Maintenance Work Instruction Form Description:
Monthly vibration Measurement to follow machine condition
Issue Date: 07/12/2017 Rev. No.: 01 Rev. Date: 21/03/2018
Activity Code:
Asset Group
Rev. No.:
01
Vibration Measurements
Exec. Dept.
Condition Monitoring
Interval
Monthly
Last Service Date
Est. Duration (hr) Asset Stop (Y/N) Reschedule required date
----min (----hr)
Activity Type
Routine Condition Monitoring
N
Coordinate with
Operation
Plant shutdown
N
Applied on the following Assets Numbers: No
Asset No.
Description
1
FH11K30NBC01-S
SKID, BELT CONVEYOR NO.1, IRON ORE OXIDE
2
FH11K30NBC02-S
SKID, BELT CONVEYOR NO.2, IRON ORE OXIDE
3
FH31B56VBS01-S
SKID, NO.1 VIBRATING SCREEN, IRON ORE OXIDE
4
FH31B56VBS02-S
SKID, NO.2 VIBRATING SCREEN, IRON ORE OXIDE
5
FH41A30NBC06-S
SKID, BELT CONVEYOR NBC06, IRON ORE OXIDE NBC06
6
FH41G74WBC01-S
SKID, WEIGH BELT FEEDER NO.1 FOR REMET HOPPER
7
FH41B36WBC02-S
SKID, WEIGH BELT FEEDER, IRON ORE OXIDE BIN02
8
FH41B36WBC03-S
SKID, WEIGH BELT FEEDER, IRON ORE OXIDE BIN03
9
FH41B36WBC04-S
SKID, WEIGH BELT FEEDER, IRON ORE OXIDE BIN04
10
FH41K30NBC07-S
SKID, BELT CONVEYOR IRON ORE OXIDE NBC07
11
FH41K30NBC08-S
SKID, BELT CONVEYOR IRON ORE OXIDE NBC08
12
FH41K30EBC01-S
SKID, ELEVATOR REDUCTION TOWER FLEXOWELL
13
FH51C30NBC51-S
SKID, DRI BELT CONVEYOR NBC51
14
FH51C30NBC52-S
SKID, BELT CONVEYOR DRI NBC52
15
FH51C36WBC51-S
SKID, WEIGH BELT FEEDER, BUFFER BIN51
16
FH51C30NBC53-S
SKID, DRI BELT CONVEYOR NBC53
17
FH61B56VBS51-S
SKID, DRI VIBRATING SCREEN, VBS51
18
FH71B30NBC54-S
SKID, DRI BELT CONVEYOR NBC54
19
FH71C70NBC55-S
SKID, DRI BELT CONVEYOR NBC55
20
FH71K30NBC57-S
SKID, DRI BELT CONVEYOR NBC57
21
FE11G10WPU01-S
SKID, PUMP, NO.1 FLOW FEEDERS
22
FE11F20WPU01-S
SKID, PUMP, NO.1 DEPRESSURIZING SCRUBBER
23
FE11F20WPU02-S
SKID, PUMP, NO.2 DEPRESSURIZING SCRUBBER
Page 1 of 4
MPRC12
Maintenance Work Instruction Form
Issue Date: 07/12/2017 Rev. No.: 01 Rev. Date: 21/03/2018
24
FE21D30KTC-S
SKID, COOLING GAS COMPRESSOR
25
FE21A40KTC-S
SKID, PROCESS GAS COMPRESSOR
26
FE31D10UFC-S
SKID, COMBUSTION AIR FAN
27
FE31K10UFC-S
SKID, FLUE GAS FAN
28
FE31G40WPU01-S
SKID, BFW PUMP NO.1 ,driven by motor,, HYL TAG: WS353-J1
29
FE31G40WPU02-S
SKID, BFW PUMP NO.2,driven by turbine, HYL TAG: WS353-J2
30
FE41A30WPU01-S
SKID, FOR LEAN SOLUTION CIRCULATING PUMP NO.1
31
FE41A30WPU02-S
SKID, FOR LEAN SOLUTION CIRCULATING PUMP NO.2
32
FE41A30WPU03-S
SKID, FOR LEAN SOLUTION CIRCULATING PUMP NO.3
33
FE51D10UFC-S
SKID, PG HEATER COMBUSTION AIR FAN
34
FE51K10UFC-S
SKID, PG HEATER FLUE GAS FAN
35
FW11A13WPU01-S
SKID, CW CICRCUIT COOLING CIRCUIT 3 PUMP 01
36
FW11A13WPU02-S
SKID, CW CICRCUIT COOLING CIRCUIT 3 PUMP 02
37
FW11A13WPU03-S
SKID, CW CICRCUIT COOLING CIRCUIT 3 PUMP 03
38
FW11A14WPU01-S
SKID, CW CIRCUIT COOLING CIRCUIT 4 PUMP 01
39
FW11A14WPU02-S
SKID, CW CIRCUIT COOLING CIRCUIT 4 PUMP 02
40
FW11A14WPU03-S
SKID, CW CIRCUIT COOLING CIRCUIT 4 PUMP 03
41
FW11G85UFC01-S
SKID, AIR FAN 01, AMONIA
42
FW11G85UFC02-S
SKID, AIR FAN 02, AMONIA
Safety & Work Preparation: Comply with EZZ STEEL permit to work system and all relevant safety precautions. Check whether it is necessary to include instructions regarding stopping of running equipment and reinstating of same. Coordinate with other disciplines, i.e. operations shift supervisor, control room, etc. Inform the control room before starting any activity. Prepare required documentation (sketches, material requisition, etc.) Refer to EZZ STEEL Safety Procedure for more specific safety instructions.
References: History. Standards. EZZ experience.
Attachments Maintenance Work Instructions (Operation):
Page 2 of 4
MPRC12
Issue Date: 07/12/2017 Rev. No.: 01 Rev. Date: 21/03/2018
Maintenance Work Instruction Form OP Seq. #
Operation Description
Dept.
Resource Seq.
Resource Code
Assign. Units
Qty.
Total Man Hrs.
With the units in operation carry out the following: Load database from AMS Machinery Manger software to CSI 2140 Analyzer.
10 20
CM
CM -Tec
0.08
CM
CM -Tec
0.167
Data dumping from CSI 2140 Analyzer to AMS Machinery Manger software.
CM
CM -Tec
.08
Item Code
UOM
Measure the vibration at specific location on machine. General notes: Clean the location where the sensor place from any dust or grease and ensure that the sensor do not move. Ensure that you select the right machine, according to sensor position before collect data. Ensure that cable of sensor has not any flexion.
30
Materials: Op Seq. #
Material Description
Required QTY.
Allocated Qty.
Required Date
Work Completion & Restart-up: Ensure work place is clean, all tools are withdrawn. Visually check the oil level, cracks, leakage and other equipment in the area, inform the control room & foreman about any abnormalities. Ensure that the work permit is signed off, that maintenance supervisors are informed about all observations, that test results are recorded on the appropriate check sheets and that maintenance history is recorded on the work history section of the work order for input in Oracle eAM.
Work Instruction Originator Page 3 of 4
Manager Approval
Maintenance Planning MPRC12
Maintenance Work Instruction Form
Date:
/
/
Date:
Page 4 of 4
/
/
Date:
Issue Date: 07/12/2017 Rev. No.: 01 Rev. Date: 21/03/2018
/
/