Name : Plamen Ivanov Trade : Finishing Manager /Delcon/ Week Ending:
Finish: Tuesday : Start Finish:
Thursday : Start Finish: Friday : Start Finish: Saturday : Start Finish: Sunday : Start:
Site : 44 Phillimore Gardens
Description of Work with allocated time 23/11/2009 7.30
Hours Worked
Breaks Deducte d
Total Hours
10.50
0.50
11.00
10.00
0.50
10.50
11.50
0.50
12.00
11.00
0.50
11.50
10.50
0.50
11.00
5.50
0.50
6.00
0.00
0.00
0.00
19.00 11/24/2009 7.30 18.00
Wednesday: 11/25/2009 Start 7.30 Finish:
Delcon Construction Ltd
Sunday, November 29, 2009
Days Monday : Start
Weekly Time Sheet
19.30 11/26/2009 7.30 19.00 11/27/2009 7.30 18.30 11/28/2009 8.00 14.00 11/29/2009
Finish:
Approved by:
59.00
Total Hours:
Delcon Construction Ltd Daily Diary - Labour Return Plamen Ivanov
Finishing Manager /Delcon/ Work Carried Out
Monday :
23/11/2009 Time on site
Measure site Temperature & Humidity Clean & Sort out materials @ SB8, ready for Logika materials - Glass panels Assisting & Organizing the Trades:- Basement, Subbasement, Externals J.Hare- Mark for them 2No. Holes @ Spa & they drill it - Wall Chase 2No. (5" for pipes + 3" for conduits) - Wall cut for lintel & nish @ SB4 Rosguill- MG ceiling @ B2 - MG opening @ DB8 - Cut out for lintel to fit @ SB4 - Lintel adjustment over door space @ DSB3 - Stick Wedyboard @ SB3 Logika- Delivery the glass panels on site Jets- Connecting dimmers @ SB7 -Move & reconnect temp 110V Transformer @ SB Premier Cooling- Move Slotted Grills @ SB No.43 side - Move unit @ SB7 Aquarend- Injection the steel over the pool @No.43 side, - Injection outside @ alleyway LHS of DB14 Stone Age- Taking extra measurements for stone wall claddings Delcon Labours
0.75
Fill in the labours Daily & Time sheets Secure the site
Total Hours
10.50
Delcon Construction Ltd Daily Diary - Labour Return Plamen Ivanov
Finishing Manager /Delcon/ Work Carried Out
Tuesday :
### Time on site
Measure site Temperature & Humidity
0.5
Meeting, walk around with Premier Cooling; John Bathurst, David, Colin
1
Assisting & Organizing the Trades:- Basement, Subbasement, Externals R.Wilde- Fit 2No. Skylight + 1 frame - 1 frame Rosguill - Start to fit manhole cover @ SB - Fit lintels @ SB3 & SB4 - Start fit ply @ chimneys - 6 No. - Start screed slotted grills @ SB - Cut nib @ DB11 - Open & adapt holding for Aspen to move in the materials in Premier Cooling - Fit Slotted grills @ SB - Finish SB6 ceiling unit Permanex - Problem with the alarm censor (1h on site) Logika - Start screen frame Borahurst - Pipe work @ SB4 Thomas & Wilson - Start stringer @ stairs GF-Basement Aspen - Receiving 10t MOT Icon - Sorting out cables @ B12 SRS - Receiving Architraves Delcon Labours Fill in the labours Daily & Time sheets Secure the site
Total Hours
10.00
Delcon Construction Ltd Daily Diary - Labour Return Plamen Ivanov
Finishing Manager /Delcon/ Work Carried Out
Wednesday:
### Time on site
Measure site Temperature & Humidity Mark the skimmers for Stone pro to be cutted, to fit fascia Assisting & Organizing the Trades:- Basement, Subbasement, Externals Stone Productions - Grout capping stone - Cut 2No. Tiles around skimmers MSR - Wall marble @ SB3 Rosguill - Ceiling @ SB6 - Protect B3 floor with MDF - Screed Slotted grills Jets - Wiring SB6 - Testing @ SB1 - Refixing No.43 side sockets low level - Re-wire @ SB4 Borahurst - Re-fit WC @ SB4 Logika - Fit Part of the frame @ SB (Left 13:45) Thomas & Wilson - Start B6 Cornice, stopped - speaker box on their way - Stringer on the stairs GF-Basement Icon - Sorting out cables @ B12 Delcon Labours Fill in the labours Daily & Time sheets Secure the site
Total Hours
11.50
Delcon Construction Ltd Daily Diary - Labour Return Plamen Ivanov
Finishing Manager /Delcon/ Work Carried Out
Thursday :
### Time on site
Measure site Temperature & Humidity Assisting & Organizing the Trades:- Basement, Subbasement, Externals Premier - Slotted grills done (12:00 finished) - Fit last bit of duct @ B3/B5 ceiling - Move unit @ SB SRS - Architraves & cills @ WB7, WB8, WB9, WB10 Rosguill - Screed slotted grills - Ply on pilasters by instructions - Floor protection @ B2 PKS - Reassembling crash deck over the pool Logika - Fit middle glass panels (Left 13:00) MSR - Wall marble @ SB3 Delcon Labours Meeting, walk around with Rosguill - Mike, Frank, Viktor Fill in the labours Daily & Time sheets Secure the site
Total Hours
11.00
Delcon Construction Ltd Daily Diary - Labour Return Plamen Ivanov
Finishing Manager /Delcon/ Work Carried Out
Friday :
### Time on site
Measure site Temperature & Humidity Assisting & Organizing the Trades:- Basement, Subbasement, Externals PKS - Move out bits from @ SB - Take down scaffold ramp @ Alleyway - Take down rear top 2 levels Logika - Fit glass panels around DSB8 - Fit frames @ DSB7, DSB9 (Left 16:00) Jets - Connections & Testing @ SB7 - Lights @ SB3 - Garden wiring - first fix Stone Productions - Stone around slotted grills & manhole @ SB MSR - Wall marble @ SB3 West Front - Delivered & move in the Spa SRS - Frame @ DSB1 & DSB1A Icon - Sorting out cables @ B12 Inbright - Windows @ B10 - MG @ top side elevation Rosguill - Ply on pilasters by instructions - Screed @ SB - Rebuild nib @ B10 - Take down temp door @ DSB6 Delcon Labours Fill in the labours Daily & Time sheets Secure the site
Total Hours
10.50
Delcon Construction Ltd Daily Diary - Labour Return Plamen Ivanov
Finishing Manager /Delcon/ Work Carried Out
Saturday :
### Time on site
Measure site Temperature & Humidity Screed floor close boxes - 5No @ SB doors Screed floor on the front of DSB1 & DSB1A Fill in the labours Daily & Time sheets Secure the site
Total Hours
5.50
9
e
e
e
e
e
e
Name : Mariusz Siemiatkowski Trade : Labour /Coyle/ Week Ending:
Finish: Tuesday : Start Finish:
Thursday : Start Finish: Friday : Start Finish: Saturday : Start Finish: Sunday : Start:
Site : 44 Phillimore Gardens
Description of Work with allocated time 23/11/2009 8.00
Hours Worked
Breaks Deducte d
Total Hours
9.50
0.75
10.25
9.25
0.75
10.00
9.75
0.75
10.50
9.25
0.75
10.00
9.25
0.75
10.00
4.25
0.75
5.00
0.00
0.00
0.00
18.00 11/24/2009 8.00 18.00
Wednesday: 11/25/2009 Start 8.00 Finish:
Delcon Construction Ltd
Sunday, November 29, 2009
Days Monday : Start
Weekly Time Sheet
19.30 11/26/2009 8.00 18.30 11/27/2009 8.00 18.00 11/28/2009 8.00 13.00 11/29/2009
Finish:
Approved by:
51.25
Total Hours:
Delcon Construction Ltd Daily Diary - Labour Return Mariusz Siemiatkowski Labour /Coyle/
Monday : Work Carried Out
23/11/2009 Time on site
Clean inside SPA Protect stone floor @ SB Clean GF Hoover around slotted ducts @ SB Clean B3, ready for protection Sort out materials on the front Tidy up Site canteen & WC Remove part of the ramp @ alleyway, provide access true DB14 Clean SB after Rosguill
0.5
General Cleaning & Protection
Total Hours
9.50
Delcon Construction Ltd Daily Diary - Labour Return Mariusz Siemiatkowski Labour /Coyle/
Tuesday : Work Carried Out
### Time on site
Clean SB Assemble ramp @ alleyway Protect stone floor @ SB Clean SB8, make space for Logika materials
0.5
Hoover skylights @ Garden, ready fro R.Wilde to install 2No. Glass Clean Basement Fill the Skip
Total Hours
9.25
Delcon Construction Ltd Daily Diary - Labour Return Mariusz Siemiatkowski Labour /Coyle/
Wednesday: Work Carried Out
### Time on site
Clean SB & Pool Protect pool floor Clean B10 after Rosguill
0.25
Protect Pool surround allow scaffold to be refitted Tidy up Site canteen & WC Clean Crash desk @ SB, ready for PKS to refit it
Total Hours
9.75
Delcon Construction Ltd Daily Diary - Labour Return Mariusz Siemiatkowski Labour /Coyle/
Thursday : Work Carried Out
### Time on site
Clean SB1 & hoover Clean SB7 after Rosguill Re-protect Crash deck @ SB Fit back temp lights @ SB - Crash deck General Cleaning
Total Hours
9.25
Delcon Construction Ltd Daily Diary - Labour Return Mariusz Siemiatkowski Labour /Coyle/
Friday : Work Carried Out
### Time on site
Unprotect & Clean the Pool, ready for water test Clean the SB Cut the top of DBS7 & DSB9 for Logika to fit the frames
1.5
Protect the Logika screen
1
Screed the holes for door closers @ SB Clean the Basement
Total Hours
9.25
Delcon Construction Ltd Daily Diary - Labour Return Mariusz Siemiatkowski Labour /Coyle/
Saturday : Work Carried Out
### Time on site
Screed floor close boxes - 5No @ SB doors Screed floor on the front of DSB1 & DSB1A Clean & Re-protect floor @ SB
Total Hours
4.25
9
Name : Krasimir Zhelev Trade : Labour /Coyle/ Week Ending:
Finish: Tuesday : Start Finish:
Thursday : Start Finish: Friday : Start Finish: Saturday : Start Finish: Sunday : Start:
Site : 44 Phillimore Gardens
Description of Work with allocated time 23/11/2009 8.00
Hours Worked
Breaks Deducte d
Total Hours
9.25
0.75
10.00
10.25
0.75
11.00
9.75
0.75
10.50
9.25
0.75
10.00
9.25
0.75
10.00
4.25
0.75
5.00
0.00
0.00
0.00
18.00 11/24/2009 8.00 19.00
Wednesday: 11/25/2009 Start 8.00 Finish:
Delcon Construction Ltd
Sunday, November 29, 2009
Days Monday : Start
Weekly Time Sheet
18.30 11/26/2009 8.00 18.00 11/27/2009 8.00 18.00 11/28/2009 8.00 13.00 11/29/2009
Finish:
Approved by:
52.00
Total Hours:
Delcon Construction Ltd Daily Diary - Labour Return Krasimir Zhelev
Labour /Coyle/
Monday : Work Carried Out
23/11/2009 Time on site
Clean GF De-water rear terrace Help Rosguill with protection G2
0.5
Protection @ FF General Cleaning
Total Hours
9.25
Delcon Construction Ltd Daily Diary - Labour Return Krasimir Zhelev
Labour /Coyle/
Tuesday : Work Carried Out
### Time on site
Fill the Skip Cut few 4" pipes @ SB floor for Premier Cooling
0.5
Assemble and take down the crash deck @ SF landing Hack off the render @ F8, south wall, re-render it Clean the road General Cleaning & Protection
Total Hours
10.25
Delcon Construction Ltd Daily Diary - Labour Return Krasimir Zhelev
Labour /Coyle/
Wednesday: Work Carried Out
### Time on site
Clean FF - C.Bell, SRS Clean SF - MSR, Inbright Clean Basement - Rosguill, Jets
Total Hours
9.75
Delcon Construction Ltd Daily Diary - Labour Return Krasimir Zhelev
Labour /Coyle/
Thursday : Work Carried Out
### Time on site
Hoover SF Chase 2No. Cables for Jets @ G2 above the fire place Clean GF Chase out for the pipes @ SB4 for Borahurst Clean FF Clean rear scaffold, ready to go down General Cleaning & Protection
Total Hours
9.25
Delcon Construction Ltd Daily Diary - Labour Return Krasimir Zhelev
Labour /Coyle/
Friday : Work Carried Out
### Time on site
Fill the skip
2
Cut the top of DBS7 & DSB9 for Logika to fit the frames
2
General Cleaning
Total Hours
9.25
Delcon Construction Ltd Daily Diary - Labour Return Krasimir Zhelev
Labour /Coyle/
Saturday : Work Carried Out
### Time on site
Chase wall @ S1, for Jets lights
1
Move down 110v Transformer to SB to be off-hired the other one
0.5
Clean FF, SF Tidy up Meeting Room & Site Office
Total Hours
4.25
9
Name : Laurence Rudd Trade : Labour /Constructive Recruitment/ Week Ending:
Delcon Construction Ltd Site : 44 Phillimore Gardens
Sunday, November 29, 2009
Days Monday : Start
Weekly Time Sheet
Description of Work with allocated time
Hours Worked
Breaks Deducte d
Total Hours
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.25
0.75
10.00
9.25
0.75
10.00
0.00
0.00
0.00
0.00
0.00
0.00
23/11/2009
Finish: Tuesday : Start
11/24/2009
Finish: Wednesday: 11/25/2009 Start Finish: Thursday : Start Finish: Friday : Start Finish: Saturday : Start
11/26/2009 8.00 18.00 11/27/2009 8.00 18.00 11/28/2009
Finish: Sunday : Start:
11/29/2009
Finish:
Approved by:
18.50
Total Hours:
Delcon Construction Ltd Daily Diary - Labour Return Laurence Rudd
Labour /Constructive Recruitment/ Work Carried Out
Thursday :
### Time on site
Help screeder @ SB around slotted grills & Manhole
2
Clean SB Clean Basement General Cleaning & Protection
Total Hours
9.25
Delcon Construction Ltd Daily Diary - Labour Return Laurence Rudd
Labour /Constructive Recruitment/ Work Carried Out
Friday :
### Time on site
Fill the skip Clean the alleyway after the ramp was removed Clean the front Wash the road Clean the B10 after Rosguill
0.5
Total Hours
9.25
Name : Ivaylo Atanasov Trade : Labour /Giltec/ Week Ending:
Finish: Tuesday : Start Finish:
Delcon Construction Ltd Site : 44 Phillimore Gardens
Sunday, November 29, 2009
Days Monday : Start
Weekly Time Sheet
Description of Work with allocated time 23/11/2009 11.00
Hours Worked
Breaks Deducte d
Total Hours
6.50
0.50
7.00
7.25
0.75
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18.00 11/24/2009 8.00 16.00
Wednesday: 11/25/2009 Start Finish: Thursday : Start
11/26/2009
Finish: Friday : Start
11/27/2009
Finish: Saturday : Start
11/28/2009
Finish: Sunday : Start:
11/29/2009
Finish:
Approved by:
13.75
Total Hours:
Delcon Construction Ltd Daily Diary - Labour Return Ivaylo Atanasov Labour /Giltec/
Monday : Work Carried Out
23/11/2009 Time on site
Clean GF Clean & Protection @ FF Clean & Protection @ SF
Total Hours
6.50
Delcon Construction Ltd Daily Diary - Labour Return Ivaylo Atanasov Labour /Giltec/
Tuesday : Work Carried Out
### Time on site
Fill the Skip Receiving Delivery Ardex creed & move it to the SB, for Rosguill
0.75
General Cleaning & Protection
Total Hours
7.25
9