Project : 2E1 & 2E2, Bkt Rimau Subject : Summary Of Surface Drain - 2E1 a b Ref Avg/Bwk Length No Depth (m) (m)
c Inner Width (m)
d Outer Width (m)
Date prepared : 29/8/01
Fwk to side of drain base (m2) b x 0.318 x 2
300mm H/R (m) b
230mm thk brickwall (m2) 2xbxa
129.54
1
0.59
109.783
0.60
1.06
69.82
109.78
2
1.39
178.058
0.60
1.06
113.24
178.06
3
0.45
59.133
0.60
1.06
37.61
59.13
4
0.56 1.08
60.040 60.040
0.60 0.60
1.06 1.06
38.19 38.19
60.04 60.04
5
0.69 0.83 0.57
96.012 24.384 96.012
0.60 0.60 0.60
1.06 1.06 1.06
61.06 15.51 61.06
96.01 24.38 96.01
6
0.63 0.65
54.196 25.230
0.60 0.60
1.06 1.06
34.47 16.05
7
0.55 0.78 0.83 0.95 0.93
59.301 23.230 38.100 55.604 25.584
0.60 0.60 0.60 0.60 0.60
1.06 1.06 1.06 1.06 1.06
0.65 0.98 1.16
48.758 85.111 52.528
0.60 0.60 0.60
9
0.40
71.968
10
0.60 0.60 1.11
11
345mm thk brickwall (m2)
Strut (nr)
Weephole Plastering at 3m c/c (nr) (m2) b/3 x 2 b(a+0.23)2
-
-
73.19
180.04
172.72 *
60
118.71
576.91
-
-
39.42
80.42
15.01 *
17
40.03 40.03
94.86 157.30
132.50 40.48 109.45
-
-
64.01 16.26 64.01
176.66 51.69 153.62
54.20 25.23
68.29 32.80
-
-
36.13 16.82
93.22 44.40
37.72 14.77 24.23 35.36 16.27
59.30 23.23 38.10 55.60 25.58
* * *
65.23 36.24 60.78 * 92.26 * 41.53 *
1.39 * 10.95 * 4.74 *
3 9 4
39.53 15.49 25.40 37.07 17.06
92.51 46.92 80.77 131.23 59.35
1.06 1.06 1.06
31.01 54.13 33.41
48.76 85.11 52.53
* *
63.39 153.20 * 94.55 *
9.12 * 27.31 *
13 18
32.51 56.74 35.02
85.81 205.97 146.03
0.60
1.06
45.77
71.97
-
-
47.98
90.68
64.008 45.672 64.008
0.60 0.60 0.60
1.06 1.06 1.06
40.71 29.05 40.71
64.01 45.67 64.01
26.24 *
22
42.67 30.45 42.67
106.25 75.82 171.54
0.50
64.008
0.60
1.06
40.71
64.01
64.01
-
-
42.67
93.45
12
0.71 0.87 0.61 0.74 0.78
97.906 45.672 43.042 25.906 65.534
0.60 0.60 0.60 0.60 0.60
1.06 1.06 1.06 1.06 1.06
62.27 29.05 27.37 16.48 41.68
97.91 45.67 43.04 25.91 65.53
139.03 79.47 52.51 38.34 102.23
-
-
65.27 30.45 28.69 17.27 43.69
184.06 100.48 72.31 50.26 132.38
13
0.57 0.54
45.672 65.532
0.60 0.60
1.06 1.06
29.05 41.68
45.67 65.53
52.07 70.77
-
-
30.45 43.69
73.08 100.92
14
1.14 1.22 1.28 0.55
112.673 19.514 13.863 106.729
0.60 0.60 0.60 0.60
1.06 1.06 1.06 1.06
71.66 12.41 8.82 67.88
112.67 19.51 13.86 106.73
54.08 * 12.29 * 10.54 *
38 7 5
75.12 13.01 9.24 71.15
308.72 56.59 41.87 166.50
15
0.60 0.55 0.68 0.72
29.334 96.012 27.432 91.440
0.60 0.60 0.60 0.60
1.06 1.06 1.06 1.06
18.66 61.06 17.45 58.16
29.33 96.01 27.43 91.44
-
-
19.56 64.01 18.29 60.96
48.69 149.78 49.93 173.74
16
1.23
6.096
0.60
1.06
3.88
6.10
3
4.06
17.80
17
0.56
6.096
0.60
1.06
3.88
6.10
-
4.06
9.63
1,572.84
4,732.19
8
1,500.49 Note : * Refer attachment
2,359.22
*
320.50 * 53.22
*
67.24 109.67 *
57.57
*
* * *
76.81 54.81 115.21 *
202.81 * 35.13 * 24.95 * 117.40 35.20 105.61 37.31 131.67
*
10.97 * 6.83 3,281.58
3.96 * 348.35
199
Summary Of Entrance Slab - 2E1
Date prepared : 29/8/01
Entrance Slab Cover a Length
5.162
b width
1.06
c Qty
125mm thk Concrete (m2) axbxc
137
749.63
Steel bar R12 (kg) 8.88 x c
2 layer of BRC B6 (m2) axbxcx2
1,216.56
1,499.25
Fwk to side slab base (m) 2a x c
Extra fwk to side of slab base (m) 0.15 x 2 x c
1,106.14
41.10
Fwk to soffit of slab (m2) 0.6 x a x c 424.32
Entrance Slab Base a Length
b width
c Qty
BRC B6 (m2) axbxc
4.037
1.36
137
Steel bar - R12 L = 4 x 1.5 + 4(1.060 - 2(0.03)) =6+4 = 10 m R12 = 10m x 0.888m/kg = 8.88 kg per grating cover
752.17
Lean conc. (m2) axbxc 752.17
Fwk to side of cover slab (m) (2a + b)c 1,559.61
Omission And Addition For Rebated Concrete Coping & Plastering - 2E1
Deduction For Rebated Concrete Coping At Backlane Ref No. Backlane (m) 34.75 60.04 96.01 59.3 31.71 64.01 65.53 106.73 96.01
3 4 5 7 9 11 13 14 15
614.09
Deduction For Rebated Concrete Coping & Plastering At Entrance Slab a
b Length
Qty
(m)
(nr)
5.162
137
Entrance slab cover length (m) axb 707.19
Addition For Rebated Concrete Coping At Backlane Rebated concrete coping at backlane = 137 x 0.45 x 2 = 123.3 m
Top plastering for entrance slab (m2) a x 0.23 x b x 2 325.31
Date prepared : 29/8/01
Date prepared : 19/7/01
Rebated Concrete Coping , Plastering, Side Formwork To Drain Base, Concrete To Drain Base & Concrete Benching - 2E1
∴ Rebated concrete coping = 2 (Total drain length - Backlane - Entrance slab ) + P.C.slab at backlane = 2 (2359.22 - 614.09 - 707.19) + 123.30 = 2075.88 + 123.30 = 2199.18 m ∴ Plastering
= Total plastering - Entrance slab area top plastering = 4732.19 - 325.31 = 4406.88 m2
∴ Formwork to side of drain base = Side formwork of total drain base - Side formwork of entrance slab base = 1500.49 - (1106.14 x 0.15) = 1500.49 - 165.92 = 1334.57 m2 ∴ Concrete to drain base = Drain base concrete + Extra arising from entrance + Additional concrete from 345mm thk bwk = 375.13 + 137(2 x 0.15 x 0.15 x 4.037) + 19.84 = 375.13 + 24.89 + 19.84 = 419.86 m3 ∴ Concrete to benching = Concrete benching -Volume affected by entrance base detail +Additional conc.from 345mm thk bwk = 315.49 - 137 x 2 ( 0.23 x 0.168 x 4.037) + 22.22 = 315.49 - 42.74 + 22.22 = 294.97 m3 ∴ 230mm brickwork
= 230mm thk bwk + Additional bwk affected by entrance base detail = 3281.58 + 137 ( 2 x 0.168 x 4.037) = 3281.58 + 185.83 = 3467.41 m2
∴ 450 x 600mm p.c slab = Qty for rebated concrete coping =
2199.18 2 x 0.45
=
2444 pcs
÷2
÷ 0.45
∴ Excavation n.e 1.5m deep = Excavation n.e 1.5 m + Additional excavation from 345mm thk bwk = =
2705.13 + 201.15 2906.28 m3