358 FUEL AND OXIDIZER REFILLING DEVICES [ЗУГ], [ЗУО] GMT CREW ACTIVITY 12:00-12:05

CDR

12:00-12:10

FE-1, FE-2

12:05-12:10

CDR

12:10-12:30

CDR, FE-2

12:10-12:40

FE-1

12:30-13:15

CDR, FE-2

12:40-13:30

FE-1

13:15-13:30

CDR, FE-2

13:30-13:55

SLEEP - data logging Morning inspection Post-sleep BREAKFAST TV PAO with cadets of test-pilot school (S + Ku-band) Prep for Work

13:55-14:10

Daily Planning Conference (S-band)

14:10-14:25

ISS crew and ГОГУ (RSA Flight Control Team) weekly conference (S-band)

14:25-17:20

FE-2

14:25-17:25

CDR

Integrated Station Lan (ISL) Installation in LAB forward

14:25-14:45

PLASMA CRYSTAL-3 PLUS. Telescience Hardware removal from SM

14:45-15:00

IMS tagup (S-band)

15:00-15:15 15:15-16:45

FE-1

Pressure monitoring in Liquid Unit БЖ #056 (Elektron-VM) Physical Exercise (TVIS), day 2

16:45-16:55

Private medical conference (with counter-measure system specialist) (VHF)

16:55-17:45

PILLE dosimeter reading

17:20-18:20

FE-2

Physical Exercise (RED)

17:25-18:55

CDR

Physical Exercise (TVIS + CEVIS)

17:45-18:45

FE-1

On MCC-M Go: Removing УС-21 box from Progress №358

18:20-18:50

FE-2

СОЖ Maintenance

18:45-18:55

FE-1

Progress 358 Stowage Completion Status Calldown (S-band)

18:50-18:55

FE-2

On MCC-M GO ISS O2 repress from Progress 358 СрПК (start)

18:55-19:55

LUNCH

19:55-21:25

CDR

Equipment prepack for return on Soyuz

19:55-20:00

FE-2

ISS O2 repress from Progress 359 СрПК (terminate)

19:55-20:55

FE-1

Equipment prepack for return on Soyuz

20:00-20:20

TRAC - hardware setup

20:20-20:30

TRAC - video equipment set up

20:30-21:05

FE-2

TRAC - data Inspection of Portable Breathing Apparatus (PBA) and Portable Fire Extinguisher (PFE)

21:05-21:45 21:05-21:40

FE-1

TRAC - data

21:25-21:55

CDR

CWC inspection

21:40-22:40

FE-1

Physical Exercise (VELO+RED) day 2

21:45-22:15

FE-2

Post-ISL installation in Lab Closeout Ops

21:55-22:10

CDR

Food frequency questionnaire

22:15-22:30

FE-2

22:30-22:40

Crew discretionary conference (S-band) O2 level check

Page 2 of 2 22:40-22:45

Rebooting OCA SSC router.

22:40-00:40

FE-1

Surface samples from FGB equipment and structures

22:40-23:15

CDR

TRAC - data

22:45-00:15

FE-2

Physical Exercise (CEVIS)

23:15-23:30 23:30-00:30 00:15-00:30 00:30-00:45

CDR FE-2

TRAC - equipment stow Physical Exercise (RED) Evening work prep Food frequency questionnaire

00:30-00:55

CDR

Evening work prep

00:40-00:55

FE-1

Reactivation of condensate transfer from СКВ-1

00:45-00:50 00:50-00:55

FE-2

Payload status check Transfer TVIS/RED/CEVIS/HRM data to MEC

00:55-01:10

Daily planning conference (S-band)

01:10-01:45

DINNER

01:45-02:15

Daily food prep

02:15-02:35

Flight Director / ISS Crew Tagup (S-band)

02:35-03:30

Pre-sleep

03:30-12:00

SLEEP ТБУ (Universal Bioengineering Thermostat). Temperature check

Task List

FE-1

RASTENIYA-2. Status check

URAGAN. Observation and photography Note. See OSTP for references to US activities. End of Radiogram