Project : 2E1 & 2E2 , Bkt Rimau Subject : Average Depth Of Surface Drain - 2E1
Location
Length RL/RL+ 0.15
Upstream IL
Date prepared : 29/8/01
Depth
RL/RL+ 0.15
Downstream IL
Average Depth
Ddt H/R 150mm high
Average depth
1
109.783
7.60
7.10
0.50
7.60
6.62
0.98
0.74
(0.15)
0.59
2
178.058
9.15
7.75
1.40
8.45
6.78
1.67
1.54
(0.15)
1.39
3
59.133
9.25
8.60
0.65
8.85
8.30
0.55
0.60
(0.15)
0.45
4
60.040 60.040 120.080
9.45 9.45
8.80 8.34
0.65 1.11
9.25 9.15
8.48 7.80
0.77 1.35
0.71 1.23
(0.15) (0.15)
0.56 1.08
5
96.012 24.384 96.012 216.408
9.45 9.45 9.50
8.80 8.52 9.00
0.65 0.93 0.50
9.45 9.45 9.45
8.41 8.41 8.52
1.04 1.04 0.93
0.84 0.99 0.72
(0.15) (0.15) (0.15)
0.69 0.84 0.57
6
54.196 25.230 79.426
8.45 8.55
7.80 7.80
0.65 0.75
8.45 8.45
7.54 7.60
0.91 0.85
0.78 0.80
(0.15) (0.15)
0.63 0.65
7
59.301 23.230 38.100 55.604 25.584 201.819
8.75 8.55 8.35 8.35 8.65
8.10 7.80 7.65 7.65 8.00
0.65 0.75 0.70 0.70 0.65
8.55 8.65 8.65 8.65 8.65
7.80 7.55 7.40 7.15 7.15
0.75 1.10 1.25 1.50 1.50
0.70 0.93 0.98 1.10 1.08
(0.15) (0.15) (0.15) (0.15) (0.15)
0.55 0.78 0.83 0.95 0.93
8
48.758 85.111 52.528 186.397
9.15 8.80 8.70
8.50 7.85 7.40
0.65 0.95 1.30
8.80 8.70 8.88
7.85 7.40 7.56
0.95 1.30 1.32
0.80 1.13 1.31
(0.15) (0.15) (0.15)
0.65 0.98 1.16
9
71.968
9.15
8.50
0.65
8.55
8.10
0.45
0.55
(0.15)
0.40
10
64.008 45.672 64.008 173.688
9.45 9.15 9.15
8.70 8.40 7.92
0.75 0.75 1.23
9.15 8.88 8.88
8.40 8.14 7.60
0.75 0.74 1.28
0.75 0.75 1.26
(0.15) (0.15) (0.15)
0.60 0.60 1.11
11
64.008
9.45
8.80
0.65
9.05
8.40
0.65
0.65
(0.15)
0.50
12
97.906 45.672 43.042 25.906 65.534 278.060
9.55 9.45 9.55 9.55 9.45
8.90 8.39 8.90 8.68 8.55
0.65 1.06 0.65 0.87 0.90
9.45 9.15 9.55 9.45 9.15
8.39 8.17 8.68 8.55 8.20
1.06 0.98 0.87 0.90 0.95
0.86 1.02 0.76 0.89 0.93
(0.15) (0.15) (0.15) (0.15) (0.15)
0.71 0.87 0.61 0.74 0.78
13
45.672 65.532 111.204
9.55 9.40
8.90 8.90
0.65 0.50
9.45 9.45
8.67 8.58
0.78 0.87
0.72 0.69
(0.15) (0.15)
0.57 0.54
14
112.673 19.514 13.863 106.729 252.779
9.15 8.65 8.65 9.15
7.90 7.32 7.25 8.40
1.25 1.33 1.40 0.75
8.65 8.65 8.65 8.65
7.32 7.25 7.19 8.00
1.33 1.40 1.46 0.65
1.29 1.37 1.43 0.70
(0.15) (0.15) (0.15) (0.15)
1.14 1.22 1.28 0.55
15
29.334 96.012 27.432 91.440 244.218
9.45 9.45 9.15 9.55
8.80 8.80 8.40 8.70
0.65 0.65 0.75 0.85
9.55 9.15 9.15 9.15
8.70 8.40 8.25 8.27
0.85 0.75 0.90 0.88
0.75 0.70 0.83 0.87
(0.15) (0.15) (0.15) (0.15)
0.60 0.55 0.68 0.72
16
6.096
9.15
7.80
1.35
9.15
7.75
1.40
1.38
(0.15)
1.23
17
6.096
9.25
8.60
0.65
9.25
8.48
0.77
0.71
(0.15)
0.56
Project : 2E1 & 2E2, Bkt Rimau Subject : Summary Of Surface Drain - 2E1
Ref No
a Length (m)
b Average Depth (m)
c Actual Exc. depth (m)
d Exc depth n.e 1.5m (m)
e Exc depth e. 1.5 b.n e 3.0m (m)
f Inner Width (m)
g Outer Width (m)
a + 0.168 + 0.15
Excavation Excavation e. Conc to n.e 1.5 1.5 b.n e 3.0m drain base (m3) (m3) (m3) axgxd axgxe a x g x 0.15
Concrete benching (m3)
Fillet (m) 2a
a x g x 0.168 a x 1/2 x 3.143 x 0.168 2
1
109.783
0.59
0.91
0.91
2
178.058
1.39
1.71
1.50
3
59.133
0.45
0.77
0.77
4
60.040 60.040
0.56 1.08
0.88 1.40
5
96.012 24.384 96.012
0.69 0.83 0.57
6
54.196 25.230
-
0.60
1.06
105.66
-
17.46
14.68
219.57
0.60
1.06
283.11
39.26
28.31
23.81
356.12
-
0.60
1.06
48.14
-
9.4
7.91
118.27
0.88 1.40
-
0.60 0.60
1.06 1.06
55.88 88.97
-
9.55 9.55
8.03 8.03
120.08 120.08
1.01 1.15 0.89
1.01 1.15 0.89
-
0.60 0.60 0.60
1.06 1.06 1.06
102.59 29.67 90.37
-
15.27 3.88 15.27
12.84 3.26 12.84
192.02 48.77 192.02
0.63 0.65
0.95 0.97
0.95 0.97
-
0.60 0.60
1.06 1.06
54.46 25.89
-
8.62 4.01
7.25 3.37
108.39 50.46
0.208
7
59.301 23.230 38.100 55.604 25.584
0.55 0.78 0.83 0.95 0.93
0.87 1.10 1.15 1.27 1.25
0.87 1.10 1.15 1.27 1.25
-
0.60 0.60 0.60 0.60 0.60
1.06 1.06 1.06 1.06 1.06
54.56 27.04 46.36 74.74 33.84
-
9.43 3.69 6.06 8.84 4.07
7.93 3.11 5.09 7.44 3.42
118.60 46.46 76.20 111.21 51.17
8
48.758 85.111 52.528
0.65 0.98 1.16
0.97 1.30 1.48
0.97 1.30 1.48
-
0.60 0.60 0.60
1.06 1.06 1.06
50.03 117.10 82.29
-
7.75 13.53 8.35
6.52 11.38 7.02
97.52 170.22 105.06
9
71.968
0.40
0.72
0.72
-
0.60
1.06
54.77
-
11.44
9.62
143.94
10
64.008 45.672 64.008
0.60 0.60 1.11
0.92 0.92 1.43
0.92 0.92 1.43
-
0.60 0.60 0.60
1.06 1.06 1.06
62.28 44.44 96.89
-
10.18 7.26 10.18
8.56 6.11 8.56
128.02 91.34 128.02
11
64.008
0.50
0.82
0.82
-
0.60
1.06
55.50
-
10.18
8.56
128.02
12
97.906 45.672 43.042 25.906 65.534
0.71 0.87 0.61 0.74 0.78
1.03 1.19 0.93 1.06 1.10
1.03 1.19 0.93 1.06 1.10
-
0.60 0.60 0.60 0.60 0.60
1.06 1.06 1.06 1.06 1.06
106.69 57.51 42.34 29.05 76.27
-
15.57 7.26 6.84 4.12 10.42
13.09 6.11 5.76 3.46 8.76
195.81 91.34 86.08 51.81 131.07
13
45.672 65.532
0.57 0.54
0.89 0.86
0.89 0.86
-
0.60 0.60
1.06 1.06
42.99 59.60
-
7.26 10.42
6.11 8.76
91.34 131.06
14
112.673 19.514 13.863 106.729
1.14 1.22 1.28 0.55
1.46 1.54 1.60 0.87
1.46 1.50 1.50 0.87
0.60 0.60 0.60 0.60
1.06 1.06 1.06 1.06
174.13 31.03 22.04 98.20
0.79 1.44 -
17.92 3.1 2.2 16.97
15.07 2.61 1.85 14.27
225.35 39.03 27.73 213.46
15
29.334 96.012 27.432 91.440
0.60 0.55 0.68 0.72
0.92 0.87 1.00 1.04
0.92 0.87 1.00 1.04
0.60 0.60 0.60 0.60
1.06 1.06 1.06 1.06
28.54 88.34 29.02 100.61
-
4.66 15.27 4.36 14.54
3.92 12.84 3.67 12.23
58.67 192.02 54.86 182.88
16
6.096
1.23
1.55
1.50
0.60
1.06
9.69
0.31
0.97
0.82
12.19
17
6.096
0.56
0.88
0.88
0.60
1.06
5.67
-
0.97
0.82
12.19
315.49
4,718.45
2,359.221
0.038 0.098 0.048 -
2,686.30
41.80
375.13