Radiogram No. 4688u Form 24 for 02/13/07 PREPARATION FOR EVA. MEDICAL EXPERIMENTS GMT
CREW
ACTIVITY
02:00-02:10
Morning inspection
02:10-02:40
Post-sleep
02:40-03:25 FE-1 02:40-03:30 CDR, FE-2 03:25-03:40 FE-1
(UPDATED)
BREAKFAST Regeneration of БМП Absorption Cartridge Ф2 (start)
03:30-03:40 CDR, FE-2 Prep for Work 03:40-03:55
Daily Planning Conference (S-band)
03:55-04:25 FE-1 03:55-04:15 CDR, FE-2
Prep for Work
04:15-04:50 FE-2
US EVA tool config
04:15-04:20 CDR
Connect DCP power cable
Reviewing the preliminary EVA T/L radiogram and EVA tool procedures Tagup 04:30-06:30 CDR, FE-1 with specialists (S-band) 04:50-05:15 05:15-06:45
FE-2
US EVA tool config Physical Exercise (TVIS)
06:30-08:00 CDR, FE-1
Searching for Russian hardware and tools for EVA-17A. Tagup with specialists (Sband)
06:45-06:55
TVIS Weekly Maintenance
06:55-08:50
FE-2
US EVA Tool Stowage Ops
08:00-09:00 CDR
Physical Exercise (RED)
08:00-09:00 FE-1
Physical Exercise (VELO) day 1
08:50-09:00 FE-2
FMK deployment ops
09:00-10:00
LUNCH
10:30-11:00 FE-1
СОЖ maintenance
10:30-13:35 FE-2
US EVA Tool Stowage Ops
11:00-11:30 FE-1
Preparation of СКК #9-СМ. Photography Tagup with specialists (S-band) Comm config from DC: Return to nominal comm. configuration:
11:30-13:00 FE-1
Physical Exercise (TVIS), day 1
11:30-13:00
Physical Exercise (CEVIS)
13:00-13:20
CDR
IMS update / Auxiliary Computer Systems [ВКС], item 3.4-3.7, pp. 3-2 through 3-3
13:15-13:55 FE-1
Evening work prep
13:35-13:40 FE-2
Scheduled inspection of RED
13:35-14:20 CDR
Evening work prep
13:40-14:40 FE-2
Physical Exercise (RED)
13:55-14:20 FE-1
ISS-MCC-M TV. Greetings on the 60th Anniversary of Security Force For Top Secret Installations (То=13:55, Т1, Т2, Т3 - from СПП)
14:20-14:40 FE-1
Evening work prep
14:20-14:35 CDR
Private Medical Conference (S + Ku-band)
14:40-14:55
Daily Planning Conference (S-band)
14:55-15:00 FE-2
Transfer TVIS/RED/CEVIS/HRM data to MEC
14:55-15:10 CDR
Evening work prep
14:55-15:30 FE-1
Daily Food Prep
15:00-15:15 FE-2
Evening work prep
15:10-15:40 CDR
Daily Food Prep
15:15-15:30 FE-2
Private medical conference (S + Ku-band)
15:30-15:40 FE-1
Set up 825М3 Battery Pack 1 for charging and start charging
15:30-16:10 FE-2
Evening work prep
15:40-16:10
FE-1, CDR МО-6. Hand ergometry То = 15:42. Tagup with specialists (VHF) (пом.)
16:10-16:25 FE-1
Private Medical Conference (S + Ku-band)
16:10-17:10 CDR
Pre-sleep
16:10-16:40 FE-2
Daily Food Prep
16:25-16:40
Regeneration of БМП Absorption Cartridge Ф2 (terminate)
16:40-17:10
FE-1
16:40-17:40 FE-2
Pre-sleep Pre-sleep
CDR, FE-1 17:10-17:40 МО-6. Hand ergometry. Tagup with specialists (VHF) То = 17:14 (пом.) 17:40-18:10
DINNER
18:10-02:40
SLEEP
Task List
FE-1
ТБУ (Universal Bioengineering Thermostat). Temperature check
RASTENIYA-2. Recharging water tank Note: See OSTP for references to US activities. End of Radiogram