Name : Plamen Ivanov Trade : Finishing Manager /Delcon/ Week Ending:

Finish: Tuesday : Start Finish:

Thursday : Start Finish: Friday : Start Finish: Saturday : Start Finish: Sunday : Start:

Site : 44 Phillimore Gardens

Description of Work with allocated time 23/11/2009 7.30

Hours Worked

Breaks Deducte d

Total Hours

10.50

0.50

11.00

10.00

0.50

10.50

11.50

0.50

12.00

11.00

0.50

11.50

10.50

0.50

11.00

5.50

0.50

6.00

0.00

0.00

0.00

19.00 11/24/2009 7.30 18.00

Wednesday: 11/25/2009 Start 7.30 Finish:

Delcon Construction Ltd

Sunday, November 29, 2009

Days Monday : Start

Weekly Time Sheet

19.30 11/26/2009 7.30 19.00 11/27/2009 7.30 18.30 11/28/2009 8.00 14.00 11/29/2009

Finish:

Approved by:

59.00

Total Hours:

Delcon Construction Ltd Daily Diary - Labour Return Plamen Ivanov

Finishing Manager /Delcon/ Work Carried Out

Monday :

23/11/2009 Time on site

Measure site Temperature & Humidity Clean & Sort out materials @ SB8, ready for Logika materials - Glass panels Assisting & Organizing the Trades:- Basement, Subbasement, Externals J.Hare- Mark for them 2No. Holes @ Spa & they drill it - Wall Chase 2No. (5" for pipes + 3" for conduits) - Wall cut for lintel & nish @ SB4 Rosguill- MG ceiling @ B2 - MG opening @ DB8 - Cut out for lintel to fit @ SB4 - Lintel adjustment over door space @ DSB3 - Stick Wedyboard @ SB3 Logika- Delivery the glass panels on site Jets- Connecting dimmers @ SB7 -Move & reconnect temp 110V Transformer @ SB Premier Cooling- Move Slotted Grills @ SB No.43 side - Move unit @ SB7 Aquarend- Injection the steel over the pool @No.43 side, - Injection outside @ alleyway LHS of DB14 Stone Age- Taking extra measurements for stone wall claddings Delcon Labours

0.75

Fill in the labours Daily & Time sheets Secure the site

Total Hours

10.50

Delcon Construction Ltd Daily Diary - Labour Return Plamen Ivanov

Finishing Manager /Delcon/ Work Carried Out

Tuesday :

### Time on site

Measure site Temperature & Humidity

0.5

Meeting, walk around with Premier Cooling; John Bathurst, David, Colin

1

Assisting & Organizing the Trades:- Basement, Subbasement, Externals R.Wilde- Fit 2No. Skylight + 1 frame - 1 frame Rosguill - Start to fit manhole cover @ SB - Fit lintels @ SB3 & SB4 - Start fit ply @ chimneys - 6 No. - Start screed slotted grills @ SB - Cut nib @ DB11 - Open & adapt holding for Aspen to move in the materials in Premier Cooling - Fit Slotted grills @ SB - Finish SB6 ceiling unit Permanex - Problem with the alarm censor (1h on site) Logika - Start screen frame Borahurst - Pipe work @ SB4 Thomas & Wilson - Start stringer @ stairs GF-Basement Aspen - Receiving 10t MOT Icon - Sorting out cables @ B12 SRS - Receiving Architraves Delcon Labours Fill in the labours Daily & Time sheets Secure the site

Total Hours

10.00

Delcon Construction Ltd Daily Diary - Labour Return Plamen Ivanov

Finishing Manager /Delcon/ Work Carried Out

Wednesday:

### Time on site

Measure site Temperature & Humidity Mark the skimmers for Stone pro to be cutted, to fit fascia Assisting & Organizing the Trades:- Basement, Subbasement, Externals Stone Productions - Grout capping stone - Cut 2No. Tiles around skimmers MSR - Wall marble @ SB3 Rosguill - Ceiling @ SB6 - Protect B3 floor with MDF - Screed Slotted grills Jets - Wiring SB6 - Testing @ SB1 - Refixing No.43 side sockets low level - Re-wire @ SB4 Borahurst - Re-fit WC @ SB4 Logika - Fit Part of the frame @ SB (Left 13:45) Thomas & Wilson - Start B6 Cornice, stopped - speaker box on their way - Stringer on the stairs GF-Basement Icon - Sorting out cables @ B12 Delcon Labours Fill in the labours Daily & Time sheets Secure the site

Total Hours

11.50

Delcon Construction Ltd Daily Diary - Labour Return Plamen Ivanov

Finishing Manager /Delcon/ Work Carried Out

Thursday :

### Time on site

Measure site Temperature & Humidity Assisting & Organizing the Trades:- Basement, Subbasement, Externals Premier - Slotted grills done (12:00 finished) - Fit last bit of duct @ B3/B5 ceiling - Move unit @ SB SRS - Architraves & cills @ WB7, WB8, WB9, WB10 Rosguill - Screed slotted grills - Ply on pilasters by instructions - Floor protection @ B2 PKS - Reassembling crash deck over the pool Logika - Fit middle glass panels (Left 13:00) MSR - Wall marble @ SB3 Delcon Labours Meeting, walk around with Rosguill - Mike, Frank, Viktor Fill in the labours Daily & Time sheets Secure the site

Total Hours

11.00

Delcon Construction Ltd Daily Diary - Labour Return Plamen Ivanov

Finishing Manager /Delcon/ Work Carried Out

Friday :

### Time on site

Measure site Temperature & Humidity Assisting & Organizing the Trades:- Basement, Subbasement, Externals PKS - Move out bits from @ SB - Take down scaffold ramp @ Alleyway - Take down rear top 2 levels Logika - Fit glass panels around DSB8 - Fit frames @ DSB7, DSB9 (Left 16:00) Jets - Connections & Testing @ SB7 - Lights @ SB3 - Garden wiring - first fix Stone Productions - Stone around slotted grills & manhole @ SB MSR - Wall marble @ SB3 West Front - Delivered & move in the Spa SRS - Frame @ DSB1 & DSB1A Icon - Sorting out cables @ B12 Inbright - Windows @ B10 - MG @ top side elevation Rosguill - Ply on pilasters by instructions - Screed @ SB - Rebuild nib @ B10 - Take down temp door @ DSB6 Delcon Labours Fill in the labours Daily & Time sheets Secure the site

Total Hours

10.50

Delcon Construction Ltd Daily Diary - Labour Return Plamen Ivanov

Finishing Manager /Delcon/ Work Carried Out

Saturday :

### Time on site

Measure site Temperature & Humidity Screed floor close boxes - 5No @ SB doors Screed floor on the front of DSB1 & DSB1A Fill in the labours Daily & Time sheets Secure the site

Total Hours

5.50

9

e

e

e

e

e

e

Name : Mariusz Siemiatkowski Trade : Labour /Coyle/ Week Ending:

Finish: Tuesday : Start Finish:

Thursday : Start Finish: Friday : Start Finish: Saturday : Start Finish: Sunday : Start:

Site : 44 Phillimore Gardens

Description of Work with allocated time 23/11/2009 8.00

Hours Worked

Breaks Deducte d

Total Hours

9.50

0.75

10.25

9.25

0.75

10.00

9.75

0.75

10.50

9.25

0.75

10.00

9.25

0.75

10.00

4.25

0.75

5.00

0.00

0.00

0.00

18.00 11/24/2009 8.00 18.00

Wednesday: 11/25/2009 Start 8.00 Finish:

Delcon Construction Ltd

Sunday, November 29, 2009

Days Monday : Start

Weekly Time Sheet

19.30 11/26/2009 8.00 18.30 11/27/2009 8.00 18.00 11/28/2009 8.00 13.00 11/29/2009

Finish:

Approved by:

51.25

Total Hours:

Delcon Construction Ltd Daily Diary - Labour Return Mariusz Siemiatkowski Labour /Coyle/

Monday : Work Carried Out

23/11/2009 Time on site

Clean inside SPA Protect stone floor @ SB Clean GF Hoover around slotted ducts @ SB Clean B3, ready for protection Sort out materials on the front Tidy up Site canteen & WC Remove part of the ramp @ alleyway, provide access true DB14 Clean SB after Rosguill

0.5

General Cleaning & Protection

Total Hours

9.50

Delcon Construction Ltd Daily Diary - Labour Return Mariusz Siemiatkowski Labour /Coyle/

Tuesday : Work Carried Out

### Time on site

Clean SB Assemble ramp @ alleyway Protect stone floor @ SB Clean SB8, make space for Logika materials

0.5

Hoover skylights @ Garden, ready fro R.Wilde to install 2No. Glass Clean Basement Fill the Skip

Total Hours

9.25

Delcon Construction Ltd Daily Diary - Labour Return Mariusz Siemiatkowski Labour /Coyle/

Wednesday: Work Carried Out

### Time on site

Clean SB & Pool Protect pool floor Clean B10 after Rosguill

0.25

Protect Pool surround allow scaffold to be refitted Tidy up Site canteen & WC Clean Crash desk @ SB, ready for PKS to refit it

Total Hours

9.75

Delcon Construction Ltd Daily Diary - Labour Return Mariusz Siemiatkowski Labour /Coyle/

Thursday : Work Carried Out

### Time on site

Clean SB1 & hoover Clean SB7 after Rosguill Re-protect Crash deck @ SB Fit back temp lights @ SB - Crash deck General Cleaning

Total Hours

9.25

Delcon Construction Ltd Daily Diary - Labour Return Mariusz Siemiatkowski Labour /Coyle/

Friday : Work Carried Out

### Time on site

Unprotect & Clean the Pool, ready for water test Clean the SB Cut the top of DBS7 & DSB9 for Logika to fit the frames

1.5

Protect the Logika screen

1

Screed the holes for door closers @ SB Clean the Basement

Total Hours

9.25

Delcon Construction Ltd Daily Diary - Labour Return Mariusz Siemiatkowski Labour /Coyle/

Saturday : Work Carried Out

### Time on site

Screed floor close boxes - 5No @ SB doors Screed floor on the front of DSB1 & DSB1A Clean & Re-protect floor @ SB

Total Hours

4.25

9

Name : Krasimir Zhelev Trade : Labour /Coyle/ Week Ending:

Finish: Tuesday : Start Finish:

Thursday : Start Finish: Friday : Start Finish: Saturday : Start Finish: Sunday : Start:

Site : 44 Phillimore Gardens

Description of Work with allocated time 23/11/2009 8.00

Hours Worked

Breaks Deducte d

Total Hours

9.25

0.75

10.00

10.25

0.75

11.00

9.75

0.75

10.50

9.25

0.75

10.00

9.25

0.75

10.00

4.25

0.75

5.00

0.00

0.00

0.00

18.00 11/24/2009 8.00 19.00

Wednesday: 11/25/2009 Start 8.00 Finish:

Delcon Construction Ltd

Sunday, November 29, 2009

Days Monday : Start

Weekly Time Sheet

18.30 11/26/2009 8.00 18.00 11/27/2009 8.00 18.00 11/28/2009 8.00 13.00 11/29/2009

Finish:

Approved by:

52.00

Total Hours:

Delcon Construction Ltd Daily Diary - Labour Return Krasimir Zhelev

Labour /Coyle/

Monday : Work Carried Out

23/11/2009 Time on site

Clean GF De-water rear terrace Help Rosguill with protection G2

0.5

Protection @ FF General Cleaning

Total Hours

9.25

Delcon Construction Ltd Daily Diary - Labour Return Krasimir Zhelev

Labour /Coyle/

Tuesday : Work Carried Out

### Time on site

Fill the Skip Cut few 4" pipes @ SB floor for Premier Cooling

0.5

Assemble and take down the crash deck @ SF landing Hack off the render @ F8, south wall, re-render it Clean the road General Cleaning & Protection

Total Hours

10.25

Delcon Construction Ltd Daily Diary - Labour Return Krasimir Zhelev

Labour /Coyle/

Wednesday: Work Carried Out

### Time on site

Clean FF - C.Bell, SRS Clean SF - MSR, Inbright Clean Basement - Rosguill, Jets

Total Hours

9.75

Delcon Construction Ltd Daily Diary - Labour Return Krasimir Zhelev

Labour /Coyle/

Thursday : Work Carried Out

### Time on site

Hoover SF Chase 2No. Cables for Jets @ G2 above the fire place Clean GF Chase out for the pipes @ SB4 for Borahurst Clean FF Clean rear scaffold, ready to go down General Cleaning & Protection

Total Hours

9.25

Delcon Construction Ltd Daily Diary - Labour Return Krasimir Zhelev

Labour /Coyle/

Friday : Work Carried Out

### Time on site

Fill the skip

2

Cut the top of DBS7 & DSB9 for Logika to fit the frames

2

General Cleaning

Total Hours

9.25

Delcon Construction Ltd Daily Diary - Labour Return Krasimir Zhelev

Labour /Coyle/

Saturday : Work Carried Out

### Time on site

Chase wall @ S1, for Jets lights

1

Move down 110v Transformer to SB to be off-hired the other one

0.5

Clean FF, SF Tidy up Meeting Room & Site Office

Total Hours

4.25

9

Name : Laurence Rudd Trade : Labour /Constructive Recruitment/ Week Ending:

Delcon Construction Ltd Site : 44 Phillimore Gardens

Sunday, November 29, 2009

Days Monday : Start

Weekly Time Sheet

Description of Work with allocated time

Hours Worked

Breaks Deducte d

Total Hours

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.25

0.75

10.00

9.25

0.75

10.00

0.00

0.00

0.00

0.00

0.00

0.00

23/11/2009

Finish: Tuesday : Start

11/24/2009

Finish: Wednesday: 11/25/2009 Start Finish: Thursday : Start Finish: Friday : Start Finish: Saturday : Start

11/26/2009 8.00 18.00 11/27/2009 8.00 18.00 11/28/2009

Finish: Sunday : Start:

11/29/2009

Finish:

Approved by:

18.50

Total Hours:

Delcon Construction Ltd Daily Diary - Labour Return Laurence Rudd

Labour /Constructive Recruitment/ Work Carried Out

Thursday :

### Time on site

Help screeder @ SB around slotted grills & Manhole

2

Clean SB Clean Basement General Cleaning & Protection

Total Hours

9.25

Delcon Construction Ltd Daily Diary - Labour Return Laurence Rudd

Labour /Constructive Recruitment/ Work Carried Out

Friday :

### Time on site

Fill the skip Clean the alleyway after the ramp was removed Clean the front Wash the road Clean the B10 after Rosguill

0.5

Total Hours

9.25

Name : Ivaylo Atanasov Trade : Labour /Giltec/ Week Ending:

Finish: Tuesday : Start Finish:

Delcon Construction Ltd Site : 44 Phillimore Gardens

Sunday, November 29, 2009

Days Monday : Start

Weekly Time Sheet

Description of Work with allocated time 23/11/2009 11.00

Hours Worked

Breaks Deducte d

Total Hours

6.50

0.50

7.00

7.25

0.75

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18.00 11/24/2009 8.00 16.00

Wednesday: 11/25/2009 Start Finish: Thursday : Start

11/26/2009

Finish: Friday : Start

11/27/2009

Finish: Saturday : Start

11/28/2009

Finish: Sunday : Start:

11/29/2009

Finish:

Approved by:

13.75

Total Hours:

Delcon Construction Ltd Daily Diary - Labour Return Ivaylo Atanasov Labour /Giltec/

Monday : Work Carried Out

23/11/2009 Time on site

Clean GF Clean & Protection @ FF Clean & Protection @ SF

Total Hours

6.50

Delcon Construction Ltd Daily Diary - Labour Return Ivaylo Atanasov Labour /Giltec/

Tuesday : Work Carried Out

### Time on site

Fill the Skip Receiving Delivery Ardex creed & move it to the SB, for Rosguill

0.75

General Cleaning & Protection

Total Hours

7.25

9