Nombre de tarea

Duración

Comienzo

Fin

1

2

3 4 5 6 7

8 9 10 11 12 13 14 15 16 17

17 jun '19 S-2

24 jun '19 S-1

AMPLIACION DEL SERVICIO DE 180 días? lun 01/07/19 mié 22/01/20 PROTECCION CONTRA INUNDACIONES EN LA LOCALIDAD DE PUENTE PALCA,PUTACCA,LA FLORIDA,CHALLHUAPUQUIO DEL DISTRITO DE PALCA,PROVINCIA DE HUANCAVELICA-HUANCAVELICA 1.1 INICIO DE OBRA 0 días lun 01/07/19 lun 01/07/19 1.2 OBRAS PROVISIONALES 180 días lun 01/07/19 mié 22/01/20 1.2.1 CARTEL DE OBRA 3.60 X 1 día lun 01/07/19 lun 01/07/19 2.40 SEGÚN MODELO 1.2.2 ALQUILER DE LOCAL PARA 180 días lun 01/07/19 mié 22/01/20 ALMACEN Y OFICINA 1.2.3 MOVILIZACION Y 10 días mar 02/07/19 vie 12/07/19 DESMOVILIZACION DE EQUIPO CON PLATAFORMA 1.2.4 SEÑALIZACION EN OBRA 40 días vie 12/07/19 mar 27/08/19 DURANTE LA EJECUCION 1.3 DEFENSA RIBEREÑA 171.81 días? mar 09/07/19mar 21/01/20 1.3.1 TRABAJOS PRELIMINARES 44.94 días mar 09/07/19mié 28/08/19 1.3.1.1 TRAZO, NIVELACION Y 20.56 días mar 09/07/19 jue 01/08/19 REPLANTEO 1.3.1.2 ENCAUSAMIENTO DE 15 días vie 02/08/19 lun 19/08/19 CURSO DE AGUA. 1.3.1.3 DESARENADO DE LECHO 10 días vie 02/08/19 mar 13/08/19 DE RIO 1.3.1.4 LIMPIEZA DEL CAUSE DEL 9 días lun 19/08/19 mié 28/08/19 RIO 1.3.2 GAVIONES TIPO I 46 días? lun 19/08/19 jue 10/10/19 1.3.2.1 MOVIMIENTO DE 46 días? lun 19/08/19 jue 10/10/19 TIERRAS 1.3.2.1.1 EXCAVACION EN LECHO 18 días mié 28/08/19 mié 18/09/19 DE RIO, C/MAQUINARIA

01 jul '19

08 jul '19 S1

15 jul '19 S2

22 jul '19 S3

29 jul '19 S4

S5

05 ago '19 S6

12 ago '19 S7

19 ago '19 S8

26 ago '19 S9

1

18

1.3.2.1.2

19

1.3.2.1.3

20

1.3.2.1.4

21

1.3.2.1.5

22

1.3.2.1.6

23

1.3.2.1.7

24

1.3.2.1.8

25

1.3.3

26

1.3.3.1

Proyecto: Proyecto1 Fecha: sáb 13/04/19

ACOPIAMIENTO DE PIEDRAS EN LECHO DEL RIO D=6-8 RELLENO CON MATERIAL PROPIO ELIMINACION DE MATERIAL EXCEDENTE SUMINISTRO E INSTALACION GAVION CAJA TIPO "A" (5.00 X 1.00 X 1.00) SUMINISTRO E INSTALACION GAVION CAJA TIPO B(5.00 X 1.50 X 1.00) SUMINISTRO E INSTALACION GAVION CAJA TIPO C (5.00 X 2.00 X 1.00) GEOTEXTIL NO TEJIDO MACTEX MT 200 MURO DE CONCRETO CICLOPEO (H=2M, H=1.6M) MOVIMIENTO DE TIERRAS

13 días

lun 19/08/19 mar 03/09/19

20 días

jue 12/09/19 vie 04/10/19

5 días

vie 04/10/19 jue 10/10/19

7 días

mar 03/09/19 mié 11/09/19

1 día?

mié 11/09/19 jue 12/09/19

8 días

jue 12/09/19 vie 20/09/19

14 días

jue 12/09/19 vie 27/09/19

01/07

135.88 días lun 19/08/19 mar 21/01/20 135.88 días lun 19/08/19 mar 21/01/20

Tarea

Resumen

Hito inactivo

solo duración

solo el comienzo

Hito externo

División crítica

División

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha límite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas críticas

Progreso manual

Página 1

02 sep '19 S10

09 sep '19 S11

16 sep '19 S12

Id

EDT 27

1.3.3.1.1

28

1.3.3.1.2

29

1.3.3.1.3

30

1.3.3.1.4

31

1.3.3.1.5

32

1.3.3.2

33

1.3.3.2.1

34

1.3.3.2.2

35

1.3.3.2.3

36

1.3.3.2.4

37

1.3.3.2.5

38

1.3.3.2.6

39

1.3.3.2.7

40

1.3.3.2.8

41

1.3.3.3

42

1.3.3.3.1

43

1.4 1.4.1 1.4.2

44 45

Proyecto: Proyecto1 Fecha: sáb 13/04/19

Nombre de tarea

EXCAVACION PARA CIMIENTOS DE MUROS DE CONCRETO CICLOPEO RELLENO CON MATERIAL DE PRESTAMO MANUAL RELLENO CON MATERIAL PROPIO RELLENO PARA DRENAJE CON GRAVA ELIMINACION DE DESMONTE PROVENIENTE DE CORTE INC. 25% ESPONJ. OBRAS DE CONCRETO SIMPLE ENCOFRADO Y DESENCOFRADO PARA ZAPATAS CONCRETO EN ZAPATAS f'c=175 kg/cm2+ 30% P.G ENCOFRADO Y DESENCOFRADO EN MUROS CONCRETO EN MUROS f'c=175 kg/cm2+ 30% P.G DRENAJE CON TUBERIAS DE 3 JUNTA DE CONSTRUCCION CON TEKNOPORT ENSAYO DE DISEÑO DE MEZCLA ENSAYO DE CALIDAD DE CONCRETO (RESISTENCIA A LA COMPRENSION) SUMINISTRO E INSTALACION DE TUBERIAS SUMINISTRO E INSTALACION DE TUBERIA PVC DN=160MM FLETE TERRESTRE FLETE TERRESTRE FINAL

Duración

Comienzo

Fin

10 días

mié 28/08/19 mar 10/09/19

37 días

mar 10/12/19 mar 21/01/20

10 días

lun 19/08/19 jue 29/08/19

20 días

vie 27/09/19 sáb 19/10/19

4 días

sáb 19/10/19 jue 24/10/19

100 días 100 días

mar jue 02/01/20 10/09/19 mar 10/09/19 jue 02/01/20

76.5 días

mié 25/09/19 vie 20/12/19

27.63 días

sáb 28/09/19 mié 30/10/19

25.5 días

jue 31/10/19 vie 29/11/19

35 días

jue 31/10/19 mar 10/12/19

20 días

vie 29/11/19 sáb 21/12/19

1 día

sáb 21/12/19 sáb 21/12/19

11 días

vie 29/11/19 mié 11/12/19

7 días

mié 25/09/19

7 días

mié 25/09/19 mié 02/10/19

180 días 150 días 0 días

lun 01/07/19 mié 22/01/20 lun 01/07/19 mié 18/12/19 mié 22/01/20 mié 22/01/20

17 jun '19 S-2

24 jun '19 S-1

01 jul '19

08 jul '19 S1

15 jul '19 S2

22 jul '19 S3

29 jul '19 S4

S5

05 ago '19 S6

12 ago '19 S7

19 ago '19 S8

26 ago '19 S9

mié 02/10/19

Tarea

Resumen

Hito inactivo

solo duración

solo el comienzo

Hito externo

División crítica

División

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha límite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas críticas

Progreso manual

Página 2

02 sep '19 S10

09 sep '19 S11

16 sep '19 S12

16 sep '19 S12

23 sep '19 S13

Proyecto: Proyecto1 Fecha: sáb 13/04/19

30 sep '19 S14

07 oct '19 S15

14 oct '19 S16

21 oct '19 S17

28 oct '19 S18

04 nov '19 S19

11 nov '19 S20

18 nov '19 S21

25 nov '19 S22

02 dic '19 S23

09 dic '19 S24

16 dic '19 S25

23 dic '19 S26

30 dic '19 S27

06 ene '20 S28

Tarea

Resumen

Hito inactivo

solo duración

solo el comienzo

Hito externo

División crítica

División

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha límite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas críticas

Progreso manual

Página 3

13 ene '20 S29

20 ene '20 S30

27 ene '20 S31

16 sep '19 S12

23 sep '19 S13

30 sep '19 S14

07 oct '19 S15

14 oct '19 S16

21 oct '19 S17

28 oct '19 S18

04 nov '19 S19

11 nov '19 S20

18 nov '19 S21

25 nov '19 S22

02 dic '19 S23

09 dic '19 S24

16 dic '19 S25

23 dic '19 S26

30 dic '19 S27

06 ene '20 S28

13 ene '20 S29

20 ene '20 S30

22/01

Proyecto: Proyecto1 Fecha: sáb 13/04/19

Tarea

Resumen

Hito inactivo

solo duración

solo el comienzo

Hito externo

División crítica

División

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha límite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas críticas

Progreso manual

Página 4

27 ene '20 S31

Related Documents

Ms Projet
August 2019 22
Projet
July 2020 40
Projet
November 2019 47
Projet Management
November 2019 20
Projet Ppsm2
July 2020 15
Projet 10
November 2019 20

More Documents from ""

Ms Projet
August 2019 22
Informe 015 Residente X.docx
November 2019 20
December 2019 23
December 2019 24