Nasa 174249main 04 13 2007 Tl

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Nasa 174249main 04 13 2007 Tl as PDF for free.

More details

  • Words: 655
  • Pages: 3
Radiogram No. 5078u HANDOVER TO E15 CREW GMT

Form 24 for 04/13/07

CREW

ACTIVITY

18:00-18:10

Morning inspection

18:10-18:40

Post-sleep

18:40-19:30

BREAKFAST

19:30-20:00

SFPVC

19:30-19:40

FE-1, CDR, FE-2, Prep for Work FE-1-15, CDR-15

19:40-19:55

CDR-15, FE-1, CDR, FE-1-15, FE-2

Daily Planning Conference (S-band)

19:55-20:15

FE-1-15, FE-1, FE-2, CDR-15

Prep for Work

19:55-20:15

CDR

TRAC - hardware setup

20:15-20:40

VC PAO TV downlink (То=20:19, Т1, Т2, Т3 - Automated daily timeline) FE-1-15, SFPVCUse Comm Panel ПА-4 (Push CHANNEL2, CHANNEL2 lights up (for assists comm via VHF1))

20:15-21:15

CDR-15

PLASMA-ISS. Hardware setup

20:15-20:30

FE-2

Food frequency questionnaire

20:15-20:30 20:30-21:05

CDR

Prep for Work

TRAC - video equipment set up TRAC - CDR data

20:30-20:45

FE-2

TRAC - history photo

20:45-21:45

FE-1

Physical Exercise (TVIS), Day 3

20:45-22:15

FE-2

Physical Exercise (CEVIS)

20:50-21:05 21:05-21:20

FE-1-15

Verify ИП-1 sensor installation Taking readings from АОК ГАНК-4М gas analyzer

21:15-21:25

CDR-15

PLASMA-ISS. Experiment ops

21:25-22:25

CDR

Physical Exercise (RED)

21:25-21:40

SFPVC

VC12 SFP Earth Photo/Video Ops

21:25-21:40

FE-1-15, CDR-15 CMS exercise overview

21:40-21:50

CDR-15

PLASMA-ISS. Experiment ops

21:45-00:25

FE-1, FE-1-15

E14 to E15 Crew Handover

21:55-22:20

CDR-15

E14 to E15 Crew Handover

22:00-22:10

SFPVC

Tagup with Consultants Team via VHF1

22:10-23:10

SFPVC

SAMPLE. ISS sample collection Tagup with specialists (VHF) / TM-12, item 6.3-6.4, p. 6-3

22:15-22:25

FE-2

PAO hardware setup

22:20-22:25

CDR-15

PLASMA-ISS. Experiment Ops (calibration)

22:25-22:35

FE-2,CDR

Crew prep for PAO

22:25-22:45

CDR-15

E14 to E15 Crew Handover

22:35-22:55

FE-2,CDR

TV greetings for NASA award ceremony in Houston (Ku + S-band)

22:45-22:55

CDR-15

PLASMA-ISS. Experiment ops

22:55-00:00

CDR-15

E14 to E15 Crew Handover

22:55-00:25

CDR

TVIS Accessory Kit Audit

22:55-00:25

FE-2

Leak check kit reconfig, retrieval of PWRK kit and procedure printout

00:00-01:00

CDR-15

Physical Exercise (CEVIS)

00:20-00:40

SFPVC

PILLE. Daily session. Retrieve, read, and install

00:25-01:00

FE-1-15

Sampling condensate water [КАВ] upstream of СРВ-К2М ФГС – use compressor to take sample, pack the sample

00:25-01:00

FE-1

TRAC – FE1 data

00:25-00:30

CDR

SAMS hardware activation

00:45-01:00

FE-2

TRAC - history photo

00:50-00:55

CDR

SAMS hardware health check

00:55-01:00

CDR

On MCC Go ISS O2 repress from Progress 359 СрПК (start)

01:00-02:00

SFPVC, FE-2, CDR, FE-1, FE-1- LUNCH 15

01:00-01:50

CDR-15

LUNCH

01:50-02:00

CDR-15

PLASMA-ISS. Experiment ops

02:00-02:05

CDR

ISS O2 repress from Progress 359 СрПК (terminate)

02:00-02:10

CDR-15

LUNCH

02:00-02:30

FE-2

Microgravity Acceleration Measurement System Screen Cleaning

02:00-02:50

FE-1-15

Pumping KAV from CWC to EDV using pumping unit and US filter / r/g 5109

02:00-02:10

SFPVC

Private conference using IP-Phone (Ku-band)

02:10-02:25

SFPVC

E-MAIL ops

02:15-03:00

FE-1

PLANTS-2. Plant sample collection. Close-out ops

02:15-03:00

CDR

TVIS Monthly Maintenance

02:20-02:35

CDR-15

PLASMA-ISS. Experiment ops

02:30-03:05

FE-2

TRAC - FE2 data

02:35-02:50

CDR-15

PLASMA-ISS. Hardware teardown

02:50-03:00

CDR-15

Transfer of medical supply kit delivered by Soyuz

03:00-04:30

CDR

Physical Exercise (TVIS + CEVIS)

03:00-04:00

CDR-15, FE-1, FE-1-15

E14 to E15 Crew Handover

03:05-03:20

FE-2

TRAC - equipment stow

03:05-03:20

SFPVC

MATRIX Z1. Preparations and video 3

03:20-03:40

FE-2

EPO (PL) demonstration - procedure review

03:45-04:45

FE-2

Physical Exercise (RED)

04:00-04:50

CDR-15

Replacing filters in FGB dust collectors ПС1, ПС2 (ФГБ1ПГО_2_224_1 bag #353-8, b/c №351-3, bag #29. Discard removed filters. Update IMS)

04:00-05:00

FE-1

Physical Exercise (TVIS), day 3

04:15-04:30

FE-1-15

Evening work prep

04:30-04:50

CDR

EPO (PL) demonstration - procedure review

04:30-05:30

FE-1-15

Physical Exercise (CEVIS)

04:45-05:15

FE-2

СОЖ Maintenance

04:50-05:05

SFPVC

MATRIX Z1. Video 3 close-out ops. Phase 2 / r/g 5086

04:55-05:05

CDR

O2 level check

04:55-05:15

CDR-15

IMS update

05:05-05:10

CDR

OCA SSC router reboot

05:10-05:15

CDR

SSC file server reboot

05:10-05:15

FE-1

Transfer TVIS/RED/CEVIS/HRM data to MEC

05:15-06:00

CDR, FE-1, FE-2 Evening work prep

05:15-05:30

SFPVC

Earth photo/video ops

05:15-06:00

CDR-15

Evening work prep

05:30-06:00

FE-1-15

Evening work prep

06:00-06:15

CDR, FE-1, FE-2, Daily Planning Conference (S-band) CDR-15,

06:15-06:30

CDR, FE-1, FE-2, Report prep CDR-15, FE-1-15

06:15-06:20

SFPVC

MUSCLE (LOW BACK PAIN) -Low Back Pain Questionnaire

06:30-07:00

DINNER

07:00-07:30

Daily Food Prep

07:30-08:30

Pre-sleep

08:30-17:00 SLEEP Note: See OSTP for references to US activities. End of Radiogram

Related Documents