Project : 2E1 & 2E2, Bkt Rimau Subject : Summary Of Surface Drain - 2E1 a b Ref Avg/Bwk Length No Depth (m) (m)

c Inner Width (m)

d Outer Width (m)

Date prepared : 29/8/01

Fwk to side of drain base (m2) b x 0.318 x 2

300mm H/R (m) b

230mm thk brickwall (m2) 2xbxa

129.54

1

0.59

109.783

0.60

1.06

69.82

109.78

2

1.39

178.058

0.60

1.06

113.24

178.06

3

0.45

59.133

0.60

1.06

37.61

59.13

4

0.56 1.08

60.040 60.040

0.60 0.60

1.06 1.06

38.19 38.19

60.04 60.04

5

0.69 0.83 0.57

96.012 24.384 96.012

0.60 0.60 0.60

1.06 1.06 1.06

61.06 15.51 61.06

96.01 24.38 96.01

6

0.63 0.65

54.196 25.230

0.60 0.60

1.06 1.06

34.47 16.05

7

0.55 0.78 0.83 0.95 0.93

59.301 23.230 38.100 55.604 25.584

0.60 0.60 0.60 0.60 0.60

1.06 1.06 1.06 1.06 1.06

0.65 0.98 1.16

48.758 85.111 52.528

0.60 0.60 0.60

9

0.40

71.968

10

0.60 0.60 1.11

11

345mm thk brickwall (m2)

Strut (nr)

Weephole Plastering at 3m c/c (nr) (m2) b/3 x 2 b(a+0.23)2

-

-

73.19

180.04

172.72 *

60

118.71

576.91

-

-

39.42

80.42

15.01 *

17

40.03 40.03

94.86 157.30

132.50 40.48 109.45

-

-

64.01 16.26 64.01

176.66 51.69 153.62

54.20 25.23

68.29 32.80

-

-

36.13 16.82

93.22 44.40

37.72 14.77 24.23 35.36 16.27

59.30 23.23 38.10 55.60 25.58

* * *

65.23 36.24 60.78 * 92.26 * 41.53 *

1.39 * 10.95 * 4.74 *

3 9 4

39.53 15.49 25.40 37.07 17.06

92.51 46.92 80.77 131.23 59.35

1.06 1.06 1.06

31.01 54.13 33.41

48.76 85.11 52.53

* *

63.39 153.20 * 94.55 *

9.12 * 27.31 *

13 18

32.51 56.74 35.02

85.81 205.97 146.03

0.60

1.06

45.77

71.97

-

-

47.98

90.68

64.008 45.672 64.008

0.60 0.60 0.60

1.06 1.06 1.06

40.71 29.05 40.71

64.01 45.67 64.01

26.24 *

22

42.67 30.45 42.67

106.25 75.82 171.54

0.50

64.008

0.60

1.06

40.71

64.01

64.01

-

-

42.67

93.45

12

0.71 0.87 0.61 0.74 0.78

97.906 45.672 43.042 25.906 65.534

0.60 0.60 0.60 0.60 0.60

1.06 1.06 1.06 1.06 1.06

62.27 29.05 27.37 16.48 41.68

97.91 45.67 43.04 25.91 65.53

139.03 79.47 52.51 38.34 102.23

-

-

65.27 30.45 28.69 17.27 43.69

184.06 100.48 72.31 50.26 132.38

13

0.57 0.54

45.672 65.532

0.60 0.60

1.06 1.06

29.05 41.68

45.67 65.53

52.07 70.77

-

-

30.45 43.69

73.08 100.92

14

1.14 1.22 1.28 0.55

112.673 19.514 13.863 106.729

0.60 0.60 0.60 0.60

1.06 1.06 1.06 1.06

71.66 12.41 8.82 67.88

112.67 19.51 13.86 106.73

54.08 * 12.29 * 10.54 *

38 7 5

75.12 13.01 9.24 71.15

308.72 56.59 41.87 166.50

15

0.60 0.55 0.68 0.72

29.334 96.012 27.432 91.440

0.60 0.60 0.60 0.60

1.06 1.06 1.06 1.06

18.66 61.06 17.45 58.16

29.33 96.01 27.43 91.44

-

-

19.56 64.01 18.29 60.96

48.69 149.78 49.93 173.74

16

1.23

6.096

0.60

1.06

3.88

6.10

3

4.06

17.80

17

0.56

6.096

0.60

1.06

3.88

6.10

-

4.06

9.63

1,572.84

4,732.19

8

1,500.49 Note : * Refer attachment

2,359.22

*

320.50 * 53.22

*

67.24 109.67 *

57.57

*

* * *

76.81 54.81 115.21 *

202.81 * 35.13 * 24.95 * 117.40 35.20 105.61 37.31 131.67

*

10.97 * 6.83 3,281.58

3.96 * 348.35

199

Summary Of Entrance Slab - 2E1

Date prepared : 29/8/01

Entrance Slab Cover a Length

5.162

b width

1.06

c Qty

125mm thk Concrete (m2) axbxc

137

749.63

Steel bar R12 (kg) 8.88 x c

2 layer of BRC B6 (m2) axbxcx2

1,216.56

1,499.25

Fwk to side slab base (m) 2a x c

Extra fwk to side of slab base (m) 0.15 x 2 x c

1,106.14

41.10

Fwk to soffit of slab (m2) 0.6 x a x c 424.32

Entrance Slab Base a Length

b width

c Qty

BRC B6 (m2) axbxc

4.037

1.36

137

Steel bar - R12 L = 4 x 1.5 + 4(1.060 - 2(0.03)) =6+4 = 10 m R12 = 10m x 0.888m/kg = 8.88 kg per grating cover

752.17

Lean conc. (m2) axbxc 752.17

Fwk to side of cover slab (m) (2a + b)c 1,559.61

Omission And Addition For Rebated Concrete Coping & Plastering - 2E1

Deduction For Rebated Concrete Coping At Backlane Ref No. Backlane (m) 34.75 60.04 96.01 59.3 31.71 64.01 65.53 106.73 96.01

3 4 5 7 9 11 13 14 15

614.09

Deduction For Rebated Concrete Coping & Plastering At Entrance Slab a

b Length

Qty

(m)

(nr)

5.162

137

Entrance slab cover length (m) axb 707.19

Addition For Rebated Concrete Coping At Backlane Rebated concrete coping at backlane = 137 x 0.45 x 2 = 123.3 m

Top plastering for entrance slab (m2) a x 0.23 x b x 2 325.31

Date prepared : 29/8/01

Date prepared : 19/7/01

Rebated Concrete Coping , Plastering, Side Formwork To Drain Base, Concrete To Drain Base & Concrete Benching - 2E1

∴ Rebated concrete coping = 2 (Total drain length - Backlane - Entrance slab ) + P.C.slab at backlane = 2 (2359.22 - 614.09 - 707.19) + 123.30 = 2075.88 + 123.30 = 2199.18 m ∴ Plastering

= Total plastering - Entrance slab area top plastering = 4732.19 - 325.31 = 4406.88 m2

∴ Formwork to side of drain base = Side formwork of total drain base - Side formwork of entrance slab base = 1500.49 - (1106.14 x 0.15) = 1500.49 - 165.92 = 1334.57 m2 ∴ Concrete to drain base = Drain base concrete + Extra arising from entrance + Additional concrete from 345mm thk bwk = 375.13 + 137(2 x 0.15 x 0.15 x 4.037) + 19.84 = 375.13 + 24.89 + 19.84 = 419.86 m3 ∴ Concrete to benching = Concrete benching -Volume affected by entrance base detail +Additional conc.from 345mm thk bwk = 315.49 - 137 x 2 ( 0.23 x 0.168 x 4.037) + 22.22 = 315.49 - 42.74 + 22.22 = 294.97 m3 ∴ 230mm brickwork

= 230mm thk bwk + Additional bwk affected by entrance base detail = 3281.58 + 137 ( 2 x 0.168 x 4.037) = 3281.58 + 185.83 = 3467.41 m2

∴ 450 x 600mm p.c slab = Qty for rebated concrete coping =

2199.18 2 x 0.45

=

2444 pcs

÷2

÷ 0.45

∴ Excavation n.e 1.5m deep = Excavation n.e 1.5 m + Additional excavation from 345mm thk bwk = =

2705.13 + 201.15 2906.28 m3