Nasa 170155main 02 23 2007 Tl

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Nasa 170155main 02 23 2007 Tl as PDF for free.

More details

  • Words: 304
  • Pages: 2
Radiogram No. 4747u

Form 24 for 02/23/07

Post-EVA Closeout Ops. Satellite Navigation Equipment [ACH-M] Test GMT

CREW

ACTIVITY

06:00-06:10

Morning inspection

06:10-06:40

Post-sleep

06:40-07:30

BREAKFAST

07:30-08:00

FE-2

07:30-07:55

CDR, FE-1 Prep for Work

07:55-08:00

CDR

Medical Kits Restow

07:55-08:10

FE-1

Post-EVA PILLE dosimeter reading

08:00-08:10

CDR

Stowing Urolux hardware

08:25-08:30

FE-2

Disconnect Display and Control Panel (DCP) power cable

08:25-08:35

CDR

CWC audit

08:25-09:45

FE-1

Open РО-ПрК hatch in SM between Progress 358 and SM without leak check

08:10-08:25

Prep for Work

Daily Planning Conference (S-band)

08:45-09:45

FE-2

Physical Exercise (RED)

08:55-09:15

CDR

Closeout ops with DCS 760 camera used for EVA

09:15-09:45

CDR

EVA17 Photo Downlink

09:45-11:00

Post-EVA Debrief. Tagup with specialists (S-band)

11:00-12:00

LUNCH

12:00-13:00

CDR, FE-2 Procedure review (6-month maintenance) and tool selection

12:00-12:40

FE-1

13:00-13:30

CDR, FE-1 Post-EVA Orlan debrief with specialists (S-band)

13:00-13:05

FE-2

Post-EVA close-out ops with СКК cassette DC1 comm config Restore the nominal comm. configuration On MCC Go ISS O2 repress from Progress 358 СрПК (start)

13:05-13:35

FE-2

СОЖ Maintenance.

13:30-14:40

CDR

Physical Exercise (TVIS + CEVIS)

13:35-13:50

FE-1

Private Medical Conference (S + Ku-band)

13:35-13:50

FE-2

Taking readings from АОК ГАНК-4М gas analyzer

13:50-14:50

FE-1

Physical Exercise (VELO + RED) day 3

14:00-14:05

FE-2

OCA SSC router reboot

14:05-14:10

FE-2

ISS O2 repress from Progress 358 СрПК (terminate)

14:10-14:15

FE-2

Disconnecting LTL

14:15-14:25

FE-2

O2 level check

14:25-14:30

FE-2

Payload status check /

14:40-14:55

CDR

Private Medical Conference (S + Ku-band)

14:50-14:55

FE-2

Transfer of TVIS/RED/CEVIS data to MEC

14:55-15:10

Daily Planning Conference (S-band)

15:15-15:35

FD / ISS crew conference (S-band)

15:35-16:05

DINNER

16:05-16:15

Daily Food Prep

16:15-16:35

ISS Crew / Kent Rominger tagup (Astronaut Office) (S-band)

16:35-17:30

Pre-sleep

17:30-02:00

SLEEP

Task List

FE-1

ТБУ (Universal Bioengineering Thermostat). Temperature check

RASTENIYA-2. Payload status check Note: See OSTP for references to US activities. End of Radiogram

Related Documents