Radiogram No. 4614u USOS EVA-6 GMT
Form 24 for 01/31/07
CREW
ACTIVITY
10:00-10:10
FE-1
Morning Inspection
10:00-10:30
CDR, FE-2
Post-sleep ops in A/L
10:10-11:00
FE-1
Post-sleep. BREAKFAST
10:30-11:40
CDR, FE-2
EVA - Hygiene Break/Prebreathe
11:00-11:10
FE-1
Comm config for EVA
11:10-11:40
FE-1
EVA - Hygiene Break/Prebreathe
FE-1
DCS 760 EVA Camera Hatch Close Configuration
CDR, FE-2
Post-sleep ops in A/L. Post-sleep
11:40-11:50 11:50-13:20
EVA Prep
13:20-13:35 13:35-14:25
EMU purge .
EMU prebreathe
14:25-14:55
Crew Lock depress
14:55-15:00
Terminate prebreathe
15:00-18:15
FE-1
EVA-6 IVA SUPPORT
15:00-15:30
CDR, FE-2
Crewlock Egress and EVA 6 Setup
15:30-17:15 17:15-18:00 18:00-18:15
LOOP A Reconfiguration CDR, FE-2
18:15-19:05
Video tape change out FE-1
19:35-20:50
Filling EDV [KOB] for Elektron СОЖ maintenance.
19:05-19:35 19:05-19:35
P6 Starboard Radiator Retract Starboard Radiator cinch
18:15-18:25 18:25-19:05
Starboard Radiator Preparation
CDR, FE-2
Starboard Radiator Shroud Install EAS Fluid Line Preparation
19:35-21:05
FE-1
Physical Exercise (TVIS), day 4
20:50-21:05
CDR,FE-2
EVA Cleanup
21:05-21:20
Crew Lock Ingress
21:20-21:25
Crewlock Pre Repress
21:25-21:35
Crew Lock Repress
21:35-22:55
Post-EVA 6 Activities
22:55-23:00
CDR
23:05-23:15
DCS 760 camera config for the next EVA СТТС reconfig for nominal ops
22:55-23:05 FE-1
ALTCRISS. PCMCIA card replacement.
23:15-23:30
Post-EVA Pille dosimeter reading
23:30-00:00
DINNER
00:00-00:30
Daily food prep
00:30-01:30
Pre-sleep
01:30-10:00
SLEEP
Task List
FE-1
ТБУ (Universal Bioengineering Thermostat). Temperature check
RASTENIYA-2. Payload status check Note: See OSTP for references to US activities. End of Radiogram