Radiogram No. 4570u

Form 24 for 01/23/07

Dynamic Test of Progress ДПО Thrusters GMT

CREW

ACTIVITY

08:30-08:40

Morning Inspection

08:40-09:10

Post-sleep

09:10-10:00

BREAKFAST

10:00-10:15

Prep for Work

10:15-10:30

Daily Planning Conference (S-band)

10:30-13:30

CDR

Installation of Vibration IsolatorsВПО2, ВПО3, ВПО4. Tagup (S-band)

10:30-14:00

FE-1

Checking АСН-М Antenna Feeder Unit pos. А79. Tagup (S-band)

10:30-11:25

FE-2

EMU Cooling Loop Scrub to eliminate the bio-mass and particulate matter (start)

11:25-11:45

FE-2

Start BSA battery charge

11:45-12:35

FE-2

Inspection of Portable Breathing Apparatus (PBA) and Portable Fire Extinguisher (PFE)

12:35-13:05

FE-2

EMU Cooling Loop Scrub to eliminate the bio-mass and particulate matter (terminate)

13:05-13:20

FE-2

Private medical conference (S-band)

13:20-14:20

FE-2

Physical Exercise (RED)

13:30-15:00

CDR

Physical Exercise (CEVIS)

14:10-15:10

FE-1

Physical Exercise (VELO+RED) day 4

14:20-15:05

FE-2

ODF procedure printout

15:10-16:10

LUNCH

16:10-16:30

Crew Discretionary Conference (S + Ku-band)

16:30-19:30

ISS Emergency descent drill. Tagup (S-band)

19:30-19:45

CDR

Private Medical Conference (S + Ku-band)

19:30-21:00

FE-1

Physical Exercise (TVIS), day 4

19:30-21:00

FE-2

Physical Exercise (CEVIS)

19:45-20:45

CDR

Physical Exercise (RED)

20:45-21:05

CDR

IMS update

21:00-21:10

FE-1

Evening work prep

21:00-21:05

FE-2

Transfer TVIS/RED/CEVIS/HRM data to MEC

21:05-21:45

CDR, FE-2 Evening work prep

21:10-21:25

FE-1

Private Medical Conference (S + Ku-band)

21:25-21:45

FE-1

Evening work prep

21:45-22:00

Daily Planning Conference (S-band)

22:00-22:30

DINNER

22:30-23:00

Daily food prep

23:00-00:00

Pre-sleep

00:00-08:30

SLEEP ТБУ (Universal Bioengineering Thermostat). Temperature check

Task List

FE-1

Search for 2 air ducts (SECTION #2) 27КСМ.53Ю 6100-60 to be installed in Progress 359

Note: See OSTP for references to US activities. End of Radiogram