Nasa 169245main 02 13 2007 Tl

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Nasa 169245main 02 13 2007 Tl as PDF for free.

More details

  • Words: 397
  • Pages: 2
Radiogram No. 4688u Form 24 for 02/13/07 PREPARATION FOR EVA. MEDICAL EXPERIMENTS GMT

CREW

ACTIVITY

02:00-02:10

Morning inspection

02:10-02:40

Post-sleep

02:40-03:25 FE-1 02:40-03:30 CDR, FE-2 03:25-03:40 FE-1

(UPDATED)

BREAKFAST Regeneration of БМП Absorption Cartridge Ф2 (start)

03:30-03:40 CDR, FE-2 Prep for Work 03:40-03:55

Daily Planning Conference (S-band)

03:55-04:25 FE-1 03:55-04:15 CDR, FE-2

Prep for Work

04:15-04:50 FE-2

US EVA tool config

04:15-04:20 CDR

Connect DCP power cable

Reviewing the preliminary EVA T/L radiogram and EVA tool procedures Tagup 04:30-06:30 CDR, FE-1 with specialists (S-band) 04:50-05:15 05:15-06:45

FE-2

US EVA tool config Physical Exercise (TVIS)

06:30-08:00 CDR, FE-1

Searching for Russian hardware and tools for EVA-17A. Tagup with specialists (Sband)

06:45-06:55

TVIS Weekly Maintenance

06:55-08:50

FE-2

US EVA Tool Stowage Ops

08:00-09:00 CDR

Physical Exercise (RED)

08:00-09:00 FE-1

Physical Exercise (VELO) day 1

08:50-09:00 FE-2

FMK deployment ops

09:00-10:00

LUNCH

10:30-11:00 FE-1

СОЖ maintenance

10:30-13:35 FE-2

US EVA Tool Stowage Ops

11:00-11:30 FE-1

Preparation of СКК #9-СМ. Photography Tagup with specialists (S-band) Comm config from DC: Return to nominal comm. configuration:

11:30-13:00 FE-1

Physical Exercise (TVIS), day 1

11:30-13:00

Physical Exercise (CEVIS)

13:00-13:20

CDR

IMS update / Auxiliary Computer Systems [ВКС], item 3.4-3.7, pp. 3-2 through 3-3

13:15-13:55 FE-1

Evening work prep

13:35-13:40 FE-2

Scheduled inspection of RED

13:35-14:20 CDR

Evening work prep

13:40-14:40 FE-2

Physical Exercise (RED)

13:55-14:20 FE-1

ISS-MCC-M TV. Greetings on the 60th Anniversary of Security Force For Top Secret Installations (То=13:55, Т1, Т2, Т3 - from СПП)

14:20-14:40 FE-1

Evening work prep

14:20-14:35 CDR

Private Medical Conference (S + Ku-band)

14:40-14:55

Daily Planning Conference (S-band)

14:55-15:00 FE-2

Transfer TVIS/RED/CEVIS/HRM data to MEC

14:55-15:10 CDR

Evening work prep

14:55-15:30 FE-1

Daily Food Prep

15:00-15:15 FE-2

Evening work prep

15:10-15:40 CDR

Daily Food Prep

15:15-15:30 FE-2

Private medical conference (S + Ku-band)

15:30-15:40 FE-1

Set up 825М3 Battery Pack 1 for charging and start charging

15:30-16:10 FE-2

Evening work prep

15:40-16:10

FE-1, CDR МО-6. Hand ergometry То = 15:42. Tagup with specialists (VHF) (пом.)

16:10-16:25 FE-1

Private Medical Conference (S + Ku-band)

16:10-17:10 CDR

Pre-sleep

16:10-16:40 FE-2

Daily Food Prep

16:25-16:40

Regeneration of БМП Absorption Cartridge Ф2 (terminate)

16:40-17:10

FE-1

16:40-17:40 FE-2

Pre-sleep Pre-sleep

CDR, FE-1 17:10-17:40 МО-6. Hand ergometry. Tagup with specialists (VHF) То = 17:14 (пом.) 17:40-18:10

DINNER

18:10-02:40

SLEEP

Task List

FE-1

ТБУ (Universal Bioengineering Thermostat). Temperature check

RASTENIYA-2. Recharging water tank Note: See OSTP for references to US activities. End of Radiogram

Related Documents