Nasa 166644main 01 02 2007 Tl

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Nasa 166644main 01 02 2007 Tl as PDF for free.

More details

  • Words: 314
  • Pages: 2
Radiogram No. 4437u

Form 24 for 01/02/07

RS ISS ODF AUDIT GMT

CREW

CREW

06:00-06:10

.

Morning inspection

06:10-06:40

.

Post-sleep

06:40-07:30

.

BREAKFAST

07:30-07:45

.

Daily planning conference (S-band)

07:45-08:15

CDR, FE-1

07:45-08:10 08:10-08:20

FE-2

Prep for work TRAC: hard drive installation

08:15-08:25

CDR

CWC audit

08:15-09:15

FE-1

RS ISS ODF audit

08:20-08:35 08:35-08:40 08:40-09:15

TRAC: hardware assembly FE-2

09:15-10:15

TRAC: hard drive installation TRAC: data Physical exercise (RED)

09:15-09:50

FE-1

09:50-10:25

CDR

09:50-11:50

FE-1

RS ISS ODF audit

10:25-11:25

CDR

Physical exercise (RED)

TRAC: data

10:25-10:30 10:45-10:50 11:05-11:10

FE-2

11:10-11:25 11:25-11:40 11:40-12:40

TRAC: data TRAC: equipment stow

CDR, FE-2

Tagup to prepare for OGS hardware assembly (S-band) Setting up work area for Oxygen Generation System hardware

11:50-13:20

FE-1

Physical exercise (TVIS) day 3

12:40-13:25

CDR, FE-2

OGS installation prep ops

13:20-13:25

FE-1

On MCC Go ISS O2 repress from Progress 357 СрПК (start)

13:25-14:25

.

LUNCH

14:25-16:25

CDR, FE-2

OGS installation prep ops ISS O2 repress from Progress 357 СрПК (terminate)

14:25-14:30 14:30-15:10 15:10-16:00

Microbial sample collection (medium 2) FE-1

16:00-16:40 16:25-16:40 16:40-17:00

SOUND LEVEL METER. Hardware setup and sound level measurements. Tagup with specialists, if required. (S-band) Preparation and search for [СОТР] outfitting equipment

CDR

Transfer SLM data to MEC IMS update

16:40-16:50

FE-1

Sound level measurement. Closeout ops. Tagup with specialists, if required. (S-band)

16:45-17:15

FE-2

Evening work prep

16:50-17:50

FE-1

Physical exercise (VELO+RED) day 3

17:00-17:15

CDR

Private medical conference (Ku+S-band)

17:15-18:40 17:15-18:45

Physical exercise (CEVIS) FE-2

СОЖ maintenance

17:50-18:20 18:20-18:30

Physical exercise (TVIS)

FE-1

18:30-18:45

Evening work prep Private medical conference (S-band)

18:40-18:45

CDR

Transfer TVIS/RED/CEVIS/HRM data to MEC

18:45-19:00

.

Daily planning conference (S-band)

19:00-19:30

.

Evening work prep

19:30-20:00

CDR, FE-1

19:30-19:40

FE-2

19:40-19:55 19:55-20:00

FE-2

Daily food prep Private medical conference (Ku+S-band) Daily food prep

20:00-20:30

.

DINNER

20:30-21:30

.

Pre-sleep

21:30-06:00

.

SLEEP

Note: See OSTP for references to US activities

End of radiogram

Related Documents