Nasa 171452main 03 13 2007 Tl

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Nasa 171452main 03 13 2007 Tl as PDF for free.

More details

  • Words: 302
  • Pages: 2
Radiogram No. 4855u Form 24 for 03/13/07 PROGRESS 358 UNLOADING AND IMS OPS GMT

CREW

ACTIVITY

06:00-06:10

Morning inspection

06:10-06:40

Post-sleep

06:40-07:30

BREAKFAST

07:30-07:45

Prep for Work

07:45-08:00

Daily Planning Conference (S-band)

08.00-08.15

Prep for Work

08:15-09:20 CDR

PMA3 pressurization

08:15-09:15 FE-2

Progress 358 Unloading and IMS Ops

08:15-11:35 FE-1

Progress 358 Unloading and IMS Ops

09:20-09:35 CDR

PMA3 ingress

09:35-09:55 CDR, FE-2 Disk cover dismantling in Node 1 09:55-11:25 FE-2

Progress 358 Unloading and IMS Ops

09:55-11:25 CDR

CBM CPA Dismantling

11:25-12:10 CDR, FE-2 PMA3 Equipment Unstow 11:35-12:35 FE-1

Physical Exercise (VELO+RED) day 4

12:10-12:25 CDR

Private Medical Conference (Ku + S-band)

12:10-13:40 FE-2

Physical Exercise (TVIS)

12:35-12:55 FE-1

Cleaning БВН [Heater Fan ] screen in Soyuz

12:40-13:40 CDR

Physical Exercise (RED)

12:55-13:10

БСР-ТМ. SW Reboot Tagup with specialists (S-band)

13:10-13:30

FE-1

13:40-14:40 .

IMS update LUNCH

14:40-17:10 CDR, FE-2 Node 1 Starboard Hatch window installation 14:40-15:05

АОК ГАНК-4М [Real-time harmful contaminant gas analyzer] Calibration and Readings (To calibrate analyzer for СО, enter coefficient В=-62.7 (minus 62.7)). Tagup with specialists (as necessary, S-band)

15:05-15:35 FE-1

Filling and disinfection of US/RSA-B hose. Tagup with specialists (as necessary) (S-band)

15:35-16:15

Filling EDV [KOB] (separation) for Elektron

16:15-16:45

СОЖ Maintenance

16:45-18:15

Physical Exercise (TVIS), Day 4

17:10-17:25 FE-2

Private Medical Conference (Ku + S-band)

17:10-18:40 CDR

Physical Exercise (CEVIS)

17:25-17:55

Boeing Bearing Motor Roll Ring Module (BMRRM) Tie Down

17:55-18:55 18:15-18:30 18:30-18:55

FE-2 FE-1

Physical Exercise (RED) Private Medical Conference (Ku + S-band) Evening work prep

18.40-18.45

РМА3 hatch closure

18:45-18:50 CDR

Transfer TVIS/RED/CEVIS/HRM data to MEC

18:50-18:55

Evening work prep

18:55-19:10

Daily Planning Conference (S-band)

19:10-19:30

Evening work prep

19:30-20:00

DINNER

20:00-20:30

Daily Food Prep

20:30-21:30

Pre-sleep

21:30-06:00

SLEEP

Task List

FE-1

ТБУ (Universal Bioengineering Thermostat). Temperature check

URAGAN. Observation and photography Note: See OSTP for references to US activities. End of Radiogram

Related Documents