Radiogram No. 4570u
Form 24 for 01/23/07
Dynamic Test of Progress ДПО Thrusters GMT
CREW
ACTIVITY
08:30-08:40
Morning Inspection
08:40-09:10
Post-sleep
09:10-10:00
BREAKFAST
10:00-10:15
Prep for Work
10:15-10:30
Daily Planning Conference (S-band)
10:30-13:30
CDR
Installation of Vibration IsolatorsВПО2, ВПО3, ВПО4. Tagup (S-band)
10:30-14:00
FE-1
Checking АСН-М Antenna Feeder Unit pos. А79. Tagup (S-band)
10:30-11:25
FE-2
EMU Cooling Loop Scrub to eliminate the bio-mass and particulate matter (start)
11:25-11:45
FE-2
Start BSA battery charge
11:45-12:35
FE-2
Inspection of Portable Breathing Apparatus (PBA) and Portable Fire Extinguisher (PFE)
12:35-13:05
FE-2
EMU Cooling Loop Scrub to eliminate the bio-mass and particulate matter (terminate)
13:05-13:20
FE-2
Private medical conference (S-band)
13:20-14:20
FE-2
Physical Exercise (RED)
13:30-15:00
CDR
Physical Exercise (CEVIS)
14:10-15:10
FE-1
Physical Exercise (VELO+RED) day 4
14:20-15:05
FE-2
ODF procedure printout
15:10-16:10
LUNCH
16:10-16:30
Crew Discretionary Conference (S + Ku-band)
16:30-19:30
ISS Emergency descent drill. Tagup (S-band)
19:30-19:45
CDR
Private Medical Conference (S + Ku-band)
19:30-21:00
FE-1
Physical Exercise (TVIS), day 4
19:30-21:00
FE-2
Physical Exercise (CEVIS)
19:45-20:45
CDR
Physical Exercise (RED)
20:45-21:05
CDR
IMS update
21:00-21:10
FE-1
Evening work prep
21:00-21:05
FE-2
Transfer TVIS/RED/CEVIS/HRM data to MEC
21:05-21:45
CDR, FE-2 Evening work prep
21:10-21:25
FE-1
Private Medical Conference (S + Ku-band)
21:25-21:45
FE-1
Evening work prep
21:45-22:00
Daily Planning Conference (S-band)
22:00-22:30
DINNER
22:30-23:00
Daily food prep
23:00-00:00
Pre-sleep
00:00-08:30
SLEEP ТБУ (Universal Bioengineering Thermostat). Temperature check
Task List
FE-1
Search for 2 air ducts (SECTION #2) 27КСМ.53Ю 6100-60 to be installed in Progress 359
Note: See OSTP for references to US activities. End of Radiogram